Inspection history · 15
23 March 2026
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8319644
23 April 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8117903
26 February 2025
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8086213
29 February 2024
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7872252
22 February 2023
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7640599
5 December 2022
DAPI Audit · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7601805
24 March 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7418093
2 March 2022
Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7382544
23 September 2021
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7318608
16 February 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7141106
14 January 2020
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6887232
29 October 2019
Administrative Inspection · Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6848610
7 January 2019
DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6606729
8 August 2017
DAPI Audit · Deficiency Check · COI Inspection · Administrative Inspection · Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6235412
25 May 2017
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6155396
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 23 April 2025
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. Port side fuel shutoff valve does not close completely due to cable loop getting caught in eye bolt. Additionally, starboard valve handle is broken and does not stop at the fully closed/open positions. Repair shutoff valves to satisfaction of MI.
46 CFR 182.20-40 (b)(3)
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2025
Resolved 6 May 2025
Resolution: Verified new starboard side fuel shutoff valve was installed and can fully open and close, as well as port side fuel shutoff valve cable loop was fixed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 April 2025
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Lighting wire for aft deck found disconnected and open. Repair/replace to satisfaction of MI.
46 CFR 183.01-15 (a)
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2025
Resolved 6 May 2025
Resolution: Verified lighting wiring on aft deck was reconnected
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 April 2025
Resolved
A second power pump is an acceptable alternative to a hand pump if it is supplied by a source of power independent of the first power bilge pump. Cabin compartment electronic submersible pump was inoperable. Repair/replace to satisfaction of MI.
46 CFR 182.520(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2025
Resolved 6 May 2025
Resolution: Verified forward cabin space ESP is now operable. Breaker was off previously.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 February 2024
Resolved
Fuel shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines. Discovered port side fuel shutoff unable to fully close due to pull cable crimp getting caught in eye bolt. Repair/replace pull cable to allow valve to fully close.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2024
Resolution: O/O Provided picture of cable crimp for fuel shut off.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 29 February 2024
Resolved
The power fire pump shall be self priming and of such size as to discharge an effective stream from a hose connected to the outlet. Fire pump was unable to produce stream of water to fire hoses. O/O provided video showing fire pump working properly after MI's departed the vessel. Ice was built up in the discharge line blocking the stream of water.
Action required: 10 - Deficiency Rectified
Resolved 29 February 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 February 2024
Resolved
All vessels except non-self-propelled vessels shall be provided with suitable steering apparatus. Discovered cotter pins on steering ram assembly to be severely corroded. Replace corroded cotter pins on steering ram assembly.
46 CFR 182.30-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2024
Resolved 6 March 2024
Resolution: O/O provided picture of new cotter pins
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 February 2024
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be replaced if the expiration date has passed. Found three floating water lights with expired batteries. Replace floating water light batteries.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2024
Resolved 6 March 2024
Resolution: O/O Provided picture of newly purchased float light batteries.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 February 2024
Resolved
All electrical installations shall be to the satisfaction of the officer in charge, marine inspection. Found several dead end electrical wires behind console in pilot house. Remove any old/unused wires & cap/secure remaining electrical wires under console.
46 CFR 183.01-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2024
Resolved 6 March 2024
Resolution: O/O provided pictures of electrical wires secured/capped.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 December 2022
Resolved
Flexible nonmetallic hose must meet SAE J1942 and have factory end fittings that meet SAE 1475. Diesel supply hose for starboard engine is hose clamped to its end fittings and has no visible markings showing what standard the hose meets. 46 CFR 182.720
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 15 December 2022
Resolution: Replacement hose is a Parker 221FR-8. Listed as equivalent to SAE J1942.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 5 December 2022
Resolved
Remove all zip ties that from the life float, especially those used for coiling the painter and pendants. CORRECTED ON THE SPOT. 46 CFR 180.130(a)(2)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 December 2022
Resolution: Corrected on the spot.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 2 March 2022
Resolved
Vessel's sewage overboard valve was not properly secured. Install proper securing device to sewage overboard valve.
33CFR159.7(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 24 March 2022
Resolution: USCG satisfied with picture sent from [name withheld]
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 March 2022
Resolved
Vessel unable to provide annual servicing report for portable fire extinguishers. Provide Marine Inspector servicing report attesting that the annual maintenance was carried out for all portable extinguishers. 46CFR176.810(b)(1)(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 25 March 2022
Resolution: USCG satisfied with picture provided by [name withheld] to clear the deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 March 2022
Resolved
Vessel only had 01 donning instructions posted and has 03 different life jacket models requiring different donning instructions. Acquire and post donning instructions for all life jacket models carried on board. 46CFR185.516(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 24 March 2022
Resolution: USCG satisfied with pictures that [name withheld] provided
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 2 March 2022
Resolved
01 light in the machinery space and lazarette are missing lenses. 01 light in the machinery space is missing protective guard. Install missing lenses and protective guards on all lighting fixtures in machinery space and lazarette. 46CFR183.410(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2022
Resolved 24 March 2022
Resolution: USCG satisfied with pictures that [name withheld] provided.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 23 September 2021
Resolved
Penetrations and opening in watertight bulkheads must have means to make watertight. Vessel's fresh water hose penetrated the lazarette/engine room bulkhead and the engine room/# 2 space compartment bulkhead on the port side and penetrations were not watertight. Various electrical cables and wiring penetrations were also found on both port and starboard side of the lazarette and engine room bulkhead that were not watertight. Vessel has old/unused generator piping that penetrates the lazarette/engine room bulkhead in the center of bulkhead that is not watertight. Make all penetrations watertight. 46 CFR 171.114
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 October 2021
Resolved 22 October 2021
Resolution: O/O submitted photos of all bulkhead penetrations being properly sealed up.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 23 September 2021
Resolved
Each opening exposed to the weather must be watertight.
Vessel had an installed fresh water hose that penetrated the weather deck over the lazarette compartment on the starboard side of the vessel. Remove penetration and make watertight or install satisfactory metallic valve. 46 CFR 171.124
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 October 2021
Resolved 15 October 2021
Resolution: O/O submitted satisfactory photos of an installed valve to the fresh water pipe fitting that penetrated the weather deck.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 February 2021
Resolved
Life jackets must be stowed in convenient places
distributed throughout the accommodation spaces. Each
life jacket kept in a stowage container must be readily
available. Life jackets are stowed in one centralized
location in a forward compartment of the accommodation
space located within the head. Passengers on weather
deck would need to open three doors to access them.
Prepare a proposal in order to have life jackets in an
arrangement spread throughout the accommodation spaces
and readily available and submit to USCG for review. 46 CFR 180.78.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 26 March 2021
Resolution: Owner sent photos of new arrangement. 18 starboard and 18 aft by the starwell, properly marked.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 16 February 2021
Resolved
Each hatch exposed to the weather must be watertight on
a partially protected route. Each hatch cover must have
a securing device; and be attached to the hatch frame or
coaming by hinges, captive chains, or other devices of
substantial strength to prevent its loss. Engine room
and laz space hatches do not have securing devices to
maintain watertight integrity; hatches are not attached
to the vessel. Alternatively, prove watertightness of
current arrangement by a 30PSI hose test though a nozzle
of not less than .5". 46 CFR 171.214.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 2 March 2021
Resolution: Cleared. 02MAR2021. Witnessed satisfactory
installation and hydro test with pressurized water hose of ER deck hatches. No water entered ER. - - PDJArnett-CIV
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 February 2021
Resolved
The discharge ends of vent pipes shall be fitted with
removable flame screens or flames arresters. The flame
screen shall consist of a single screen of corrosion
resistant wire of at least 30x30 mesh. Vessel was
missing flame screen on diesel fuel tank vent pipe
discharge end (starboard aft). Replace to standard
above. 46 CFR 182.20-35(d).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 12 March 2021
Resolution: Received photo of flame screen installation and receipt of proper type.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 February 2021
Resolved
Life ring must be fitted with a lifeline of at least
60ft. Each life buoy with a floating water light must
have a lanyard 3-6ft that secures the water light around
the body of the ring life buoy. Life Buoy was outfitted
with a line attached around the grab line of the buoy
and was more than 3-6 feet. Attach 60ft lifeline to life
ring and separately attach water light on a 3-6 lanyard,
secured around the body of the life ring. 46 CFR 180.70(c) and(d)(2).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 2 March 2021
Resolution: Cleared. 02MAR2021. Observed life rings were properly outfitted with lanyard of appropriate material and lengths. -- PDJArnett-CIV
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 February 2021
Resolved
Where fire extinguishing equipment is not required but
is installed, the system or equipment and its
installation shall meet the requirements of this part.
One fire extinguisher in the engine room was overdue for
annual service and in the red. Replace or remove
extinguisher (this is an extra fire extinguisher per
requirement for the space.)46 CFR 181-05-5(a).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 2 March 2021
Resolution: Cleared. 02MAR2021. Observed fire extinguisher had been removed from the ER. -- PDJArnett-CIV
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 January 2020
Resolved
Provide 10 adult PFD's, passenger count is limited to 35 until corrected. 46 CFR 176.808
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2020
Resolved 19 March 2020
Resolution: Operator purchased 10 new life jackets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 January 2020
Resolved
Replace flexible vent hose. 46 CFR 182.20-30
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2020
Resolved 19 March 2020
Resolution: Reviewed operator submitted photo of new hose installed.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 14 January 2020
Resolved
Provide emergency procedures at the operating station. 46 CFR 185.506
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2020
Resolved 19 March 2020
Resolution: procedures have been posted as required.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 14 January 2020
Resolved
Vessel passengers are restricted from accessing the bow due to low rail height. If passenger access is desired, submit plans for changes to CG. Address issue at next drydock, activity 6887232
Action required: 705 - Other - as specified
Due 14 February 2020
Resolved 16 February 2021
Resolution: Vessel added additional course of rail to existing configuration. Rail height is now 40 inches.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 January 2020
Resolved
Provide plug for fuel filter drain.
Action required: 10 - Deficiency Rectified
Due 14 February 2020
Resolved 14 January 2020
Resolution: Operator provided plug.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 14 January 2020
Resolved
Replace ball valve with a screw type valve in the forepeak. Due at next drydock.
Action required: 705 - Other - as specified
Due 31 October 2021
Resolved 23 September 2021
Resolution: Owner replaced valve, MI witnessed replacement during DD/ISE exam.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 7 January 2019
Resolved
Small hole found on aft vent on port side where the deck meets the vent approximately 18" forward of the back of the vent. Complete temporary repair, and finish permanent repair at next dry dock.
46 CFR 179.320
Action required: 10 - Deficiency Rectified
Resolved 7 January 2019