MAURY USCG vessel records Sign in
← All vessels

CAPT. JP III

CAPT. JP III is a 1985 passenger vessel (inspected). The Coast Guard has recorded 100 inspections since 1985, most recently in August 2025, along with 176 deficiencies, 2 operational controls and 1 casualty investigation in 2012.

Records from 1985 to 2025. Most recent: inspection, 26 August 2025.

Built
1985
Last inspected
26 August 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDJ2012
254086
Flag
UNITED STATES
368031590
Maury page id
psix-254086

Inspections, by type

…with no type recorded14
Years with a record 37 calendar years (1985–2025)
The 100 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)149.5 ft × 34.0 ft × 7.0 ft
Registered tonnagegross 99 / net 83
ITC dimensions (L × B × D)149.5 ft × 34.0 ft × 7.0 ft
ITC tonnagegross 781 / net 276
BuilderSERODINO INC · GUILD, TN, UNITED STATES · built 1985
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portFORT MYERS, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 19 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it781 - Convention (Subpart B), Gross Ton
99 - Regulatory (Subpart C or D), Gross Ton
276 - Convention (Subpart B), Net Ton
83 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK2012MMSI 368031590 · active · compulsorily equipped · granted 7 April 2018, expires 7 April 2028
WDA2208MMSI 367459650 · expired · compulsorily equipped · granted 3 July 2010, cancelled 7 November 2020
WCX2369MMSI not assigned · expired · compulsorily equipped · granted 28 January 1997, cancelled 31 March 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 100

26 August 2025 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8217894
4 September 2024 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7995803
18 July 2024 In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7960989
18 May 2023 Deficiency Check · MTSA Verification · In-Service Inspection · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7691095
27 January 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7585262
19 July 2022 In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7515783
8 June 2022 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7470061
31 August 2021 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7301897
30 September 2020 MTSA Verification · DAPI Audit · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7070094
28 August 2019 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6797339
26 August 2019 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6794741
12 August 2019 DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6780775
25 January 2019 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6615294
25 January 2019 Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6618671
27 September 2018 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6559373
1 May 2018 Inclining Experiment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6435168
5 April 2018 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6385332
1 February 2018 Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6384565
1 June 2017 Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6162095
31 March 2016 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 5844256
19 January 2016 Deficiency Check · Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5803548
5 June 2014 Annual Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4879121
19 May 2012 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 4342969
14 May 2012 Annual Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4310852
22 February 2012 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 4419068
14 September 2010 Administrative Inspection
Administrative · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3855139
15 January 2010 Examination of Repairs · Plan Review "T" Boat
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3800011
11 May 2009 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3472022
27 October 2008 Administrative Inspection · Hull Examination · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3352260
27 February 2008 MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3154382
12 June 2007 Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 2946563
8 March 2005 In-Service Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2305768
20 January 2005 Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 2280632
19 November 2004 MTSA Verification
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2244425
31 October 2004 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2238622
16 March 2004 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2020486
7 January 2004 In-Service Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1992760
1 August 2003 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1859493
17 March 2003 COI Inspection · Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1757019
16 January 2003 Administrative Inspection
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1727745
10 July 2002 COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1644232
6 May 2002 Administrative Inspection
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1613542
27 February 2002 In-Service Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1491953
2 January 2002 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1474801
18 September 2001 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1074592
22 August 2001 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1450668
12 April 2001 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 184154
31 January 2001 Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1366136
11 January 2001 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1413865
5 September 2000 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1376329
5 September 2000 Initial Construction-Excluding Oversight
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1449378
8 February 2000 Plan Review "T" Boat
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1048154
7 February 2000 Plan Review "T" Boat
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1048152
28 July 1999 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1378763
28 July 1999 Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1442877
11 November 1998 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 147481
8 October 1998 Deficiency Check · Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1398971
25 July 1997 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1383624
29 April 1997 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1093315
15 April 1997 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1439864
16 January 1997 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1098889
16 January 1997 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1099118
18 December 1996 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1377897
13 September 1996 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1405966
25 July 1996 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1451088
28 July 1995 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1187125
31 May 1995 Hull Examination · Plan Review "T" Boat
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1424100
19 October 1994 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1180473
5 August 1994 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1177307
11 July 1994 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 865104
2 February 1994 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1161945
30 September 1993 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1155235
20 July 1993 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1153916
11 February 1993 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1140912
29 July 1992 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 959378
1 November 1991 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 941033
4 September 1991 Inclining Experiment · Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1252288
19 July 1991 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1000133
6 February 1991 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 918191
18 January 1991 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1227038
9 November 1990 Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1227037
18 October 1990 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 929519
14 September 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1233425
26 July 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 901006
14 July 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 922214
6 July 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1237955
2 May 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 900790
5 April 1990 Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1217394
8 January 1990 COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1222130
10 July 1989 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1036360
14 June 1989 Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 896661
8 March 1989 Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 928216
25 January 1989 COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1033847
2 February 1988 COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1000924
25 August 1987 Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1030249
26 July 1987 Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1021157
22 December 1986 COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1312330
8 August 1986 Examination of Repairs
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1005758
27 December 1985 Initial Construction-Excluding Oversight · Initial Certification
Physical examination · MSO NASHVILLE · Activity 1293369
27 December 1985 Initial Certification
Physical examination · MSO NASHVILLE · Activity 1295809

Deficiency record · 176

09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 26 August 2025 Resolved
Where pressure-indicating gages are used, they must be chosen to be compatible with the pressure to be indicated. MIs observed a broken pressure gauge on the relief valve of the Air Compressor. Replace the pressure gauge with an appropriate sized gauge for the pressures to be observed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 September 2025
Resolution: Vessel submitted photos showing the pressure gauge was replaced. See correspondence in documents tab.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 August 2025 Resolved
An adult life jacket must be provided for each person carried on board a vessel. Vessel reported that they were missing 14 adult life jackets. Passenger count limited to 586.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2025
Resolution: Vessel sent email with invoice to show condemned life jackets were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 August 2025 Resolved
A number of child-size life jackets equal to at least 10% of the number of persons permitted on board must be provided,
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2025
Resolution: Vessel sent email with invoice to show condemned life jackets were replaced.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 4 September 2024 Resolved
CO2 Cylinders must be maintained in accordance with NFPA Standards. CO2 Cylinders Hydrostatic testing greater than 12 Years from Stamp. Hydrostatic test all CO2 Cylinders. 46 CFR 181.400 - 701 (c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2024
Resolution: Provided servicing reciept of CO2 cylinder's being hydrostatically tested.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 4 September 2024 Resolved
Fire Dampeners installed in engine room with fixed fire extinguishing systems must have dampeners installed. Engine room fire dampener missing. 46 CFR 181.20-35
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2024
Resolution: Reference pictures attached.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Health protection, medical care?)
Issued 4 September 2024 Resolved
Vessel is missing alcohol testing swabs. 46 CFR 122.212
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: Provided documentary evidence of new swabs on board.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 September 2024 Resolved
Permanently wire or remove decorative LED lights from Pilot House to Aft Exhaust Stack. 46 CFR 120.410
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: Recieved documentary evidence via photos that lights were hardwired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 September 2024 Resolved
Review Circuit boards and electrical pannels. De-energize breakers labelled as spares and update directory for pannel d in liquor locker on 2nd deck. 46CFR 120.330
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: photos attesting to completion of deficiency clearance.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 4 September 2024 Resolved
Railing for guard rail opening was secured with zip ties. Remove and install rigid closure pins. 46 CFR 115.830
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: Pictures added showing metal pins added to secure the guards.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 September 2024 Resolved
Renew life rings, life rings sealing plugs were missing. Compromising internal foam. 46 CFR 117.71
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: photos attesting to completion of deficiency clearance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 September 2024 Resolved
02 hydralic lines in steering system need to be replaced. 46 CFR 115.814
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: photos attesting to completion of deficiency clearance.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 4 September 2024 Resolved
Structural fire protection in engine room damaged and worn. Replace. 46 CFR 116.405
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: photos attesting to completion of deficiency clearance.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 September 2024 Resolved
Emergency Lighting in engine room space not working.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 4 September 2024 Resolved
Several lights missing guards/ covers.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: See attached pictures.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 September 2024 Resolved
Replace wirenuts in stbd side battery compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 September 2024
Resolution: see attached pictures.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 May 2023 Resolved
All electrical installations shall be to the satisfaction of the OCMI. - Remove or cap all dead end wiring in generator and engine room - Main power distribution wiring located in engine room is not properly secured and beginning to corrode on shielding. Re secure and remove corrosion. - Shaft seal bilge pump wiring is twisted together as a spice. install single run of wire or environmentally seal splice. - HP Air cond chiller No1 and No2 circuit breakers call for 100A breakers, 125 are installed. Provided original drawings or electricians report attesting the breaker requirements and install new breaker as appropriate. - Install blanking plate on distribution panel in generator room. (under AC Comp (13)) - Lighting in lazerette does not function. - Dead end wire in way of stbd rudder post. Re-install wiring. 46CFR183.01-15(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 June 2023
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 18 May 2023 Resolved
Vessels that carry more then 150 passengers shall meet the requirements of subchapter H for structural fire protection. Reinstall SFP in both machinery spaces where it has been removed. Provide repair plan and materials list prior to installation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 June 2023
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 18 May 2023 Resolved
All escape hatches and other emergency exits shall be marked "Emergency Exit, Keep Clear." - Fwd escape hatch for generator space needs to be remarked, letters have been worn off. - Sign leading to fwd escape in generator space has broken off. Re-attached sign indicating route of escape.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 June 2023
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 18 May 2023 Resolved
Vessels that carry more then 150 passengers shall meet the requirements of subchapter H for structural fire protection. - Install fire stop in all wire penetrations through bulkheads. 46CFR177.10-5(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 June 2023
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 18 May 2023 Resolved
All vessels shall be provided with no less then two avenues of escape. Top hinge on male bathroom door on 01 deck is broken. Door does not function properly and is an egress hazard. Repair door.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 June 2023
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 31 August 2021 Resolved
A DEVICE MUST BE PROVIDED TO AUTOMATICALLY SHUT DOWN VENTILATION SERVING THE PROTECTED SPACE AND ENGINES THAT DRAW INTAKE AIR FROM THE PROTECTED PACE PRIOR TO RELEASE OF THE EXTINGUISHING AGENT INTO THE SPACES. MI DISCOVERED THAT THE STBD ENGINE SPACE'S VENTILATION DID NOT SHUT DOWN ONCE THE FIXED SYSTEM WAS TESTED. 46 CFR 118.410 (b)(10)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 September 2021
Resolution: Operator had a technician come onboard after the inspection. The technician installed a lever connected to the vessel's emergency shutdown. Once activated, both blowers shut down ventilation.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 August 2021 Resolved
COMBUSTIBLE INSTALLATION SHALL BE USED FOR PIPE AND MACHINERY COVERING OR LAGGING WITHIN A MACHINERY SPACE. MI DISCOVERED PORTIONS IN THE ENGINE ROOM SUCH AS ABOVE THE BOILER WERE MISSING REQUIRED PORTIONS OF INSULATION. 46 CFR 116.430(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 September 2021
Resolved 1 September 2021
Resolution: Operator sent photographs showing all newly placed/installed portions of installation above called out areas in the engine room.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 31 August 2021 Resolved
A VESSEL GREATER THAN 65 FEET IN LENGTH MUST CARRY A MINIMUM OF THREE LIFE BUOYSR. DISCOVERED THAT THE VESSEL CARRIED 02 LIFE BUOYS. 46 CFR 117.70(a)(3)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 September 2021
Resolved 1 September 2021
Resolution: Operator sent a photograph of 03 life ring buoys onboard.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 31 August 2021 Resolved
WITH PERMANENT TYPE CONNECTORS. SPRING CLIPS OR OTHER TEMPORARY TYPE CLAMPS ARE PROHIBITED. DISCOVERED THAT THE BATTERY CONNECTIONS WERE NOT PERMANENT TYPE CONNECTORS. 46 CFR 120.350(d)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 September 2021
Resolved 1 September 2021
Resolution: Operator sent photographs of permanent battery connectors. Opeator overhauled all temporary connectors.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 31 August 2021 Resolved
THE STORAGE CYLINDERS FOR A FIXED FIRE SYSTEM SHALL BE ACCESSIBLE FOR INSPECTION/TO ACCESS ITS CONTROLS IN CASE OF AN EMERGENCY. DISCOVERED THAT THE OPERATOR WAS UNABLE TO ACCESS ALL REQUIRED CONTROLS FOR THE FIXED SYSTEM. 46 CFR 118.410
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 September 2021
Resolved 1 September 2021
Resolution: Operator sent video/photograph of easily accessing the fixed fire system.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 August 2019 Resolved
EACH LIFE JACKET CARRIED MUST BE MARKED IAW 46CFR122.604. SEVERAL LIFEJACKETS HAD THE VESSEL'S PREVIOUS NAME AND/OR FADED/DETERIORATED RETRO-REFLECTIVE TAPE. 46CFR117.71(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 August 2019 Resolved
T-L VESSELS SHALL BE FITTED WITH SUITABLE BILGE SUCTION STRAINERS W/NOT LESS THAN THREE TIME THE NOMINAL OPENING OF THE PIPE. THE ENGINE ROOM BILGE SUCTION STRAINER WAS WASTED TO FAILURE. 46CFR182.25-5(b) 'OLD T'
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 August 2019
10 - Safety of Navigation › N/A - No Subsystem › Monitoring of voyage or passage plan
Issued 25 January 2019 Resolved
Prior to movement of the vessel from its current berth in Troy, NY, you are to notify the Command Center at US Coast Guard Sector NY at [phone withheld]. This requirement is in reference to the conducting Towing Operations under safe weather conditions on the Hudson River.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 28 February 2019
Resolution: Vessel owner and Salver kept SECNY informed of details of the towing operation. Vessel was safely towed from Troy, NY to Nyack, NY and secured at the North River Shipyard, Nyack, NY.
Documentation › Certificates/Documents › FCC SSL
Issued 5 April 2018 Resolved
provide FCC station license - vessel is restricted to <1000ft from shore.
Action required: 705 - Other - as specified
Resolved 10 April 2018
Resolution: O/op provided electronic copy of FCC Station License.
Communications › Radio Communications › VHF Radiotelephone
Issued 5 April 2018 Resolved
Program MMSI number into VHF radio
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 10 April 2018
Resolution: O/op provided electronic documentation of programmed MMSI number in VHF radio.
Documentation › Markings/Placards › Warning Signs
Issued 5 April 2018 Resolved
Post emergency broadcasting placard at operating station
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 10 April 2018
Resolution: O/op provided electronic documentation of posted emergency broadcast placard.
Documentation › Certificates/Documents › Permit, Other
Issued 5 April 2018 Resolved
prove complete proof on elevator inspection - prior to using elevator.
Action required: 705 - Other - as specified
Resolved 17 April 2018
Resolution: Vessel proved proper operation of elevator.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 5 April 2018 Resolved
clean bilges of oil and flammable material in generator space.
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Bilges were properly cleaned.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 5 April 2018 Resolved
secure armored cable to electrical panel in generator space
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Armored cable was properly secured.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 April 2018 Resolved
remove or cap all dead-end wires in void space fwd of the generator space and also in the laz
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: All dead-end wires were properly removed.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 5 April 2018 Resolved
prove proper operation of float light on ring buoy - restricted to daytime operations.
Action required: 705 - Other - as specified
Resolved 17 April 2018
Resolution: Confirmed operation of float light.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 5 April 2018 Resolved
provide 2018 light list and tide/current
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Confirmed new LL and tide/currents.
Documentation › Certificates/Documents › Permit, Other
Issued 5 April 2018 Resolved
prove written designation of senior deckhand and required engineer.
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed proper designation of senior deckhand and engineer.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 5 April 2018 Resolved
Provide record of completion of man overboard, fire, and security drills.
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 10 April 2018
Resolution: O/op provided electronic documentation of recorded drills.
Construction/Loadline › Hull › Weld
Issued 5 April 2018 Resolved
properly seal cut openings in port and stbd bulkhead in laz space to ensure watertight integrity
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed properly sealed openings in bulkhead.
Construction/Loadline › Hull › Hull Plating
Issued 5 April 2018 Resolved
provide repair proposal for corroded area in overhead on fwd stbd side of laz
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed proper repairs of corroded overhead in laz compartment.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 April 2018 Resolved
seal all wire runs in all spaces to ensure watertight integrity
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed sealed wire runs.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 5 April 2018 Resolved
vessel must prove proper operation of 480v ground detection
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed operation of ground detection on 480V.
Electrical › Electric Generation Source (service) › Ground Indicator
Issued 5 April 2018 Resolved
install ground fault meter for 208/120 circuit
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed properly operating and installed ground fault meter.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 April 2018 Resolved
enclose all wire connections in junction boxes
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed installation of required junction boxes.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 April 2018 Resolved
provide unexpired first aid kit
Action required: 705 - Other - as specified
Due 19 April 2018
Resolved 17 April 2018
Resolution: Witnessed required first aid kit.
Engineering › Bilge Water Management System › Pump
Issued 1 June 2017 Resolved
Prove proper operation of bilge pump, to include the pumping of all watertight spaces, prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 April 2018
Resolved 5 April 2018
Resolution: Verified the proper operation of all bilge pumps.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 1 June 2017 Resolved
Provide licensing for all crew operating vessel.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 April 2018
Resolved 5 April 2018
Resolution: Verified all MMCs for master/crew.
Operations/Management › Drills/Instruction › Not Conducted
Issued 1 June 2017 Resolved
Conduct Fire and Man Overboard drills prior to carrying passengers.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 April 2018
Resolved 5 April 2018
Resolution: Conducted satisfactory fire, man overboard, and security drills.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 1 June 2017 Resolved
Provide proof of DAPI enrollment.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 April 2018
Resolved 5 April 2018
Resolution: Verified proof of DAPI enrollment.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 1 June 2017 Resolved
Provide a CG approved first aid kit.
Action required: 705 - Other - as specified
Due 10 April 2018
Resolved 5 April 2018
Resolution: Vessel's new first aid kit was expired since purchasing; requirement rewritten as 835 in Activity# 6385332.
Navigation › Piloting/Steering › Marine Charts
Issued 1 June 2017 Resolved
Provide updated charts, coast pilot, light list, and tides and currents tables for operating area.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 April 2018
Resolved 5 April 2018
Resolution: Cleared chart/Coast Pilot from def; requirement for tides/currents and Light List rewritten as 835 in Activity# 6385332.
Construction/Loadline › Structures › Door
Issued 1 June 2017 Resolved
Repair 3rd deck emergency exit door.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 November 2017
Resolution: Witnessed satisfactory operation.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 June 2017 Resolved
Prove proper operation of navigation lights.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 November 2017
Resolution: Witnessed satisfactory operation.
Documentation › Certificates/Documents › Permit, Other
Issued 1 June 2017 Resolved
Provide proof of elevator annual inspection. Prior to using elevator.
Action required: 705 - Other - as specified
Resolved 13 November 2017
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 1 June 2017 Resolved
Provide fire protection in overhead of the lazarette and space aft of bow thruster.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2017
Resolved 13 November 2017
Engineering › Steam Boiler (auxiliary/waste heat) › Air Heater
Issued 1 June 2017 Resolved
Prove electric water heater meets part 53 and 63 in subchapter F.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2017
Resolved 5 April 2018
Resolution: Verified electric water heater met applicable subchapters.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 19 January 2016 Resolved
Properly blank off open space in Panel F - generator room.
Due 19 February 2016
Resolved 27 January 2016
Resolution: Spaces were properly blanked with commercial blanks.
Fire Fighting › Structural - Horizontal Zones › General
Issued 19 January 2016 Resolved
Insulation in generator room is falling in several areas.
Due 19 February 2016
Resolved 27 January 2016
Resolution: Insulation has been properly hung as required.
Engineering › Pressure Vessel › Safety Valve
Issued 19 January 2016 Resolved
The pressure/temp relief valve on the hot water heater is directed to an open space. Install diverter pipe to safe direction. Location - generator room
Due 19 February 2016
Resolved 27 January 2016
Resolution: A PVC diverter line has been permanently fitted to the P/V relief valve.
Engineering › Fuel Oil Service System › Piping
Issued 19 January 2016 Resolved
Fix leaking F/O pipe in the overhead of the generator room - port side.
Due 19 February 2016
Resolved 27 January 2016
Resolution: The coupling was tightened and is no longer showing signs of leakage.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 19 January 2016 Resolved
Prove proper operation of rescue boat/launching mechanism.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 January 2016
Resolution: Resue boat was launched using the ships davit and the rescue boat was run for approx. 10 minutes with both fwd and reverse verified and a full range of speed witnessed.
Electrical › Electric Supply System (service) › Cable
Issued 19 January 2016 Resolved
Properly terminate dead end wire in generator space.
Due 19 February 2016
Resolved 27 January 2016
Resolution: Wire was terminated inside an existing junction box and secured appropriately.
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 5 June 2014 Resolved
Prove proper operation of all emergency lights
Due 5 July 2014
Resolved 15 July 2014
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 5 June 2014 Resolved
Properly wire all electrical outlets on the 02 deck (reverse polarity)
Due 5 July 2014
Resolved 15 July 2014
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 5 June 2014 Resolved
Label sewage pump motor controller
Due 5 July 2014
Resolved 15 July 2014
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 5 June 2014 Resolved
Provide cover for outlet in the wait station on main deck
Due 5 July 2014
Resolved 15 July 2014
Lifesaving › Rescue Boat › Construction
Issued 5 June 2014 Resolved
Make repairs to the crack on the rescue boat transom (starboard side)
Due 5 July 2014
Resolved 15 July 2014
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 5 June 2014 Resolved
Properly mount smoke detector in the generator space.
Due 5 July 2014
Resolved 15 July 2014
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 5 June 2014 Resolved
Provide repair proposal for the wasted raw water pipe on the A/C condensors
Due 5 July 2014
Resolved 15 July 2014
Resolution: Pipe was replaced in kind.
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 5 June 2014 Resolved
Provide proper wire connections for port SSDG.
Due 5 July 2014
Resolved 15 July 2014
Lifesaving › Lifebuoys › Serviceable
Issued 14 May 2012 Resolved
Replace the deteriorated lifebuoy on the main deck of the port bow.
Due 28 May 2012
Resolved 28 May 2012
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 14 May 2012 Resolved
Replace the deteriorated lifeline on the stbd bridge wing lifebuoy.
Due 28 May 2012
Resolved 28 May 2012
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 14 May 2012 Resolved
Properly label the upper deck with maximum passenger capacity IAW the new stability letter.
Due 28 May 2012
Resolved 28 May 2012
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 14 May 2012 Resolved
Renew all faded labeling on the weather decks as necessary.
Due 28 May 2012
Resolved 28 May 2012
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 14 May 2012 Resolved
Remove or repair the exterior emergency light on the o2 deck for the forward ladder leading to the main deck.
Due 28 May 2012
Resolved 28 May 2012
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 14 May 2012 Resolved
Replace the batteries in the emergency lighting throughout the vessel as necessary.
Due 28 May 2012
Resolved 28 May 2012
Electrical › Lighting (emergency) › Lighting Fixture
Issued 14 May 2012 Resolved
Replace the batteries in the exit lights as necessary.
Due 28 May 2012
Resolved 28 May 2012
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 14 May 2012 Resolved
Provide the vessel with an updated NAVRULES.
Due 28 May 2012
Resolved 28 May 2012
Navigation › Piloting/Steering › Marine Charts
Issued 14 May 2012 Resolved
Provide the vessel with a chart for the area of operation.
Due 28 May 2012
Resolved 28 May 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 May 2012 Resolved
Properly terminate the dead end wire in the bow thruster space.
Due 28 May 2012
Resolved 28 May 2012
Electrical › Electrical Distribution System (service) › Junction Box
Issued 14 May 2012 Resolved
Properly mount the junction box in the mid body void.
Due 28 May 2012
Resolved 28 May 2012
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 14 May 2012 Resolved
Properly label the motor controlers in the mid body void.
Due 28 May 2012
Resolved 28 May 2012
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 14 May 2012 Resolved
Provide a cover where missing for the outlet box in the galley.
Due 28 May 2012
Resolved 28 May 2012
Lifesaving › Rescue Boat › Propulsion Engine
Issued 11 May 2009 Resolved
Prior to the carriage of passengers repair or replace the motor on the Rescue Boat.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 June 2009
Resolved 12 May 2009
Construction/Loadline › Structures › End Bulkhead
Issued 11 May 2009 Resolved
Make proper modification to the bulkhead penetration for the grease trap in the aft bulkhead or the Engine Room in accordance with NVIC 9-97.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Construction/Loadline › Structures › End Bulkhead
Issued 11 May 2009 Resolved
Repair/Repack stuffing tubes as needed in the aft bulkhead of the Engine Room and the aft bulkhead of the Gen Room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Electrical › Electrical Distribution System (service) › Junction Box
Issued 11 May 2009 Resolved
Install Junction boxes in the Engine Room for the two exposed wire splices.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Construction/Loadline › Structures › Superstructure
Issued 11 May 2009 Resolved
Replace missing insulation in the overhead of the Engine Room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Electrical › Electric Generation Source (emergency) › Generator
Issued 11 May 2009 Resolved
Replace the Fuel Hoses on both Generators with the proper type hose (SAE J-1942).
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Electrical › Electric Generation Source (service) › Generator
Issued 11 May 2009 Resolved
Provide valve handles for two skin valves on the port side of the Generator Room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Construction/Loadline › Structures › Manhole
Issued 11 May 2009 Resolved
Install Dogging Mechanism on the escape hatch in the Generator Room.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 June 2009
Resolved 12 May 2009
Electrical › Electric Supply System (service) › Battery Installation
Issued 11 May 2009 Resolved
Install Lock Washers or Lock Nuts on Battery Connections as needed.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 11 May 2009 Resolved
Properly label Life Jacket Storage Box on 2nd Deck aft.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 11 May 2009 Resolved
Repair the toilet in the Women's Head on the 2nd Deck.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 11 May 2009 Resolved
Remove excessive flammables from the vessel.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 11 May 2009 Resolved
Provide a Drain Plug for the Fuel Containment at the Fuel Fill.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2009
Resolved 12 June 2009
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 11 May 2009 Resolved
Conduct Man Overboard Drill once Rescue Boat is repaired and prior to carriage of passengers.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 June 2009
Resolved 12 May 2009
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 9 June 2007 Resolved
Replace reflective tape on 9 adult PFD's
Action required: 705 - Other - as specified
Due 11 June 2007
Resolved 11 June 2007
Resolution: Sighted reflective tape replaced.
Electrical › Lighting (emergency)
Issued 17 March 2003 Resolved
SHOW PROPER OPERATION OF ALL EMERGENCY LIGHTS. LEGACY COMPONENT DESC: Battery Operated Lantern
Condition: Improper/Lack of Maintenance
Due 21 March 2003
Resolved 21 March 2003
Fire Fighting › Miscellaneous Items
Issued 17 March 2003 Resolved
LABEL ALL FIRE AXES WITH CORRECT NAME.
Condition: Improper/Lack of Maintenance
Due 21 March 2003
Resolved 21 March 2003
Electrical › Electrical Distribution System (service)
Issued 17 March 2003 Resolved
PROVIDE AND POST UP TO DATE CIRCUIT BREAKER LABELS IN ALL CIRCUIT BREAKER BOXES. LEGACY COMPONENT DESC: Distribution Panel Bus
Condition: Improper/Lack of Maintenance
Due 21 March 2003
Resolved 21 March 2003
Electrical › Electrical Distribution System (service)
Issued 17 March 2003 Resolved
INSTALL COVER ON JUCTION BOX SERVING PHONE LINES IVO 2ND DECK BAR. LEGACY COMPONENT DESC: Junction Box
Condition: Improper/Lack of Maintenance
Due 21 March 2003
Resolved 21 March 2003
Lifesaving › Lifebuoys
Issued 17 March 2003 Resolved
STENCIL NAME ON RING BUOY ON STBD SIDE OF 2ND DECK. LEGACY COMPONENT DESC: Markings (ship name/port)
Condition: Improper/Lack of Maintenance
Due 21 March 2003
Resolved 21 March 2003
Electrical › Electrical Distribution System (service)
Issued 17 March 2003 Resolved
REMOVE ALL DEAD ENDED WIRING IN ENGINE ROOM.
Condition: Improper/Lack of Maintenance
Due 21 March 2003
Resolved 21 March 2003
Operations/Management › Drills/Instruction
Issued 17 March 2003 Resolved
PROVIDE CREW TO PERFORM DRILLS. LEGACY COMPONENT DESC: Man Overboard Recovery
Condition: Improper/Lack of Maintenance
Due 28 March 2003
Resolved 1 August 2003
Electrical
Issued 22 August 2001 Resolved
Prove proper operation of all emergency lights on interior decks._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 August 2001
Resolved 22 August 2001
Documentation
Issued 22 August 2001 Resolved
Provide letter by the master designating senior deck hand.
Condition: Unknown
Due 22 August 2001
Resolved 22 August 2001
Lifesaving
Issued 22 August 2001 Resolved
Properly install reflector tape on all life jackets.
Condition: Unknown
Due 22 August 2001
Resolved 22 August 2001
Electrical
Issued 22 August 2001 Resolved
Properly aluminate all interior exit signs.
Condition: Unknown
Due 22 August 2001
Resolved 22 August 2001
Lifesaving
Issued 28 July 1999 Resolved
Conduct complete inspection of all ship's safety systems and devices, to the satisfaction of the cognizant Officer in Charge, Marine Inspection, prior to carrying passengers or getting underway.
Condition: Unknown
Due 18 August 1999
Resolved 18 August 1999
Construction/Loadline
Issued 28 July 1999 Resolved
Install high level bilge alarms per 46 CFR 119.530
Condition: Unknown
Due 18 August 1999
Resolved 18 August 1999
Fire Fighting
Issued 28 July 1999 Resolved
Prove proper operation of fire and bilge pumps.
Condition: Unknown
Due 18 August 1999
Resolved 18 August 1999
Navigation
Issued 8 October 1998 Resolved
Repair steering system fluid leak at reservoir filter outlet fittings.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Accommodation/Occupational Safety
Issued 8 October 1998 Resolved
Properly mount sewage pump to mounting bracket.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Electrical
Issued 8 October 1998 Resolved
Prove proper operation of all emergency lights
Condition: Unknown
Due 8 October 1998
Resolved 8 October 1998
Fire Fighting
Issued 8 October 1998 Resolved
Repair stuffing tubes in aft generator space, port top side.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Electrical
Issued 8 October 1998 Resolved
Clean all battery terminals and add electrolyte as required.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Engineering
Issued 8 October 1998 Resolved
Repair cooling water leak IWO port generator, front end of engine.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Fire Fighting
Issued 8 October 1998 Resolved
Repair holes in aft gererator space bulkhead, port and stbd sides._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Accommodation/Occupational Safety
Issued 15 April 1997 Resolved
PROVIDE INSECT SCREEN FOR POTABLE WATER TANK.
Condition: Unknown
Due 15 May 1997
Resolved 29 April 1997
Accommodation/Occupational Safety
Issued 15 April 1997 Resolved
PROVIDE AUTO PICK-UP FOR TELEPHONE IN ELEVATOR.
Condition: Unknown
Due 15 May 1997
Resolved 29 April 1997
Fire Fighting
Issued 18 December 1996 Resolved
PLACE SPANNER WRENCH IN FIRE STATIONS IN THE ENGINE AND GENERATOR ROOM.
Condition: Unknown
Due 18 December 1996
Resolved 18 December 1996
Documentation
Issued 18 December 1996 Resolved
RENEW OUTDATED FCC RADIO LIC.
Condition: Unknown
Due 18 December 1996
Resolved 18 December 1996
Construction/Loadline
Issued 18 December 1996 Resolved
ELEC WIRE NEEDS TO BE PLUGGED SO THAT COLLISION BULKHEAD IS WATERTIGHT.
Condition: Unknown
Due 18 December 1996
Resolved 18 December 1996
Electrical
Issued 13 September 1996 Resolved
REPLACE BATTERY IN EMERGENCY LIGHT ON THIRD DECK ATRIUM.
Condition: Unknown
Due 16 October 1996
Resolved 26 September 1996
Navigation
Issued 13 September 1996 Resolved
REPLACE MISSING ANCHOR LIGHT WITH AND APPROVED MARINE LIGHT BULB.
Condition: Unknown
Due 16 October 1996
Resolved 26 September 1996
Electrical
Issued 25 July 1996 Resolved
PROVE PROPER OPERATION OF "E" LIGHTS.
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Electrical
Issued 25 July 1996 Resolved
INSTALL METAL WIRE TIES IN E/R WERE NEEDED TO ENSURE THAT ALL CABLE RUNS ARE SUPPORTED AT INTERVALS NO LANGER THAN 24 INCHES AS PER IEEE 20.5
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Lifesaving
Issued 25 July 1996 Resolved
PROPERLY LABEL PFD LOCKER IWO STARBOARD SIDE, 3rd DECK, W/QTY
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Engineering
Issued 25 July 1996 Resolved
PROVE PROPER OPERATION OF ALL PROPULSION INSTRUMENTATION ON BRIDGE
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Lifesaving
Issued 25 July 1996 Resolved
REPLACE STARBOARD BRIDGE WING RING BUOY
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Engineering
Issued 25 July 1996 Resolved
PROVE PROPER OPERATION TACK. IN ENG ROOM.
Condition: Unknown
Due 25 July 1996
Resolved 25 July 1996
Fire Fighting
Issued 25 July 1996 Resolved
PROPERLY LABEL FIRE AX WITH VESSELS NAME
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Electrical
Issued 25 July 1996 Resolved
PROPER SECURE ELECTRICAL DISTRIBUTION PANEL "D" COVER ON LIGHTING PANEL IN 2nd DECK MONEY ROOM.
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Accommodation/Occupational Safety
Issued 25 July 1996 Resolved
PROPERLY MARK THE MAT COVERING THE GENERATOR SPACE EMERGENCY ESCAPE HATCH LEADING TO THE STBD SIDE OF THE MAIN CASINO.
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Fire Fighting
Issued 25 July 1996 Resolved
PROVE PROPER OPERATION OF THE PORT AND STARBOARD FIRE DAMPER.
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Electrical
Issued 25 July 1996 Resolved
PROPERLY SUPPORT CABLE RUN, IWO BULKHEAD FM GENERATOR SPACE FORWARD TO HEATERS, PORT SIDE
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Electrical
Issued 25 July 1996 Resolved
REMOVE INOPERATIVE MOTOR CONTROLLER IWO E/R PORT SIDE, MOUNTED TO ELEVATOR TRUNK
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Electrical
Issued 25 July 1996 Resolved
PROVE PROPER OPERATION OF THE LIGHTING FIXTURE IWO STERN, MAIN DECK
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Electrical
Issued 25 July 1996 Resolved
Prove proper operation of all emergency exit signs (lights).
Condition: Unknown
Due 25 August 1996
Resolved 14 August 1996
Lifesaving
Issued 28 July 1995 Resolved
CONDUCT EMERGENCY DRILLS IN PRESENCE OF USCG MARINE INSPECTOR PRIOR TO CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 28 July 1995
Resolved 28 July 1995
Documentation
Issued 28 July 1995 Resolved
MARK MAXIMUM NUMBER OF PERSON ALLOWED BY STABILITY LETTER ON EACH UPPER DECK AS REQUIRED BY 46 CFR 185.30-3(e).
Condition: Unknown
Due 28 July 1995
Resolved 28 July 1995
Lifesaving
Issued 28 July 1995 Resolved
POST EMERGENCY CHECK-OFF LIST AS PER 46 CFR 185.25-1 AND 185.25-5.
Condition: Unknown
Due 28 July 1995
Resolved 28 July 1995
Navigation
Issued 11 July 1994 Resolved
REPLACE DEFECTIVE MAST HEAD LIGHT.
Condition: Unknown
Due 11 July 1994
Resolved 13 July 1994
Lifesaving
Issued 11 July 1994 Resolved
POST EMERGENCY CHECKOFF LIST ON VESSEL, PER 46CFR185.25-5.
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Deck/Cargo
Issued 11 July 1994 Resolved
CONTACT [name withheld] TO SCHEDULE ANCHOR TEST TO PROVE ANCHOR HOLDING POWER
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Unknown
Issued 11 July 1994 Resolved
POST GARBAGE POLLUTION PLACARD.
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Lifesaving
Issued 11 July 1994 Resolved
COMPLETE RESTENCILING OF LIFE JACKETS WITH NEW VESSEL NAME.
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Electrical
Issued 11 July 1994 Resolved
INSTALL "FRONT" ON POWER PANEL INTERIOR, PANEL "F" IN GENERATOR ROOM.
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Lifesaving
Issued 11 July 1994 Resolved
LABLE EMERGENCY EXIT IN GENERATOR ROOM.
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Unknown
Issued 11 July 1994 Resolved
MARK VESSEL NAME PORT AND STBD BOW PER 46CFR 67/69
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Electrical
Issued 11 July 1994 Resolved
REPAIR LEAKING SEAL ON PORT GENERATOR FUEL/GOV BLOCK ASSY.
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Electrical
Issued 11 July 1994 Resolved
REPAIR EMERGENCY LIGHT IN FIRST DECK FEMALE HEAD.
Condition: Unknown
Due 11 July 1994
Resolved 11 July 1994
Lifesaving
Issued 20 July 1993 Resolved
WATERLIGHT DOES NOT OPERATE.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Lifesaving
Issued 20 July 1993 Resolved
MISSING TWO (2) RED FLARE SIGNALS AND TWO (2) ORANGE SMOKE SIGNALS.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Navigation
Issued 20 July 1993 Resolved
VHF RADIO ON STARBOARD SIDE OF BRIDGE IS INOPERABLE.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Navigation
Issued 20 July 1993 Resolved
SHIP'S BELL NOT MOUNTED.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Unknown
Issued 20 July 1993 Resolved
CONDUCT OPERATIONAL DRILLS IN THE PRESENCE OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Fire Fighting
Issued 20 July 1993 Resolved
NO INDICATION THAT THE CO2 SYSTEM HAS BEEN SERVICED.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Unknown
Issued 4 September 1991 Resolved
PRIOR TO 15NOV91, SUBMITT TO [name withheld], DOCUMENTATION THAT ALL TONNAGEOPENINGS ARE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH APPLICABLE REGULATIONS.
Condition: Unknown
Due 4 September 1991
Resolved 4 September 1991
Unknown
Issued 4 September 1991 Resolved
PRIOR TO 15NOV91, SUBMITT TO [name withheld], PLANS AND SPECIFICATIONS FOR APPROVAL OF THE ENGINE ROOM CONTROL BOOTH.
Condition: Unknown
Due 4 September 1991
Resolved 4 September 1991
Lifesaving
Issued 19 July 1991 Resolved
DEMONSTRATE WITH A FULL PASSENGER LOAD THAT THE VESSEL CAN SAFELY ACCOMMODATE 600 PASSENGERS.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Navigation
Issued 19 July 1991 Resolved
PROVE STAISFACTORY OPERATION OF P.A. SYSTEM AND INTERCOM SYSTEM
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Deck/Cargo
Issued 19 July 1991 Resolved
PRVIDE SATISFACTORY ANCHOR.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Accommodation/Occupational Safety
Issued 19 July 1991 Resolved
ALL INTERIOR WALL AND DECK FINISHES TO BE COMPLETED.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Electrical
Issued 19 July 1991 Resolved
CONDUCT A LOAD TEST OF THE TWO NEW CAT GENERATORS AFTER GAMBLING EQUPMENT HAS BEEN INSTALLED
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Lifesaving
Issued 19 July 1991 Resolved
INSTALL ONE COAST GUARD APPROVED RESCUE BOAT
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Documentation
Issued 19 July 1991 Resolved
PLACE A CURRENT CERTIFICATE OF DOCUMENTION ON VESSEL.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Lifesaving
Issued 19 July 1991 Resolved
PRIOR TO CARRYING PASSENGERS PROVIDE A COY OF THE EMERGENCY OPERATIONS MANUAL FOR REVIEW AND APPROVAL
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Documentation
Issued 19 July 1991 Resolved
CONDUCT A SATISFACTORY STABILITY TEST WITH ALL PASSENGER WEIGHT EVENLY DISTRIBUTED ON THE UPPER TWO DECKS.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Lifesaving
Issued 19 July 1991 Resolved
CONDUCT CREW EMERGENCY DRILLS
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Accommodation/Occupational Safety
Issued 19 July 1991 Resolved
ALL WALKWAYS AND AISLES ON EACH DECK WILL BE A MINIMUM OF 42 INCHES, AFTER VESSEL HAS BEEN OUT FITTED.
Condition: Unknown
Due 19 July 1991
Resolved 19 July 1991
Engineering
Issued 26 July 1990 Resolved
PRIOR TO CARRIAGE OF PASSENGERS THE VESSEL MUST PROVIDE OPERATIONAL TEST OF THE PROPULSION SYSTEM IN THE PRESENT OF USCG INSPECTOR.
Condition: Unknown
Due 26 July 1990
Resolved 26 July 1990
Electrical
Issued 25 August 1987 Resolved
PROVIDE ELECTROLYTE RESISTANT BOXES FOR BATTERIES.
Condition: Unknown
Due 25 August 1987
Resolved 25 August 1987
Engineering
Issued 22 December 1986 Resolved
GAS FREE FUEL TANK AND WELD LOWER FWD BULKHEAD EXTERIOR.
Condition: Unknown
Due 22 December 1986
Resolved 22 December 1986

Casualty record · 1

19 May 2012Routine · role: Involved in a Marine Casualty · 1 injured · activity 4342969
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

HENRIETTA III (2012). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record