Inspection history · 19
13 February 2025
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8079065
24 April 2024
Construction Oversight · COI Inspection · Simplified Stability Test · Plan Review "T" Boat
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8078046
13 February 2024
Plan Review "T" Boat
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7866245
8 June 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7681533
5 April 2023
Administrative Inspection
Administrative · USCG Northeast District (dp) · USCG Northeast District (CGD-NE) · Activity 7663452
28 June 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7458526
7 April 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7403000
29 July 2021
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7271771
13 May 2021
COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7186237
24 August 2020
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7041656
30 March 2020
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6933196
16 May 2019
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6684582
29 May 2018
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6427232
22 December 2017
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6331212
27 April 2017
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6133911
11 June 2016
Type not recorded
No type recorded · Station Point Allerton · USCG Northeast District (CGD-NE) · Activity 5905583
11 June 2016
Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5905799
11 June 2016
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5920940
17 May 2016
COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5879260
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 8 June 2023
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. No emergency instructions were posted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2023
Resolved 13 June 2023
Resolution: Verified posted emergency instructions.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 June 2022
Resolved
Submersible electric bilge pump shall have a positive control valve installed at the hull penetration. The vessel's higher bilge pump discharge line does not have a positive control valve installed at its hull penetration.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2022
Resolved 8 July 2022
Resolution: O/O sent pictures of newly installed PCV and tested, reporting no leaks and fully operational.
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 13 May 2021
Resolved
Vessel required to carry life float—Approved under approval series 160.027 or other standard specified by the Commandant.
One life float is damaged beyond repair.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2021
Resolution: Installed new life float.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 May 2021
Resolved
A pre-engineered fixed gas fire extinguishing system must: have a means to reset devices used to automatically shut down ventilation systems and engines. Unable to reset the engine shut down devices without entering the affected space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2021
Resolution: Provided evidence of sucessful test of fire supresion system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 May 2021
Resolved
A vessel must be provided with a main steering gear that is:
Of adequate strength and capable of steering the vessel at all service speeds. Vessel hydraulic hoses for steering are wasted/damaged beyond repair. Replace with approved hoses, demonstrate proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2021
Resolution: provided objective evidence of new istallation of steering hydraulic hoses in kind and operational test.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 May 2021
Resolved
A vessel must be provided with a main steering gear that is:
Of adequate strength and capable of steering the vessel at all service speeds. Vessel hydraulic hoses for steering are wasted/damaged beyond repair. Replace with approved hoses, demonstrate proper operation. Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Exposed conductors on aft deck light junction box. Make proper connection in enclosure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2021
Resolved 26 May 2021
Resolution: provided objective evidence of new deck lights installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 August 2020
Resolved
A Pre-engineered fixed gas fire extinguishing system must have a means to reset engine shut down. The fireboy system reset was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2020
Resolved 23 September 2020
Resolution: Owner showed proper operation of system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 August 2020
Resolved
A submersible electric bilge pump discharge line must have a positive shutoff valve installed at the hull penetration. The electric bilge discharge line does not have a valve installed at hull penetration.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2020
Resolved 23 September 2020
Resolution: Verified installation of valve at skin of ship.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 24 August 2020
Resolved
A vessel not required to have a power driven fire pump must have at least three 2.5 gallon buckets with an attached lanyard. The vessel only had one fire bucket which did not have an attached lanyard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2020
Resolved 23 September 2020
Resolution: Verified 03 new fire buckets.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 August 2020
Resolved
Each paddle must be of at least 4 feet in length and lashed to the life float to which it belongs and buoyant. The life float paddles are not lashed to its designated life float.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2020
Resolved 23 September 2020
Resolution: Verified paddles lashed to life floats.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 August 2020
Resolved
Each life ring buoy with a floating waterlight must have a lanyard of at least three feet in length but not more than six feet in length. The life ring buoy waterlight line is approximately two feet long.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2020
Resolved 23 September 2020
Resolution: Verified new line installed for life buoy light.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 24 August 2020
Resolved
Each flare to be carried must be stowed in a portable watertight container. Six out of the twelve flares are not being stowed in a designated watertight container.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2020
Resolved 23 September 2020
Resolution: New watertight container provided for flares.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 16 May 2019
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. The rotating belts on the main engine are exposed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2019
Resolved 6 June 2019
Resolution: Operator has made the space inaccessible to crew while the engine is running.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 16 May 2019
Resolved
A vessel must carry one floating water light. Vessel’s watertight was not operational. Vessel restricted to day time operations until water light is operational.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2019
Resolved 6 June 2019
Resolution: Operator purchased new water light.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 May 2019
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in a machinery space. The audible alarm was not operational.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 16 May 2019
Resolved 16 May 2019
Resolution: Audible alarm was replaced and is operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 May 2019
Resolved
An adult life jacket must be provided for each person carried onboard a vessel. Only 48 life jackets are serviceable after four were condemned.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 16 May 2019
Resolution: 2 additional satisfactory lifejackets were provided.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 29 May 2018
Resolved
Missing 01 adult life jacket. Provide 01 adult life jacket. Total persons allowed limited to 49.
Condition: Invalid
Action required: 705 - Other - as specified
Due 5 June 2018
Resolved 30 May 2018
Resolution: Provided 01 adult life jacket.
Documentation › Safety Management System › Reports and Analysis Procedures
Issued 1 May 2017
Resolved
Provide test report for the fixed ENG room extinguisher.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 10 May 2017
Resolution: Rcvd test rpt for fixed ER extinguisher.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 27 April 2017
Resolved
Provide means of securing ENG room air intake.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 10 May 2017
Resolution: Rcvd photos showing the securing of ER air intakes.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 27 April 2017
Resolved
Install 60 feet of line onto the ring buoy.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 10 May 2017
Resolution: Rcvd photo of new installed lifeline.
Documentation › Manifests/Lists › Emergency Checkoff List
Issued 27 April 2017
Resolved
There was no emergency instructions list.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 10 May 2017
Resolution: Rcvd photo of emergency instruction list.
Electrical › Electric Supply System (service) › Battery Installation
Issued 11 June 2016
Resolved
Prove proper operation of propulsion machinery after loss of propulsion.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 11 June 2016
Resolution: Vessel rep replaced batteries, and was able to start enging with no issue.
Operations/Management › Drills/Instruction › Not Conducted
Issued 20 May 2016
Resolved
Required to get U/W to conduct engine trials and MOB drill.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2016
Resolution: Conducted sat engine trial and MOB Drill
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 20 May 2016
Resolved
Crew could not reach water to effectively recover MOB from deck of vessel.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 26 May 2016
Resolution: Master provided life sling with lifting point and ladder to waterline to reach MOB.
Fire Fighting › Fire Bucket › Availability
Issued 20 May 2016
Resolved
There were no fire buckets onboard. Provide 03 approved fire buckets.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2016
Resolution: Three approved fire buckets were provided.
Engineering › Fuel Oil Service System › Valve
Issued 20 May 2016
Resolved
The deck hatch covering the port fuel shutoff valve was broken and not easily accessible. Replace cover.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 26 May 2016
Navigation › Piloting/Steering › US Coast Pilot
Issued 20 May 2016
Resolved
There were no nav pubs onboard. Provide nave pubs (coast pilot, light list, tides, currents, nav rules)
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 26 May 2016
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 20 May 2016
Resolved
The sorage locations were not correctly labeled.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 26 May 2016
Lifesaving › Lifefloat › Markings
Issued 17 May 2016
Resolved
There were no spacers between the lifefloats. Provide spacers.
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 26 May 2016