Records from 1986 to 2001. Most recent: inspection, 26 February 2001.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Engineering
Issued 24 September 2000
Resolved
PLENUM LEVEL BOILERS AIR FEED LINES ARE DISCONNECTED
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Electrical
Issued 24 September 2000
Resolved
SHIPS SERVICE GENERATOR #2 WATER PUMP LEAKS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
HAVE THE RECOGNIZED ORGANIZATION CONDUCT A RE-AUDIT OF THE SAFETY MANAGEMENT SYSTEM
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Unknown
Issued 24 September 2000
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Construction/Loadline
Issued 24 September 2000
Resolved
THE M/T NEPTUNE DORADO RETAINED OIL IN THE #2 PORT BALLAST TANK AND BOTH_x001C_ #7 PORT & STBD BALLAST TANKS. IN ADDITION, THE VSL MASTER ADMITTED TO DISCHARGING OIL SLUDGE FM THE #7 PORT TANK OVERBOARD BETWEEN CHINA & AUSTRALIA AND BETWEEN AUSTRALIA AND AFRICA.
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
A VIO OF 33CFR155.1035(i)(5) IN THAT THE VSL DID NOT HAVE AN OSRO AVAILABLEPRIOR TO ENTRY INTO SAN FRANCISCO BAY.
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
OIL DISCHARGE MONITORING EQUIPMENT DOES NOT WORK
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
MAIN DIESEL ENGINE EXPANSION TANK HAS BRACING AND PLUGGING TO KEEP IT FROM LEAKING ALL OF ITS COOLANT.
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
SAFETY RELIEF VALVE REMOVED FROM WASTE HEAT BOILER AND BLIND FLANGED
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
ALL REMOTE MANUAL BOILER SAFETY RELIEF ACTUATORS REMOVED FROM SERVICE.
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
COOLING WATER PIPE/AIR COOLANT EXCHANGER TO MAIN DIESEL ENGINE LEAKING
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
LUBE OIL HEAT EXCHANGER LEAKING RAW WATER FROM UNFIRED PRESSURE VESSEL INSPECTION PORT
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
HEAT EXCHANGER FOR JACKET WATER TO MAIN DIESEL ENGINE LEAKING RAW WATER FROM UNFIRED PRESSURE VESSEL INSPECTION PORT
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Unknown
Issued 24 September 2000
Resolved
SHIPS SERVICE # 2 FRESH WATER EVAP. UNIT IS DISASSEMBLED
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
AS ARESULT OF THE SAFETY MANAGEMENT RE-AUDIT. MASTER IS TO IMPLEMENT THE SAFETY AND ENVIORMENTAL PROTECTION POLICY OF THE COMPANY, VERIFY THAT REQUIREMENTS ARE OBSERVED, REVIEW THE SMS AND REPORT ITS DEFICIENCIES TO THE SHORE BASED MANAGEMENT
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
COMPANY SHOULD CARRY OUT INTERNAL SAFETY AUDITS TO VERIFY WHETHER SAFETY AND POLLUTION PREVENTION ACTIVITIES COMPLY WITH SAFETY MANAGEMENT SYSTEM
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
THERE IS NO COMPUTATION OF VESSEL STABILITY FOR CARGO TRANSFER-(LOADING MANUAL)
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
THE SAFETY MANAGEMENT SYSTEM SHOULD PROVIDE FOR SPECIFIC MEASURES AIMED AT PROMOTING THE RELIABILITY OF CRITICAL EQUIPMENT (VITAL SYSTEMS)
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
SAFETY MANAGEMENT SYSTEM SHOULD ENSURE COMPLIANCE WITH ALL MANDATORY RULES AND REGULATIONS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
NO FLAME SCREENS ARE INSTALLED ON ANY FUEL OIL, LUBE OIL, CARGO VENTS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Unknown
Issued 24 September 2000
Resolved
THERE IS A SHORTAGE OF SPARE PARTS ABOARD THE VESSEL RESULTING IN FAILURE TO MAINTAIN EQIPMENT PROPERLY
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Electrical
Issued 24 September 2000
Resolved
WIRE SPLICE WITH BLACK TAPE WAS OBSERVED ON EXPLOSION PROOF LIGHTING CIRCUIT IN PAINT LOCKER
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Fire Fighting
Issued 24 September 2000
Resolved
BOTH FIRE MAIN PUMPS DO NOT OPERATE
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
FAILURE TO HAVE AN ORIGNAL INERT GAS MANUAL
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Accommodation/Occupational Safety
Issued 24 September 2000
Resolved
MARINE SANITATION DEVICE RELEASING SEWAGE INTO MAIN DIESEL ENGINE SPACE
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Navigation
Issued 24 September 2000
Resolved
VESSEL DID NOT HAVE AN INSTALLED AUTO PILOT ALARM
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
MISSING POLLUTION PLACARD
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Unknown
Issued 24 September 2000
Resolved
CANNOT ACCESS MEDICINE CHEST
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
BRIDGE MANAGEMNT MANUAL MISSING
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
FAILURE TO HAVE VITAL SYSTEMS SURVEY
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 24 September 2000
Resolved
MISSING UNDER KEEL CLEARENCE POLICY
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
FUEL OIL LINES TO MAIN DIESEL ENGINE MISSING BOLTS ON FLANGES AND LEAK
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Accommodation/Occupational Safety
Issued 24 September 2000
Resolved
MAIN VENTILLATION BLOWERS FOR ENGINE ROOM ARE INOPERABLE
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
STARBOARD AUXILIARY BOILER FUEL OIL SETTLING TANK LEAKS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
2 DAYS AFTER COMPLETION OF THE CARGO TRANSFER OPERATIONS THE CREW FAILED TOCLEAN THE DISCHARGE CONTAINMENT OF APPROXIAMTELY 1/2 BARREL OF CRUDE OIL
Condition: Unknown
Due 12 October 2000
Resolved 16 October 2000
Deck/Cargo
Issued 24 September 2000
Resolved
THE CREW OF THE M/T NEPTUNE DORADO PURPOSELY CLOSED THE VENT MAST RISER TO THE CARGO BLOCK, THIS VENT MAST RISER WAS THE ONLY LOCATION WHERE THE CARGOBLOCK COULD VENT TO ATMOSPHERE FOR SMALL PRESSURE ADJUSTMENTS IN TH ETANKS.T HE VESSEL IS NOT EQUIPTED WITH INDIVIDUAL P/V FOR EACH CARGO TANK
Condition: Unknown
Due 24 September 2000
Resolved 16 October 2000
Deck/Cargo
Issued 24 September 2000
Resolved
THE CREW OF THE M/T NEPTUNE DORADO MANUALLY CLOSED THE ONLY PRESSURE VALVE FOR THE ENTIRE CARGO BLOCK, THIS RESULTED IN THE OVER PRESSURIZATION OF THECARGO BLOCK WHICH CAUSED THE SHIPS COMMON PRESSSURE VACCUM BREAKER TO UNCONTROLABLY RELEASE TO THE ATMOSPHERE
Condition: Unknown
Due 24 September 2000
Resolved 16 October 2000
Unknown
Issued 24 September 2000
Resolved
NO 4 HR ADVANCE NOTICE OF A FUEL TRANSFER (LIGHTERING) MADE TO THE COTP SANFRANCISCO BAY IAW 33CFR156.118(b)&(c) and CAPTAIN OF THE PORT PUBLIC_x001C_ ADVISORY 02-97
Condition: Unknown
Due 6 October 2000
Resolved 16 October 2000
Engineering
Issued 24 September 2000
Resolved
SHIPS NO. 1 MAIN DIESEL ENGINE CYLINDER JACKET WATER COOLING SEAL LEAKS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
INERT GAS FAN TEMPERATURE SENSORS HAVE BEEN REMOVED AND REPLACED WITH HAND THERMOTERS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
CARGO PIPING DRESLER COUPLINGS ARE DETERIORATED AND ARE NOT ELECTRICALLY BONDED
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
INERT GAS SYSTEM IS MISSING PRESSURE VALVE
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
MULTIPLE FUEL OIL LEAKS IN STARBOARD BOILER FUEL OIL SYSTEM
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
LEAKING FLEXIBLE AIR SUPPLY HOSE TO PORT AUX. BOILER
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
BIOLER FLAT FIRE STAION HAS LEAKING FIRE PLUG
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
PORT SIDE SHIP SERVICE GENERATOR HEAD HAS AN EXCESSIVE FUEL LEAK
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
MAIN DIESEL ENGINE TRANSFER PUMP HAS LEAKING SEALS AND FROZEN VALVES
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
HIGH LEVEL ALARMS AND OVERFILL DEVICES ARE INOPERABLE
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Unknown
Issued 24 September 2000
Resolved
OIL IN THE MAIN SPACE BILGES
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Unknown
Issued 24 September 2000
Resolved
OIL UNDER GENERATORS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Deck/Cargo
Issued 24 September 2000
Resolved
ULLAGE OPENINGS LEAK INERT GAS
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
FUEL VENT GASKETS FROM DAY SETTLING TANK ARE LEAKING
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Engineering
Issued 24 September 2000
Resolved
MISSING LAGGING ON MAIN DIESEL ENGINE EXHAUST AT PLENUM LEVEL
Condition: Unknown
Due 26 February 2001
Resolved 26 February 2001
Documentation
Issued 19 June 1996
Resolved
VESSEL IS TO ENSURE THAT ALL OFFICERS ARE SERVING IN PORITIONS THEY ARE QUALIFIED FOR AS PER INTERNATIONAL CONVENTION FOR STANDARDS OF TRAINGIN, CERTIFICATION, AND WATCHKEEPING
Condition: Unknown
Due 19 June 1996
Resolved 8 July 1996
Deck/Cargo
Issued 25 August 1987
Resolved
PROVIDE PERMANENT REPAIRS TO THE CRACK BETWEEN THE #6 PORT SLOP TANK AND THE #7 PORT BALLAST TANK TO THE SATISFACTION OF THE CLASS SOCIETY.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Documentation
Issued 25 August 1987
Resolved
VESSEL ENTERED PORT AND BEGAN DISCHARGE OF CRUDE OIL AND DID NOT HAVE DOCUMENTATION THAT THE C.O.W. SYSTEM HAD BEEN INSPECTED & APPROVED AS REQUIRED BY 33CFR157.118.
Condition: Unknown
Due 25 August 1987
Resolved 25 August 1987