Records from 1986 to 2005. Most recent: inspection, 9 December 2005.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 18
9 December 2005
Administrative Inspection
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2548811
14 June 2001
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1370308
28 August 2000
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1376316
25 August 1999
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1404846
25 June 1998
COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1388528
18 February 1992
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 943501
12 November 1991
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1257019
11 October 1990
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1216536
20 July 1990
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1297281
15 May 1990
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 916601
15 December 1989
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 919046
13 November 1989
Hull Examination · COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 925577
6 May 1989
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1203224
16 August 1988
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1347797
27 June 1988
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 898669
14 May 1987
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1338086
18 July 1986
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 996633
1 July 1986
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 996630
Fire Fighting
Issued 14 June 2001
Resolved
Provide documentation of fixed fire extinguishing system service.
Condition: Unknown
Due 30 June 2001
Resolved 30 July 2001
Lifesaving
Issued 14 June 2001
Resolved
Install retro-reflective material to ring buoy.
Condition: Unknown
Due 30 June 2001
Resolved 30 July 2001
Fire Fighting
Issued 28 August 2000
Resolved
Install additional type I portable fire extinguisher.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Navigation
Issued 28 August 2000
Resolved
Show proper operation of port running light.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Electrical
Issued 28 August 2000
Resolved
Install protective coverings for both batteries.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Lifesaving
Issued 28 August 2000
Resolved
Obtain 3 red/3 orange smoke flares.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Fire Fighting
Issued 28 August 2000
Resolved
Show proper installation of fixed fire extinguishing system with manual andautomatic release.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Lifesaving
Issued 25 June 1998
Resolved
PROVIDE EMERGENCY CHECK OFF LIST ABOARD.
Condition: Unknown
Due 25 June 1998
Resolved 17 August 1998
Engineering
Issued 25 June 1998
Resolved
REPLACE VENTILATION DUCT HOSES IN MACHINERY SPACE WITH APPROVED TYPE DUCTING.
Condition: Unknown
Due 25 July 1998
Resolved 17 August 1998
Lifesaving
Issued 25 June 1998
Resolved
STENCIL NAME AND APPLY REFLECTIVE TAPE ON RING BUOY AND ALL PFD'S.
Condition: Unknown
Due 25 July 1998
Resolved 17 August 1998
Documentation
Issued 25 June 1998
Resolved
VESSEL LIMITED TO 6 PASSENGERS WHEN OPERATED BY OUPV LICENSED OPERATOR.
Condition: Unknown
Due 25 June 1998
Resolved 25 June 1998
Engineering
Issued 15 May 1990
Resolved
REPLACE CRACKED FUEL SUPPLY FLEX HOSES ON BOTH ENGINES.
Condition: Unknown
Due 15 May 1990
Resolved 15 May 1990
Lifesaving
Issued 15 May 1990
Resolved
STENCIL RING BUOY WITH VESSEL'S NAME.
Condition: Unknown
Due 15 May 1990
Resolved 15 May 1990
Electrical
Issued 15 May 1990
Resolved
REMOVE DEAD END WIRING ON PORT SIDE UNDER BULWARK IN WAY OF ENGINE ROOM BULKHEAD.
Condition: Unknown
Due 15 May 1990
Resolved 15 May 1990
Accommodation/Occupational Safety
Issued 13 November 1989
Resolved
REPLACE ENGINE ROOM VENT HOSES WITH FIREPROOF TYPE.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Construction/Loadline
Issued 13 November 1989
Resolved
MAKE LOWER PORTION OF ENGINE ROOM BULKHEAD WATER TIGHT.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Lifesaving
Issued 13 November 1989
Resolved
PROVIDE 2 ADDITIONAL CHILD'S PFDS.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Accommodation/Occupational Safety
Issued 13 November 1989
Resolved
PROVIDE ADDITIONAL ENGINE ROOM BLOWER.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Construction/Loadline
Issued 27 June 1988
Resolved
MAKE PERMANENT REPAIRS TO THE FRACTURED WELD AT THE INTERSECTION OF THE LONGITUDINAL FRAME AND THE FIRST TRANSVERSE FRAME.
Condition: Unknown
Due 27 June 1988
Resolved 27 June 1988
Construction/Loadline
Issued 27 June 1988
Resolved
MAKE PERMANENT REPAIRS TO THE FRACTURED WELD IN THE SIDE SHELL FRAMING LOCATED IN WAY OF STBD SIDE OF ENGINE COMPARTMENT.
Condition: Unknown
Due 27 June 1988
Resolved 27 June 1988
Engineering
Issued 14 May 1987
Resolved
PROVIDE CHECK VALVES IN ALL BILGE DISCHARGE LINES (IN ACCORDANCE WITH 46 CFR 182.25-5(C)), OR ARRANGE BILGE LINE SO AS TO PREVENT BACKFLOW.
Condition: Unknown
Due 14 May 1987
Resolved 14 May 1987
Fire Fighting
Issued 14 May 1987
Resolved
WEIGHT HALON CYLINDER FOR FIXED FIREFIGHTING SYSTEM.
Condition: Unknown
Due 14 May 1987
Resolved 14 May 1987
Construction/Loadline
Issued 14 May 1987
Resolved
CROP AND RENEW DAMAGED SECTION OF BOTTOM LONGITUDINAL IN MIDSECTION OF VESSEL.
Condition: Unknown
Due 14 May 1987
Resolved 14 May 1987
Fire Fighting
Issued 1 July 1986
Resolved
PROVIDE SERVICING(WEIGHING) FOR FIXED HALON BOTTLE.
Condition: Unknown
Due 1 July 1986
Resolved 1 July 1986
Engineering
Issued 1 July 1986
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE REPAIR FORWARD BILGE PUMP.
Condition: Unknown
Due 1 July 1986
Resolved 1 July 1986
Lifesaving
Issued 1 July 1986
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE RENEW RING BUOY.
Condition: Unknown
Due 1 July 1986
Resolved 1 July 1986
Electrical
Issued 1 July 1986
Resolved
INTERLOCK IGNITION WITH POWER VENTILATION IN ACCORDANCE WITH 46 CODE OF FEDERAL REGULATIONS PART 182.15-45(D).
Condition: Unknown
Due 1 July 1986
Resolved 1 July 1986
Lifesaving
Issued 1 July 1986
Resolved
VESSEL IS LIMITED TO CARRIAGE OF ELEVEN TOTAL PERSONS(PASSENGERS AND CREW) UNTIL SIX ADDITIONAL ADULT TYPE 1 PERSONAL FLOATATION DEVICES ARE PROVIDED.
Condition: Unknown
Due 1 July 1986
Resolved 1 July 1986