Records from 2022 to 2026. Most recent: inspection, 5 August 2026.
Inspection history · 52
5 August 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8456232
22 July 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8444261
13 July 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8436937
7 July 2026
PSC B · COC-CVE Quarterly
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8420839
10 June 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8397827
13 May 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8372766
1 May 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8359262
7 April 2026
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8344443
31 January 2026
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8302518
12 January 2026
Bulk Liquid Transfer Monitor
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8294821
6 December 2025
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8278285
4 December 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8277832
2 November 2025
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8260963
2 November 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8261996
22 October 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8266756
27 August 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8219188
6 August 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8204121
30 July 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8198735
16 July 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8187386
2 July 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8173171
25 June 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8167305
18 June 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8162061
10 June 2025
PSC B · COC-CVE Quarterly
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8156094
21 May 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8140880
15 April 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8112104
26 March 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8100683
24 March 2025
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8098880
12 January 2025
COC-CVE Annual · PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8059208
2 December 2024
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8041776
25 September 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8009177
20 August 2024
COC-CVE Quarterly · PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7985013
16 March 2024
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7875215
25 February 2024
COC-CVE Annual · PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7856550
23 December 2023
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7865542
6 November 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7828351
16 October 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7809358
22 August 2023
COC-CVE Quarterly
Type not classified · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7773607
25 February 2023
Deficiency Check · Administrative Inspection · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7639399
15 February 2023
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7637032
17 January 2023
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7622352
13 December 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7608295
18 October 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7579551
2 October 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7570741
31 August 2022
PSC B · COC-CVE Quarterly
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7548310
26 April 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7438473
4 April 2022
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7424124
4 April 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7433351
21 March 2022
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7416415
7 March 2022
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7408532
6 March 2022
Deficiency Check · COC-CVE Annual
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7405445
5 March 2022
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7407918
1 March 2022
PSC A · COC-CVE Annual · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7403771
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 July 2026
Resolved
On all passenger ships each lifejacket shall be fitted with a light complying with the requirements of paragraph 2.2.3 of the Code. PSCOs identified 9 lifejacket lights inoperable.
74 SOLAS 20 III/22.3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 July 2026
Resolved 7 July 2026
Resolution: All lights identified as inoperable were replaced prior to the conclusion of the exam.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 7 July 2026
Resolved
Where "A" class divisions are penetrated for the passage of electric cables, pipes, trunks, ducts, etc., or for girders, beams or other structural members, arrangements shall be made to ensure that the fire resistance is not impaired. PSCO observed non-approved material in the cable run penetration of the A-60 bulkhead above FSD 1.6.08 and above FSD 1.6.11.
74 SOLAS 01 II-2/18.1.1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2026
Resolved 17 July 2026
Resolution: DNV survey attests to installation of approved firestop materials.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 July 2026
Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. PSCO observed an air compressor in the garbage room that had a portable fan permanently installed next to it for cooling as the air compressor commonly overheats and trips off, presenting an electrical hazard.
74 SOLAS 04 II-1/45.1.3
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 August 2026
Resolved 17 July 2026
Resolution: DNV survey attests to removal of unauthorized fan.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 7 July 2026
Resolved
Above the bulkhead deck there shall be at least two means of escape from each main vertical zone or similarly restricted space or group of spaces at least one of which shall give access to a stairway forming a vertical escape. PSCO observed a crew breakroom (space category 7) within the deck 9 pantry near fire station 9.2.6 (space category 13) without a safe escape route to a stairway, nor an acceptable means to notify crew normally employed in the space of a fire in the surrounding space.
74 SOLAS 01 II-2/28.1.2
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 August 2026
Resolved 17 July 2026
Resolution: DNV survey attests to installation of interconnected fire alarm in crew breakroom.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage
Issued 2 November 2025
Resolved
Every ship of 100 gross tonnage shall carry a garbage management plan which the crew shall follow. The plan shall provide procedures of disposing of garbage including the use of the equipment on board. It was self-reported the shipboard incinerator required by the garbage management plan is inoperable due to failure of second chamber burner flange gasket.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2025
Resolved 6 December 2025
Resolution: Attended vessel and examined burner and gasket.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 10 June 2025
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above hte deck at all points of the secape route, including angles and intersections. The marking must enable passengers to identify the routes of escape and readily identify the secape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. Category 3 corridor (lobby near service lifts 7 and 8, near maitre'd office) is missing low location lighting/tape.
74 SOLAS 01 II-2/28.1.10
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 10 June 2025
Resolved 10 June 2025
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 10 June 2025
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Assigned crew for lifeboat 8 unfamiliar with operation of emergency tiller.
74 SOLAS 20 III/19.2.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 10 June 2025
Resolved 10 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 January 2025
Resolved
Fire doors in main vertical zone bulkheads and stairway enclosures shall satisfy the following requirements: A door designed to re-open upon contacting an object in its path shall re-open sufficiently to allow a clear passage of at least 0.75m but no more than 1m. PSCO observed F.S.D.8.3.09 re-opened upon contacting the crash bar more than 1 meter.
74 SOLAS 01 II-2/30.4.11
Action required: 10 - Deficiency Rectified
Resolved 12 January 2025
Resolution: Door was adjusted to meet normal re-opening distance.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 January 2025
Resolved
All "A" class doors located in stairways, public spaces, and main vertical zone bulkheads in escape routes shall be equipped with a self-closing hose port of material, construction and fire resistance which is equivalent to the door into which it is fitted, and shall be a 150mm square clear opening with the door closed and shall be inset into the lower edge of the door, opposite the door hinges or, in the case of sliding doors, nearest the opening. PSCO's observed fire doors F.S.D.A.6.01 and F.S.D.A.4.20 with hose ports that did not fully close when the fire doors were at the closed position.
74 SOLAS 01 II-2/30.7
Action required: 10 - Deficiency Rectified
Resolved 12 January 2025
Resolution: Doors were adjusted to allow full closure.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 12 January 2025
Resolved
Where the contents and use of a space are such that there is a doubt as to its classification for the purpose of this regulation, it shall be treated as a space within the relevant category having the most stringent boundary requirements. PSCO observed combustible material stored in Category (10) Spaces F.S.D.5.6.02 and F.S.D.4.6.02.
74 SOLAS 01 II-2/26.2.2
Action required: 10 - Deficiency Rectified
Resolved 12 January 2025
Resolution: Combustible material was removed from the spaces.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 January 2025
Resolved
Within the perimeter of such stairway enclosures, only public toilets, lockers of non-combustible material providing storage for non-hazardous safety equipment, and open information counters are permitted. PSCO observed combustible storage underneath stairway leading outside the Pharaoh Theater.
74 SOLAS 01 II-2/29.2
Action required: 10 - Deficiency Rectified
Resolved 12 January 2025
Resolution: Combustible material was removed from underneath the stairs
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 January 2025
Resolved
Fire doors in main vertical zone bulkheads, galley boundaries, and stairway enclosures, double-leaf doors equipped with a latch necessary to their fire integrity shall have a latch that is automatically activated by the operation of the doors when released by the system. PSCO observed double leafed F.S.D.9.2.11 not properly close.
74 SOLAS 01 II-2/30.4.12
Action required: 10 - Deficiency Rectified
Resolved 12 January 2025
Resolution: Door was adjusted to close properly
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 12 January 2025
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO's observed in lifeboat #18 the starter battery was non-operational.
74 SOLAS 20 III/20.2
Action required: 10 - Deficiency Rectified
Resolved 12 January 2025
Resolution: Starter battery was replaced.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 February 2024
Resolved
The means of control of any fixed gas fire-extinguishing
system shall be readily accessible and simple to operate and
shall be grouped together in as few locations as possible at
positions not likely to be cut off by a fire in a protected space. At each location there shall be clear instructions relating to the operation of the system having regard to the safety of personnel. PSCO observed CO2 operating instructions in the main CO2 space not clearly correlating to the release
components. 74 SOLAS (01) II-2/5.1.7
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2024
Resolved 16 March 2024
Resolution: Operating instructions were revised to include applicable release component procedures.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 February 2024
Resolved
Within the perimeter of stairway enclosures, only public
toilets, lockers of non-combustible material providing
storage for safety equipment and open information counters are permitted. PSCO observed ATM cash machine fitted in stairway 160, deck 2 forward starboard side. 74 SOLAS (01) II-2/29.2
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2024
Resolved 16 March 2024
Resolution: ATM machine was removed from stairway 160, deck 2 fwd starboard wide and is clear of any obstacles.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 25 February 2024
Resolved
Fire doors in main vertical zone bulkheads, galley
boundaries and stairway enclosures, the approximate time
of closure for hinged fire doors shall be no more than 40 s and no less than 10 s from the beginning of their movement.
PSCO observed stairway fire door B.4.04 close in 3 seconds. PSCO observed main vertical zone fire door 5.4.01 close in more than 40 seconds. 74 SOLAS (01) II-2/30.4.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 February 2024
Resolution: Fire door closure was adjusted and retested to the satisfaction of the attending PSCO.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 25 February 2024
Resolved
The Load Line ring, lines and letters shall be painted white or yellow on a dark background or in black on a light background. They shall also be permanently marked.
PSCO observed deck line not painted in contrasting colors
to the hull.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 February 2024
Resolution: Load Line deck mark starboard side was painted black to the satisfaction of the attending PSCO.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 25 February 2024
Resolved
A self-contained emergency source of electrical power
shall be provided to supply all those services that are
essential for safety in an emergency, including emergency
lighting at every muster and embarkation station. PSCO
observed emergency light at launch station between lifeboats 6 and 8 not functioning. 74 SOLAS (04) II-1/42.2.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 February 2024
Resolution: Emergency lighting was repaired and retested to the satisfaction of the attending PSCO.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 25 February 2024
Resolved
Fire doors in main vertical zone bulkheads and stairway
enclosures shall satisfy the following requirements: The
doors shall be self-closing and be capable of closing against
an angle of inclination of up to 35 degrees opposing closure.
PSCO observed double leaf hinged fire door A.3.27 in MVZ
boundary not latch completely closed.
74 SOLAS (01) II-2/30.4.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 February 2024
Resolution: Fire door was repaired and tested to the satisfaction of the attending PSCO
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 25 February 2024
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Crew
assigned to lifeboat 6 was unfamiliar with boat starting
arrangements. Crew assigned to lifeboat 16 was unfamiliar
with location of fishing kit and radar reflector.
SOLAS 74 (20) III/19.2.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 February 2024
Resolution: Safety Officer & Training Officer held training with assigned boat crew to the satisfaction of the attending PSCO
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 February 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on boars. PSCOs found storage of non-combustibles exceeding marked height restrictions in various spaces including main laundry, art auction locker, hospital space, and housekeeping stores.
74 SOLAS 29 I/11(a)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 4 March 2023
Resolved 2 March 2023
Resolution: Rectified to the satisfaction of class.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 February 2023
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers to identify the routes of escape and readily identify the escape exits. Low location lighting was extinguished in MVZ 4, Deck 3 near FSD 3.4.07. Low location lighting on Deck 7 near FSSD 7.2.10 was cracked and exposed.
74 SOLAS 01 II-2/28.1.5.10
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 4 March 2023
Resolved 2 March 2023
Resolution: Low location lighting replaced, Resolved to the satisfaction of class.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 25 February 2023
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Tender #3 could not secure power to the port engine. Crew used fuel shut off valve to stop diesel engine and lifeboat remained inoperable throughout the exam.
74 SOLAS 20 III/20.2
Action required: 10 - Deficiency Rectified
Resolved 25 February 2023
Resolution: Engine was tested satisfactory prior to departure.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 February 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCOs observed excessive water leak from AC drain line in overhead pipe in crew accommodation space Deck C, MVZ 5.
74 SOLAS 20 I/11(a)
Action required: 10 - Deficiency Rectified
Resolved 25 February 2023
Resolution: Leak was found satisfactory prior to departure.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 February 2023
Resolved
Two means of escape shall be provided from each machinery space. Machinery space escape ladder was blocked by luggage carts and other miscellaneous material in the stbd tender embarkation area.
74 SOLAS 01 II-2/28.3.1
Action required: 10 - Deficiency Rectified
Resolved 25 February 2023
Resolution: Exit was found satisfactory prior to departure.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 March 2022
Resolved
Fire doors in main vertical zone bulkheads, shall be self-closing, and a door designed to reopen upon contacting an object in its path shall reopen not more than one meter from the point of contact. PSCO observed FSD 3.4.01 open beyond one meter upon contact, and did not continue to close as designed. PSCO also observed FSD 2.5.09 continue closing upon contact with an object although it is designed to reopen closing upon contact with an object although it is designed to reopen closing upon contact with an object although it is designed to reopen upon contact.
74 SOLAS 01 II-2/30.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2022
Resolution: Attended the vessel to observe corrective actions.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 March 2022
Resolved
The means of control of any fixed gas fire-extinguishing system shall be readily accessible. PSCO observed storage of galley items completely blocking fire door (No. 9.3.16) leading to CO2 controls for the aft galley.
74 SOLAS 01 II-2/5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2022
Resolution: Attended the vessel to observe corrective actions.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 6 March 2022
Resolved
Each power-operated sliding watertight door shall be provided with an audible alarm, distinct from any other alarm in the area, which will sound whenever the door is closed remotely by power. PSCO observed at Frame 166, WTD 5 does not alarm & doesn't fully seal.
74 SOLAS 04 II-1/15.7.1.6
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2022
Resolution: Attended the vessel to observe corrective actions.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 6 March 2022
Resolved
The activation of any detector or manually operated call point shall initiate a visible and audible fire signal at the control panel indicating units. PSCO observed call point number 5617.1032, above hood #2, in the deck 10 aft galley did not initiate a visible or audible alarm.
74 SOLAS 01 II-2/13
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2022
Resolution: Attended the vessel to observe corrective actions.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 March 2022
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. PSCO observed emergency egress from cabins, missile hazards, and electrical shock and safety concerns.
74 SOLAS 20 IX/3.1 ISM Code 10.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2022
Resolution: Attended the vessel to observe corrective actions.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 6 March 2022
Resolved
Before being assigned to shipboard duties, all persons employed or engaged on a seagoing ship shall receive approved familiarization training and be able to: communicate with other persons on board on elementary safety matters, know what to do if a person falls overboard, fire or smoke is detected, or the fire or anandon ship alarm is sounded; identify muster and embarkation stations and emergency escape routes. PSCO observed several stairwell guides and a hotel services crew member that were unable to communicate what to do in the event of fire or abandoning ship.
STCW V/2.2, A-VI/I.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 March 2022
Resolved
Fire doors in galley boundaries shall be capable of remote release from the continuously manned central control station, and shall be capable of release from a position at both sides of the door. PSCO observed the magnetic hold back for door # 9.2.10 would not hold the door, preventing remote release of the door.
74 SOLAS 01 II-2/30
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 March 2022
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazard will be ensured. PSCO observed dead-end wires in the electrical locker of the LIDO galley starboard side forward of the ship.
74 SOLAS 04 II-1/40.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 March 2022
Resolved
Where electrical cables are carried through watertight bulkheads, arrangements shall be made to ensure watertight integrity of bulkheads. PSCO observed piping improperly installed in electrical bulkhead penetration at central fresh water near chemical storage station in the engine room.
74 SOLAS (01) II-1/15.2.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 6 March 2022
Resolved
The bulkhead deck or a deck above it shall be weathertight. The PSCO observed latches on weathertight doors leading from passenger cabins to balconies were inoperable, preventing doors to be closed in cabins 7271, 7259, 7295, 6228, 6218, 6210, 6194, 6178, 6176, 6140.
74 SOLAS 04 II-1/20.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 6 March 2022
Resolved
Lifejackets shall be so placed as to be readily accessible and their position plainly indicated. PSCO noted that the placard to mark location of PFDs in passenger cabin 8123 was missing.
74 SOLAS 20/III.7.2.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 March 2022
Resolved
All "A" class doors located in stairways, public spaces, main vertical zone bulkheads in escape routes shall be equipped with a self-closing hose port. PSCO observed hose port on door #6404 could not close all the way.
74 SOLAS 01 II-2/30.7
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 6 March 2022
Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements. PSCO observed a soft patch to the grey water system in the starboard side forward overhead of the engine room.
74 SOLAS (04)/II-1.3-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 6 March 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed numerous passenger cabins on multiple decks with excessive gear adrift (missinglight fixtures, shower heads not installed, spare glass railing stored in rooms, open ceiling tiles, exposed electrical sockets, furniture adrift); presenting unsafe conditions for carriage of passengers. PSCO noted storage closet with mattresses stacked to the ceiling in excess of storage limits.
74 SOLAS 20 I/11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 March 2022
Resolved
Handrails and other handholds shall be of such strength as to withhold a distributed horizontal and vertical load. PSCO observed the gate pins seized in the up position on the handrails of the embarkation deck, presenting an unsafe condition for crew and passengers.
SOLAS 74 (01): II-2/13.7.3.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2022
Resolved 16 March 2022
Resolution: See attached Class report dated 14MAR22.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 March 2022
Resolved
Machinery spaces of category A shall be adequately ventilated so as to ensure that machinery is operating at full power in all weather conditions. PSCO observed the EDG louver system is not functioning as designed. The interior louver solenoid system is not functioning.
74 SOLAS (04)II-1/35
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2022
Resolved 4 April 2022
Resolution: Received class report attesting to repairs.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 6 March 2022
Resolved
The bulkhead deck or a deck above it shall be weathertight. On decks 5, 6, & 7 multiple doors from passenger cabins to balconies were missing gaskets.
74 SOLAS 04 II-1/20.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2022
Resolved 18 April 2022
Resolution: Received report from class attesting to repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 March 2022
Resolved
Electrical installations shall be such that the safety of the passengers, crew and ship from electrical hazards will be ensured. PSCO observed a portable electric vacuum pump (440V) hardwired into an electrical controller in the aft sewage space.
74 SOLAS 04 II-1/40.3
Action required: 10 - Deficiency Rectified
Resolved 6 March 2022
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 March 2022
Resolved
Indication shall be provided at the fire door indicator panel in the continuously manned central control station whether each of the remote-released doors are closed. Indications for double leaf doors 10.5.01 and 10.5.02 are incorrect at bridge.
SOLAS 01 II-2/30.4.6
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 6 March 2022
Resolution: Received class report, and confirmed while onboard for COC.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 March 2022
Resolved
Fire doors designed to reopen upon contacting an object in its path shall reopen not more than 1m from the point of contact. Fire door 10.3.01 does not reopen upon contact.
SOLAS 01 II-2/3.4.11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 6 March 2022
Resolution: Received class report, and confirmed while onboard for COC.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 March 2022
Resolved
Within the perimeter of such stairway enclosures, only public toilets, lockers or non-combustible material providing storage for safety equipment and open information counters are permitted. Category 2 space in vicinity of FSD A.5.11 is being used for storage of unauthorized items.
SOLAS 01 II-2/30.4.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 6 March 2022
Resolution: Received class report, and confirmed while onboard for COC.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 March 2022
Resolved
The approximate time of closure for hinged fire doors shall be no more than 40 seconds. Fire doors 6.3.08 and 10.3.02 failed to close within allotted time after contact with bumper.
SOLAS 01 II-2/30.4.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 6 March 2022
Resolution: Received class report, and confirmed while onboard for COC.