Records from 2007 to 2025. Most recent: inspection, 26 August 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 61
26 August 2025
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8218433
9 July 2025
Internal Structural Exam · Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8180387
26 February 2025
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8085077
17 November 2024
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8036229
17 November 2024
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8038346
9 October 2024
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8007999
24 September 2024
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8009311
23 July 2024
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7965189
14 May 2024
Administrative Inspection · In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7912522
14 May 2024
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7913757
16 April 2024
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7896169
19 January 2024
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7851846
3 October 2023
COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7802859
23 September 2023
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7797252
8 August 2023
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7762955
26 July 2023
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7753204
28 April 2023
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7677513
1 March 2023
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7644084
25 January 2023
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7626979
3 December 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7603719
3 December 2022
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7604546
6 October 2022
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7572832
15 June 2022
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7478292
25 May 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7459108
25 May 2022
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7459832
11 March 2022
Administrative Inspection · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7410328
3 March 2022
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7405065
18 January 2022
Examination of Repairs · Plan Review (Other than "T") · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7382352
1 October 2021
COI Inspection · MTSA Verification · Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7321367
29 June 2021
Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7239501
31 March 2021
Administrative Inspection · MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7166415
11 December 2020
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7110389
28 October 2020
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7085679
10 September 2020
MTSA Verification · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7055032
12 August 2020
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7031132
24 March 2020
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6931004
28 February 2020
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6917457
10 December 2019
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6871470
10 September 2019
COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6808589
20 June 2019
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6720191
21 March 2019
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6646767
12 December 2018
Re-Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6596665
21 October 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6579206
5 September 2018
COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6532579
13 June 2018
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6521563
7 March 2018
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6367790
26 February 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6361786
14 October 2017
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6324044
7 October 2017
Excursion Permit
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6281543
20 September 2017
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6271464
8 September 2017
MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6260801
16 May 2017
DAPI Audit · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6147883
6 February 2017
MTSA Verification · Drydock Exam · Re-Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6083462
28 September 2016
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6011530
11 July 2016
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5938026
8 July 2016
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5934204
6 June 2016
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5899501
10 May 2016
Deficiency Check · MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5873739
29 April 2016
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5867948
1 April 2016
Administrative Inspection · Excursion Permit
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5845439
22 February 2016
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5820137
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 31 March 2025
Resolved
Vessels that operate in salt water must undergo two drydock exams within a 5 year period. No more than 3 years may elapse between any two examinations. Vessel must undergo a drydock exam before the carriage of passengers.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 September 2025
Resolved 8 September 2025
Resolution: Vessel completed drydock in Houston. Refer to activity 8180387.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 February 2025
Resolved
All engine installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Generator installation was found to be leaking diesel fuel and it was unable to do automation tests such as overspeed and low lube oil. Repair leak and demonstrate tests prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2026
Resolution: Vessel made repairs to generator
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 February 2025
Resolved
The minimum instrumentation, alarms, and safety controls required for specific types of systems are listed in Table 62.35-50. Vessel could not perform low lube oil shutdowns on either the main propulsion engines or the generators. Vessel is required to perform these tests to the satisfaction of USCG MI.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 April 2025
Resolved 5 June 2026
Resolution: Vessel added a lube oil shutdown device and performed satisfactory test
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 November 2024
Resolved
When only the main steering gear is power-driven, two separate and independent systems for full followup control must be provided in the pilothouse; except that the steering wheel or lever need not be duplicated.
Vessel reported loss of steering pump 2. Affect permitted repairs to the satisfaction of the USCG.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 November 2024
Resolved 21 November 2024
Resolution: RIO Marine installed replacement parts on steering pump #2 and dockside drills successful. Caption of vessel conducted sea trials with your permission. All 3 steering stations were successful in Non Follow-up, Follow Up and bridge control.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 October 2024
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Lifebuoy light on starboard side main deck was found to be inoperable. Rectify deficiency prior to getting underway after sunset or within 14 days.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2024
Resolved 16 October 2024
Resolution: Vessel sent in video documentation of life buoy light.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 July 2024
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space.
Inspectors found multiple emergency lighting fixtures with inoperable lights installed. Vessel is to replace bulbs in each faulty emergency lighting fixture.
46 CFR 111.75-15(c)(2)
60c
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 23 July 2024
Resolved 6 August 2024
Resolution: Photo evidence received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 July 2024
Resolved
Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards.
Rotating machinery in the emergency generator room was found to not have a guard over it’s right side, exposing a rotating shaft capable of causing injury.
46 CFR 58.01-20
16c
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 August 2024
Resolved 6 August 2024
Resolution: Photo evidence received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2024
Resolved
The respective piping systems installed on ships shall have the necessary valves and flanges for safe and efficient operation of the vessel. Bow thruster directional control valve is leaking significantly. Valve shall be repaired, be leak free, and have all hydraulic fluid removed from the bilge to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 June 2024
Resolved 30 May 2024
Resolution: Witnessed satisfactory testing of bow thruster with no leaks.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 January 2024
Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. Each control valve to branch lines must be marked to indicate the related space served.
Marine inspector witnessed labeling for the CO2 fire suppression system was incorrectly labeled on the system when comparing to detailed operating instructions and system schematic diagram was missing.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 January 2024
Resolved 31 January 2024
Resolution: Corrected.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 October 2023
Resolved
Fixed fire extinguishing systems must be checked as noted in table 71.25–20(a)(2). In addition all parts of the fixed fire extinguishing systems must be examined for excessive corrosion and general conditions.
Marine inspector witnessed documentation for CO2 fire suppression system was missing requirements in the CFR cite.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2023
Resolved 26 January 2024
Resolution: 19JAN24 deficiency corrected. Inspected by [name withheld].
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 October 2023
Resolved
Central control locations must (i) Be arranged to allow the operator to safely and efficiently communicate, , control, and monitor the vital systems under normal and emergency conditions, with a minimum of operator confusion and distraction.
Marine Inspector witnessed the M/E low oil pressure indicator lights on the bridge were inop.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2023
Resolved 26 January 2024
Resolution: 19JAN24 deficiency corrected. Inspected by [name withheld].
10 - Safety of Navigation › N/A - No Subsystem › Record of drills and steering gear tests
Issued 26 July 2023
Resolved
Indication of the rudder angle must be provided both at the main steering station in the pilothouse and in the steering-gear compartment. The rudder-angle indicator must be independent of control systems for steering gear. The pilothouse and engine room rudder angle indicators did not reflect the same rudder angled. Repair/adjust indicators so they match and reflect the correct rudder angle.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 August 2023
Resolved 13 September 2023
Resolution: Engine room rudder angle indicator was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 26 July 2023
Resolved
Onboard training, musters, and drills: held in accordance with Subchapter W (Lifesaving Appliances and Arrangements) of this chapter. During abandon ship drill MI observed the crew and during questioning crew was unfamiliar with duties during drill. MI asked master if there were any training manuals or training procedures that were being utilized to train and instruct crew on proper procedures, there are no training manuals or aids other than the training received for crew licensing. Vessel must develop crew training manual in accordance with 46 CFR 199.180 parts A through H as applicable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 August 2023
Resolved 21 September 2023
Resolution: MI's reviewed the crew training manual with the vessel [name withheld] of training manual were satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 July 2023
Resolved
The outlet at each fire hydrant must be provided with a cock or valve fitted in such a position that the firehose may be removed while the fire main is under pressure. Marine Inspector (MI) identified a broken valve for the fire hydrant on the port side of the top deck, which must be replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 August 2023
Resolved 8 August 2023
Resolution: Broken valve was replaced with a new valve.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 April 2023
Resolved
Each item of lifesaving equipment required by this part to be carried on board the vessel must be approved. Marine Inspector (MI) observed that the lifefloat onboard does not have an approval placard or any information indicating that it is approved. 46 CFR 199.40(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2023
Resolved 8 June 2023
Resolution: Lifefloat is not required to be onboard and was therefore removed. COI amended to reflect 00 survival craft required, however survival craft onboard but not required must meet SubChapter W respectively (see Special Note and MISLE narrative for details).
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 28 April 2023
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. MI observed one self-igniting waterlight attached to a ring life-buoy did not work.
46 CFR 199.190(a)
Action required: 10 - Deficiency Rectified
Resolved 28 April 2023
Resolution: Corrected on the spot.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 28 April 2023
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space. MI observed six emergency lights that had inoperable bulbs. 46 CFR 111.75-15(c)(2)
Action required: 10 - Deficiency Rectified
Resolved 28 April 2023
Resolution: Corrected on the spot.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 28 April 2023
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. MI observed the access panel of an electrical distribution box in the machinery space was not secure allowing potential contact by a person.
46 CFR 111.01(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2023
Resolved 12 May 2023
Resolution: Electrical box was repaired to allow the box to be secured.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 28 April 2023
Resolved
Each self-propelled vessel must have duplicate light sources for the side, masthead, and stern lights. MI observed that the secondary masthead light alarm was alerting that the light was not working. 111.75-17(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 May 2023
Resolution: Mast light was repaired.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 1 March 2023
Resolved
Means shall be provided for closing all openings to the space protected from outside such space. Vessel reported allision and subsequent damage sustained to starboard side ventilation cover leading to engine room. Renew/replace closure to satisfaction of attending Marine Inspector.
CITE: 46 CFR 76.15 35(c)
Action required: 60 - Rectify deficiencies prior to movement
Due 16 March 2023
Resolved 7 March 2023
Resolution: New intake vent cover installed to the satisfaction of the duty marine inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 1 March 2023
Resolved
All passenger vessels shall have efficient guard rails or bulwarks on decks and bridges. As result of allision, vessel sustained damage to railings on starboard side. Renew railings to satisfaction of attending Marine Inspector.
CITE: 46 CFR 72.40 5(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2023
Resolved 20 April 2023
Resolution: All repairs were satisfactorily completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 January 2023
Resolved
All vessels shall be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment. Marine Inspector (MI) observed corrosion on the rudder room bilge suction pipe. After exploring the corrosion utilizing an inspection hammer, MI punctured a ½” hole in the pipe. Renew pipe to the satisfaction of the USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2023
Resolution: Received photographic evidence of the rudder room bilge piping replaced satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 January 2023
Resolved
Cables manufactured to IEC 60092-353 must be installed in accordance with IEC 60092-352 (both incorporated by reference; see 46 CFR 110.10-1), including clause 8. MI observed metallic support bands for the horizontal electrical cable run on the Galveston deck are all corroded away and need to be renewed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 23 February 2023
Resolution: Metallic supports bands were installed. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
46 CFR 58.10-5
Engine design. All installations shall be or marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. MI’s observed fuel leaking from inside of the port valve cover on the port main diesel engine indicative of a failure/leak of the fuel system within the valve cover. Vessel shall identify and correct all fuel leaks to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2022
Resolution: manufacturer technician completed repairs and witnessed test under load. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
46 CFR 58.10-5
Engine design. All installations shall be or marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. MI’s observed fuel leaking from inside of the starboard valve cover on the starboard main diesel engine indicative of a failure/leak of the fuel system within the valve cover. Vessel shall identify and correct all fuel leaks to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 October 2022
Resolved
46 CFR 58.10-5
Engine design. All installations shall be or marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. MI’s observed fuel leaking from three fuel injectors on the Port Ship's service generator engine. Vessel shall identify and correct all fuel leaks to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 October 2022
Resolved
46 CFR 56.01-1
The respective piping systems installed on ships shall have the necessary valves and flanges for safe and efficienct operation of the vessel. Bow thruster directional control valve is leaking significantly, vessel is restricted from operating until valve is repaired and leak free to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 October 2022
Resolved
46 CFR 111.81-1 (f)
Each outlet must be constructed to the appropriate NEMA or IEC standard. MI’s observed several electrical outlets on the Galveston deck up forward in the dining area on the columns as well as on the Texas deck in the aft portion of the bar area that were broken and presented an electrical hazard. Vessel is to replace all broken outlets/covers to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 October 2022
Resolution: Outlets replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 October 2022
Resolved
46 CFR 56.20-9
Each valve must close with a right-hand (clockwise) motion of the hand wheel or operating lever as seen by one facing the end of the valve stem. MI's observed that the bilge system overboard valve was not able to be operated by hand. Vessel shall repair/replace valve to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 October 2022
Resolution: Valve loosened for operation.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 October 2022
Resolved
46 CFR 78.47-40
Illuminated exit signs are required and must be installed in accordance with subchapter J. MI's observed that the emergency exit for forward auxiliary space did not have an illuminated exit sign. Vessel shall install an illuminated exit sign to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2022
Resolved 25 October 2022
Resolution: A photoluminescent exit sign was installed. All sat.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 11 October 2022
Resolved
33 CFR 159.7 (c)
When operating a vessel on a body of water where the discharge of untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3, the operator must secure each Type III device in a manner which prevents discharge of sewage. MI's observed that the sewage overboard valve was open. Vessel's crew closed the valved and secured it in the closed position with a chain and padlock.
Action required: 10 - Deficiency Rectified
Resolved 11 October 2022
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 11 October 2022
Resolved
The activation of any detector or manual pull station must cause an audible and visual fire detection alarm signal at the control panel. Marine Inspectors observed that the fire control panel in the navigation bridge did not alarm when the smoke detector in the generator room was tested, which must be corrected to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 October 2022
Resolution: Fire detection unit serviced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 11 October 2022
Resolved
Each vessel must carry lifejackets approved under approval series 160.155, 160.176 or 160.177 and each lifejacket must be marked With Type I retro-reflective material approved under approval series 164.018. The arrangement of the retro-reflective material must meet IMO Resolution A.658(16). 06 Lifejackets found in unsatisfactory condition with bouyant material degraded. 01 lifejacket requires found with degraded reflective tape. Replace 06 lifejackets and renew reflective material on 01 lifejacket.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 October 2022
Resolution: Lifejackets replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 October 2022
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. The lifebuoys shall be fitted with retro-reflective material (tape) with a minimum of 5 cm (2 inches) width around the lifebuoy at four locations - spaced equally around the circumference of the lifebuoy. Retro-reflective material shall be Type II material that is approved under 46 CFR 164.018. Ring buoys on Main Deck, 01 Deck, and Stern deck found with degraded retro-reflective material. 04 ring buoys require tape renewal. Renew reflective material.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 October 2022
Resolution: Retro-reflective tape renewed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 October 2022
Resolved
Electric installations on vessels must ensure maintenance of services necessary for safety under normal and emergency conditions. Battery in pilothouse found with presence of moisture and corrosion at terminals. Replace battery.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 14 October 2022
Resolution: Battery replaced.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 October 2022
Resolved
Each navigation light must be installed so that its location and its angle of visibility meet the applicable navigation rules. The second anchor light is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 October 2022
Resolution: Anchor light replaced.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 October 2022
Resolved
On vessels required to have a final emergency power source by § 112.05-5(a) of this chapter, the following emergency lighting and power loads must be arranged so that they can be energized from the final emergency power source: Lighting for survival craft launching, including muster stations, embarkation stations, the survival craft, its launching appliances and the area of the water where it is to be launched. Life float and IBA locations do not have functional lighting. Lighting must be brought into operational condition.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 21 October 2022
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 11 October 2022
Resolved
Emergency means of communication required by this subpart must provide common talking means of two-way voice communication and calling among the navigating bridge, emergency control stations, must be a reliable means of voice communication and must be independent of the vessel's electrical system. Marine Inspectors witnessed inability among crew communications between engine room and bridge. Provide evidence of reliable means of communication.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2022
Resolution: Use of portable radios proved satisfactory.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 October 2022
Resolved
Be arranged to allow the operator to safely and efficiently communicate, control, and monitor the vital systems under normal and emergency conditions, with a minimum of operator confusion and distraction. Several alarm indicators in the navigation bridge are unreadable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 25 October 2022
Resolution: Alarm indicators were all relabled. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 June 2022
Resolved
The respective piping systems installed on ships shall have the necessary valves and flanges for safe and efficient operation of the vessel. Bow thruster directional control valve is leaking significantly, vessel is restricted from operating until valve is repaired and leak free to the satisfaction of USCG Inspector.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 15 July 2022
Resolved 17 June 2022
Resolution: O-rings were replaced. Operational test SAT.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 June 2022
Resolved
Battery operated lanterns must be capable of providing light for at least 3 hours. STBD side FWD Galveston Deck Emergency Light illuminated for approximately 5 minutes while on emergency power.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 June 2022
Resolved 17 June 2022
Resolution: Verified lighting was working properly.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 May 2022
Resolved
Nothing in this subpart shall be construed as limiting the inspector from making such test or inspections as he deems necessary to be assured of the safety and seaworthiness of the vessel.
Vessel broke free from its moorings during heavy weather and became hard aground in muddy bottom approx 200 feet from pier. Vessel reported no hull damage or flooding during interior inspection by crew. Vessel stated they will have divers check the bottom once re-floated. Provide sea trial report and dive report to USCG Marine Inspectors for approval prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2022
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 March 2022
Resolved
Each firehouse on each hydrant must have a combination solid stream and water spray firehose nozzle that meets the requirements of 46 CFR 162.027.
Firehose nozzle at fire station #10 was spraying water through fittings and attachments due to appreciable corrosion.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 11 March 2022
Resolved 11 March 2022
Resolution: Vessel brought on replacement firehose nozzle.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 11 March 2022
Resolved
Each EAP education program must include at least the following elements: Display and distribution of a community service hot-line telephone number for crewmember assistance. Vessel was unable to identify a location or provide evidence of a community service hot-line number being posted or displayed for crewmember assistance.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2022
Resolved 21 March 2022
Resolution: Vessel provided evidence of hotline number being posted on bulletin board with contact information highlighted.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2022
Resolved
Twist-on type of connectors may not be used for making joints in cables, facilitating a conductor splice, or extending the length of the circuit. Twist-on type connectors were observed being used to facilitate a splice in the air compressor room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2022
Resolved 21 March 2022
Resolution: Proper splicing used on electrical, twist-on connections replaced with butt connections.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 29 June 2021
Resolved
Repair/replace check valve on fire pump.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 June 2021
Resolution: Check valve replaced. Operational check satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 29 June 2021
Resolved
Provide machinery guards for #1 generator.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 June 2021
Resolution: Machinery screen guards installed. All sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 29 June 2021
Resolved
Repair emergency light forward port side of E/R.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2021
Resolution: New battery installed in light. Operational check satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 31 March 2021
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use.
Marine Inspectors identified 04 unserviceable adult life jackets from overhead lockers located on the 01 deck and 22 unserviceable children’s life jacket from 03 lockers located on the main deck and 02 deck. In addition, the overhead lifejacket stowage lockers were inoperative. Replace the unserviceable life jackets with the same type and quantity IAW with the COI requirements and service inoperative stowage locker latches.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2021
Resolved 29 June 2021
Resolution: All lifejackets replaced and stowage locker latches repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 31 March 2021
Resolved
Each link certified by the manufacture to meet the requirements of this subpart must have a corrosion resistance, waterproof tag attached to it.
Marine Inspectors observed that the 25 person life float (aft of the bridge) had a weak link without a tag, nor could the tag be located on the vessel. Replace the existing weak link with the correctly rated weak link for the life float on the vessel.
46 CFR 160.073-20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2021
Resolved 17 May 2021
Resolution: New weak link installed.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 31 March 2021
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space.
Inspectors found an emergency light on the main deck that wasn’t illuminating properly. Vessel to repair light to the satisfaction of a USCG Marine Inspector.
46 CFR 111.75-15(c)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2021
Resolved 17 May 2021
Resolution: Emergency light tested satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 March 2021
Resolved
Each cable installation must meet sections 25, except 25.11 of IEEE 45-2002. Cable retention devices should be installed not less than 2.5 meters on horizontal runs.
Vessel had wasted cable supports on the upper deck below the bridge space. Vessel to replace the cable supports to the satisfaction of a USCG Marine Inspector.
46 CFR 111.60-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2021
Resolved 17 May 2021
Resolution: Cables properly supported.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 31 March 2021
Resolved
All passenger vessels shall have efficient guard rails or bulwarks on decks and bridges as follows: The decks and bridges as follows: The height of rails or bulwarks shall be at least 39 ½ inches from the deck.
Deck rails around the bridge were found wasted completely through. Vessel to replace and repair the wasted railing to the satisfaction of a USCG Marine Inspector.
46 CFR 72.40-5(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2021
Resolved 17 May 2021
Resolution: Satisfactory new deck rails installed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 31 March 2021
Resolved
All portable fire extinguishers and semi-portable fire extinguishing systems must be maintained in accordance with NFPA 10. Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew. Each lifesaving appliance, including lifeboat equipment, must be inspected monthly using the checklists under paragraph (b)(1)(i) of this section to make sure the appliance and the equipment are complete and in good working order. A report of the inspection, including a statement as to the condition of the equipment, must be recorded in the vessel’s official log book.
Vessel is not performing monthly service inspections on firefighting or lifesaving equipment. Vessel is to start monthly inspections of both the firefighting and live saving equipment and provide a record of inspections. Verification of the monthly inspections and logs will be made by a USCG Marine Inspector at the next quarterly.
46 CFR 199.190(e)
Action required: 705 - Other - as specified
Due 26 April 2021
Resolved 29 June 2021
Resolution: Vessel provided evidence of monthly inspections of firefighting and lifesaving equipment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 September 2020
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the stands established by the ABS Steel Vessel Rules
MI observed exhaust leak on the #1 STBD Generator.
46 CFR 58.05-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2020
Resolved 16 September 2020
Resolution: Exhaist leaks repairs completed. Witnessed SAT running of #1 SSDG with no leaks.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 March 2019
Resolved
Electrical installations on vessels must ensure protection of passengers, crew, other persons, ad the vessel from electrical hazards. An extension cord (draped over the sink) and power strip were found supplying power to multiple appliances at the snack bar on the 2nd deck. Extension cords are intended for temporary use, and not permanent installations. A permanent electrical installation shall be used to power appliances in the snack bar to the satisfaction of the attending Marine Inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 April 2019
Resolution: Permanent eletrical outlet installed.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 21 March 2019
Resolved
The location of equipment (portable fire extinguishers) shall be to the satisfaction of the Officer in Charge, Marine Inspection. The fire extinguisher in the snack bar on the 2nd deck was hidden behind the sink and ice machine and not located in the open so as to be readily seen. The fire extinguisher shall be moved to where it is readily visible in case of emergency to the satisfaction of the attending Marine Inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 April 2019
Resolution: Extinguisher removed since it was not required on fire plan.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 March 2019
Resolved
Each entrance to a space storing carbon dioxide cylinders or a space protected by carbon dioxide must be conspicuously marked as follows:
Spaces storing carbon dioxide - "CARBON DIOXIDE CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFORE ENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCATON."
Spaces protected by carbon dioxide - "CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. WHE ALARM OPERATES OR WINTERGREEN SCET IS DETECTED, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM WHEN SERVICING." The reference to wintergreen scent may be omitted for carbon dioxide systems not required to have odorizing units and not equipped with such units.
The carbon dioxide storage space and EDG space (CO2 protected space) were not marked properly. Ensure proper marking are on both spaces to the satisfaction of the attending Marine Inspectors.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 April 2019
Resolution: Doors properly labeled.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 21 March 2019
Resolved
Vents extending above the freeboard deck from fuel oil tanks must be at least Schedule 40 in wall thickness. A fuel tank vent on the fwd port side of the vsl was found to have significant wastage where the vent piping is welded to the deck. Permanent repairs shall be made to the satisfaction of the attending Marine Inspector at the next dry dock.
Action required: 705 - Other - as specified
Resolved 16 September 2020
Resolution: Deficiency rectified during March drydock.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 12 December 2018
Resolved
Remove red and green holiday lights that interfere with navigational lights.
Action required: 705 - Other - as specified
Resolved 12 December 2018
Resolution: The red and green lights were removed.
Lifesaving › Lifefloat › Serviceable
Issued 7 March 2018
Resolved
Before vessel leaves port and all timees during voayge, each lifesaving appliance must be in working order and ready for immediate use. Repair or replace lifefloat straps for grab lines to the satisfaction of the attending Marine Inspector. 46 CFR 199.190(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 April 2018
Resolved 17 September 2018
Resolution: Life float straps have been replaced.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 20 September 2017
Resolved
Vessel added 20 lifejackets for a total of 650. Vessel is restricted to 650 total persons on board.
Action required: 705 - Other - as specified
Resolved 10 September 2018
Resolution: Reduced passenger count on COI to 650.
Navigation › Piloting/Steering › Notices to Navigation
Issued 8 September 2017
Resolved
Provide information for ECDIS chart stard and method for updating.
Action required: 705 - Other - as specified
Due 8 October 2017
Resolved 20 September 2017
Resolution: ECDIS system updates automatically up activation and has a manual SYNC button if needed.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 8 September 2017
Resolved
Provide 69 life jackets. Vessel is restricted to 630 total persons on board.
Due 8 October 2017
Resolved 20 September 2017
Fire Fighting › Fire Main › Condition
Issued 8 September 2017
Resolved
Crop and renew fire pump piping IWO hole/leak.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 September 2017
Resolution: Fire main piping was cropped and renewed. Tested satisfactorily.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 14 March 2017
Resolved
The top ladder rung servicing the emergency exit from the pump room is broken. Re-weld connection.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Rung reattached.
Lifesaving › Lifefloat › Platform
Issued 14 March 2017
Resolved
Lifefloat improperly stowed. Debris obstructing float free arrangement. Remove all loose gear IVO lifefloat station.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Debris removed.
Construction/Loadline › Structures › Door
Issued 14 March 2017
Resolved
WTD leading from the engine room to the pump room is not properly sealing. Adjust door as needed. Chalk test.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Door adjusted in presence of CG MI.
Fire Fighting › Fire Hydrants › Location/Position
Issued 14 March 2017
Resolved
Fire hose station #5 and #6 are obstructed by the life jacket boxes. Make accessible and re-mark for all to see.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Marking of fire station redone to make visible.
Fire Fighting › Fire Hydrants › Material
Issued 6 February 2017
Resolved
Improper spanner wrench attached to fire hose station #2. Replace with correct type of spanner wrench.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Correct type of spanner added to fire station.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 6 February 2017
Resolved
Machinery spaces contained excessive amount of uncollected oil rags, wood material and improperly stowed equipment which is blocking access to vital equipment.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Material removed.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 3 October 2016
Resolved
46 CFR 78.05-5 Required Navigation Publications are not current.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 October 2016
Resolved 6 October 2016
Resolution: Vessel captain attained electronic copies of updated nav pubs and corrected charts.
Operations/Management › Navigation Safety › Proper Use of Navigation/Anchor Lights
Issued 3 October 2016
Resolved
Secondary bulb for "Not Under Command" light not working.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 October 2016
Resolved 6 October 2016
Resolution: Burned out bulb replaced, all sat.
Operations/Management › Drills/Instruction › Fire
Issued 3 October 2016
Resolved
Repeat fire drill taking into account deck hands searching all decks for passengers.
46 CFR 78.17
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 October 2016
Resolved 6 October 2016
Resolution: Fire drill satisfactorily completed.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 3 October 2016
Resolved
Replace 25% OF the ADULT LIFE PRESERVERS ONBOARD VESSEL. UNITL COMPLETED THE VESSEL'S PASSENGER COUNT FOR ADULTS WILL BE REDUCED TO 524 PASSENGERS.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 6 October 2016
Resolution: PFDs replaced.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 3 October 2016
Resolved
VERIFY ALL OUTLETS IN THE BAR AREAS, WHERE THEY CAN BE EXPOSED TO WATER, FOR THE GALVESTON AND TEXAS ROOMS ARE ON A GFI BREAKER.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 6 October 2016
Resolution: GFCI outlets installed.
Engineering › Compressed Air System (control) › Hose
Issued 3 October 2016
Resolved
REPLACE BROKEN AIR HOSE CONNECTED TO THE ENGINE ROOM'S AIR ACTUATED THROTTLE CONTROL.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 October 2016
Resolved 3 October 2016
Resolution: Corrected on the spot.
Engineering › Fuel Oil Service System › Hose
Issued 3 October 2016
Resolved
REPLACE 25% PF FLEXIBLE FUEL HOSES IN ENGINE ROOM DUE TO NON-FLEXIBLE, CRACKING AND CHAFING. DUE BY THE END OF DRY-DOCK IN FEB 2017
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 10 March 2017
Resolution: Hoses replaced during DD.
Stability › Watertight Integrity › General
Issued 3 October 2016
Resolved
ADJUST ALL WATERTIGHT DOORS FOR PROPER OPERATIONS.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 6 October 2016
Resolution: WTDs adjusted.
Accommodation/Occupational Safety › Ventilation › General
Issued 3 October 2016
Resolved
CROP AND RENEW ALL VENT GOOSENECKS ON PORT SIDE STERN AREA AND HAND RAILS IN THE SAME AREA THAT ARE WASTED.
Condition: Improper/Lack of Maintenance
Due 3 November 2016
Resolved 6 October 2016
Resolution: Areas cropped/renewed.
Lifesaving › Lifebuoys › Stowage
Issued 3 October 2016
Resolved
REPLACE WASTED LIFE RING HOLDER AND SAFETY CHAIN HOLD ON STBD AFT DECK.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 6 October 2016
Resolution: Life ring holder replaced, all sat.
Electrical › Electrical Distribution System (emergency) › Junction Box
Issued 3 October 2016
Resolved
PROPERLY INSTALL ENGINE ROOM'S BILGE ALARM CONNECTION WIRE WITHIN ITS JUNCTION BOX.
Condition: Improper Installation
Due 3 November 2016
Resolved 3 October 2016
Resolution: CORRECTED ON THE SPOT.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 October 2016
Resolved
REMOVE DEAD-END WIRES IN EMERGENCY GENERATOR SPACE.
Condition: Improper Installation
Due 3 November 2016
Resolved 3 October 2016
Resolution: CORRECTED ON THE SPOT.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 October 2016
Resolved
PROPERLY SUPPORT WIRE RUNS IN THE E-GEN SPACE AND PUMP ROOM.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 6 October 2016
Resolution: Repaired.
Engineering › Steering Gear System › Piping
Issued 8 July 2016
Resolved
Flexible pipe couplings of the compression or slip-on type is leaking hydraulic fluid excessively.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 July 2016
Resolved 11 July 2016
Resolution: Vessel made effective repairs to the satisfaction of the attending Marine Inspector.
Personnel › Training › Familiarization Training
Issued 10 May 2016
Resolved
Vessel Deckhands were found to have insufficient training for emergencie duties. Prove proper traiing of deckhands.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 June 2016
Resolved 11 May 2016
Resolution: Conducted fire drill / MOB and evaluated competency/training of deckhands. Both drill were completed satisfactory
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 10 May 2016
Resolved
Vessels fire control Plans were found to be out dated and incorrect. Vessel must renew fire control plans to the satisfaction of the marine inspector.
Action required: 705 - Other - as specified
Due 20 June 2016
Resolved 8 July 2016
Resolution: Vessel provided updated Firesafety plans that reflect the arrangements on the board. All plans stamped approved by MSU Texas City Marine Inspector.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 10 May 2016
Resolved
Vessel shall update Station Bill to Properly reflect personnel responsibilities.
Action required: 705 - Other - as specified
Due 20 June 2016
Resolved 13 June 2016
Resolution: Received vsl's updated station bill.
Accommodation/Occupational Safety › Ventilation › General
Issued 22 February 2016
Resolved
Aft most vent closure on the starboard side is severely bent and can not be properly closed.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 1 April 2016
Resolution: Verified aft most vent closure device on stbd side was replaced and closed properly.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 22 February 2016
Resolved
IBA station does not have the required lighting to properly illuminate the area.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 1 April 2016
Resolution: Verified emergency lighting installed at launching station for IBA.