Records from 2016 to 2025. Most recent: inspection, 7 May 2025.
Inspection history · 19
7 May 2025
Appeal · Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8080924
31 March 2025
Plan Review "T" Boat · Simplified Stability Test
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8092550
30 January 2025
Hull Examination · Examination of Repairs · Deficiency Check · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8036552
20 February 2024
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7846810
20 March 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7633582
12 January 2023
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7601298
22 August 2022
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7541460
9 February 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7393444
22 November 2021
Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7356487
13 October 2021
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7332229
1 March 2021
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7141483
20 January 2021
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7127238
20 May 2020
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6923206
15 April 2019
Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6659128
9 January 2019
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6604907
17 April 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6376727
9 May 2017
Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6129147
9 February 2017
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6081993
22 February 2016
DAPI Audit · Internal Structural Exam · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5813760
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 May 2025
Resolved
Rails on passenger decks of a ferry or a vessel engaged in excursion trips, including but not limited to sightseeing trips, dinner and party cruises, and overnight cruises, must be at least 1,000 millimeters (39.5 inches) high. Vessel's rails are lower than 39.5 inches. Provide plan for correction to Marine Inspector. 46 CFR 177.900(d)(1) 46CFR177.35-1(c)(Old-T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2025
Resolved 9 July 2025
Resolution: This deficiency has been overturned as part of an OCMI reconsideration, and as such has been marked as cleared. See MISLE activity 8080924 and associated correspondence for additional information.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 May 2025
Resolved
excursion trip the following must be installed: Bulwarks; Chain link fencing or wire mesh that has openings of not more than 4 inches in diameter; or bars, slats, rail courses, or an equivalent spaced at intervals of not more than 100 millimeters (4 inches). Provide plan to Marine Inspector for the installation of rail courses that meet the standard listed above.
46 CFR 177.900(g)(1)
46CFR177.35-1(c)(Old-T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2025
Resolved 9 July 2025
Resolution: This deficiency has been overturned as part of an OCMI reconsideration, and as such has been marked as cleared. See MISLE activity 8080924 and associated correspondence for additional information.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 7 May 2025
Resolved
A power-driven vessel underway shall exhibit: a masthead light; sidelights and a sternlight. Vessel's stern light was found inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2025
Resolved 8 May 2025
Resolution: Stern light was repaired satisfactorily.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 7 May 2025
Resolved
A vessel of less than 50 meters in length may exhibit an all-round white light where it can best be seen. Vessel's all-round (anchor) light was found inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2025
Resolved 9 May 2025
Resolution: Anchor light repaired and in service.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 7 May 2025
Resolved
he requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. First-Aid kit was found missing required items.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2025
Resolved 8 May 2025
Resolution: Vessel procured First-Aid kit containing all required items.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 7 May 2025
Resolved
xcept as allowed by paragraph (d) of this section, each vessel constructed of a material other than wood certificated to operate on a limited coastwise route in cold water must be provided with life floats of an aggregate capacity that will accommodate at least 100% of the total number of persons permitted on board. One 22-person life float has a broken lifeline tab. Vessel limited to 72 total persons onboard until life float is repaired to the satisfaction of the attending Marine Inspector.
Code 705c: Vessel limited to 72 Persons oboard
Action required: 705 - Other - as specified
Resolved 16 May 2025
Resolution: Lifeline tab repaired to the satisfaction of the Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 20 February 2024
Resolved
The float-free link required by § 180.130(a)(1) must be: (2)Of proper strength for the size of the life float or buoyant apparatus as indicated on its identification tag. Marine Inspector noticed that the float free link's identification tag was missing.
46 CFR 180.137 (b)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2024
Resolved 26 February 2024
Resolution: Received photo evidence of new weak link with tag properly installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 20 February 2024
Resolved
Footholds, handholds, ladders, and similar means provided to aid escape, must be suitable for use in emergency conditions, of rigid construction, and permanently fixed in position, unless they can be folded, yet brought into immediate service in an emergency. Marine Inspector noticed the ladder in the lazarette space had two rungs that were no longer serviceable and wasted away.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2024
Resolved 12 March 2024
Resolution: Ladder rungs in lazarette have been repaired.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 20 March 2023
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces:A machinery space bilge, bilge well, shaft alley bilge, or other spaces subject to flooding from sea water piping within the space. Audible alarm and light was inoperable on bridge serving galley bilge.
46CFR182.525(a)(2)
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 20 March 2023
Resolved 20 March 2023
Resolution: Operator was able to rectify. Audible alarm and light in satisfactory condition.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 20 March 2023
Resolved
If the vessel carries more than one life float or buoyant apparatus in a group with each group secured by a single painter:Each life float and buoyant apparatus must be individually attached to the painter. Painter line was found disconnected and not properly attatch to life floats.
46CFR180.137(e)(3)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 20 March 2023
Resolved 20 March 2023
Resolution: Operator and crew properly attached painter line to life floats.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 20 March 2023
Resolved
The number of persons capacity must be marked or painted in clearly legible letters and numbers on each life float and buoyant apparatus.
46CFR185.604(e)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2023
Resolved 24 March 2023
Resolution: Received pictures of persons capacity proper marked. All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 20 March 2023
Resolved
The name of the vessel must be marked or painted in clearly legible letters on each life float paddle.
46CFR185.604(g)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2023
Resolved 24 March 2023
Resolution: Revied pictures of proper marked life float paddles. All Sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 August 2022
Resolved
All portable fire extinguishers shall be installed and located to the satisfaction of the Officer in Charge, Marine Inspection. The salon portable fire extinguisher was not charged as evidenced by the indicator being in the red and no servicing tag was present.
Action required: 10 - Deficiency Rectified
Due 22 August 2022
Resolved 22 August 2022
Resolution: Extinguisher was replaced with new extinguisher with indicator in the green and servicing tag attached. Servicing month August, 2022.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 9 February 2022
Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. The galley's bilge high level indicating light was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 February 2022
Resolved 10 February 2022
Resolution: Operator sent video and proof of proper light operation for the galley's high level alarm indicating light.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 9 February 2022
Resolved
Each life jacket must be marked with Type I retroreflective material. 25 Child size life jacket retroreflective tape needs replaced.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 9 February 2022
Resolved 9 February 2022
Resolution: Retroreflective tape replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 9 February 2022
Resolved
Each rescue boat and ring life buoy must be marked with Type II retroflective material. Two of the life bouy's need retroreflective tape replaced.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 9 February 2022
Resolved 9 February 2022
Resolution: Retroreflective tape replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 9 February 2022
Resolved
Transverse watertight bulkhead had cable penetrations that were not watertight.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 9 February 2022
Resolved 9 February 2022
Resolution: The penetrations were appropriately made water tight.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 February 2022
Resolved
MI identified two wasted steering hydraulic line hangers in the lazarette.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 9 February 2022
Resolved 9 February 2022
Resolution: Both were immediately replaced with new hangers by vessel crew.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 May 2020
Resolved
Connections must be made to battery terminals with permanent type connectors. Spring clips or other temporary type clamps prohibited. Butterfly nuts installed on all batteries. Remove and replace with permanent type hardware.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 20 May 2020
Resolved 20 May 2020
Resolution: Removed butterfly nuts at terminals and replaced with permanent type hardware.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 May 2020
Resolved
Electrical equipment on vessel must be installed and maintained to: protect passengers, crew, other persons, and the vessel from electrical hazards. Battery switch cable ends were found disconnected in engine room. Upon new battery switch cable installation, old cable installation had not been removed. Removed on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 20 May 2020
Resolved 20 May 2020
Resolution: Removed old battery switch cable.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 April 2019
Resolved
Permanently affix fresh water tank in compartment beneath galley. 50c
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2019
Resolved 13 May 2019
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 9 May 2017
Resolved
Provide 12 additional life jackets (adult size) to bring total to 90 adult life jackets. Vessel's passenger count reduced to 78 persons.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2017
Resolved 16 May 2017
Construction/Loadline › Hull › Hull Plating
Issued 9 February 2017
Resolved
Clad weld pit located below port shaft in engine room.
Action required: 705 - Other - as specified
Due 15 February 2017
Resolved 8 March 2017
Resolution: Operator had the pit clad welded to the satisfaction of the attending MI.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 22 February 2016
Resolved
Provide 26 adult life jackets, restricted to 62 adult passengers IAW 46 CFR 180.71(a).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 February 2016
Resolution: Provided 26 adult lifejackets.
Navigation › Piloting/Steering › Marine Charts
Issued 22 February 2016
Resolved
Provide large scale chart for Catalina and Long Beach IAW 46 CFR 184.420(a).
Action required: 705 - Other - as specified
Due 4 March 2016
Resolved 26 February 2016
Resolution: Provided updated charts for Catalina and Long Beach
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 February 2016
Resolved
Provide metallic supports for all electrical wiring, with spacing no more than 24 inches IAW 43 CFR 183.340(b)(4).
Action required: 705 - Other - as specified
Due 4 March 2016
Resolved 26 February 2016
Resolution: provided metallic supports for electrical wiring.