PURRSEAVERANCE

PURRSEAVERANCE is a 2001 passenger vessel (inspected). The Coast Guard has recorded 30 inspections since 2002, most recently in April 2007, along with 150 deficiencies and 4 casualty investigations between 2003 and 2005.

Records from 2002 to 2007. Most recent: inspection, 23 April 2007.

Built
2001
Last inspected
23 April 2007
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8977297 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDA6318
Flag
UNITED STATES
366831090 (licence lapsed)
Maury page id
psix-25591

Inspections, by type

…with no type recorded6
Years with a record 6 calendar years (2002–2007)
The 30 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 19 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
243 - Convention (Subpart B), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
79 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDA6318MMSI 366831090 · expired · compulsorily equipped · granted 27 November 2001, cancelled 28 January 2012
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 30

23 April 2007 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2913677
13 September 2006 Hull Examination
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2777117
5 October 2005 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2518377
8 April 2005 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2329627
8 April 2005 Plan Review "T" Boat · Construction Oversight · In-Service Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2329629
4 March 2005 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2303725
23 February 2005 MTSA Verification · Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2298360
23 February 2005 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2309670
14 February 2005 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2292067
13 February 2005 Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2291435
11 February 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2291919
13 December 2004 Deficiency Check · Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2258023
28 June 2004 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2113495
28 April 2004 COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2056295
24 February 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2012034
28 October 2003 Damage Survey · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1938045
28 October 2003 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1938046
29 August 2003 Administrative Inspection · Plan Review "T" Boat
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1920923
20 August 2003 In-Service Inspection · Examination of Repairs · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1881760
20 June 2003 Examination of Repairs
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1822288
19 June 2003 Examination of Repairs · Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1820837
18 June 2003 Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1920402
2 June 2003 Deficiency Check · Examination of Repairs
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1807647
30 May 2003 Type not recorded
No type recorded · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1808103
30 May 2003 Damage Survey
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1813086
7 May 2003 Examination of Repairs
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1788281
5 May 2003 In-Service Inspection · Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1778865
25 February 2003 Damage Survey
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1753891
20 November 2002 Construction Oversight · Plan Review "T" Boat · Inclining Experiment · Initial Certification · Deficiency Check
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1708302
1 October 2002 Plan Review "T" Boat
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1690908

Deficiency record · 150

Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 13 September 2006 Resolved
Remove excessive amount of oil from engine compartment bilges.
Action required: 705 - Other - as specified
Resolved 21 September 2006
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 13 September 2006 Resolved
Remove excessive amount of water from all compartments.
Action required: 705 - Other - as specified
Resolved 21 September 2006
Construction/Loadline › Hull › Side Shell
Issued 8 April 2005 Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE OBTAIN WRITTEN CG PLAN APPROVAL AND VERIFICATION OF COMPLIANCE WITH APPROVED PLANS, TESTING, SEA TRIAL, AND COI ENDORSEMENTS BY A CG MARINE INSPECTOR. DEMONSTRATE CREW PROFICIENCY PER VESSEL OPERATIONS AND TRAINING MANUAL FOR CURRENT ROUTE AND SERVICE. PROVIDE DOCUMENTATION OF RESULTS OF 6 HR DOCK TRIAL & A 2 HR SEA TRIAL AT MAX SPEED OF NEW LIFT FANS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 August 2005
Resolved 26 August 2005
Construction/Loadline › Hull › Girder
Issued 8 April 2005 Resolved
PROVIDE [name withheld] WITH SUMMARY AND EVALUATION OF STRUCTURAL MODIFICATIONS BY ATTENDING STRUCTURAL COMPOSITE ENGINEER FOR STRUCTURAL REPAIRS OF VESSEL FOR LIFT FAN CHANGE OVER PROJECT. DETAIL THE STEP-BY-STEP MODIFICATIONS AND REPAIRS PERFORMED. PROVIDE ALL MFG SPECS OF COMPONENTS USED.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 August 2005
Resolved 26 August 2005
Documentation › Manuals/Policy Documentation › Stability Instructions
Issued 8 April 2005 Resolved
PROVIDE EXISTING APPROVED ELECTRICAL PLANS AND STRUCTURAL PLANS TO PROVE CONFIGURATION IS UNCHANGED FOLLOWING LIFT FAN CHANGE OVER. PROVE CURRENT AS BUILT STRUCTURE IS SUFFICIENT IN WAY OF MODIFIED FAN AIR INTAKES IN SIDE SHELL OF HULL. PROVIDE COMPOSITE LIFT FAN SPECIFICATIONS (OPERATING PARAMETERS) AND PLANS (COMPONENTS AND MATERIALS USED) FROM FAN MANUFACTURER.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2005
Resolved 25 August 2005
Stability › Intact Righting Energy › General
Issued 8 April 2005 Resolved
FOLLOWING WEIGHT CHANGES INVOLVING LIFT FAN CHANGE OVER PROVE NEW DISPLACEMENT OF VESSEL IS WITHIN 2% CHANGE IN DEADWEIGHT BY A NAVAL ARCHITECT OR CONDUCT STABILITY TEST TO SATISFACTION OF CG MARINE SAFETY CENTER. PROVIDE CHANGE IN FREEBOARD MEASUREMENTS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 September 2005
Resolved 12 September 2005
Resolution: RECEIVED STABILITY LETTER FROM MSC.
Accommodation/Occupational Safety › Ventilation › General
Issued 8 April 2005 Resolved
Adjust vent closure in PORT and STBD fan rooms, so they will close 100% when handle is pulled. Vent louver closes approx. 80% which will allow extinguishing agent to escape if discharged.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 September 2005
Resolved 19 September 2005
Resolution: TESTED CLOSURES, ALL SAT
Navigation › Collision/Grounding Avoidance › Radar
Issued 8 April 2005 Resolved
Repair PORT radar. Vessel is required to have two masters operating the vessel at all times. The PORT radar is OOC so the master in the PORT seat does not have a radar directly in front of him for safe navigation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 September 2005
Resolved 19 September 2005
Resolution: SECOND RADAR REPAIRED.
Engineering › Diesel Engine (auxiliary) › Air Cleaner
Issued 8 April 2005 Resolved
Provide filters on all crankcase breather OVBD DISCH lines to prevent discharging oil into the water. As installed, they have the breather lines going directly OVBD and a visible oil line going OVBD can be observed causing an oil sheen.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 September 2005
Resolved 19 September 2005
Resolution: NEW FILTERS WERE INSTALLED IN EACH ENGINE.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 8 April 2005 Resolved
Provide a mooring cleat on the barge OB 150 for proper mooring operations. While demonstrating passenger transfer procedures, master needed a cleat in a position AFT of the gangway to properly moor vessel. Right now they have a line going under the gangway, which in any kind of swell, could lift the gangway, causing a passenger to fall.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 September 2005
Resolved 19 September 2005
Resolution: CLEAT WAS INSTALLED AND INSPECTED.
Operations/Management › Passenger Operations › Safety Orientation
Issued 8 April 2005 Resolved
Provide an updated passenger transfer plan encluding vessel. In process.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 September 2005
Resolved 19 September 2005
Resolution: VESSEL IS NO LONGER IN SERVICE.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 8 April 2005 Resolved
Fax or mail a copy of the 3rd party report for the service of your FFFE system and detection system that was review duringthis inspection for the file.
Condition: Unknown
Due 19 September 2005
Resolved 8 April 2005
Operations/Management › Drills/Instruction › Abandon Ship
Issued 23 February 2005 Resolved
Include abandonship video recorded during initial COI in training of all crew and document training.
Due 31 July 2005
Resolved 26 August 2005
Resolution: WE HAD VIDEO ON FILE.
Engineering › Bilge Water Management System › Pump
Issued 23 February 2005 Resolved
Demonstrate operation of the 110v high water bilge sump pump in stbd bow thruster space in the presence of a Coast Guard Marine Inspector.
Due 31 July 2005
Resolved 26 August 2005
Resolution: PUMP WAS REMOVED FROM VESSEL.
Electrical › Electrical Distribution System (service) › Wiring
Issued 23 February 2005 Resolved
Replace solenoid terminal cap for remote windlass operation located in stbd bow thruster space.
Due 31 July 2005
Resolved 26 August 2005
Resolution: CORRECTED.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 23 February 2005 Resolved
Demonstrate GFI's operate in wet areas, add to monthly checklists for engineer.
Due 31 March 2005
Resolved 8 April 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 23 February 2005 Resolved
In presence of Coast Guard Marine Inspector and in company of professional service technician, examine two pipe nipples on head of FE 200 Fixed fire ext system in port void at next servicing.
Action required: 705 - Other - as specified
Due 12 September 2005
Resolved 12 September 2005
Resolution: REVIEWED REPORT ON VESSEL.
Fire Fighting › Ventilation Systems › Ducts
Issued 23 February 2005 Resolved
Demonstrate to a Coast Guard marine inspector the forward bow compartment vent fan covers are provided with secure locking devices in the case of fire.
Due 31 March 2005
Resolved 8 April 2005
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 23 February 2005 Resolved
Provide copies of reports for fire detection and fixed fire ext system servicing to MSO Tampa.
Action required: 705 - Other - as specified
Due 12 September 2005
Resolved 12 September 2005
Resolution: REVIEWED REPORT ON VESSEL.
Communications › Alarms/Indicators › Bilge Alarm
Issued 13 February 2005 Resolved
Show proper operation of all bilge alarms, bilge pumps, and fire pumps.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2005
Resolution: Completed witnessing all high bilge alarms - sat.
Communications › Alarms/Indicators › Bilge Alarm
Issued 13 February 2005 Resolved
Due to inop bilge alarms, complete rounds of all spaces with through-hull fittings every 30 minutes, and maintain a log of these rounds until vessel is moored in Tampa.
Due 14 February 2005
Resolved 2 March 2005
Resolution: Witnessed ops of all high bilge alarms, bilge pumps, and fire pumps noted in other def''s.
Engineering › Bilge Water Management System › Pump
Issued 13 December 2004 Resolved
Prove proper operation of bilge dewatering system from all spaces served. Both primary and secondary bilge pumps.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 23 February 2005
Resolution: WITNESSED OPERATION OF BILGE PUMPS DEWATER STBD FAN COMPARTMENT THAT HAD A FLOODING CASUALTY WHILE VESSEL WAS ENR FROM MIAMI TO TAMPA IN FEB 05. SATISFIED SYSTEMS OPERATIONAL.
Engineering › Bilge Water Management System › Hose
Issued 13 December 2004 Resolved
Cap off and remove unused hose in starboard engine room.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Engineering › Bilge Water Management System › Pump
Issued 13 December 2004 Resolved
Install missing sub-pump in staraboard engineroom.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Electrical › Electric Supply System (service) › Cable
Issued 13 December 2004 Resolved
In both engine rooms provide metalic electrical cable supports every 24" for all cables.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 13 December 2004 Resolved
Re-attach ground wires throught out vessel.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Electrical › Lighting (service) › Lighting Fixture
Issued 13 December 2004 Resolved
Repair or replace broken overhead light fixture.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Engineering › Sea-water System (primary cooling) › Piping
Issued 13 December 2004 Resolved
Provide independent supports for hoses in port and starboard generator space.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Engineering › Bilge Water Management System › Valve
Issued 13 December 2004 Resolved
Provide check valves in port and starboard bilge pump overboard piping systems in port and starboard fan tunnel spaces. Bilge pumps serve bilge under fuel tank.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Construction/Loadline › Hull › Bottom Plating
Issued 13 December 2004 Resolved
Complete hull repairs as indicated by CG inspector.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Construction/Loadline › Structures › End Bulkhead
Issued 13 December 2004 Resolved
Remove and replace oil saturated lagging on aft bulkhead of port engine room.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Engineering › Steering Gear System › Hydraulic Hose
Issued 13 December 2004 Resolved
Repair all hydraulic system leaks in port side engine room.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Fire Fighting › Fire Pumps › Arrangement
Issued 13 December 2004 Resolved
Make permanent repairs to fire main piping on portside fan space elbow (pinhole) and various epoxy repairs throughout system.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 8 February 2005
Engineering › Sea-water System (primary cooling) › Piping
Issued 13 December 2004 Resolved
Provide chaffing protection to raw water piping in portside engine room, pipe is chaffing on engine mount bolt.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Electrical › Electrical Distribution System (service) › Shore Connection Box
Issued 13 December 2004 Resolved
Repair or replace portside shore tie connection outlet.
Action required: 705 - Other - as specified
Due 13 January 2005
Resolved 16 December 2004
Fire Fighting › Fire Main › Material
Issued 28 April 2004 Resolved
Provide approved end fittings for all flex hose installed in vital systems IAW 182.720
Due 30 April 2004
Resolved 24 June 2004
Lifesaving › Lifebuoys › Serviceable
Issued 28 April 2004 Resolved
Provide line for ring bouy IAW 180.70
Due 14 May 2004
Resolved 24 June 2004
Lifesaving › Inflatable Liferafts › Servicing
Issued 28 April 2004 Resolved
Provide life rafts as required on current COI, vessel's route is reduced to no more than 3 miles from land.
Due 14 May 2004
Resolved 23 February 2005
Resolution: IBA''S MOVED FROM 2ND DECK LEVEL TO CABIN TOP AND RAILINGS INSTALLED. TWO CONTAINERS WITH TWO 50 PERSON INFLATABLE IBA''S ON EACH SIDE FOR TOTAL OF 200 PERSONS.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 28 April 2004 Resolved
Provide one additional child size life jacket. Total passengers allowed is reduced to 139.
Due 14 May 2004
Resolved 24 June 2004
Navigation › Collision/Grounding Avoidance
Issued 9 April 2004 Resolved
Repair and prove proper operation of ARPA radar.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2004
Resolved 9 April 2004
Fire Fighting › Fire Pumps
Issued 9 April 2004 Resolved
Repair and prove proper operation of port and starboard fire pumps.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2004
Resolved 9 April 2004
Navigation › Piloting/Steering
Issued 9 April 2004 Resolved
Provide current and corrected charts and publications
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2004
Resolved 9 April 2004
Documentation › Manuals/Policy Documentation
Issued 9 April 2004 Resolved
Review and prove compliance with vessel operation and maintenance manuals
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2004
Resolved 9 April 2004
Engineering › Diesel Engine (propulsion-electric)
Issued 9 April 2004 Resolved
Repair and prove port generator does not lose cooling water suction with vessel manuvering in port and starboard turns.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2004
Resolved 9 April 2004
Lifesaving › Lifejacket/PFD (Type II)
Issued 9 April 2004 Resolved
Label PFD stowage.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2004
Resolved 9 April 2004
Engineering › Diesel Engine (propulsion-electric)
Issued 9 April 2004 Resolved
Repair starboard generator ehaust leak.
Due 9 April 2004
Resolved 9 April 2004
Accommodation/Occupational Safety
Issued 9 April 2004 Resolved
Prove proper operation of public address system in way of main deck passenger seating above fan motors wjhile vessel is underway.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2004
Resolved 9 April 2004
Construction/Loadline › Hull
Issued 31 October 2003 Resolved
Submitt proposal for review and approval to conduct repairs to port and starboard hulls where damaged due to grounding. All repairs are to be completed in accordance with approved procedures and under supervision of attending Coast Guard marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 October 2003
Resolved 9 April 2004
Engineering › Steering Gear System
Issued 31 October 2003 Resolved
Submitt plans for review and approval for steering gear as presently installed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 October 2003
Resolved 9 April 2004
Engineering › Steering Gear System
Issued 31 October 2003 Resolved
Provide a revised failure mode and effect analysis for the directional control system in accordance with chapter 5r of HSC code and NVIC 6-99.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 October 2003
Resolved 9 April 2004
Navigation › Piloting/Steering
Issued 22 October 2003 Resolved
Re-install accelerometer and prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 22 October 2003
Electrical › Electric Supply System (service)
Issued 22 October 2003 Resolved
Provide copy of electrical plans indicating as built modifications for lift fan syatem for review and approval.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 22 October 2003
Engineering
Issued 22 October 2003 Resolved
Provide copy of hydraulic plans indicating as built modifications for lift fan system for review and approval.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 22 October 2003
Documentation › Manuals/Policy Documentation
Issued 22 October 2003 Resolved
Provide updated operations manual to address manning and operational limits.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Documentation › Manuals/Policy Documentation
Issued 22 October 2003 Resolved
Provide documentation crew training and qualifications have been completed in accordance with approved vessel training manual.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 22 October 2003 Resolved
Properly install fixed fire fighting system remote pulls.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Electrical › Electrical Distribution System (service)
Issued 22 October 2003 Resolved
Prfovide signs indicating dual voltage on AC control box for hydraulic switch gear port generator space.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Stability › Watertight Integrity
Issued 22 October 2003 Resolved
Properly seal all cable pentrations in watertight bulkheads to make them watertight.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Electrical › Electrical Distribution System (service)
Issued 22 October 2003 Resolved
Install dril sheild over starboard side AC drive box (motor controler)
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Electrical › Electric Supply System (service)
Issued 22 October 2003 Resolved
Provide metal cable supports for all new cable installation and where missing.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 22 October 2003 Resolved
Prove proper operation of starboard fire boy shutdown box.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 22 October 2003 Resolved
All electric motors required to be derated must be derated by protection and new label indicating revised information applied.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 24 June 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 22 October 2003 Resolved
Provide insulation for main engine exhaust (outboard starboard) exhaust to provide adequate personnel protection from burns.
Due 22 October 2003
Resolved 9 April 2004
Stability
Issued 22 October 2003 Resolved
Provide MSC acceptance of weight changes.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 19 February 2004
Electrical
Issued 22 October 2003 Resolved
Provide revised electrical plans and make new installation of power trim tabs available for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Construction/Loadline › Penetrations
Issued 22 October 2003 Resolved
Make all PVC pipe pentrations in way of watertight bulkheads watertight in accordance with 46 CFR 182.720.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 9 April 2004
Operations/Management › Equipment Service/Testing
Issued 29 August 2003 Resolved
Conduct satisfactory sea trial in presence of US Coast Guard that demonstrates electrical motors of fan-lift system are compatible with vessel's intended operations. Sea trials shall include: hard turns while at cruising speed, backing down, and crash stops.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Deck/Cargo › Mooring/Anchoring
Issued 29 August 2003 Resolved
Install pressure relief vent for anchor windlass hydraulic line. LEGACY COMPONENT DESC: Capstan
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Stability › Weathertight Integrity
Issued 29 August 2003 Resolved
Replace cracked window on hatch leading to port side forecastle deck. LEGACY COMPONENT DESC: Deck Hatches
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Stability › Watertight Integrity
Issued 29 August 2003 Resolved
Replace broken lever on hatch leading to starboard side forecastle deck. LEGACY COMPONENT DESC: Hatch
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Deck/Cargo › Mooring/Anchoring
Issued 29 August 2003 Resolved
Repair broken supports for windlass hydraulic line. LEGACY COMPONENT DESC: Hydraulics
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 29 August 2003 Resolved
Repair/Replace safety guards on lighting throughout machinery spaces.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 29 August 2003 Resolved
Securely mount cover on ice maker for main deck snack bar. LEGACY COMPONENT DESC: Ice Maker
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 29 August 2003 Resolved
Provide proper SAE J-1475 fittings for generator fuel lines on all flexible hoses. LEGACY COMPONENT DESC: Fuel Lines
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 29 August 2003 Resolved
Replace missing bolts on forward side of port outboard engine exhaust hangers. LEGACY COMPONENT DESC: Exhaust
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Fire Fighting › Structural Fire Protection - General
Issued 29 August 2003 Resolved
Replace loose tape holding fire insulation on overheads in generator rooms. LEGACY COMPONENT DESC: Insulation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Operations/Management › Casualty Reporting/Post-Casualty Actions
Issued 29 August 2003 Resolved
Provide CG-2692 to MSD Fort Myers that describes casualty to starboard lift motor on 28 Aug 2003 and list corrective measures. LEGACY COMPONENT DESC: Notice of Marine Casualty
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Engineering
Issued 29 August 2003 Resolved
Re-install accelerometer and associated software. Provide satisfactory demonstration to Coast Guard inspector. LEGACY COMPONENT DESC: Accelerometer
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 29 August 2003 Resolved
Install machinery guards on aft end of port and starboard generators. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Construction/Loadline › Structures
Issued 20 August 2003 Resolved
Conduct sea trial and make newly installed fan motor brackets located in port and starboard hulls available for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 August 2003
Electrical › Electrical Distribution System (service)
Issued 20 August 2003 Resolved
Provide copy of CG approved electrical plans for new installation of generators, fan motors, bow thruster motor and associated control wiring. LEGACY COMPONENT DESC: Wiring
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 October 2003
Electrical › Electrical Distribution System (service)
Issued 20 August 2003 Resolved
Provide documentation bow thruster is approved for 50 degrees C or show motor has been derated in accordance with 46 CFR 183.320 (a) (2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 August 2003
Construction/Loadline › Structures
Issued 20 August 2003 Resolved
Make FRP repairs to main deck hatches to generator spaces forward and aft, port and starboard available for inspection by attending Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 August 2003
Fire Fighting › Structural Fire Protection - General
Issued 20 August 2003 Resolved
Provide specification sheet indicating compliance with 46 CFR 177.410 for newly installed insulation in overhead of generator spaces.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 August 2003
Construction/Loadline › Structures
Issued 20 August 2003 Resolved
Complete FRP repairs to deflector panels located below each fan motor port and starboard hulls. Deflector panels were not completed prior to vessel being refloated.
Due 20 August 2003
Resolved 25 August 2003
Engineering
Issued 20 August 2003 Resolved
Remove all accessories no longer in use (fuel piping, wiring, fixed fire fighing etc) associated with the removal of the forward generators port and starboard hulls.
Due 20 September 2003
Resolved 25 August 2003
Construction/Loadline › Penetrations
Issued 20 August 2003 Resolved
Permanently close vent intake in way of forward generator spaces. Butterfly valve currently installed must be blanked off or valve removed and FRP hull permanently repaired to the satisfaction of attending Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 August 2003
Resolution: Verified that penetrations was closed off.
Construction/Loadline › Hull
Issued 20 August 2003 Resolved
Provide copy photos taken of FRP repairs to tunnel insert above fan motor installation port and starboard hulls.
Due 20 September 2003
Resolved 25 August 2003
Stability
Issued 20 August 2003 Resolved
Provide G-MSC acceptance of weight changes as result of generator removal and fan motor installation completed Aug 2003.
Due 12 September 2003
Resolved 19 February 2004
Electrical › Electric Supply System (service)
Issued 20 August 2003 Resolved
Make vessel available for inspection by attending Coast Guard Marine Inspector to verify electrical installation was completed in accordance with approved electrical plans.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 August 2003
Engineering › Diesel Engine (propulsion-electric)
Issued 20 August 2003 Resolved
Prove proper operation of diesel generator emergency shutdowns upon activation of fixed fire fighting system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 August 2003
Resolution: Verified that emergency shutdowns were correctly installed and operating.
Electrical › Electrical Distribution System (service)
Issued 20 August 2003 Resolved
Install drip shields above electrical distribution boxes, below fuel fill hoses where installed in port/stbd fan tunnel spaces outboard hull. LEGACY COMPONENT DESC: Wiring
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 August 2003
Resolution: Verified that drip shields were installed.
Fire Fighting › Structural Fire Protection - General
Issued 20 August 2003 Resolved
Submitt proposal to meet structural fire protection requirements of 46 CFR 177.410 for machinery space created by installation of fan motors exceeding 10 hp in tunnel spaces. LEGACY COMPONENT DESC: Fiber Reinforced Plastic
Due 5 September 2003
Resolved 25 August 2003
Resolution: Vessel operator installed metal sheilding above each motor.
Engineering › Diesel Engine (propulsion-electric)
Issued 20 August 2003 Resolved
Make wire run water tight aft blkd penatration in portside fuel tank space watertight. Provide approval for sealant utilized to make fitting watertight.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 August 2003
Resolved 27 August 2003
Resolution: Verified that bulkhead penetration was sealed off.
Construction/Loadline › Structures
Issued 20 August 2003 Resolved
Complete installation of foam filler to aft voids created in fan tunnel spaces.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 October 2003
Construction/Loadline › Structures
Issued 20 August 2003 Resolved
Complete installation of watertight bulkheads installed between port and stbd enginerooms in vent trunk. Provide calculations indicating adequate strength of each bulkhead.
Due 29 August 2003
Resolved 27 August 2003
Resolution: Verified that installation was complete and satisfactory.
Electrical › Electrical Distribution System (service)
Issued 20 August 2003 Resolved
Provide revised electrical plans and make new installation of power trim tabs available of inspection prior to use of system. LEGACY COMPONENT DESC: Wiring
Due 25 August 2003
Resolved 22 October 2003
Construction/Loadline › Penetrations
Issued 20 August 2003 Resolved
Permanently close or remove 1 inch thru hull fitting stbd side generator space outboard hull.
Due 29 August 2003
Resolved 27 August 2003
Resolution: Through hull was sealed up.
Engineering › Lubricating Oil Storage/Transfer System
Issued 20 August 2003 Resolved
Remove or permanently close old lube oil transfer piping.
Due 29 August 2003
Resolved 27 August 2003
Engineering
Issued 20 August 2003 Resolved
Permanently cap off 2 inch valve no longer in use stbd generator space on hydraulic expansion tank.
Due 29 August 2003
Resolved 27 August 2003
Engineering
Issued 20 August 2003 Resolved
Complete cleaning of port and stbd generator spaces, complete hanging for all piping and wiring and heat detector over engines.
Due 29 August 2003
Resolved 27 August 2003
Construction/Loadline › Penetrations
Issued 20 August 2003 Resolved
Make all watertight bulkhead hose penatrations watertight in accordance with 46 CFR 182.720
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2003
Resolved 22 October 2003
Operations/Management › Equipment Service/Testing
Issued 20 June 2003 Resolved
Conduct sea trials in the presence of US Coast Guard. Sea trials shall include hard turns to pcort & staboard, crash stops, hard backing down & an endurance run of 4 hours while operating at cruising speed. Result of sea trial shall be logged & delivered to CG.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2004
Operations/Management › Equipment Service/Testing
Issued 20 June 2003 Resolved
Prior to operation with passengers, conduct sea trials in the presence of a CG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 June 2003
Resolved 3 July 2003
Operations/Management › Equipment Service/Testing
Issued 20 June 2003 Resolved
Prior to operation with passengers, provide to the CG a statement from the drive manufacturer that indicates who many hours are needed to prove the durability of the replacement parts in the drive system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 June 2003
Resolved 3 July 2003
Operations/Management › Equipment Service/Testing
Issued 20 June 2003 Resolved
Prior to 2 July 2003 provide to the CG a root-cause analysis that definitiely indicates the reason for the tie-bar failure to the starboard out-drive on 5 June 2003.
Action required: 705 - Other - as specified
Due 5 July 2003
Resolved 3 July 2003
Operations/Management › Equipment Service/Testing
Issued 20 June 2003 Resolved
Prior to 2 July 2003, provide to the CG, manufacturer results of metallurgical test of the two starboard shafts to determine if there was an inherent flaw in the metal. Corrective measures shall also be indicated.
Action required: 705 - Other - as specified
Due 5 July 2003
Resolved 2 July 2003
Documentation › Logs/Records › Report of Marine Accident, Injury or Death
Issued 2 June 2003 Resolved
Provide CG-2692 for marine casualty that occured on 29 May 03.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 June 2003
Resolution: Received CG-2692 for incident.
Documentation › Logs/Records › Report of Marine Accident, Injury or Death
Issued 2 June 2003 Resolved
Provide CG-2692 for marine casualty that occured on 01June03.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 June 2003
Resolution: MSD FT Myers received 2692 for incident.
Accommodation/Occupational Safety › Occupational Safety
Issued 2 June 2003 Resolved
Make permanent repairs to deck grating in engine rooms.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Deck grating was repaired.
Engineering › Diesel Engine (auxiliary)
Issued 2 June 2003 Resolved
Provide written root cause analysis for casualties affecting port lift engine.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Root cause analysis was provided and placed in vessel''s file.
Engineering › Diesel Engine (auxiliary)
Issued 2 June 2003 Resolved
Make permanent repairs and address water intrusion problems of engine control boxes on port and starboard lift engines. LEGACY COMPONENT DESC: Control Box
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Engine control boxes were sealed and wrapped in plastic bags.
Engineering › Generator (propulsion-electric)
Issued 2 June 2003 Resolved
Correctly splice lead wire on fuel pump for starboard generator. LEGACY COMPONENT DESC: Cable
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Wire was properly spliced.
Operations/Management › Vessel Safety Management
Issued 2 June 2003 Resolved
Update periodic and daily checkoff sheets to ensure checks are being carried out. Provide space for captain's signature to ensure accountability. LEGACY COMPONENT DESC: Documentation Maintenance/Control
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Daily checkoff sheets were updated as required.
Engineering › Diesel Engine (auxiliary)
Issued 2 June 2003 Resolved
Call MSD FT Myers and conduct satisfactory test of repairs to port lift engine.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Port lift engine was tested satisfactorily.
Fire Fighting › Structural Fire Protection - General
Issued 2 June 2003 Resolved
Re-install insulation to overhead in port lift engine room LEGACY COMPONENT DESC: Accommodation Space Protection
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 12 June 2003
Resolved 12 June 2003
Resolution: Attended vessel at owner''s request to clear def and noted that work had not commenced yet, told owner to have insulation reinstalled before end of day, or boat would not be allowed to operate. Received digital photos showing insulation mounted in place
Fire Fighting › Structural Fire Protection - General
Issued 2 June 2003 Resolved
Re-install insulation to overhead in starboard lift engine room. LEGACY COMPONENT DESC: Accommodation Space Protection
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 12 June 2003
Resolved 12 June 2003
Resolution: Attended vessel at owner''s request to clear requirement. Noted that no work had been completed, told owner to have work completed or vessel would not be allowed to operate. Received digital photos of insulation reinstalled, cleared requirement.
Fire Fighting › Fire Pumps
Issued 2 June 2003 Resolved
Secure fire pump and bilge pump to decking in port lift engine room LEGACY COMPONENT DESC: Location
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 June 2003
Resolved 12 June 2003
Resolution: Cleared requirement, but noted that mounts were beginning to loosen. Engineer tightened fittings.
Engineering › Shafting/Propeller Arrangements
Issued 30 May 2003 Resolved
Make permanent repairs to the port fan engine and shaft to correct excessive vibration caused by suspected bent coupling. This items shall be corrected to the satisfaction of an attending Coast Guard Marine Inspector prior to carrying passengers. LEGACY COMPONENT DESC: Coupling
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Port lift engine coupling and transmission shaft splines were replaced. Repairs were tested satisfactorily by MSD FT Myers.
Engineering › Bilge Water Management System
Issued 30 May 2003 Resolved
Renew broken 24 volt bilge strainer in port fan space. Correct prior to carrying passengers. LEGACY COMPONENT DESC: Strainer
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2003
Resolution: Bilge strainer was repaired and pump was re-mounted.
Engineering › Freshwater Generation System
Issued 30 May 2003 Resolved
Make permanent repairs to leak in potable water system not later than 15Jun03. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 15 June 2003
Resolved 5 June 2003
Resolution: Determined that potable water system does not have a leak, verified that system will leak into space during filling through poorly designed system if crew does not shut water hose off and tank is overfilled.
Accommodation/Occupational Safety › Occupational Safety
Issued 30 May 2003 Resolved
Install a means to properly secure deck grates in engine spaces for crew safety not later than 15Jun03. LEGACY COMPONENT DESC: Deck Grating
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 15 June 2003
Resolved 5 June 2003
Resolution: Deck grates were properly secured.
Construction/Loadline › Hull
Issued 7 May 2003 Resolved
PROVIDE WRITTEN PROPOSAL TO MSD FT MYERS THAT DESCRIBES REPAIRS TO HULL IN AREAS WHERE STEERING ARMS ATTACH.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2003
Resolution: Received fax letter from [name withheld], marine surveyor that thoroughly describes repair procedure for new surface drive installation. Copy of letter will be placed in vessel''s permanent file.
Engineering › Non-conventional Propulsion/Steering
Issued 6 May 2003 Resolved
PROVIDE PERMANENT MEANS TO ATTACH STEERING FEEDBACK RAMS TO DRIVE UNITS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2003
Resolution: COLLARS WERE FABRICATED TO ATTACH THE FEEDBACK RAMS TO THE DRIVE UNITS.
Operations/Management › Port and Waterways Safety
Issued 6 May 2003 Resolved
CONDUCT SATISFACTORY SEA TRIAL IN PRESENCE OF MARINE INSPECTOR, DEMOSTRATE PROPER OPERATION OF NEW DRIVE SYSTEM.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2003
Resolution: SEA TRIALS WERE COMPLETED SATISFACTORILY AND THE VESSEL WAS ALLOWED TO OPERATE.
Operations/Management › Equipment Service/Testing
Issued 2 May 2003 Resolved
UPDATE OPERATIONS MANUAL TO INCLUDE COMPOSITE HULL REPAIR PROCEDURES FOR VARIOUS AREAS OF THE HULL AND SPECIFIC MATERIALS USED AS ACCEPTED BY INDUSTRY PROFESSIONALS. LEGACY COMPONENT DESC: Hull Repair
Due 2 June 2003
Resolved 9 April 2004
Operations/Management › Equipment Service/Testing
Issued 2 May 2003 Resolved
PROVIDE UPDATE TO OPS MANUAL REFLECTING REPLACEMENT PROPULSION/STEERING AND FAN REDUCTION SYSTEM. LEGACY COMPONENT DESC: Propulsion System Operations
Due 5 June 2003
Resolved 9 April 2004
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 28 April 2003 Resolved
PROVIDE G-MSC APPROVAL FOR REPLACEMENT OF PROPULSION AND STEERING SYSTEMS.
Condition: Unknown
Due 25 May 2003
Resolved 16 June 2003
Resolution: G-MSC examined plans for replacement and left final approval up to attending marine inspectors. MSO Tampa witnessed installation and MSD FT Myers sea trialed vessel on 28 Aug. Surface drives were sat, fan motors sustained failures.
Construction/Loadline › Hull
Issued 25 April 2003 Resolved
Provide transom repair approval from G-MSC for insert of previous drive unit hull openings and demonstrate repair procedure in the presence of an attending CG Marine Inspector.
Due 25 May 2003
Resolved 2 May 2003
Resolution: Examined final repair to 4 12" x 10" plugs instered in transom where previous propulsion unit steering arms were located. MSC accepted repair proposal.
Operations/Management › Equipment Service/Testing
Issued 25 April 2003 Resolved
CONDUCT A SATISFACTORY SEA TRAIL IN THE PRESENCE OF A CG MARINE INSPECTOR IN FORT MYERS, FL, PRIOR TO CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 25 May 2003
Resolved 15 May 2003
Resolution: MSD INSPECTORS SEA TRIALED VESSEL AND THEN RODE VESSEL ON 4 HOUR TRIP TO KEY WEST WITH NO DISCREPANCIES NOTED.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 25 February 2003 Resolved
Repair/renew broken starboard outboard propeller shaft.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2003
Documentation › Certificates/Documents
Issued 25 February 2003 Resolved
Provide a root cause analysis report from manufacturer detailing cause and corrective actions to prevent propulsion shaft/unit failure.
Due 25 March 2003
Resolved 2 May 2003
Resolution: Cleared reqmnt as Franz-Halise propulsion units were removed and replaced with Arneson drive units.
Fire Fighting › Fire Main › Material
Issued 20 November 2002 Resolved
Gauge missing from discharge side of fire pump (starboard side)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 December 2002
Resolved 4 December 2002
Resolution: Verified that gauge was installed.
Lifesaving › Embarkation Appliances/Stations
Issued 20 November 2002 Resolved
Relocate instructions for operation of mini slide to emergency evacuation muster area.
Condition: Improper Installation
Due 21 December 2002
Resolved 4 December 2002
Resolution: Instructions moved to muster area.
Accommodation/Occupational Safety › Occupational Safety
Issued 20 November 2002 Resolved
Secure CO2 bottles for soda system.
Condition: Improper Installation
Due 21 December 2002
Resolved 4 December 2002
Resolution: Soda bottles secured using "bungee" cord.
Deck/Cargo › Mooring/Anchoring › Anchor Rope
Issued 20 November 2002 Resolved
Provide adequate length of anchor rode - minimum 7:1 ratio for deepest water encountered on route.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: Verified vessel now has 450 feet of line for anchor rode.
Construction/Loadline
Issued 20 November 2002 Resolved
Complete installation of sump pump system on port side "tunnel".
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: Verified that sump system was completed and made watertight.
Engineering › Steering Gear System › Ram
Issued 20 November 2002 Resolved
Securely fasten hydraulic rams for steering system.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: Inspected repairs and got underway on vessel to test, all sat. Repair made using heavy laminate and epoxy to build up area around ram and secure to transom.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 20 November 2002 Resolved
Secure leaks on exhaust system. LEGACY COMPONENT DESC: Exhaust
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: Leaks were secured.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 20 November 2002 Resolved
Address with engine manufactuerer overheating problems on main engines.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: It was concluded that the wrong type of coolant was being used in the engines. The engines were flushed out and re-filled with the correct coolant.
Operations/Management
Issued 20 November 2002 Resolved
Provide copies of ops and training manual to MSD Marathon. LEGACY COMPONENT DESC: Ops & Training Manual
Action required: 705 - Other - as specified
Due 21 December 2002
Resolved 4 December 2002
Resolution: Manuals were received by MSD Marathon.
Lifesaving › Inflatable Liferafts
Issued 20 November 2002 Resolved
Provide label for IBA release on starboard side. LEGACY COMPONENT DESC: Markings
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: Label provided.
Electrical › Electrical Distribution System (service)
Issued 20 November 2002 Resolved
Provide warning placard for main switchboard panel. LEGACY COMPONENT DESC: Warning Placard
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: Placard provided.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 20 November 2002 Resolved
Provide rail or handhold in area of chain and capstan.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2002
Resolution: Verified that a grab rail was installed.
Operations/Management › Vessel Safety Management
Issued 20 November 2002 Resolved
EXPLAIN/DEFINE SHORE SUPPORT INFRASTRUCTURE TO ENSURE CREW FATIGUE LIMITS ARE NOT EXCEEDED & VESSEL'S PREVENTATIVE MAINT IS ACHIEVED. PROVIDE WRITTEN COMPANY POLICY IN OPS MANUAL EXPLAINING ON/OFF DUTY RESPONSIBILITY OF STATION BILL CREW HOURS OF DUTY & MEANS OF PROVIDING ADEQUATE REST FACILITIES. LEGACY COMPONENT DESC: CREW REST
Due 5 June 2003
Resolved 9 April 2004
Electrical › Electric Supply System (service)
Issued 20 November 2002 Resolved
Ensure that wire runs in engine rooms are suitably supported and have sufficient clearance. LEGACY COMPONENT DESC: Cable
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 December 2002
Resolved 4 December 2002
Resolution: Wire runs were checked and moved to provide proper clearance.
Communications › Audible Communications
Issued 20 November 2002 Resolved
Provide correctly sized bell for vessel. LEGACY COMPONENT DESC: Bell
Condition: Improper Installation
Due 20 December 2002
Resolved 4 December 2002
Resolution: Correctly sized bell on vessel.
Navigation › Collision/Grounding Avoidance
Issued 20 November 2002 Resolved
Demonstrate that navigation lights meet Annex I #13 of COLREGS or receive waiver from Coast Guard.. LEGACY COMPONENT DESC: Navigation Lights
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 December 2002
Resolved 29 August 2003
Resolution: Owner installed masthead head on post that meets height requirements in COLREGS
Fire Fighting › Combustible Materials
Issued 20 November 2002 Resolved
Provide metal trash cans on vessel. LEGACY COMPONENT DESC: Trash cans
Action required: 705 - Other - as specified
Due 20 December 2002
Resolved 4 December 2002
Resolution: Trash cans that are in passenger accomodation area are metal.
Fire Fighting › Fire Hoses
Issued 20 November 2002 Resolved
Provide documentation that prove that fire nozzles meet 181.320 (1) (3) LEGACY COMPONENT DESC: Connections
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 December 2002
Resolved 4 December 2002
Resolution: Owner supplied manufacturer''''s specifications that demonstrate that nozzles meet the regs.

Casualty record · 4

30 May 2003Routine · role: Involved in a Marine Casualty · activity 1808103
11 February 2005Routine · role: Involved in a Marine Casualty · activity 2291919
23 February 2005Routine · role: Involved in a Marine Casualty · activity 2309670
5 October 2005Routine · role: Involved in a Marine Casualty · activity 2518377
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.