CAPE FLATTERY

CAPE FLATTERY is a 1990 commercial fishing vessel. The Coast Guard has recorded 23 inspections since 2001, most recently in August 2015, along with 52 deficiencies.

Records from 2001 to 2015. Most recent: inspection, 25 August 2015.

Built
1990
Last inspected
25 August 2015
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8990964 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDI2129
Flag
UNITED STATES
367531310, 369001000 (licence lapsed)
Maury page id
psix-26457

Inspections, by type

…with no type recorded2
Years with a record 12 calendar years (2001–2015)
The 23 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 11 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Fishing Vessel class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)177.5 ft × 40.0 ft × 16.0 ft
Registered tonnagegross 495 / net 337
ITC dimensions (L × B × D)177.5 ft × 40.0 ft × 16.0 ft
ITC tonnagegross 1,011 / net 303
BuilderMCDERMOTT SHIPYARDS · MORGAN CITY, LA, UNITED STATES · built 1990
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portDUTCH HARBOR, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 9 December 2025 · expires 31 December 2026
Service, as the file records itCommercial Fishing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it495 - Regulatory (Subpart C or D), Gross Ton
1011 - Convention (Subpart B), Gross Ton
337 - Regulatory (Subpart C or D), Net Ton
303 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDG3946MMSI 367531310 · cancelled · compulsorily equipped · granted 19 May 2012, cancelled 13 May 2015
WDA7384MMSI 369001000 · expired · compulsorily equipped · granted 14 March 2002, cancelled 19 May 2012
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 23

25 August 2015 Administrative Inspection
Administrative · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 5226109
22 May 2012 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4312581
23 February 2012 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4250448
9 February 2011 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3992044
17 April 2009 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3453717
1 May 2008 Annual Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3197440
23 July 2007 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3004784
26 April 2007 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 2916493
20 April 2007 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2911956
31 January 2007 Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2865363
20 April 2006 MTSA Verification · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2632260
11 October 2005 Deficiency Check · Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2532321
2 June 2005 Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2378511
10 May 2005 Deficiency Check · Periodic Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2375738
6 April 2005 Drydock Extension
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2446985
28 April 2004 Re-Inspection
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 2134055
20 September 2003 Deficiency Check · Damage Survey
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1937052
17 September 2003 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1907209
12 February 2003 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1743844
28 August 2002 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1673053
18 July 2002 Deficiency Check · Administrative Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1648373
15 March 2002 Initial Certification
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1613254
31 July 2001 Inclining Experiment
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1071081

Deficiency record · 52

Lifesaving › Lifejacket/PFD (General) › Storage
Issued 17 April 2009 Resolved
Vsl had no labeling for PFDs stored in each room as per 46 CFR 180.78.
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 April 2009
Resolved 17 April 2009
Resolution: Labeled each storage with amount of PFDs stored in each locker.
Lifesaving › Lifefloat › Retroreflective Material
Issued 17 April 2009 Resolved
Lifering missing one line of retroreflective tape as per 46 CFR 180.70.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 April 2009
Resolved 21 April 2009
Resolution: Placed another line of retroreflective tape on lifering.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 26 April 2007 Resolved
33CFR151.28(c) Plan review and revision; owner or operator must resubmit entire plan to Commandant for reapproval 6 mos. before expiration. This plan expired on April 1, 2007, and submission was not received until 02/06/07. Plan is currently under review, however, there is a scheduled voyage for this vessel. SOPEP is currently PENDING.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 April 2007
Resolved 26 April 2007
Resolution: A SOPEP was reapproved. Issued to vessel owner,TANADGUSIX CORPORATION.
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 20 April 2007 Resolved
Comply with Standard Discharge Connection regulation in MARPOL and install 6 holes 22 mm in diameter.
Action required: 705 - Other - as specified
Due 23 July 2007
Resolved 23 July 2007
Resolution: Chief Engineer provided a flange that was in accordance with Marpol 73/78. Corrected flange meets the dimensions for flanges for discharge connections.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 2 July 2005 Resolved
Prove proper operation of Low L/O alarm in way of #1 SSDG and MDE.
Action required: 705 - Other - as specified
Due 6 October 2005
Resolved 9 November 2005
Resolution: Sighted sat ops test.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 10 May 2005 Resolved
Containment for STBD Fueling station is not adequate. Must fully contain point of connection at cam lock.
Due 10 June 2005
Resolved 31 May 2005
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 10 May 2005 Resolved
Bilge High level sensors in bow thruster room are non-operational. Replace with new sensors.
Due 10 June 2005
Resolved 31 May 2005
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 10 May 2005 Resolved
Bilge high level sensors in fore peak are missing. Replace sensors.
Due 10 June 2005
Resolved 31 May 2005
Documentation › Logs/Records › Oil Record Book
Issued 10 May 2005 Resolved
Oil record book not maintained for last three years IAW 33CFR151.25(k)
Due 10 June 2005
Resolved 31 May 2005
Electrical › Electric Generation Source (emergency) › Grounding Conductor
Issued 10 May 2005 Resolved
Electrical Switchboard matting in Emergency Generator room and ECC is missing. Replace with Approved matting IAW 46CFR111.30(c)0
Due 10 June 2005
Resolved 31 May 2005
Electrical › Electrical Distribution System (service) › Switchboard
Issued 10 May 2005 Resolved
Renew as original malfunctioning amp gauges in way of main switchboard for Port and STBD SCR.
Action required: 705 - Other - as specified
Due 6 October 2005
Resolved 9 November 2005
Resolution: Witnessed sat ops test.
Navigation › Piloting/Steering › Magnetic Compass
Issued 10 May 2005 Resolved
Magnetic compass is not readily illuminated and is missing a quadrants-sphere. Renew to meet requirements in 33CFR 164.35(b)
Due 10 June 2005
Resolved 31 May 2005
Navigation › Piloting/Steering › Deviation Table/Graph
Issued 10 May 2005 Resolved
Provide current deviation table IAW 33CFR164.35(c)
Due 1 July 2005
Resolved 2 July 2005
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 10 May 2005 Resolved
Fire door leading to engine room needs automatic closing device.
Due 10 June 2005
Resolved 31 May 2005
Deck/Cargo › Cargo Stowage › General
Issued 10 May 2005 Resolved
Portable Reefer/Laundry container needs to be moved so vessel is in compliance with stability letter.
Due 10 June 2005
Resolved 31 May 2005
Accommodation/Occupational Safety › Other Accommodation Spaces › Laundry
Issued 10 May 2005 Resolved
Make 440V power supply cable to reefer/laundry container watertight.
Due 1 July 2005
Resolved 2 July 2005
Accommodation/Occupational Safety › Other Accommodation Spaces › Laundry
Issued 10 May 2005 Resolved
Replace vent hose for dryer in ships laundry.
Due 1 July 2005
Resolved 2 July 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 10 May 2005 Resolved
Prove proper operation of MDE lube oil high temp and LOW L/O Alarm protection systems.
Due 10 June 2005
Resolved 31 May 2005
Engineering › Generator (propulsion-electric) › Switch
Issued 10 May 2005 Resolved
Prove proper operation of #2SSDG over speed trip device.
Due 10 June 2005
Resolved 31 May 2005
Engineering › Generator (propulsion-electric) › Switch
Issued 10 May 2005 Resolved
Prove proper operation of #1 SSDG over speed device and L/o alarm.
Due 10 June 2005
Resolved 31 May 2005
Engineering › Bilge Water Management System › Not Operational
Issued 10 May 2005 Resolved
Prove proper operation of Bilge Pumping system. All stations.
Due 10 June 2005
Resolved 31 May 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 May 2005 Resolved
Fold back, tape and label all dead-end wiring identified throughout the ship.
Due 1 September 2005
Resolved 2 July 2005
Fire Fighting › Fire Pumps › Arrangement
Issued 10 May 2005 Resolved
Renew as original mechanical seal in way of #5 Fire Pump.
Due 1 September 2005
Resolved 9 November 2005
Resolution: Witnessed sat ops test.
Fire Fighting › Fixed Halon Fire Extinguishing System › Piping
Issued 10 May 2005 Resolved
Rewrite instructions for and redraw diagram of the fixed fire extinguishing system in way of the paint locker.
Due 10 June 2005
Resolved 31 May 2005
Fire Fighting › Ventilation Systems › Fans
Issued 10 May 2005 Resolved
Make electrical supply power to exhaust fan explosion proof in way of paint locker.
Due 1 August 2005
Resolved 9 November 2005
Resolution: Sighted sat.
Fire Fighting › Means of Escape › Blocked
Issued 10 May 2005 Resolved
Remove permanent hold back latch in way of escape hatch in main deck passageway leading to torpedo room.
Due 1 July 2005
Resolved 2 July 2005
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 May 2005 Resolved
Remove incandescent light bulb from stern anchor light and renew with an approved navigation light bulb.
Due 1 July 2005
Resolved 2 July 2005
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 10 May 2005 Resolved
No record of lifesaving equipment maintenance being done. Create a maintenance record book.
Due 1 July 2005
Resolved 2 July 2005
Construction/Loadline › Structures › Door
Issued 10 May 2005 Resolved
Second dog on portside forward broken. Replace dog to rov hatch.
Action required: 705 - Other - as specified
Due 6 October 2005
Resolved 9 November 2005
Resolution: Sighted sat.
Electrical › Electrical Distribution System (emergency) › Junction Box
Issued 10 May 2005 Resolved
The general alarm control box on the bridge does not work all the time. Replace or repair.
Due 10 June 2005
Resolved 31 May 2005
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 10 May 2005 Resolved
Fire control plan does not reflect actual location of equipment. Equipment missing from control plan. Fire control plan needs to be updated to reflect actual locations of equipment.
Due 1 August 2005
Resolved 9 November 2005
Resolution: Sighted sat IAW revised and approved vsl''s fire control plan dtd 10NOV2005.
Construction/Loadline › Structures › Scuttle
Issued 10 May 2005 Resolved
Repair/renew/replace all stair tower closure devices. Remove all hold back devices.
Due 10 June 2005
Resolved 31 May 2005
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 10 May 2005 Resolved
Remove all oil in torpedo lower forward hold.
Due 10 June 2005
Resolved 31 May 2005
Electrical › Electrical Distribution System (service) › Junction Box
Issued 10 May 2005 Resolved
Power Panel (P414) missing latch repair/replace.
Due 1 July 2005
Resolved 2 July 2005
Accommodation/Occupational Safety › Heating › Piping
Issued 10 May 2005 Resolved
Ships Central heating system does not function as intended. Fix repair or replace so system operates IAW Manufacture’s requirements.
Due 1 August 2005
Resolved 2 July 2005
Lifesaving › Rescue Boat › Hull (inflated)
Issued 10 May 2005 Resolved
Repair/Replace rescue boat sponsons so they hold air.
Due 1 August 2005
Resolved 9 November 2005
Resolution: Sighted sat.
Accommodation/Occupational Safety › Cooking Systems › LPG System Requirements
Issued 10 May 2005 Resolved
Provide paperwork that galley Gaylord hood closure operates as intended.
Action required: 705 - Other - as specified
Due 6 October 2005
Resolved 9 November 2005
Resolution: Navy installed Gaylord hood cleaning sys non operational. Closure still operational (auto fire damper with fusible link).
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 10 May 2005 Resolved
Remote reach rods for installed bilge system in fore peak inoperable. Repair/Replace reach rod.
Due 31 May 2005
Resolved 31 May 2005
Documentation › Logs/Records › Garbage Recordkeeping
Issued 10 May 2005 Resolved
Provide shipboard garbage plan
Due 1 July 2005
Resolved 2 July 2005
Fire Fighting › Ventilation Systems › Fans
Issued 10 May 2005 Resolved
Fixed forced ventilation fan for fore peck inoperable. Fix/repair/replace forced ventilation fan.
Due 1 July 2005
Resolved 2 July 2005
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 10 May 2005 Resolved
Conducted tailshaft examination IAW 46 CFR 61.20-15 at next available drydock.
Action required: 705 - Other - as specified
Due 6 October 2005
Resolved 9 November 2005
Resolution: ABS classed tailshaft and propellers. Sighted sat at Sound Propellers Services in Seattle, WA.
Documentation › Logs/Records › Logbook (official)
Issued 10 May 2005 Resolved
Provide record of Training/Drills IAW 46 CFR 199.180
Due 1 July 2005
Resolved 2 July 2005
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2005 Resolved
Crop and renew port side shell damage in way of forepeak deck at next dry docking
Action required: 705 - Other - as specified
Due 6 October 2005
Resolved 9 November 2005
Resolution: Sighted sat fit up and NDT.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 28 April 2004 Resolved
Update fire plan to reflect actual on-board conditions.
Due 16 December 2004
Resolved 6 April 2005
Electrical › Electrical Distribution System (service)
Issued 20 September 2003 Resolved
Make permanent repairs to main electrical distribution system and demonstrate proper operation of said system to the satisfaction of USCG marine inspector. LEGACY COMPONENT DESC: Circuit Breaker
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 September 2003
Resolution: Satisfactory repairs made to above main electrical distribution system. Tech rep attended vsl and replaced damaged components, ran tests and analyses. Tech rep and vsl engineers demonstrated proper operation of said system. Vsl cleared to depart.
Personnel
Issued 12 February 2003 Resolved
Prior to vessel sailing, conduct fire and boat drill.
Action required: 705 - Other - as specified
Due 30 May 2003
Resolved 17 September 2003
Electrical › Electric Generation Source (service)
Issued 12 February 2003 Resolved
Prior to vessel sailing, prove proper operation of ships service generators LEGACY COMPONENT DESC: Generator
Action required: 705 - Other - as specified
Due 30 May 2003
Resolved 17 September 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 12 February 2003 Resolved
Prior to vessel sailing, prove proper operation of propulsion diesel.
Action required: 705 - Other - as specified
Due 30 May 2003
Resolved 17 September 2003
Fire Fighting › Fire Hoses
Issued 12 February 2003 Resolved
Prior to vessel sailing, conduct hydrostatic test of fire hoses to MAWP of fire pump.
Action required: 705 - Other - as specified
Due 30 May 2003
Resolved 17 September 2003
Operations/Management › Drills/Instruction
Issued 15 March 2002 Resolved
Conduct sea trails
Action required: 705 - Other - as specified
Due 15 July 2002
Resolved 6 August 2002
Documentation › Safety/Response Plans/Programs
Issued 15 March 2002 Resolved
Obtain an approved SOPEP. LEGACY COMPONENT DESC: SOPEP
Action required: 705 - Other - as specified
Due 15 July 2002
Resolved 6 August 2002
Operations/Management › Drills/Instruction
Issued 15 March 2002 Resolved
Conduct fire and boat drills. LEGACY COMPONENT DESC: Safety Orientation
Action required: 705 - Other - as specified
Due 15 July 2002
Resolved 6 August 2002

Ownership record