MAURY USCG vessel records
← All vessels

VISION

VISION is a 1985 passenger vessel (inspected). The Coast Guard has recorded 30 inspections since 2016, most recently in June 2026, along with 62 deficiencies, 2 operational controls and 16 casualty investigations between 2002 and 2023.

Records from 2002 to 2026. Most recent: inspection, 10 June 2026.

Built
1985
Last inspected
10 June 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 10 June 2026
…with no type recorded6
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL9630
253232
Flag
UNITED STATES
Maury page id
psix-253232

Documentation record

Registered dimensions (L × B × D)84.0 ft × 26.2 ft × 6.0 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSCOTTON CUSTOM BOATS · OXNARD, CA, UNITED STATES · built 1985
Hull materialWood
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSAN DIEGO, CA
Trade endorsementsCoastwise, unrestricted, Recreational, Registry
DocumentationValid · issued 17 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 30

10 June 2026 Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8403013
7 October 2025 Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8247201
19 September 2024 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8006418
25 January 2024 Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7855802
22 November 2023 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7833417
9 November 2023 Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7833475
27 September 2023 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7799274
15 September 2023 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7792209
4 June 2023 Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7703322
6 December 2022 Administrative Inspection · Plan Review "T" Boat
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7605267
10 November 2022 Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7593102
2 September 2022 In-Service Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7540247
21 July 2022 Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7484671
6 January 2022 Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7374759
6 November 2021 Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7346391
6 November 2021 Examination of Repairs · Deficiency Check · Damage Survey · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7347187
8 October 2021 Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7345599
10 June 2021 COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7207647
8 October 2020 Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7073651
30 July 2020 Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7020494
9 May 2020 Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6950628
25 February 2020 Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6909768
6 September 2019 Administrative Inspection · Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6804630
4 April 2019 Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6656049
7 February 2018 COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6341514
10 January 2018 Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6333229
12 April 2017 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6123151
23 October 2016 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6128339
31 March 2016 Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5844396
6 January 2016 Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5792058

Deficiency record · 62

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 September 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. The jacket water water piping on both the port and starboard main engines are leaking due to wastage. Replace the affected piping and conduct increased rounds of the engine room every 30 minutes until repairs are completed. 46 CFR 182.100 16c - rectify deficiencies within 14 days to the satisfaction of the CG
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2024
Resolved 1 October 2024
Resolution: Captain provided proof of successful repairs
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 September 2023 Resolved
On a vessel of more than 65 feet in length, each hose must: (1) Be lined commercial fire hose that conforms to UL 19 or hose that is listed and labeled by an independent laboratory recognized by the Commandant as being equivalent in performance; Fire hose at port side station ruptured upon testing and was condemned. Spare fire hose provided does not meet UL19 or equivalent standard. Provide appropriate hose to meet regulation. Use of spare temporarily allowed. 46 CFR 181.320(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 27 September 2023
Resolution: Fire hose was replaced with a new one conforming to UL 19.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 15 September 2023 Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”, unless such markings are deemed unnecessary by the cognizant [name withheld] on port and starboard egress hatches from passenger accommodation include directions on how to properly operate the hatch in the event of an emergency. From inside the space it says "To Open Hatch Push Handle and Turn Clockwise." To open the hatch the handles must be turned counter-clockwise. Confirmed both labels are misleading with the owner and vessel master. Add proper verbiage clarifying counter clockwise operation as well as "EMERGENCY EXIT, KEEP CLEAR" as per regulation prior to overnight operations with passengers. 46 CFR 185.606
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 September 2023
Resolved 19 September 2023
Resolution: Received photos via e-mail of updated emergency escape hatch signage to include "counter-clockwise" operation as well as "Emergency Exit, Keep Clear" on both port and starboard escape hatches in bunk room.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 September 2023 Resolved
Each entrance to a space storing carbon dioxide cylinders, a space protected by CO2 systems, or any space into which CO2 might migrate must be conspicuously marked as follows: (1) Spaces storing carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFORE ENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCATION.” Spaces protected by carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. WHEN ALARM OPERATES OR WINTERGREEN SCENT IS DETECTED, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM WHEN SERVICING.” The reference to wintergreen scent may be omitted for carbon dioxide systems not required to have odorizing units and not equipped with such units. Machinery space entrance did not have CO2 warning signs. CO2 bottles are stored in the space and the space is protected by CO2. Place signs to satisfaction of Marine Inspector. 46 CFR 185.612(g)(1)&(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 19 September 2023
Resolution: Received photos of new signs placed at machinery space entrance.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 September 2023 Resolved
Each nozzle must be of corrosion-resistant material and be capable of being changed between a solid stream and a spray pattern. Starboard fire hose nozzle was seized in the solid stream position and would not change to spray pattern. Crew was able to fix the nozzle prior to completion of inspection. Recommended adding fire hose nozzle maintenance to monthly life saving equipment checks. 46 CFR 181.320(d)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 September 2023
Resolved 15 September 2023
Resolution: Rectified prior to completion of inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 21 July 2022 Resolved
provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Vent from engine space to lazarette was obstructed. Vessel crew unobstructed vent cover for proper operation.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 21 July 2022
Resolution: Vessel crew unobstructed vent cover for proper operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 May 2022 Resolved
A vessel must have two independent means of controlling each propulsion engine. Control must be provided for the engine speed, direction of shaft rotation, and engine shutdown. This is an amended CG-835V stemming from Deficiency Item Number 2 issued 11/6/2021. Attended vessel to verify approved DVTP & QFA. Vessel was not able to successfully complete steps 3 & 4. When performing step #3, upon removing the actuator positive voltage cable from the ERIM, all systems respond as prescribed until trying to shift with the emergency back up controls. The back up system activates but the controls don't shift. Vessel can throttle but not shift. Vessel O/O has tested this with multiple ERIMs and they all respond exactly the same. Vessel provided successful underway testing for shifting manually at the gearboxes as back up. Vessel will need to coordinate with manufacturer and obtain correct DVTP/QFA for the installed system. Vessel will need to coordinate with manufacturer and obtain correct DVTP/QFA for the installed system. This new DVTP/QFA will need to be resubmitted to MSC for approval prior to 2023 annual inspection.
Action required: 705 - Other - as specified
Resolved 15 May 2023
Resolution: New DVTP/QFA was resubmitted to MSC and approved.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 6 November 2021 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] a grounding on 05NOV21 a dive survey was conducted showing damage to both propellers and evidence that the keel had made contact with the bottom. Make the vessel available for a damage survey to be attended by a USCG Marine Inspector or provide dive footage showing condition of hull and running gear. Following survey, provide repair proposal to the attending USCG Marine Inspector. Vessel may transit without passengers or cargo within the Sector LA/LB area to proceed to a repair facility.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 April 2022
Resolution: Vessel completed damage assessment and repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 November 2021 Resolved
A vessel must have two independent means of controlling each propulsion engine. Control must be provided for the engine speed, direction of shaft rotation, and engine shutdown. Immediately prior to the grounding on 05NOV21, the engines failed to go into gear when activated form the main pilothouse control and both wing control stations. Vessel underwent repower and installation of electronic engine controls in 2012, and QFA/DVTP verification was not conducted. In accordance with CVC Policy 17-07, submit the following for review to MSC: (1) A limited QFA of the vessel’s propulsion engine control system (throttle), documenting system compliance to CVC Policy 17-07. The limited QFA should only consider loss of power to the control system. (2) A propulsion control drawing should be submitted with an installation/operational test protocol. This test protocol is an abridged document intended to show compliance with 46 CFR.184.620. In addition, provide manufacturer's qualitative failure analysis showing failures which would lead to loss of control to engine transmission. Vessel may transit without passengers or cargo within the Sector LA/LB area to proceed to a repair facility.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 May 2022
Resolution: See amended deficiency AM4 from 25 May 2022.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 July 2021 Resolved
Vessel's three pahse system not isolated properly from shoreside single phase power. When operating using shore power, ensure isolation of three phase loads.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 6 January 2022
Resolution: Vessel generated electricity now isolated from shore power with use of shunt trip breakers
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 10 June 2021 Resolved
Each vessel subject to part III of title III of the communications act must have a detailed inspection of the radio installations and be issued a FCC Safety Radiotelephony Certificate. FCC Safety Radiotelephony Certificate not on board.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 July 2021
Resolution: Vessel installed new SSB/MF and received FCC SRC.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 10 June 2021 Resolved
An EAP training program must be conducted for employer's crew and supervisory personnel. Documentation of training unavailable. Training for designated testing crew nnot documented.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2021
Resolved 17 June 2021
Resolution: Vessel rpovided training records.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 June 2021 Resolved
Portable fire extinguisher in engine room not mounted on an approved bracket and found loose. Provide approved bracket.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2021
Resolved 22 June 2021
Resolution: Vessel purchased and installed approved bracket.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 10 June 2021 Resolved
General alarm / public address system not able to be heard in all parts of the bunk room and shower room. Vessel to provide means for alarms to be heard in all passenger spaces.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 July 2021
Resolution: Vessel demonstrated proper operation and adequate volume for the bunk room speaker.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 2 October 2019 Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. Damper located in the aft bulkhead of the engine room does not seal properly. Damper located on the port side main deck does not close properly and remains ajar. Prove proper operation of both dampers to the satisfaction of an attending marine inspector prior to getting underway.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 2 October 2019
Resolved 13 December 2019
Resolution: Vessel repaired port side damper and added weights and gaskets to all fire dampers. Operation demonstrated satisfactorily to attending USCG marine inspectors.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 2 October 2019 Resolved
Each life float must be stowed so that in the event of the vessel sinking the life float floats free. One life float is stowed in a deck box on the starboard side of the upper deck. The edge of the box that houses the life float prevents the life float from floating free. Prove float free arrangement for starboard side life float to an attending marine inspector prior to getting underway.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2019
Resolved 19 June 2020
Resolution: Verified arrangements, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 October 2019 Resolved
Each survival craft on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway. Life float located on the pilothouse has holes and tears in the body and is in disrepair. Replace or properly service life float and properly install to the satisfaction of an attending marine inspector prior to getting underway.
Action required: 60 - Rectify deficiencies prior to movement
Due 2 October 2019
Resolved 17 December 2019
Resolution: Vessel replaced life float. Installation verified satisfactorily by attending USCG marine inspectors.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 2 October 2019 Resolved
A grease extraction hood required by 46 CFR 181.400 must meet UL 710 or other standard specified by the Commandant. A grease extraction hood must be equipped with a dry or wet chemical fire extinguishing system meeting the applicable sections of NFPA 17 or NFPA 17A or other standard specified by the Commandant. G-MSE-4 policy letter 1-99 allows for the use of the existing hood, but must meet the requirements: the vessel must establish a maintenance program for the existing hood, install a fire detection system for the galley, and add one additional 40-B:C fire extinguisher to the galley. Vessel's galley heat detector was not present and there is no maintenance program for the existing hood which was evident by the heavy accumulation of grease in the vent hood and in the vent above the ovens. Properly install heat detector and produce a maintenance program for the existing hood or properly install grease extraction hood to the satisfaction of an attending marine inspector prior to enrgizing galley heating equipment.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 10 June 2021
Resolution: Vessel installed smoke detector in lieu of heat detector.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 2 October 2019 Resolved
Each overnight accommodation space on a vessel with overnight accommodations for passengers must be fitted with an independent modular smoke detection and alarm unit that must meet UL 217 and be listed as a "Single Station Smoke Detector - Also suitable for use in Recreational Vehicles," or other standard specified by the Commandant; Contain an independent power source; and Alarm on low power. Bunk room smoke detectors were removed during investigation. Install approved smoke detectors in the bunk room to the satisfaction of an attending marine inspector prior to carrying passengers overnight.
Action required: 705 - Other - as specified
Due 1 November 2019
Resolved 10 June 2021
Resolution: Vessel installed independent smoke detectors.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Repairs or alterations to the equipment that effect the safety of the vessel must not be made without the approval of the cognizant OCMI, to include electrical wiring and power supply systems. Vessel was found with numerous added electrical loads, including a NITROX generating system in the lazarette, food freezers in the lazarette, electric clothes dryer in the lazarette, a shower/bilge drain pump in the lazarette, a new electric double oven in the galley, additional engine room ventilation fans, a salon ice maker, additional salon refrigerator, water heater in shower room, reverse osmosis unit in engine room, and an electric grill on the main deck. Provide plans for approval showing electrical generating and distribution system as installed, to include materials used, over current protection details, and electrical load analysis.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 9 July 2021
Resolution: Vessel submitted plans to MSC and received an approval letter dated 09JUL21.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Conductors in power and lighting circuits must be No. 14 American Wire Gauge (AWG) or larger. 16 AWG wiring was used to wire the circuit that supplies power to the passenger bunk lights. Remove power conducting conductors smaller than 14 AWG.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 10 June 2021
Resolution: Vessel rewired bunk lights using 14AWG UL boat cable in accordance with submitted plans to MSC.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
All cable and wire must be installed with metal supports spaced not more than 24" apart, and in such a manner as to avoid chafing and other damage. Wiring throughout the engine room and lazarette was found supported with plastic wire ties. Provide metallic wire supports not more than 24" apart to secure all wire runs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 8 October 2020
Resolution: Metallic wire supports provided.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. The wiring run in the galley area was used as a storage place for cleaning supplies. Remove cleaning supplies from wire run and stow them in an approved location.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel mounted rack for cleaning supplies and protected cabling.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. The 120 VAC electrical receptacle behind the microwave in the galley was badly corroded and not grounded. Replace The 120 VAC electrical receptacle with new receptacle enclosure and ensure it is grounded.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel replaced receptacle with new grounded one.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Twist-on type wire nuts are permitted only when the connections are made within an enclosure and the insulated cap of the connector is secured to prevent loosening due to vibration. The electrical wiring for the refrigeration unit in the salon area was connected using twist type connectors. Remove the twist type connectors and make all wiring connections using pressure type connectors.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel removed twist type connectors and replaced with pressure type in an enclosure.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. Exposed wiring was found on the 120 VAC receptacles next to the salon bench. Receptacles need to be properly installed with no exposed wiring that presents an electrical hazard.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel installed new receptacles.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel and suitable for the voltage and current utilized. Three unapproved power supply strips were found plugged into the 120 VAC receptacles in the salon area, one with visible evidence of overheating. Remove the power supply strips from the vessel.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel removed power strips.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment exposed to the weather must be watertight. The wiring junction box cover for the electric windlass motor was lose and open to the weather. Properly secure the junction box cover and ensure the enclosure protects the wire connections from the weather.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: USCG marine inspectors verified cover was replaced and was weathertight.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. The AC electrical distribution panels in the engine room were not blanked off where no circuit breakers were installed creating an electrical shock hazard. Provide blanks in all distribution panels in slots that do not contain circuit breakers.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel provided blanks covering spaces.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. The door on the AC distribution panel on the starboard side of the engine room was modified and not working as designed. Provide drip-proof distribution panel which provides adequate protection form accidental shock.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel provided a door which provided a dead front cover.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Several exposed dead end electrical wires were found in the engine room. Remove unused wires or properly terminate ends.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 13 December 2019
Resolution: Vessel provided a protective enclosure in which they properly terminated ends.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Each propulsion, power, lighting or distribution system having a neutral bus or conductor must have the neutral grounded. The 120 VAC receptacle on the starboard side of the bridge was not grounded. Provide ground for the 120 VAC receptacle on the starboard side of the bridge.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Outlet properly grounded.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. The 120 VAC receptacle on the port side of the crew bunk room was missing the protective cover. Install protective cover on the 120 VAC receptacle on the port side of the crew bunk room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 11 December 2019
Resolution: Vessel installed receptacle cover.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. The protective cover on the 120 VAC receptacle on the starboard side of the crew bunk room was damaged. Repair or provide new protective cover on the 120 VAC receptacle on the starboard side of the crew bunk room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 11 December 2019
Resolution: Vessel provided new protective cover.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Cabling and wiring must be permanently installed and meet the requirements of 46 CFR 183.340. An extension cord was used as a permanent wiring installation in the starboard bridge console. Remove the extension cord and use appropriate sized approved wiring or cabling.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 11 December 2019
Resolution: Vessel removed extension cord.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Several exposed dead end electrical wires were found in the starboard side bridge console. Remove unused wires or properly terminate ends.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Exposed wires were terminated in a junction box.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire. The 120 VAC receptacle on starboard side bridge wing shows evidence of arcing and overheating. Inspect the wiring and repair as necessary. Provide a new 120 VAC receptacle.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 11 December 2019
Resolution: Vessel provided new receptacle.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 October 2019 Resolved
Construction and arrangement shall allow free and unobstructed access to the bunks. Each bunk shall be immediately adjacent to an aisle leading to a means of escape from the lounge area. Double bunks do not allow for free and unobstructed escape for the inside occupant. All double bunks currently installed may only be occupied by one (01) person. Overnight capacity has been determined to be thirty-three (33).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 October 2019
Resolved 10 June 2021
Resolution: Reduced overnight passenger count incorporated into COI amendment.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 October 2019 Resolved
Each fire hose nozzle must be of a type approved in accordance with 46 CFR 162.027 or be recognized by the Commandant as being equivalent in performance. The fire hose nozzle's on the vessel were not approved under 46 CFR 162.027 or be recognized by the Commandant as being equivalent in performance. Provide fire hose nozzle's that are approved under 46 CFR 162.027 or be recognized by the Commandant as being equivalent in performance.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Installed new approved fire hoses & nozzles.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 2 October 2019 Resolved
The following vessels must have on board a properly installed, operational Coast Guard Type-Approved AIS Class A device: A self propelled vessel of 65 feet or more in length in commercial service. The AIS was inoperable. Provide on board a properly installed, operational Coast Guard Type-Approved AIS Class A device.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: AIS working properly.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 October 2019 Resolved
Each portable fire extinguisher on a vessel must be of an approved type. The installation must be acceptable tothe OCMI. The portable fire extinguisher located in the shower room was severely corroded. Provide new portable fire extinguisher of appropriate size for this location.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 8 October 2020
Resolution: PA system installed and working.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 October 2019 Resolved
In a below deck passenger accommodation area where the length of the compartment is less than 12', one means of escape is acceptable if it does not lead to an area that contains a fire source such as a galley stove. The single means of escape from the below deck passenger shower room, lead to the galley which contains a galley stove. Provide a means of escape that leads to an area that does not contain any source of fire. - 46 CFR 177.15-1 (Old T)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 11 December 2019
Resolution: Vessel extended protective bulkhead to allow for exit from theshower space while shielded from adjacent galley heating equipment.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 October 2019 Resolved
Covered metal trash containers shall be provided in lounge areas. The trash containers in the lounge areas were not constructed of metal. Remove any non metal trash containers from the lounge areas and replace them with metal ones. - 46 CFR 177.30-7 (Old T)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Installed proper trash cans.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 2 October 2019 Resolved
A vessel with overnight accommodations must have a public address system that is operable from the operating station. The public address speaker in the passenger overnight accommodation area was inoperable. Repair or renew the speaker.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 8 October 2020
Resolution: PA system is working as designed.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 2 October 2019 Resolved
Vessels with lounge areas below the main deck shall be fitted with emergency lighting fitted along the line of escape. The emergency lighting in the below deck passenger overnight accommodations, did not illuminate the line of escape. Arrange emergency lighting to show line of escape. - 46 CFR 184.30-5 (Old T)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Emergency lighting
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 2 October 2019 Resolved
Mattresses shall be covered with a material that has been treated to give it fire resistant properties. It was unknown if the mattress covers had been treated with a fire resistant material. Provide proof that mattresses were installed prior to March of 1996 and treat all mattress covers with a material to give them fire resistant properties, or install new mattresses that meet the requirements of 46 CFR 177.405(g)(1) or (g)(2). - 46 CFR 177.30-7 (Old T)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 23 November 2020
Resolution: Received letter from O/O attesting to the age of the mattresses as well as them being coated in fire retardent spray.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 October 2019 Resolved
Power driven fire pumps shall be fitted with a pressure gauge on the discharge side of the pump. The fire pump pressure gauge was not functioning correctly. Repair or renew the pressure gauge.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Pressure gauge installed and working properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 October 2019 Resolved
Life preservers shall be distributed through the upper part of the vessel in protected places convenient to the persons on board. The life preservers were all stored in one location in a box with a heavy plywood lid that was difficult to open. Distribute life preservers throughout the upper part of the vessel and easily accessible stowage locations.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Life jackets are stored properly
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 October 2019 Resolved
Placards containing instructions for the donning of life jackets must be posted in conspicuous places that are regularly accessible to the crew and passengers. There were no life jacket donning placards posted for the types of life jackets kept aboard the vessel. Post life jacket donning placards for each type of life jacket carried aboard the vessel.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Placards posted.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 October 2019 Resolved
Vertical or horizontal surfaces within 3' of cooking appliances must have an ASTM E-84 flame spread rating of not more than 75. The electric grill on the main deck is intalled within 3' of FRP and wood material that does not meet the ASTM E-84 flame spread rating. Remove grill, or move to a location that is more than 3' away from any material that does not meet the ASTM E-84 flame spread rating.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 11 December 2019
Resolution: Vessel provided heat shielding around grill and demonstrated installation was existing under old "T" regulations.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 2 October 2019 Resolved
Use of non approved fire detection systems may be acceptable as excess equipment provided that installation conforms to requirements of 46 CFR Chapter I , Sub chapter J, Electrical Engineering. The heat detectors in the engine room and Lazarette were not securely fastened and hanging supported only by their wiring. Properly secure all heat detectors in accordance with manufactures instructions and 46 CFR Chapter I , Sub chapter J, Electrical Engineering.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 10 June 2021
Resolution: Old heat detector system removed. Engine room fixed fire detection servided and tested by servicing technician. Independent smoke detectors installed in galley, bunk rooms and pilot house.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 October 2019 Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which its installed. The main propulsion engine control on the port bridge wing was inoperable. Repair the main propulsion engine control on the port bridge wing.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Engines controls working properly.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 2 October 2019 Resolved
Spanner wrenches must be provided where a 1.5" diameter fire hose is required. Existing vessels as of July 2016 have 180 days to comply with this requirement. There were no spanner wrenches provided on board the vessel. Provide a spanner wrench at each fire hydrant.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2019
Resolved 19 June 2020
Resolution: Spanner wrenches provided.
Engineering › Bilge Water Management System › Not Operational
Issued 7 February 2018 Resolved
PROVE PROPER OPERATION OF FOREPEAK BILGE HIGH WATER ALARM PRIOR TO CARRYING PAX.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2018
Resolved 7 February 2018
Resolution: ALARM FIXED.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 7 February 2018 Resolved
PROVIDE 04 ADDITIONAL ADULT LIFE JACKETS FOR A TOTAL OF 110. RESTRICTED TO 106 ADULT PERSONS UNTIL CORRECTED.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2018
Resolved 2 March 2018
Resolution: Provided all additional lifejackets.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 7 February 2018 Resolved
UPDATE FIRST AID KIT.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 March 2018
Resolved 2 March 2018
Resolution: First aid kit updated.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 12 April 2017 Resolved
Prior to carrying passengers below deck, prove proper operation of emergency lighting.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2017
Resolved 12 April 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 12 April 2017 Resolved
Provide fixed firefighting servicing report.
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 23 May 2017
Documentation › Markings/Placards › Warning Signs
Issued 12 April 2017 Resolved
E/R: label all electrical panels
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 23 May 2017
Communications › Radio Communications › EPIRB
Issued 12 April 2017 Resolved
Update EPIRB registration decal
Condition: Invalid
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 23 May 2017
Engineering › Steering Gear System › Piping
Issued 12 April 2017 Resolved
Repair minor hydraulic fluid weeping on port & stbd steering hoses.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 23 May 2017
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 12 April 2017 Resolved
Replace under-charged B-II portable extinguisher in E/R.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 April 2017
Resolved 12 April 2017
Resolution: Replaced prior to completion of inspection.

Casualty record · 16

29 March 2002Routine · role: Involved in a Marine Casualty · 1 injured · activity 1604824
12 September 2003Significant Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 2000028
6 February 2004Routine · role: Moored/Anchored in Vicinity of Primary Subject · serious marine incident, as classified · 1 dead · activity 2008021
6 August 2004Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 2160876
11 May 2006Routine · role: Involved in a Marine Casualty · activity 2647005
3 June 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2951372
10 July 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 2991235
26 March 2008Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3173295
14 July 2008Routine · role: Subject of Search and Rescue · serious marine incident, as classified · 1 dead · activity 3269727
3 August 2008Routine · role: Involved in a Marine Casualty · activity 3289314
23 October 2016Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6128339
8 October 2021Routine · role: Involved in a Marine Casualty · 1 injured · activity 7345599
6 November 2021Routine · role: Involved in a Marine Casualty · activity 7346391
10 November 2022Routine · role: Involved in a Marine Casualty · activity 7593102
9 November 2023Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7833475
22 November 2023Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7833417
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record