Records from 1985 to 2020. Most recent: inspection, 11 December 2020.
Inspection history · 53
11 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7110432
5 October 2016
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6018175
22 September 2016
DAPI Audit · Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6006952
16 July 2015
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5186351
1 October 2014
DAPI Audit · Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4996599
16 September 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4151123
12 July 2011
Drydock Exam · MTSA Verification · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4044393
29 September 2010
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3859566
23 September 2010
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3856246
4 November 2008
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3357314
8 October 2008
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3341052
25 September 2008
Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3332605
25 June 2007
Deficiency Check · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2970221
6 June 2007
Hull Examination · Deficiency Check · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2952010
24 August 2006
Welding Related Inspections Qualification Testing · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2763083
16 June 2005
Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2415797
23 September 2004
Deficiency Check
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2203147
10 September 2004
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2192441
18 June 2003
Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1826793
16 July 2002
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1641405
20 June 2002
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1629732
2 July 2001
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1391635
18 April 2001
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 223739
18 April 2001
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 1522547
30 August 2000
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1053958
17 August 2000
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1469980
22 June 1999
Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1434906
17 February 1999
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 794175
21 January 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 209307
21 January 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 770834
13 October 1998
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 801510
9 September 1998
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1464793
5 September 1997
Hull Examination · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1407953
18 March 1997
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1404331
14 November 1996
Examination of Repairs · Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 866113
5 September 1996
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1434447
1 September 1995
Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1462461
7 September 1994
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1472794
3 September 1993
COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1151023
10 February 1993
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 828924
28 August 1992
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 952803
30 August 1991
COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1253748
25 March 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1305946
28 August 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 921140
1 September 1989
Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1027121
4 April 1989
Drydock Extension
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1033082
31 March 1989
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1203663
20 September 1988
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1350745
23 August 1988
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1037307
27 August 1987
Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1003268
9 March 1987
Drydock Extension
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1009780
18 August 1986
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1311335
8 August 1985
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 987677
Engineering › Bilge Water Management System › Valve
Issued 28 September 2016
Resolved
Bilge suction valve for fwd collision void not working properly, repair as needed.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 October 2016
Resolved 5 October 2016
Resolution: Valve operating.
Engineering › Bilge Water Management System › Strainer
Issued 28 September 2016
Resolved
laz bilge pump strainer missing, needs strainer installed.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 October 2016
Resolved 5 October 2016
Resolution: Strainer installed.
Lifesaving › Lifefloat › Paddle
Issued 28 September 2016
Resolved
lash paddles to life floats.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 5 October 2016
Resolution: Paddles lashed to life float.
Lifesaving › Lifefloat › Float-free Link
Issued 28 September 2016
Resolved
life float free link was wrong size, needs to be for more than 21 person.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 October 2016
Resolved 5 October 2016
Resolution: Correct link installed.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 28 September 2016
Resolved
FWD mast white light not working.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 28 September 2016
Resolution: Was repaired during inspection.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 28 September 2016
Resolved
WTD leading to galley needs adjusted, is too stiff to operate.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 5 October 2016
Resolution: WTD repaired and ease of operation.
Documentation › Certificates/Documents › FCC SSL
Issued 28 September 2016
Resolved
Station license on board has expired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 5 October 2016
Resolution: FCC license issued.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 28 September 2016
Resolved
04 water lights work but battery has expired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 5 October 2016
Resolution: Batterys replaced and working.
Engineering › Steering Gear System › Piping
Issued 16 July 2015
Resolved
Failure of hydraulic hard piping in steering gear void; piping failed/leaking excessive amount of hydraulic fluid. Provide satisfactory test of steering system in presence of a marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2015
Resolution: Witnessed test of repaired hydraulic line in steering void; all sat.
Engineering › Diesel Engine (propulsion-reduction gear) › Emergency shutdown
Issued 16 July 2015
Resolved
Port main diesel engine emergency shut down on pilot house inoperable. Provide satisfactory test of emergency shut down on the port main diesel engine in the presence of a marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2015
Resolution: Witnessed test of port MDE ESD, all sat.
Stability › Watertight Integrity › General
Issued 16 July 2015
Resolved
Wire thru holes in fwd engine room bulkhead not watertight. Provide proof of watertight integrity of forward bulkhead of main engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2015
Resolution: Witnessed repairs to fwd engine room watertight bulkhead; all sat.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 16 July 2015
Resolved
Provide proof of proper fire protection for paint locker.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2015
Resolution: Witnessed repairs to paint locker; all sat.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 23 October 2014
Resolved
QAWTD located in E/R very difficult to close.
Condition: Improper/Lack of Maintenance
Due 23 November 2014
Resolved 24 October 2014
Resolution: Door repaired and tested by attending MI.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 25 June 2007
Resolved
Provide a lifesaving equipment maintenance record as per 46 CFR 185.702.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Provided a lifesaving equipment maintenance record as per 46 CFR 185.702.
Navigation › Piloting/Steering › Marine Charts
Issued 25 June 2007
Resolved
Provide current charts for your operating area as per 46 CFR 184.420.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Provided current charts for your operating area as per 46 CFR 184.420.
Communications › Radio Communications › EPIRB
Issued 25 June 2007
Resolved
Prove the EPIRB is NOAA registered in way of the decal as per 46 CFR 185.728.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Proved the EPIRB is NOAA registered in way of the decal as per 46 CFR 185.728.
Construction/Loadline › Structures › Manhole
Issued 25 June 2007
Resolved
Prove the watertight integrity of the hatch leading to the lazarette as per 46 CFR 176.802.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Proved the watertight integrity of the hatch leading to the lazarette as per 46 CFR 176.802.
Construction/Loadline › Structures › Manhole
Issued 25 June 2007
Resolved
Replace the hatches for the ballast tanks as per 46 CFR 176.802.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Replaced the hatches for the ballast tanks as per 46 CFR 176.802.
Accommodation/Occupational Safety › Cooking Systems › CNG System Requirements
Issued 25 June 2007
Resolved
Provide a locking device for the oven door as per 46 CFR 184.220.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Provided a locking device for the oven door as per 46 CFR 184.220.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 25 June 2007
Resolved
Clean the Captain's quarters and the accomodation space as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Cleaned the Captain''s quarters and the accomodation space as per 46 CFR 176.800.
Fire Fighting › Fire Main › Condition
Issued 25 June 2007
Resolved
Prove proper operation of the fire main in way of the piping as per 46 CFR 181.300.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Proved proper operation of the fire main in way of the piping as per 46 CFR 181.300.
Communications › Radio Communications › VHF Radiotelephone
Issued 25 June 2007
Resolved
Prove proper operation of all electric navigational equipment, public address system and general alarm as per 46 CFR 184.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Proved proper operation of all electric navigational equipment, public address system and general alarm as per 46 CFR 184.
Lifesaving › Lifefloat › Paddle
Issued 25 June 2007
Resolved
Properly attach the paddles to the lifefloat as per 46 CFR 180.175
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly attached the paddles to the lifefloat as per 46 CFR 180.175
Engineering › Steering Gear System › Motor
Issued 25 June 2007
Resolved
Properly secure the motor controller for the #2 steering pump as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly secured the motor controller for the #2 steering pump as per 46 CFR 176.800.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 25 June 2007
Resolved
Provide and install the proper latching/locking device for the switchboard in the generator room as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Provided and installed the proper latching/locking device for the switchboard in the generator room as per 46 CFR 176.800.
Electrical › Electric Generation Source (service) › Generator
Issued 25 June 2007
Resolved
Properly clean the windings in both generators as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly cleaned the windings in both generators as per 46 CFR 176.800.
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 June 2007
Resolved
Make the connection to the battery terminal permanent as per 46 CFR 183.350.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Made the connection to the battery terminal permanent as per 46 CFR 183.350.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 June 2007
Resolved
Make proper repairs to the guards on the port generator by weldng as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Made proper repairs to the guards on the port generator by weldng as per 46 CFR 176.800.
Engineering › Fuel Oil Service System › Pump
Issued 25 June 2007
Resolved
Replace the motor controller for the fuel pump as per 46 CFR 183.320.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Replaced the motor controller for the fuel pump as per 46 CFR 183.320.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 25 June 2007
Resolved
Properly support the flexible non-metallic hoses from the clutch to the heat exchangers as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly supported the flexible non-metallic hoses from the clutch to the heat exchangers as per 46 CFR 176.800.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 25 June 2007
Resolved
Properly insulate the exhaust piping on both main engines and both ship service generators as per 46 CFR 177.970.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly insulated the exhaust piping on both main engines and both ship service generators as per 46 CFR 177.970.
Engineering › Steering Gear System › Hydraulic Hose
Issued 25 June 2007
Resolved
Properly support the hydraulic hoses in the steering compartment to prevent chaffing as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly supported the hydraulic hoses in the steering compartment to prevent chaffing as per 46 CFR 176.800.
Engineering › Steering Gear System › Ram
Issued 25 June 2007
Resolved
Provide and install the correct length bolts for the steering rams in the lazarette as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Provided and installed the correct length bolts for the steering rams in the lazarette as per 46 CFR 176.800.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 June 2007
Resolved
Remove the wire nuts in the cable/wiring for the bilge high level alarm or place them in a junction box and tape as per 46 CFR 183.340.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Removed the wire nuts in the cable/wiring for the bilge high level alarm and placed them in a junction box and tape as per 46 CFR 183.340.
Construction/Loadline › Structures › Deck Plating
Issued 25 June 2007
Resolved
Provide and install a structural member for the cat walk over the port and starboard shafts as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Provided and installed a structural member for the cat walk over the port and starboard shafts as per 46 CFR 176.800.
Engineering › Steam System (main) › Piping
Issued 25 June 2007
Resolved
Replace the rubber hose on the hot water side of the hot water heater as per 46 CFR 182.720.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Replaced the rubber hose on the hot water side of the hot water heater as per 46 CFR 182.720.
Engineering › Fuel Oil Storage/Transfer System › Manifold
Issued 25 June 2007
Resolved
Make repairs to the fuel leaks on the fuel oil transfer system as per 46 CFR 182.455.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Made repairs to the fuel leaks on the fuel oil transfer system as per 46 CFR 182.455.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 June 2007
Resolved
Properly support the electrical wires throughout the engine room as per 46 CFR 183.340.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly supported the electrical wires throughout the engine room as per 46 CFR 183.340.
Engineering › Bilge Water Management System › Pump
Issued 25 June 2007
Resolved
Properly lable the bilge pump motor controller as per 46 CFR 183.330.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly labled the bilge pump motor controller as per 46 CFR 183.330.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 25 June 2007
Resolved
Clean the engine room bilge as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Cleaned the engine room bilge as per 46 CFR 176.800.
Engineering › Pressure Vessel › Relief Valve
Issued 25 June 2007
Resolved
Prove proper operation of the pressure relief valve on the air reciever as per 46 CFR 176.812.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Proved proper operation of the pressure relief valve on the air reciever as per 46 CFR 176.812.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 25 June 2007
Resolved
Properly support the control lines on the port main engines as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Properly supported the control lines on the port main engines as per 46 CFR 176.800.
Construction/Loadline › Structures › Door
Issued 25 June 2007
Resolved
Prove the watertight integrity of the engine room watertight door as per 46 CFR 179.330.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Proved the watertight integrity of the engine room watertight door as per 46 CFR 179.330.
Operations/Management › Drills/Instruction › Not Conducted
Issued 25 June 2007
Resolved
Conduct underway man overboard, fire fighting and abandon ship drills as per 46 CFR 185.520 and 185.524.
Action required: 705 - Other - as specified
Due 25 July 2007
Resolved 28 June 2007
Resolution: Conducted underway man overboard, fire fighting and abandon ship drills as per 46 CFR 185.520 and 185.524.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 6 June 2007
Resolved
Prove the port strut bearing is good or replace as per 46CFR176.800.
Action required: 705 - Other - as specified
Due 6 July 2007
Resolved 18 June 2007
Resolution: The strut bearing was replaced.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 June 2007
Resolved
Provide and install a cover for the electric motor fan and a guard over the rotating shaft of the anchor windless as per 46 CFR 177.960.
Action required: 705 - Other - as specified
Due 6 July 2007
Resolved 28 June 2007
Resolution: Guards were installed over the rotating shaft and the fan.
Stability › Weathertight Integrity › General
Issued 6 June 2007
Resolved
Provide the original approved plans or a letter from the Coast Guard giving approval for the plastic windows in the wheel house. If you don't have this, replace the windows with a safety glazing material (safety Glass) as per 46 CFR 177.1010.
Action required: 705 - Other - as specified
Due 20 July 2007
Resolved 25 September 2008
Resolution: Replaced with safety glass as per requirement.
Stability › Weathertight Integrity › General
Issued 6 June 2007
Resolved
Replace the broken port light glass on the starboard side of the deck house as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 6 July 2007
Resolved 28 June 2007
Resolution: The broken glass was replaced with safety glass.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 6 June 2007
Resolved
Make the opening in the rails match the rails courses as per 46 CFR 177.5-1.
Action required: 705 - Other - as specified
Due 6 July 2007
Resolved 18 June 2007
Resolution: Chain were installed in the open areas to match the railing
Stability › Weathertight Integrity › General
Issued 6 June 2007
Resolved
Replace all deteriorated steel as marked in both stacks as per NVIC-7-68.
Action required: 705 - Other - as specified
Due 6 July 2007
Resolved 28 June 2007
Resolution: All deteriorated steel was replaced.
Stability › Watertight Integrity › General
Issued 6 June 2007
Resolved
Make repairs to the water tight doors leading into the galley and the engine room in way of the bottom edge of the doors in accordance with NVIC 7-68. The gasket retainer and the bottom edges of the doors are wasted.
Action required: 705 - Other - as specified
Due 6 July 2007
Resolved 18 June 2007
Resolution: The deteriorated doors were replaced with new doors.
Engineering › Bilge Water Management System › Valve
Issued 6 June 2007
Resolved
Provide and install valve handles for the valves in the potable water system, the sewage system and the bilge and ballast system as indicated as per 46CFR176.800.
Due 6 July 2007
Resolved 28 June 2007
Resolution: New valves were installed in some places and valve handles were installed in other.
Engineering › Bilge Water Management System › Piping
Issued 6 June 2007
Resolved
Make repairs to the deteriorated bilge suction piping with the soft patch located in the engine room in accordance with NVIC 7-68.
Due 6 July 2007
Resolved 28 June 2007
Resolution: The piping was replaced.
Engineering › Sea-water System (primary cooling) › Valve
Issued 6 June 2007
Resolved
Prove proper operation of the three sea valves or replace as per 46CFR176.610.
Due 6 July 2007
Resolved 28 June 2007
Resolution: The valves were replaced.
Construction/Loadline › Structures › Superstructure
Issued 6 June 2007
Resolved
Make proper repairs to the deteriorated structural members in the overhead of the 01 deck ensuring you cut back to good metal in accordance with NVIC 7-68. This also includes the attached deck if necessary.
Due 6 July 2007
Resolved 18 June 2007
Resolution: The structural members were replaced.
Engineering › Bilge Water Management System › Piping
Issued 6 June 2007
Resolved
Replace the bilge suction piping in the steering compartment and prove operation of the entire bilge system as per 46CFR182.500.
Due 6 July 2007
Resolved 28 June 2007
Resolution: The piping was replaced.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 6 June 2007
Resolved
Make proper repairs to the detached structural member and bracket located in #3 port ballast tank aft port corner in accordance with NVIC 7-68.
Due 6 July 2007
Resolved 18 June 2007
Resolution: The structural member was replaced along with new angle brackets.
Stability › Watertight Integrity › General
Issued 6 June 2007
Resolved
Make proper repairs to the water tight hatch leading from the engine room onto the deck the outside edges are deteriorated and not holding the gasket in place as per 46 CFR 179.360.
Due 6 July 2007
Resolved 18 July 2007
Resolution: The hatch was replace.
Stability › Watertight Integrity › General
Issued 6 June 2007
Resolved
Properly clean by removing all rust and grime on all of the water tight covers and seating surfaces for the fore peak, the rope locker, #1, 2 and 3 ballast tanks and prove they are water tight as per 46 CFR179.360.
Due 6 July 2007
Resolved 28 June 2007
Resolution: All rust and grime on all of the water tight covers and seating surfaces for the fore peak, the rope locker, #1, 2 and 3 ballast tanks was removed.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 July 2005
Resolved
Repair and prove operation of the port navigation light receptacle and bulb holder and the junction box for the masthead light.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 5 July 2005
Resolved 1 July 2005
Resolution: Added proper waterproof junction box and repaired light.
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 1 July 2005
Resolved
Repair the starboard main engine pilothouse oil pressure gauge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 July 2005
Resolved 1 July 2005
Resolution: replaced.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 1 July 2005
Resolved
Provide Di-Electric matting for the main switchboard.
Action required: 705 - Other - as specified
Due 5 July 2005
Resolved 1 July 2005
Resolution: Located onboard and placed in front of the switchboard.
Construction/Loadline › Structures › Door
Issued 1 July 2005
Resolved
Complete proper labeling of all reach rods, watertight doors and escape scuttles as per 46 CFR 185.606.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 July 2005
Resolved 1 July 2005
Resolution: Done.
Fire Fighting › Fire Hydrants › Condition
Issued 1 July 2005
Resolved
Provide a spanner wrench for the port main deck fire station.
Action required: 705 - Other - as specified
Due 5 July 2005
Resolved 1 July 2005
Resolution: Provided prior to departure.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 1 July 2005
Resolved
Provide and install a plug in the starboard fuel oil containment.
Action required: 705 - Other - as specified
Due 5 July 2005
Resolved 1 July 2005
Resolution: Provided and installed.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 1 July 2005
Resolved
Repair and prove operation of engine room emergency escape lighting fixture.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 5 July 2005
Resolved 1 July 2005
Resolution: Installed new fixture.
Navigation › Piloting/Steering › US Coast Pilot
Issued 1 July 2005
Resolved
Provide on board vessel an updated US Coast Pilot.
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 July 2005
Resolved 1 July 2005
Resolution: Provided.
Construction/Loadline › Hull › Bottom Plating
Issued 20 June 2005
Resolved
Crop and renew 2 sections of bottom plating in the engine room in way of the CVK and forward bulkhead to remove wasted plating.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 5 July 2005
Resolved 1 July 2005
Resolution: completed
Construction/Loadline › Hull › Hull Plating
Issued 20 June 2005
Resolved
Crop and renew 2ft x 2ft section of the lazarette compartment bottom plating at the CVK to remove and renew wasted plating.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 July 2005
Resolved 1 July 2005
Engineering › Fuel Oil Service System › Hose
Issued 10 September 2004
Resolved
Worn F/O hoses on supply & return stbd MDE, worn F/O hose to local guage on stbd MDE
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 10 September 2004
Resolution: Replaced F/O hoses
Engineering › Lubricating Oil Service System › Hose
Issued 10 September 2004
Resolved
Worn L/O hose to turbo charger on port MDE
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 10 September 2004
Resolution: Replaced L/O hose
Engineering › Freshwater System (intermediary cooling) › Valve
Issued 10 September 2004
Resolved
Missing sealing plugs on port & stbd fill & purge valves to keel cooler
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 10 September 2004
Resolution: Installed sealing plugs
Navigation › Piloting/Steering › Marine Charts
Issued 10 September 2004
Resolved
No chart 11347, Cameron approach and inner harbor area
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 10 September 2004
Resolution: Chart 11347 purchased and put on vessel
Construction/Loadline › Hull
Issued 18 June 2003
Resolved
Complete repairs to all areas noted and marked by the attending marine inspector LEGACY COMPONENT DESC: Hull Plating
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2003
Resolved 27 June 2003
Resolution: repairs completed
Electrical › Electrical Distribution System (service)
Issued 18 June 2003
Resolved
Repair 12 VDC wiring under the pilothouse console to remove all wire nut connectors. LEGACY COMPONENT DESC: Wiring
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2003
Resolved 27 June 2003
Resolution: Correct splices made.
Lifesaving › Buoyant Apparatus
Issued 18 June 2003
Resolved
Repair or replace 1 life float due to puncture in outer skin. LEGACY COMPONENT DESC: life float
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2003
Resolved 27 June 2003
Resolution: Life float repaired with manufacturer supplied repair kit.
Engineering › Bilge Water Management System
Issued 18 June 2003
Resolved
Repair/replace the engine room bilge suction piping and valve due to improper repairs. LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2003
Resolved 20 June 2003
Resolution: Suction piping and valve replaced and tested
Engineering › Bilge Water Management System
Issued 18 June 2003
Resolved
Replace the bilge suction strainer for the void below the 10 man stateroom. LEGACY COMPONENT DESC: Strainer
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2003
Resolved 20 June 2003
Resolution: Replaced
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 18 June 2003
Resolved
Provide proof of servicing all portable fire extinguishers. LEGACY COMPONENT DESC: Service
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2003
Resolved 27 June 2003
Resolution: serviced.
Navigation › Piloting/Steering
Issued 18 June 2003
Resolved
Provide updated navigation publications. LEGACY COMPONENT DESC: Coast Guard Light List
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2003
Resolved 27 June 2003
Resolution: Provided.
Accommodation/Occupational Safety › Ventilation
Issued 18 June 2003
Resolved
Repair/replace the galley range hood. LEGACY COMPONENT DESC: galley range hood
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2003
Resolved 27 June 2003
Resolution: Replaced in kind.
Communications › Alarms/Indicators
Issued 18 June 2003
Resolved
Repair and prove operation of rudder compartment high bilge level alarm. LEGACY COMPONENT DESC: Bilge Alarm
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2003
Resolved 27 June 2003
Resolution: New wiring installed and tested.
Construction/Loadline › Structures
Issued 18 June 2003
Resolved
Repair/replace all flame screens in all fuel oil vents and repair all other tank vents. LEGACY COMPONENT DESC: Air Pipe
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2003
Resolved 27 June 2003
Resolution: New ball check vents installed on all tanks with appropriate screens on each.
Engineering › Steering Gear System
Issued 18 June 2003
Resolved
Repair/replace all steering rams and associated equipment due to excessive wear in all connections and wear on all hoses.
LEGACY COMPONENT DESC: Linkage
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2003
Resolved 27 June 2003
Resolution: Rams and hoses replaced.
Deck/Cargo
Issued 20 June 2002
Resolved
2 areas in deck above engine room wasted through. LEGACY COMPONENT DESC: Deck
Condition: Improper/Lack of Maintenance
Due 21 June 2002
Resolved 21 June 2002
Resolution: Cut out to good metal and installed inserts. Hose test Sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 June 2002
Resolved
Wire run clamps missing at raceway to gen sets.
Condition: Unknown
Due 21 June 2002
Resolved 21 June 2002
Resolution: Installed clamps.
Electrical › Lighting (service)
Issued 20 June 2002
Resolved
Various overhead lighting missing covers. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Unknown
Due 21 July 2002
Resolved 16 July 2002
Engineering › Steering Gear System
Issued 20 June 2002
Resolved
Steering pump and motor not mounted. LEGACY COMPONENT DESC: Pump
Condition: Improper Installation
Due 21 July 2002
Resolved 16 July 2002
Resolution: Permanently mounted with bolts,
Accommodation/Occupational Safety › Potable Water System
Issued 20 June 2002
Resolved
150 psi relief valve installed on tank. Vsl rep chooses to install a relief valve <100 psi to avoid pressure vessel requirements. LEGACY COMPONENT DESC: Hot water heater
Condition: Improper Installation
Due 21 July 2002
Resolved 16 July 2002
Resolution: Installed 100 psi relief valve.
Engineering › Diesel Engine (auxiliary)
Issued 20 June 2002
Resolved
Inlet and outlet pipes wasted through. LEGACY COMPONENT DESC: Cooling system piping
Condition: Unknown
Due 21 June 2002
Resolved 21 June 2002
Resolution: Installed new pipes.
Engineering
Issued 20 June 2002
Resolved
Screen wasted away. LEGACY COMPONENT DESC: Supply fan intake screen
Condition: Improper/Lack of Maintenance
Due 21 June 2002
Resolved 21 June 2002
Resolution: Installed new screen.
Engineering › Fuel Oil Service System
Issued 20 June 2002
Resolved
Vent screens wasted away. LEGACY COMPONENT DESC: Vents
Condition: Unknown
Due 21 June 2002
Resolved 21 June 2002
Resolution: Installed new screen.
Construction/Loadline › Hull › Stiffener
Issued 20 June 2002
Resolved
Stiffners above main diesel engines were not fully welded. Apparently these sections had been cut out for engine work/replacement and not complety welded back when reinstalled.
Condition: Improper Installation
Due 21 June 2002
Resolved 21 June 2002
Resolution: Welded.
Documentation
Issued 17 August 2000
Resolved
Provide proof of first aid and CPR training for at least fifty percent of the crew, per NVIC 1-91. No later than 02Sep00.
Condition: Unknown
Due 30 August 2000
Resolved 30 August 2000
Navigation
Issued 17 August 2000
Resolved
Missing current copy of tide and tidal current tables. Provide current copies.
Condition: Unknown
Due 29 August 2000
Resolved 29 August 2000
Navigation
Issued 17 August 2000
Resolved
Missing emergency broadcast placard. Provide placard and post in pilot house.
Condition: Unknown
Due 29 August 2000
Resolved 29 August 2000
Lifesaving
Issued 17 August 2000
Resolved
Noted six PFD's with discrepancies from material failure. Replace PFD's to ensure total onboard of at least 36.
Condition: Unknown
Due 29 August 2000
Resolved 29 August 2000
Accommodation/Occupational Safety
Issued 17 August 2000
Resolved
Missing waste management logbook. Provide logbook and demonstrate knowledgeof proper use.
Condition: Unknown
Due 29 August 2000
Resolved 29 August 2000
Engineering
Issued 9 September 1998
Resolved
RENEW OIL SENDING UNIT ON STBD GENERATOR._x001C_
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 9 September 1998
Resolved
PROVIDE FOR MEANS TO SECURE MAIN ENGINES IN COMPLIANCE W/ 46 CFR 184.620 (2)(b).
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Construction/Loadline
Issued 9 September 1998
Resolved
REPAIR SLOP TANK HATCH COVER.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 9 September 1998
Resolved
RENEW OIL HOSE ON STBD MDE REDUCTION GEAR, OIL COOLER TO R/G.
Condition: Unknown
Due 9 September 1998
Resolved 10 September 1998
Navigation
Issued 9 September 1998
Resolved
RENEW 2 EA HYDRAULIC OIL HOSES ON STBD STEERING RAM.
Condition: Unknown
Due 9 September 1998
Resolved 10 September 1998
Navigation
Issued 9 September 1998
Resolved
PROVIDE CURRENT MAG COMPASS DEVIATION CARD.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Lifesaving
Issued 9 September 1998
Resolved
PROVIDE PROPER METAL CONTAINER FOR PAINT STORAGE.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Lifesaving
Issued 9 September 1998
Resolved
REMOVE PAINT FROM BERTHING AREA.
Condition: Unknown
Due 9 September 1998
Resolved 10 September 1998
Electrical
Issued 9 September 1998
Resolved
REPLACE ALL PLASTIC WIRE TIES W/ PROPER METAL CLAMPS ON OVERHEAD.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 18 March 1997
Resolved
PROVIDE HAND WHEELS TO THE GATE FUEL VALVES LOCATED INBOARD OF THE PORT MAIN ENGINE.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Electrical
Issued 18 March 1997
Resolved
PROVIDE GUARD TO THE PORT GENERATOR.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Lifesaving
Issued 18 March 1997
Resolved
PROVE PROPER OPERATION PRIOR TO DEPARTURE.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Construction/Loadline
Issued 18 March 1997
Resolved
REPAIR EMERGENCY ENGINE ROOM HATCH SO THAT IT PROPERLY OPERATES AND CLOSES.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Navigation
Issued 18 March 1997
Resolved
MAKE PROPOSAL TO MAKE PERMANENT REPAIRS TO PORT AND STBD RUDDER POSTS AND HOLE IN PORT LAZARETTE VENT TO PREVENT REOCCURRENCE OF FLOODING IN COMPARTMENT.
Condition: Unknown
Due 8 April 1997
Resolved 26 March 1997
Engineering
Issued 18 March 1997
Resolved
PROVIDE GUARDS FOR GAUGE GLASS ON STBD GENERATOR SET FUEL TANK.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Electrical
Issued 18 March 1997
Resolved
PROVIDE SPLASH BOWL TO RACOR FILTER ON STARBOARD GENERATOR SET.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Fire Fighting
Issued 18 March 1997
Resolved
PROVIDE HAND WHEEL FOR FIRE STATION NUMBER 2.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Fire Fighting
Issued 18 March 1997
Resolved
PROVIDE HOSE RACKS FOR FIRE STATIONS 1 AND 2.
Condition: Unknown
Due 25 March 1997
Resolved 26 March 1997
Engineering
Issued 3 September 1993
Resolved
PROPERLY INSTALL FLAME SCREENS IN FUEL OIL TANK VENTS.
Condition: Unknown
Due 3 September 1993
Resolved 3 September 1993
Documentation
Issued 3 September 1993
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 3 September 1993
Resolved 3 September 1993
Deck/Cargo
Issued 3 September 1993
Resolved
REPAIR OR RENEW ANCHOR WINDLASS TO ALLOW ANCHOR TO FREE FALL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 September 1993
Resolved 3 September 1993
Navigation
Issued 28 August 1992
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 28 August 1992
Resolved 28 August 1992
Lifesaving
Issued 28 August 1992
Resolved
ISSUED CG-835 TO PROVIDE SUITABLE PLATFORM OR RESCUE BOAT .
Condition: Unknown
Due 28 August 1992
Resolved 28 August 1992
Navigation
Issued 23 August 1988
Resolved
MAKE SSB OPERATIONAL ON 2182 BEFORE OPERATING VESSEL OUTSIDE 20 NAUTICAL MILES.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Construction/Loadline
Issued 23 August 1988
Resolved
PAINT DRAFT MARKS FORWARD AND AFT, ON BOTH PORT AND STARBOARD SIDES OF HULL.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988