USNS PREVAIL

USNS PREVAIL is a 1986 research vessel. The Coast Guard has recorded 83 inspections since 1986, most recently in July 2016, along with 81 deficiencies.

Records from 1986 to 2016. Most recent: inspection, 14 July 2016.

Built
1986
Last inspected
14 July 2016
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

267148
Flag
UNITED STATES
—
Maury page id
psix-267148

Inspections, by type

…with no type recorded34
Years with a record 19 calendar years (1986–2016)
The 83 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Research Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it1914 - Convention (Subpart B), Gross Ton
574 - Convention (Subpart B), Net Ton
2297 - Displacement, Ton
786 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 83

14 July 2016 Administrative Inspection
Administrative · Activities Europe · Activity 5940149
21 May 2003 Administrative Inspection
Administrative · Activities Europe · Activity 1798373
14 November 2002 Drydock Extension · Annual Inspection
Physical examination · Activities Europe · Activity 1698990
20 August 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1663950
15 February 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1488506
10 January 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1477330
1 November 2001 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1439286
28 September 2001 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1073816
18 July 2001 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1070956
5 May 2001 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 108202
12 April 2001 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1462225
10 April 2001 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 185392
10 April 2001 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1413906
17 October 2000 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1393543
27 June 2000 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 82609
10 May 2000 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 71910
1 March 2000 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 166772
18 February 2000 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 19124
8 November 1999 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1457712
9 July 1999 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 227874
25 January 1999 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 791195
22 January 1999 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1123603
8 January 1999 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 810811
7 December 1998 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1406400
15 October 1998 Type not recorded
No type recorded · Commandant (CG-INV) · Activity 226692
22 September 1998 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 219668
6 February 1998 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 776513
5 February 1998 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 773246
5 February 1998 Hull Examination · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1364568
19 December 1997 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1413281
11 November 1997 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 90240
11 November 1997 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 231910
31 January 1997 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 223156
12 November 1996 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1173000
11 November 1996 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 127213
16 October 1996 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1360648
30 August 1996 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 59710
5 May 1996 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 132133
25 March 1996 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 36545
15 December 1995 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 109309
30 November 1995 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 883076
22 November 1995 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1453179
8 November 1995 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 184781
19 October 1995 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1428537
26 January 1994 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1165675
14 July 1993 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1158658
27 May 1993 Re-Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1382581
13 March 1993 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 217137
20 February 1993 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 17356
6 February 1993 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 227342
13 March 1992 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 220615
13 March 1992 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 232090
6 March 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 959691
21 October 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 938685
23 April 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1306727
18 April 1991 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1222604
21 March 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 925830
27 February 1991 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1253329
4 February 1991 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 993294
8 January 1991 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 223970
16 November 1990 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 932934
17 October 1990 Hull Examination · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1239686
27 September 1990 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 915384
7 August 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1231309
24 April 1990 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1220729
16 April 1990 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1213098
24 October 1989 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 892174
15 May 1989 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1203438
22 April 1989 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1035549
28 April 1988 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1341691
1 April 1988 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1342144
10 June 1987 Examination of Repairs
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1030354
15 May 1987 Examination of Repairs
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1332216
1 May 1987 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1015786
26 February 1987 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1320224
10 February 1987 Re-Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1312147
10 September 1986 Excursion Permit
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1309628
5 September 1986 Excursion Permit
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1333827
2 July 1986 Examination of Repairs
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 998173
19 June 1986 Excursion Permit
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1302114
13 June 1986 Excursion Permit
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 993207
7 May 1986 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1292657
28 February 1986 Credit Drydock · Initial Construction-Excluding Oversight
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1306328

Deficiency record · 81

Engineering › Sea-water System (primary cooling)
Issued 14 November 2002 Resolved
Sea suction spool piece forward port generator room wasted and holed. Make permanent repair to spool piece in lieu of temporary repair. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 1 December 2002
Resolved 14 July 2016
Stability › Watertight Integrity › General
Issued 14 November 2002 Resolved
Vent riser starboard side # 4-52-3 cut and clamped together. Make permanent repair to vent riser in lieu of temporary repair.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2003
Resolved 14 July 2016
Resolution: Vessel deactivated pending scrap Deficiencies no longer apply.
Documentation
Issued 1 November 2001 Resolved
PROVIDE APPROVED AUTOMATION PROCEDURE.
Condition: Unknown
Due 1 December 2001
Resolved 12 December 2001
Lifesaving
Issued 1 November 2001 Resolved
REMOUNT OVERHEAD LIGHT FIXTURE LOCATED FORWARD OF EMERGENCY GENERATOR ROOM IN STEWARD STORE ROOM 01-3-1.
Condition: Unknown
Due 1 December 2001
Resolved 12 December 2001
Engineering
Issued 1 November 2001 Resolved
PROVIDE MANUFACTURER DATA FOR MAWP OF AIR START #1 RECEIVER AND PROVE PROPER OPERATION OF SAFETY VALVE.
Condition: Unknown
Due 12 December 2001
Resolved 12 December 2001
Engineering
Issued 1 November 2001 Resolved
PROVE PROPER OPERATION OF #1 AND #3 MDE JACKET WATER TEMP ALARM/SHUTDOWN.
Condition: Unknown
Due 1 December 2001
Resolved 9 January 2002
Construction/Loadline
Issued 1 November 2001 Resolved
REMOVE SALT WATER FLUSHING TANK AND ALL ASSOCIATED EQUIPMENT OR MAKE TANK PERMANENTLY INOPERABLE OR MAKE READY FOR INSPECTION.
Condition: Unknown
Due 31 January 2002
Resolved 20 August 2002
Resolution: Vessel removed salt water flushing tank and all associated equipment.
Engineering
Issued 1 November 2001 Resolved
PROVE PROPER OPERATION OF #3 MAIN DIESEL ENGINE REVERSE POWER RELAY PRIOR TO PARALLELING THAT ENGINE WITH ANY OTHER.
Condition: Unknown
Due 1 December 2001
Resolved 9 January 2002
Resolution: conducted test, Breaker is a AKR 50, 600 Volts. Time delay should be between- Min 4 sec, intermed 10 sec and max 22 sec @ - 42 KW. During test it tripped at 4.8 sec
Documentation
Issued 1 November 2001 Resolved
PRIOR TO GETTING UNDERWAY PROVIDE VALID SAFETY RADIO CERTIFICATE.
Condition: Unknown
Due 2 November 2001
Resolved 2 November 2001
Documentation
Issued 1 November 2001 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 12 December 2001
Resolved 12 December 2001
Deck/Cargo
Issued 1 November 2001 Resolved
PROVE PROPER OPERATION OF PORT ANCHOR SYSTEM.
Condition: Unknown
Due 31 January 2002
Resolved 15 February 2002
Lifesaving
Issued 1 November 2001 Resolved
PROVIDE PROPER IMO SYMBOLS THROUGHOUT VESSEL DIRECTING CREW TO PRIMARY EXITS AND TO LIFERAFT STATIONS
Condition: Unknown
Due 1 December 2001
Resolved 12 December 2001
Fire Fighting
Issued 1 November 2001 Resolved
PROVE PROPER OPERATION OF FIRE MAIN PRESSURE GAUGE.
Condition: Unknown
Due 1 December 2001
Resolved 9 January 2002
Fire Fighting
Issued 1 November 2001 Resolved
PROVIDE APPROVED FIRE HOSES AND REMOVE ALL UNAUTHORIZED HOSES.
Condition: Unknown
Due 30 November 2001
Resolved 12 December 2001
Fire Fighting
Issued 1 November 2001 Resolved
REPAIR OR RENEW DOGS ON BOTH VENTILATION DUCTS SERVICING WINCH ARRAY ROOM.
Condition: Unknown
Due 1 December 2001
Resolved 12 December 2001
Fire Fighting
Issued 1 November 2001 Resolved
PROVE PROPER OPERATION OF FIXED EXTINGUISHING SYSTEM SERVICING GALLEY.
Condition: Unknown
Due 1 December 2001
Resolved 12 December 2001
Electrical
Issued 1 November 2001 Resolved
PROPERLY RELABEL ALL EMERGENCY LIGHTS.
Condition: Unknown
Due 1 December 2001
Resolved 12 December 2001
Construction/Loadline
Issued 18 July 2001 Resolved
MAKE REPAIRS TO BALLAST TANKS 4-6-1 AND 4-6-2 PRIOR TO SATISFACTION OF THE ATTENDING CG INSPECTOR.
Condition: Unknown
Due 18 July 2001
Resolved 18 July 2001
Documentation
Issued 18 July 2001 Resolved
SUBMIT WRITTEN REPAIR PROPOSAL FOR BALLAST TANKS 4-6-1 AND 4-6-2, PRIOR TO AFFECTING REPAIRS
Condition: Unknown
Due 18 July 2001
Resolved 18 July 2001
Construction/Loadline
Issued 5 May 2001 Resolved
THE VENT SYSTEM CONSISTS OF 2 PIPES TO EACH BALLAST TANK. THE PIPING IS ROUTED W/SMALL & TIGHT 90 DEG BENDS THAT TURN INTO LENGTHY HORIZONTAL RUNS.THIS ALLOWS FOR SALT WATER & MARINE LIFE TO STAND IN THE PIPE & OVER TIME RESTRICT THE AIR FLOW.
Condition: Unknown
Due 12 December 2001
Resolved 12 December 2001
Lifesaving
Issued 10 April 2001 Resolved
VSL EQUIPPED W/SINGLE POINT DAVIT FOR RESCUE BOAT & LIFERAFTS. HOOK FAILED IN SERVICE BECAUSE IT WAS NOT PROPERLY ASSEMBLED. SEE MINS FOR DETAILS.
Condition: Unknown
Due 12 December 2001
Resolved 12 December 2001
Lifesaving
Issued 10 April 2001 Resolved
DEMONSTRATE A 110% WEIGHT TEST OF BOTH LIFE RAFT RELEASE ASSEMBLIES AND RESCUE BOATS RELEASE ASSEMBLY.
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Lifesaving
Issued 10 April 2001 Resolved
PROVIDE DOCUMENTATION ATTESTING TO THE BREAKING STRENGTH OF THE PORT AND STBD FALLS.
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Lifesaving
Issued 10 April 2001 Resolved
DEMONSTRATE A 110% WEIGHT TEST OF THE PORT AND STBD DAVIT FALLS._x001C_
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Lifesaving
Issued 10 April 2001 Resolved
PROVIDE MANUFACTURES REPORT ATTESTING TO PROPER ASSEMBLY AND OPERATION OF RESCUE BOAT'S RELEASE ASSEMBLY_x001C_
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Lifesaving
Issued 17 October 2000 Resolved
STORE 3 LIFEJACKETS REMOTELY NEAR RESCUE BOAT LOCATION.
Condition: Unknown
Due 18 October 2000
Resolved 30 October 2000
Fire Fighting
Issued 17 October 2000 Resolved
RENEW/REPAIR THE CO2 EMER SHUT DOWN SWITCH FOR PORT PROPULSION MOTOR PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 18 October 2000
Resolved 30 October 2000
Electrical
Issued 17 October 2000 Resolved
PROVE PROPER OPERATION OF REVERSE POWER RELAYS FOR ALL FOUR (4) DIESEL GENERATORS.
Condition: Unknown
Due 17 October 2000
Resolved 17 October 2000
Documentation
Issued 17 October 2000 Resolved
PROVIDE AN UPDATED FIRE CONTROL PLAN FOR CG APPROVAL.
Condition: Unknown
Due 31 January 2001
Resolved 20 August 2002
Resolution: Vessel provided updated Fire Control Plan and posted in accordance with regulations.
Lifesaving
Issued 17 October 2000 Resolved
PROVIDE THREE (3) NEW EMBARKATION LADDERS OF PROPER LENGTH THAT WOULD ACCOMMODATE A 15 DEGREE ADVERSE LIST OF THE VESSEL.
Condition: Unknown
Due 17 October 2000
Resolved 17 October 2000
Lifesaving
Issued 17 October 2000 Resolved
RELOCATE ONE SART TO PORT SIDE OF VESSEL NEAR EXIT.
Condition: Unknown
Due 17 October 2000
Resolved 17 October 2000
Electrical
Issued 27 June 2000 Resolved
VSL WAS UNDERWAY W/4 GENERATORS ON LINE IN PARALLEL. THE GEN ENGINE MODULE FAILED ON THE #1 CYLINDER ON THE #1 ENGINE. CAUSE OF THE FAILED MODULE IS NOT KNOWN. THE FAILED MODULE LED TO INTERMITTENT VOLTAGE & CAUSED CIRCUIT BREAKER FOR THE STBD PROPULSION MOTOR TO TRIP.
Condition: Unknown
Due 12 December 2001
Resolved 12 December 2001
Electrical
Issued 10 May 2000 Resolved
STARBOARD MOTOR COOLING BLOWER CIRCUIT TRIPPED. UNABLE TO DETERMINE CAUSE.
Condition: Unknown
Due 12 December 2001
Resolved 12 December 2001
Electrical
Issued 1 March 2000 Resolved
THE FUSE FOR THE POWER FILTER ON THE #3 SSDG WAS LOOSE, CAUSING A LOW VOLTAGE CONDITION. FUSE WAS TIGHTENED & POWER RESTORED.
Condition: Unknown
Due 12 December 2001
Resolved 10 January 2002
Fire Fighting
Issued 7 December 1998 Resolved
INSTALL COAST GUARD ACCEPTED FIRE STOPS IN WAY OF LAUNDRY ROOM AND SEWAGE PUMP ROOM WIRE RUN PENETRATIONS.
Condition: Unknown
Due 7 December 1998
Resolved 7 December 1998
Lifesaving
Issued 7 December 1998 Resolved
PROVIDE TWO COAST GUARD ACCEPTED LIGHTS FOR LIFEJACKETS FOR ADDITIONAL LIFEJACKETS ON BOARD.
Condition: Unknown
Due 7 December 1998
Resolved 7 December 1998
Engineering
Issued 7 December 1998 Resolved
PROVE PROPER OPERATION OF THE #4 MAIN DIESEL ENGINE PRIOR TO OPERATING.
Condition: Unknown
Due 7 December 1998
Resolved 7 December 1998
Navigation
Issued 7 December 1998 Resolved
PROVE PROPER OPERATION OF ENGINE ORDER TELEGRAPH LOSS OF POWER ALARM ON THENAVIGATION BRIDGE.
Condition: Unknown
Due 7 December 1998
Resolved 7 December 1998
Lifesaving
Issued 19 December 1997 Resolved
REPLACE OR HYDROSTATICALLY TEST ALL OXYGEN BOTTLES IN HOSPITAL SPACE.
Condition: Unknown
Due 19 December 1997
Resolved 19 December 1997
Electrical
Issued 19 December 1997 Resolved
PROVE PROPER OPERATION OF #3 SHIP'S SERVICE GENERATOR REVERSE POWER RELAY, AND DO NOT OPERATE IN PARALLEL UNTIL SUCH TIME.
Condition: Unknown
Due 19 December 1997
Resolved 19 December 1997
Engineering
Issued 16 October 1996 Resolved
PROVE PROPER OPERATION OF THE OILY WATER SEPERATOR.
Condition: Unknown
Due 16 October 1996
Resolved 16 October 1996
Engineering
Issued 22 November 1995 Resolved
PROVE PROPER OPERATION OF THE REMOTE FUEL OIL TRIPS FOR EACH MAIN ENGINE, LOCATION OF TRIPS IS IN THE ENGINE CONTROL ROOM.
Condition: Unknown
Due 30 November 1995
Resolved 30 November 1995
Fire Fighting
Issued 22 November 1995 Resolved
PROVE PROPER OPERATION OF THE HALON SHUTDOWNS FOR EACH MAIN ENGINE.
Condition: Unknown
Due 30 November 1995
Resolved 30 November 1995
Fire Fighting
Issued 26 January 1994 Resolved
REPAIR FIRE DETECTOR (IONIZATION SYSTEM) NO. 10, PRIOR TO SAILING, NLT 30JAN94.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Fire Fighting
Issued 26 January 1994 Resolved
PROVE PROPER OPERATION OF FIRE MAIN LOW PRESSURE ALARM IAW TEST PROCEDURE.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Electrical
Issued 26 January 1994 Resolved
PROVE PROPER OPERATION OF LOW LUBE OIL ALARM AND TRIP #1 GENERATOR.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Electrical
Issued 26 January 1994 Resolved
PROVE PROPER OPERATION OF HIGH JACKET WATER TEMP. ALARM AND SHUTDOWN OF #2GENERATOR.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Fire Fighting
Issued 27 May 1993 Resolved
Repair/replace and demonstrate the proper operation of the #2 fire/ballast pump motor operated discharge valve.
Condition: Unknown
Due 27 May 1993
Resolved 27 May 1993
Fire Fighting
Issued 27 May 1993 Resolved
Replace existing rain gear in emergency locker with appropriate protective clothing including a helmet with visor.
Condition: Unknown
Due 27 May 1993
Resolved 27 May 1993
Fire Fighting
Issued 27 May 1993 Resolved
Repair/replace and demonstrate proper operation of the #1 fire/ballast pumpmotor operated suction valve.
Condition: Unknown
Due 27 May 1993
Resolved 27 May 1993
Lifesaving
Issued 6 March 1992 Resolved
CONDUCT THE UNDERWAY TESTS OF THE PROPULSION POWER LIMITING ALARMS AND PROPULSION MOTOR LIMITS IN ACCORDANCE WITH APPROVED TEST PROCEDURES. CHIEFENGINEER TO NOTIFY [name withheld] IN WRITING UPON SATISFACTORY COMPLETION.
Condition: Unknown
Due 28 May 1992
Resolved 28 May 1992
Construction/Loadline
Issued 6 March 1992 Resolved
INSTALL GOOSENECK VENT BUG SCREENS AND CLOSURE DEVICES (BALL AND HINGED FLAP) MISSING FOR BALLAST TANKS 4-24-0 AND 4-24-2.
Condition: Unknown
Due 28 May 1992
Resolved 28 May 1992
Lifesaving
Issued 6 March 1992 Resolved
EFFECT REPAIR AND PROVE PROPER OPERATION OF STARBOARD PROPULSION SYSTEM'S ALARM, AUTOMATIC SHUTDOWN, AND STARTING INTERLOCK FOR "BARRING IRONS NOT STOWED" CONDITION. IAW APPROVED TEST PROCEDURES [name withheld] [name withheld] IN WRITING UPON SATISFACTORY COMPLETION.
Condition: Unknown
Due 28 May 1992
Resolved 28 May 1992
Documentation
Issued 21 March 1991 Resolved
SUBMIT TO [name withheld] A PROPOSAL FOR MANNING. CURRENT MANNING LEVEL AUTHORIZED UNITL 30 SEPTEMBER 1991.
Condition: Unknown
Due 21 March 1991
Resolved 21 March 1991
Lifesaving
Issued 27 February 1991 Resolved
PROPERLY PROVIDE ONE USCG APPROVED IMMERSION SUIT TO REPLACED DAMAGED IMMERSION SUIT.
Condition: Unknown
Due 20 September 1991
Resolved 20 September 1991
Documentation
Issued 27 February 1991 Resolved
PROVIDE CURRENT LOADLINE CERTIFICATE.
Condition: Unknown
Due 20 September 1991
Resolved 20 September 1991
Deck/Cargo
Issued 17 October 1990 Resolved
PROVIDE COAST GUARD APPROVED PLANS FOR THE ELECTRO-HYDRAULIC CRANE INSTALLED ON THE AFT 01 DECK. PLANS TO ADDRESS STRUCTURAL INSTALLATION, ELECTRICAL INSTALLATION AND EFFECT ON VESSELS STABILITY.
Condition: Unknown
Due 17 October 1990
Resolved 17 October 1990
Construction/Loadline
Issued 27 September 1990 Resolved
PERFORM NECESSARY REPAIRS TO THE STRUCTURAL DAMAGE IN BALLAST TANK 2-24-3. PERFORM TEST (HYDRO OR AIR) AFTER REPAIRS TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR.ENSURE THAT ADJOINING TANKS ARE ALSO SURVEYEDOR INSPECTED WHEN VESSEL IS IN DRYDOCK.
Condition: Unknown
Due 27 September 1990
Resolved 27 September 1990
Navigation
Issued 24 April 1990 Resolved
PROVIDE PROOF OF (TO [name withheld]) AND POST MANEUVERING CHARACTERISTICS FACT SHEET IN PILOTHOUSE AFTER APPROPRIATE VESSEL MANEUVERING TESTS ARE COMPLETED AND FACT SHEET IS CREATED IN ACCORDANCE WITH 46 CFR 97.19.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Lifesaving
Issued 16 April 1990 Resolved
PROVIDE CURRENTLY DATED LIFERING DISTRESS SMOKE SIGNALS FOR PORT & STBD BRIDGE WINGS. PHOTOGRAPH & DOCUMENTATION MAY SUBMITTED BE FOR EFFECTIVE COMPLETION.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Lifesaving
Issued 16 April 1990 Resolved
PROVIDE CURRENTLY DATED KILGORE LINE THROWING GUN LAUANCHING CAPS. PHOTOGRAPH & DOCUMENTATION MAY BE SUBMITTED FOR EFFECTIVE COMPLETION.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Lifesaving
Issued 16 April 1990 Resolved
PROVE THE PROPER INSTALLATION/ARRANGEMENT OF EACH LIFERAFT & HRU. THIS ITEMTO BE COMPLETED PRIOR TO DEPARTURE. PHOTOGRAPH & DOCUMENTATION MAY BE SUBMITTED FOR EFFECTIVE COMPLETION.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Engineering
Issued 16 April 1990 Resolved
PROPERLY CONDUCT TEST & FORWARD BY WRITTEN NOTIFICAITON BY VSL'S CHIEF ENGINEER, THE RESULTS OF THE PROPULSION POWER LIMITING DEVICES AS PER THE APPROVED AUTOMATION PROCEDURES DTD 09MAY88, PART D. THIS ITEM TO BE COMPLETED WITHIN 48 HOURS OF DEPARTURE..
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Lifesaving
Issued 16 April 1990 Resolved
REPLACE OUTDATED RED ROCKET PARACHUTE FLARES WITHIN 12 MONTHS OF THEIR EXPIRATION OR AT NEXT U.S. PORT OF CALL, WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Fire Fighting
Issued 16 April 1990 Resolved
PROVIDE APPROVED MARINE TYPE MOUNTING BRACKET FOR FIRE STATION #1-84-2 & AN APPROVED HOSE FOR THE BII DRY CHEMICAL PORTABLE AT FIRE STATION #1-84-1.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Fire Fighting
Issued 16 April 1990 Resolved
PROPRELY HYDROSTATIC TEST FOLLOWING DOT PORTABLE CYLINDERS:1)ALL L/R CO2 CYLINDERS EXCEPT ELLIOT L/R SER#2281 LOT#31.2)ALL PORTABLE OXYGEN CYLINDERSFM VSL'S HOSPITAL.3)ALL PORTABLE BII CO2 FIRE EXT. WHERE GREATER THAN 5 YRSSINCE LAST TEST ELAPSED OR THOSE THAT HAVE HYDOR-DTD 10-88 WHICH IS INVALID
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Lifesaving
Issued 24 October 1989 Resolved
PROVIDE EVIDENCE OF ACCEPTANCE OF RESCUE BOAT IN ACCORDANCE WITH SOLAS.
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Unknown
Issued 24 October 1989 Resolved
PROVIDE INCREASED CONTAINMENT AROUND FUELD OIL VENTS AT NEXT YARD PERIOD (MINIMUM OF 1 BARREL CONTAINMENT REQUIRED).
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Lifesaving
Issued 24 October 1989 Resolved
SUPPLY RESCUE BOAT WITH EQUIPMENT AS PER SOLAS.
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Lifesaving
Issued 24 October 1989 Resolved
CONDUCT WEIGHT TEST OF RESCUE BOAT.
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Accommodation/Occupational Safety
Issued 24 October 1989 Resolved
ALTER 0-1 DECK RAILS IN WAY OF AFT EMBARKATION LADDER PORT AND STARBOARD TO ALLOW FOR PROPER ACCESS.
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Fire Fighting
Issued 22 April 1989 Resolved
PROPERLY LOCATE AND MOUNT THE INTERNATIONAL SHORE CONNECTION.
Condition: Unknown
Due 22 April 1989
Resolved 22 April 1989
Fire Fighting
Issued 22 April 1989 Resolved
PROPERLY FILL THE 3 SCBA AIR CYLINDERS.
Condition: Unknown
Due 22 April 1989
Resolved 22 April 1989
Fire Fighting
Issued 22 April 1989 Resolved
CONDUCT A FIRE DRILL IN THE PRESENCE OF A USCG INSPECTOR.
Condition: Unknown
Due 22 April 1989
Resolved 22 April 1989
Electrical
Issued 22 April 1989 Resolved
PROVE THE PROPER OPERATION OF THE OVERSPEED TRIP ON THE MAIN DIESEL ELECTRIC GENERATOR AS PER ABS REGULATION.
Condition: Unknown
Due 22 April 1989
Resolved 22 April 1989
Documentation
Issued 22 April 1989 Resolved
PROVIDE SATISFACTORY PROOF OF THE FOLLOWING: ANNUAL SERVICING OF THE INFLATABLE LIFERAFTS, ANNUAL SERVICING OF THE FIRE FIGHTING EQUIPMENT AND THE ANNUAL LOADLINE SURVEY. THIS REQUIREMENT MAY BE CLEARED BY A FAX TO THEOCMI NEW YORK.
Condition: Unknown
Due 22 April 1989
Resolved 22 April 1989
Engineering
Issued 22 April 1989 Resolved
PROVIDE AND INSTALL A PRESSURE RELIEVING DEVICE EQUIPPED WITH HAND RELIEVING GEAR ON THE NO. 2 STARTING AIR RECEIVER IN ACCORDANCE WITH 46 CFR54.15-10(C). THIS REQUIREMENT MAY BE CLEARED BY PROVIDING SATISFACTORY PROOF (FAX) TO THE [name withheld] THAT IT HAS BEEN INSTALLED.
Condition: Unknown
Due 22 April 1989
Resolved 22 April 1989
Fire Fighting
Issued 1 April 1988 Resolved
PROVIDE SPARE BOTTLES FOR 2 SELF CONTAINED BREATHING APPARATUS.
Condition: Unknown
Due 1 April 1988
Resolved 1 April 1988
Electrical
Issued 10 February 1987 Resolved
PROVE BY MANUFACTURERS DOCUMENTATION THAT OVERSPEED TRIP CIRCUIT HAS BEEN SATISFACTORILY REPAIRED BY INSTALLATION OF NEW TYPE FUEL PRESSURE SWITCH.
Condition: Unknown
Due 10 February 1987
Resolved 10 February 1987
Fire Fighting
Issued 28 February 1986 Resolved
PROVIDE A COAST GUARD APPROVED FIXED FIRE EXTINGUISHING SYSTEM FOR PAINT LOCKER. THIS DEFICIENCY WAS TO HAVE BEEN CORRECTED BY 15 APRIL 1986.
Condition: Unknown
Due 28 February 1986
Resolved 28 February 1986
Unknown
Issued 28 February 1986 Resolved
PROVIDE APPROVED COAST GUARD OIL TRANSFER PROCEDURES. THIS DEFICIENCY WAS TO HAVE BEEN CORRECTED BY 15 APRIL 1986.
Condition: Unknown
Due 28 February 1986
Resolved 28 February 1986

Ownership record