SEADREAM II is a 1985 passenger vessel (inspected). The Coast Guard has recorded 11 inspections since 2016, most recently in December 2025, along with 15 deficiencies and 1 operational control.

Records from 2016 to 2025. Most recent: inspection, 7 December 2025.

Built
1985
Last inspected
7 December 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 7 December 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8203440
267757
Flag
NORWAY
Maury page id
psix-267757

Documentation record

Tonnage as PSIX records it4333 - Convention (Subpart B), Gross Ton
4260 - Regulatory (Subpart C or D), Gross Ton
1300 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 11

7 December 2025 COC-CVE Annual · PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8278035
9 November 2024 Ballast Water Examination · PSC B · COC-CVE Annual · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8029305
18 January 2023 Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7623026
21 November 2022 PSC B · COC-CVE Annual
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7597918
18 March 2022 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7414228
2 December 2021 Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7361312
16 November 2021 COC-CVE Annual
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7352067
9 November 2019 Ballast Water Examination · ISPS II Exam · COC-CVE Annual
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6851600
27 October 2018 COC-CVE Annual · Deficiency Check · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6565834
21 November 2017 COC-CVE Annual · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6308626
9 November 2016 Ballast Water Examination · COC-CVE Annual · Deficiency Check · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6032311

Deficiency record · 15

07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 December 2025 Resolved
All power ventilation, except machinery space and cargo space ventilation and any alternative system which may be required under regulation 16.6, shall be fitted with controls so grouped that all fans may be stopped from either two seperate positions which shall be situated as far as practicable. Controls provided for the power ventilation serving machinery spaces shall also be grouped so as to be outside such spaces, Ventilation louvers in EDG room did not close completely. 74 SOLAS 81 AMEND II-2/32.1.6
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 December 2025
Resolved 7 December 2025
Resolution: Louvers were adjusted while PSC exam team onboard. Def rectified
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 7 December 2025 Resolved
Ventilation ducts passing through divisions between main vertical zones shall be equipped with a fail-safe automatic closing fire damper which shall also be capable of being manually closed from each side of the disision. Fire damper #420, deck 4, suite 401, and #421 not working properly. 74 SOLAS 01 II-2/41-2.6.3
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 December 2025
Resolved 7 December 2025
Resolution: Indicators were repaired while PSC exam team onboard. Def rectified
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 7 December 2025 Resolved
Ventilation ducts passing through divisions between main vertical zones shall be equipped with a fail-safe automatic closing fire damper which shall also be capable of being manually closed from each side of the division. Deck 6, fire damper in the lift machinery room did not close manually. 74 SOLAS 01 II-2/41-2.6.3
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 7 December 2025
Resolved 7 December 2025
Resolution: Fire damper was adjusted while PSC exam team onboard. Def rectified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 November 2024 Resolved
Every steam pipe and every fitting connected thereto through which may pass shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subject. PSCO found a leaking steam pipe with patches in the funnel casing at the stern of the vessel 74SOLAS(97)II-1/33.1, Code 16AC.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 November 2024
Resolved 28 November 2024
Resolution: A new section of steel pipe was welded.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 9 November 2024 Resolved
Where "A" Class divisions are penetrated for the passage of electrical cables, pipes, trunks, ducts, etc, or for girders, beams or other structural members arrangements shall be made to ensure that the fire resistance is not impaired. PSCO found a squared section cut-out in the structural steel A60 fire boundary to pass water hoses in an electrical locker in deck 4, adjacent to the elevator. 74SOLAS(81)II-2/18.1.1 Code 50AC(30days).
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 December 2024
Resolved 28 November 2024
Resolution: Cut-out steel section was re-welded in place.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 9 November 2024 Resolved
Arrangements shall be provided to permit a rapid shut-down effective closure the ventilation system in case of a fire. Ventilation ducts, including dampers, shall be made of steel and their arrangements shall be to the satisfaction of the Administration (74SOLAS(81)II-2/38.3.3.5) PSCO found all ventilation dampers in deck 4 port and starboard made of aluminum and in deteriorated condition, some not closing closing properly. 74SOLAS(81)-2/38.3.4. Code 50AC (30 Days).
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 December 2024
Resolved 3 January 2025
Resolution: Lloyd's Register issued a condition of class to be corrected in MARCH2025, company has issued a purchase order for new in-kind ventilation louvers.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 November 2022 Resolved
The ring lines and letters shall be painted in white or yellow on a dark background or in black on alight ground. They shall also be permanently marked on the sides of the hsips to the satisfaction of the administration. The marks shall be plainly visible and if necessary, special arrangements shall be made for this purpose. The ship's deck line was not marked in a contrasting color. ILLC 66/ Annex 1 Reg 8
Condition: Placed in Improper Service
Action required: 15 - Rectify deficiencies by next port
Due 28 November 2022
Resolved 20 January 2023
Resolution: Received photos of painted deckline on the port and starboard side of the vessel. Photos attached.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 November 2022 Resolved
For the purpose of determining the appropriate fire integrity standards to be applied to boundaries between adjacent spaces, such spaces are classified according to the fire risk as shown in category (1) to (14) spaces. Combustible materials for daily use in the salon were found in a contained that is not an approved container for flammable storage. 74 SOLAS 74 II-2/20
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 December 2022
Resolved 18 January 2023
Resolution: Received receipt of new flammable locker purchased and photo of removal of old locker
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 27 November 2022 Resolved
All lifeboats shall be of sufficient strength to enable them to be safely lowered into the water when loaded with their full complement of persons and equipment. All lifeboats shall be of such strength that they will not suffer residual deflection if subjected to an overload of 25%. Cracking on the upper shell, port side bow, was identified on Life boat #1. Separation along the affected area allowed for daylight to show through. 74 SOLAS 74 III/5(e)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 December 2022
Resolved 18 January 2023
Resolution: Received class report attesting to satisfactory repair.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 27 November 2022 Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs; structural fire protection including fire resisting divisions and protection of openings and penetrations in these divisions. Fire dampers in the emergency generator room were not closing automatically. 74 SOLAS 20 II-2/41.2.1.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 27 November 2022
Resolution: Replaced bad solenoid and dampers operated as intended.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 November 2021 Resolved
Where due to any particular structural arrangements in the ship, difficulty is experienced in determining from the tables the minimum fire integrity value of any divisions, such values shall be determined to the satisfaction of the Administration. Combustible materials were found stored in the portside 606 room, and forward A/C room on deck 2. Flammable materials for the nail salon was not stored in an appropriate chemical locker, and found stored in a small closet in the gym. 74SOLASII-2 Reg 20.
Action required: 10 - Deficiency Rectified
Resolved 20 November 2021
Resolution: Corrected on the spot, materials have been relocated to a chemical locker.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 27 October 2018 Resolved
After any survey of the ship under regulation 7 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. Two soft patches were found on the emergency bilge suction in the vicinity of the OWS.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2018
Resolved 10 November 2018
Resolution: The vessel provided a Class report attesting to the crop and renewal of piping that had soft patches.
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 27 October 2018 Resolved
Where the contents and the use of a space are such that there is a doubt as to its classification for the purpose of this regulation, this shall be treated as a space within the relevant category having the most stringent boundary requirements. The crew stored combustibles in an unprotected and uninsulated void space under a stairway.
Action required: 10 - Deficiency Rectified
Resolved 27 October 2018
Resolution: The crew removed the storage under the stairway before we departed.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 27 October 2018 Resolved
The following fire protection systems shall be kept in good order as so as to ensure their required performance if a fire occurs: means of escape systems and appliances. The EEBDs in the engine room were still covered in plastic and not readily accessible.
Action required: 10 - Deficiency Rectified
Resolved 27 October 2018
Resolution: The crew removed the plastic before we departed.
Fire Fighting › Structural - A Class Divisions › Aux Spaces (moderate fire risk)
Issued 9 November 2016 Resolved
THE MINIMUM FIRE INTEGRITY OF ALL BULKHEADS AND DECKS SHALL BE AS PRESCRIBED IN TABLES 1-4 IN THIS REGULATION. TALBE 4 PRESCRIBES A-60 BOUNDRY FOR AN ACCOMADATION SPACE OF MODERATE RISK (7) ABOVE A MACHINERY SPACE (12). PSCO OBSERVED MISSING INSULATION ABOVE BOTH AUXILIARY BOILERS, WHICH ARE LOCATED BELOW MAIN DINING ROOM.
Action required: 705 - Other - as specified
Due 25 November 2016
Resolved 29 November 2016
Resolution: Received class report stating SFP installed satisfactory.

Ownership record