← All vessels
FREEPORT PRINCESS
Passenger (Inspected) · Passenger Ship class · Built 1980s · USCG Northeast District (CGD-NE) · Other hulls named FREEPORT PRINCESS
FREEPORT PRINCESS is a 1986 passenger vessel (inspected). The Coast Guard has recorded 67 inspections since 1986, most recently in September 2020, along with 126 deficiencies — 2 with no resolution recorded —.
Records from 1986 to 2020. Most recent: inspection, 4 September 2020.
- Built
- 1986
- Last inspected
- 4 September 2020
- Documentation
- No Operation - PM · documentation file of 10 September 2026
- Deficiencies
- 126 recorded · 2 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
696744
WDF8353
269100
Flag
UNITED STATES
367103330, 367493970 (licence lapsed)
Maury page id
psix-269100
Inspections, by type
…with no type recorded4
…past their stated due date2
Years with a record
30 calendar years (1986–2020)
The 67 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 6 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)95.4 ft × 21.0 ft × 7.3 ft
Registered tonnagegross 92 / net 62
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLYDIA YACHTS OF STUART INC · STUART, FL, UNITED STATES · built 1986
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationNo Operation - PM · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it92 - Regulatory (Subpart C or D), Gross Ton
62 - Regulatory (Subpart C or D), Net Ton
62 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDF8353MMSI 367493970 · expired · compulsorily equipped · granted 9 June 2011, cancelled 14 August 2021
WTX3413MMSI 367103330 · expired · compulsorily equipped · granted 30 March 2006, cancelled 11 June 2016 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 67
4 September 2020
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7049825
14 June 2019
Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6734949
17 April 2019
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6662448
6 August 2018
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6488951
18 July 2018
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6485295
22 January 2018
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6341213
24 April 2017
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6131586
2 June 2016
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5895379
7 January 2016
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5792762
6 January 2016
Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5792140
20 June 2012
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4350788
3 May 2012
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4301220
6 May 2009
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3468105
9 May 2008
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3202786
22 April 2008
Internal Structural Exam · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3191965
20 April 2007
MARPOL Annex V Examination · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2923987
27 April 2006
MARPOL Annex V Examination · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2644018
20 March 2006
Hull Examination · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2606122
5 May 2005
MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2349686
28 April 2004
Annual Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2060200
1 April 2004
Hull Examination · Internal Structural Exam
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2036303
6 May 2003
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1787438
15 April 2002
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1605072
1 April 2002
Hull Examination · Internal Structural Exam
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1599193
11 July 2001
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1073066
26 April 2001
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1395700
28 February 2001
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1058716
28 July 2000
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 21220
8 June 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 114734
13 April 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1415343
23 March 2000
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1421821
13 July 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1098422
13 April 1999
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1415161
9 March 1999
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 801317
22 January 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1438872
27 April 1998
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1124398
16 March 1998
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 805426
29 April 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1091987
10 April 1996
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1080721
13 March 1996
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 885857
12 April 1995
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 849202
23 January 1995
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1137786
9 June 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 863690
23 May 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1326879
10 May 1994
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1170344
7 April 1994
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1167650
12 May 1993
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1150541
15 June 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1257913
11 May 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 953746
30 April 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 959989
10 May 1991
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1198110
9 April 1991
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1225952
14 June 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1240947
9 May 1990
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 928050
23 March 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 909495
8 September 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1340606
15 May 1989
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 886677
12 May 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1342916
9 March 1989
Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 890269
25 May 1988
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 887380
4 April 1988
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1194075
1 June 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1027619
27 March 1987
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1328129
3 November 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1323997
8 September 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1024596
22 August 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 988181
18 June 1986
Initial Certification
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 994131
Deficiency record · 126
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 4 September 2020
No resolution recorded
Failure to complete inspections IAW 46 CFR 176.500 and §176.600
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 17 April 2019
Resolved
Replace/repair public address system.
46CFR184.610
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 17 April 2019
Resolved
Provide charts and navigation publications for intended voyage. 46CFR184.420
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 April 2019
Resolved
Remove or properly connect wiring for winch in the bow void space. 46CFR183.340(g)
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 17 April 2019
Resolved
Provide emergency instructions at the operating station.
46CFR185.510
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 17 April 2019
Resolved
Provide garbage placards as required by 33CFR151.59
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 August 2018
Resolved
Replace as original exhaust loop on center main engine.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2018
Resolved
Repair air leak on pneumatic controller in engine room.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 August 2018
Resolved
Remove rags from galley exhaust and replace with noncombustable material.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 August 2018
Resolved
Remove electrical wiring not in service from electrical cabinet on main deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 August 2018
Resolved
Inspect port main engine for exhaust leak on inboard exhaust.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 August 2018
Resolved
Remove starter wiring from STBD diesel generator.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 6 August 2018
No resolution recorded
Provide manufacture specs for each Buoyant Apparatus/Life Float with date of manufacture and person capacity.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 August 2018
Resolved
Ensure life jackets are stowed in convenient locations on main and upper deck levels.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 18 July 2018
Resolved
Conduct permanent repairs to fore deck
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 9 June 2016
Resolved
Provide copy of valid FCC Safety Radio Certificate.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 9 June 2016
Resolved
Provide copy of valid FCC Bridge to Bridge Certificate.
Communications › Radio Communications › VHF Radiotelephone
Issued 9 June 2016
Resolved
Provide proper VHF/DSC Radio and program MMSI# per MSIB.
Lifesaving › Lifefloat › Float-free Link
Issued 20 June 2012
Resolved
Provide proper link rated for the capacity of the life floats.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 20 June 2012
Resolved
Bilge alarm panel doesn't operate properly. When 1 compartment alarm is tested all lights light up. Repair/Replace system to isolate compartment.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 6 May 2009
Resolved
Remove 12 volt outlet no longer operational in the engine room s/s aft. (corrected on spot)
Electrical › Electrical Distribution System (service) › Junction Box
Issued 6 May 2009
Resolved
Repair/remove broken junction box above the centerline MDE. (corrected on spot)
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 6 May 2009
Resolved
Provide servicing for 2 (two) B-II fire extinguishers or provide proof that both extinguishers were serviced with the rest of the portable fire fighting equipment. Vessel is restricted from carrying passengers until corrected.
Construction/Loadline › Structures › Door
Issued 9 May 2008
Resolved
Repair leaking window IWO port side pilot house.
Construction/Loadline › Structures › Door
Issued 9 May 2008
Resolved
Repair cracked window IWO Pilot house (stbd side).
Communications › Public Address System › Announcing Station
Issued 9 May 2008
Resolved
Repair inoperable public address system and test in presence of USCG inspector.
Electrical › Electric Supply System (service) › Cable
Issued 9 May 2008
Resolved
Remount wires leading into wiper control unit (pilot house).
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 9 May 2008
Resolved
Provide for CO2 opertion instruction for local and remote station.
Operations/Management › Navigation Safety › Doors Closed at Sea
Issued 9 May 2008
Resolved
Repair stbd weather door top deck.
Operations/Management › Navigation Safety › Doors Closed at Sea
Issued 9 May 2008
Resolved
Repair exterior pilot house cracked, rot etc.
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 9 May 2008
Resolved
Repair inoperable water light IWO Buoyant apparatus 10 man.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 May 2008
Resolved
Remount forward mast light and rewire. (it was loose)
Accommodation/Occupational Safety › Heating › Piping
Issued 9 May 2008
Resolved
Provide for grab rails IWO galley stove.
Operations/Management › Navigation Safety › Doors Closed at Sea
Issued 9 May 2008
Resolved
Replace missing dogs IWO port/ stbd windows located in engine room.
Fire Fighting › Fire Pumps › Arrangement
Issued 9 May 2008
Resolved
Remount port fire pump ( Clamp down)
Fire Fighting › Fire Pumps › Pressure
Issued 9 May 2008
Resolved
Replace firepump gauge.
Fire Fighting › Fire Hoses › Condition
Issued 9 May 2008
Resolved
Replace cracked hose IWO (fresh water) center motor heat exchanger.
Operations/Management › Drills/Instruction › Not Conducted
Issued 9 May 2008
Resolved
Conduct for underway exam in presence of USCG inspectors.
Engineering › Generator (propulsion-electric) › Coil
Issued 9 May 2008
Resolved
Remove scales IWO both heat exchangers on generator. (By water fill inlet)
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 9 May 2008
Resolved
Replace worn/torn retro-reflective tape IWO 39 lifejackets ( 38 lifejackets adult and one child)
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 9 May 2008
Resolved
Remount or remove sounding proof/ overhead insulation IWO lazzerette and Engine room.
Engineering › Bilge Water Management System › Hose
Issued 9 May 2008
Resolved
Replace cracked bilge hose on stbd engine as marked.
Engineering › Freshwater Generation System › Piping
Issued 9 May 2008
Resolved
Replace cracked hose IWO salt water exchange line on stbd generator.
Engineering › Generator (propulsion-electric) › Cable
Issued 9 May 2008
Resolved
Replace cracked hose IWO port heat exchanger on port generator.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 22 April 2008
Resolved
Repair oil leak on starboard engine turbocharger.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 22 April 2008
Resolved
Replace oil soaked exhaust lagging on starboard engine.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 22 April 2008
Resolved
Repair leaking exhaust on starboard engine.
Lifesaving › Buoyant Apparatus › Lifeline
Issued 20 April 2007
Resolved
Replace line on 10-pax buoyant apparatus (line connected to the weak link)
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 20 April 2007
Resolved
Make permanent repairs to cracked weld on exhaust piping. (Elbow, gen space)
Electrical › Lighting (emergency) › Lighting Fixture
Issued 20 April 2007
Resolved
Properly label emergency lighting on lower pax deck.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 April 2007
Resolved
Properly bundle/remove old wires for bilge system and thermostat.
Engineering › Generator (propulsion-electric) › Cable
Issued 20 April 2007
Resolved
Double clamp flex hose on muffler hose on port gen.
Navigation › Piloting/Steering › Marine Charts
Issued 27 April 2006
Resolved
Provide updated navigation pubs.
Lifesaving › Buoyant Apparatus › Marking
Issued 27 April 2006
Resolved
Re-mark 10 person bouyant apparatus.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 27 April 2006
Resolved
Make lanyard for waterlight on ring buoy between 3 to 6 feet.
Lifesaving › Lifebuoys › Serviceable
Issued 27 April 2006
Resolved
Repair holes on ring buoys to manufacturer's specifications.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 27 April 2006
Resolved
Repair leak on port generator heat exchanger.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 20 March 2006
Resolved
Make proper repairs to engine room overhead fire insulation.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 20 March 2006
Resolved
Repair overhead fire insulation in lazzerette/generator space.
Accommodation/Occupational Safety › Ventilation › General
Issued 20 March 2006
Resolved
Provide guard for fan blades in engine room overhead above/aft of port engine.
Engineering › Steering Gear System › Piping
Issued 20 March 2006
Resolved
Make proper repairs to steering gear hydraulic leaks starboard side.
Electrical › Electric Generation Source (service) › Generator
Issued 20 March 2006
Resolved
Replace wasted vent screen on starboard generator.
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 5 May 2005
Resolved
Properly repair Port MDE RPM gauge.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 May 2005
Resolved
Remove all outdated items from the First Aid kit and renew needed items.
Documentation › Markings/Placards › Lifejacket Placard
Issued 5 May 2005
Resolved
Post donning placard for lifejackets on 2nd deck.
Communications › Alarms/Indicators › Bilge Alarm
Issued 5 May 2005
Resolved
Properly repair bilge high level alar in dinning room bilge. Vessel crew required to make rounds and observe bilge area every 30 minutes untils repairs are completed.
Lifesaving › Buoyant Apparatus
Issued 28 April 2004
Resolved
Prove proper operation of waterlight for one BA. Vessel is restricted to daylight operations only until this requirement is met.
Communications › Radio Communications › VHF Radiotelephone
Issued 28 April 2004
Resolved
Provide current FCC radio safety certificate. Vessel is restricted to operations less than a 1000 feet from shore until this requirement is met.
Electrical › Electric Supply System (service) › Cable
Issued 1 April 2004
Resolved
Make proper wire conections to the shore tie over the port SSDG. LEGACY COMPONENT DESC: Cable
Electrical › Electric Supply System (service) › Cable
Issued 1 April 2004
Resolved
Install metal wire ties over the port SSDG wire run. LEGACY COMPONENT DESC: Cable
Accommodation/Occupational Safety › Refrigeration (air conditioning)
Issued 15 April 2002
Resolved
Clean dining room A/C unit evaporator coils. LEGACY COMPONENT DESC: Evaporator
Accommodation/Occupational Safety › Medical/First Aid
Issued 15 April 2002
Resolved
Replace expired medications in first aid kit. LEGACY COMPONENT DESC: Medicine Chest
Accommodation/Occupational Safety › Occupational Safety
Issued 15 April 2002
Resolved
Post hearing protection placard at engine room access. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Accommodation/Occupational Safety
Issued 15 April 2002
Resolved
Label emergency escape in generator room. LEGACY COMPONENT DESC: Emergency Escape
Lifesaving
Issued 26 April 2001
Resolved
Replace lines to all ring lifebuoys, waterlights & survival craft w/ UV resistant or dark colored, floating line.
Lifesaving
Issued 26 April 2001
Resolved
Either provide 2 additional child size PFDs or re-mark forward stowage location to reflect 18.
Lifesaving
Issued 26 April 2001
Resolved
Remove expired medication & replace Aspirin.
Lifesaving
Issued 26 April 2001
Resolved
Provide wire splint for first aid kit.
Fire Fighting
Issued 26 April 2001
Resolved
Install device to automatically shut down power ventillation to E/R and Generator Room prior to release of extinguishing agent into the space.
Fire Fighting
Issued 26 April 2001
Resolved
Install closure devices for natural air exhaust discharges to E/R & Generator Room. They must be be readily available & mounted in the vicinityof the vent.
Fire Fighting
Issued 13 April 1999
Resolved
Provide hydro report of piping for newly installed fixed fire fighting system.
Lifesaving
Issued 13 April 1999
Resolved
Replace 20 person B/A w/18' line to water light.
Lifesaving
Issued 13 April 1999
Resolved
Attach water light w/18' line to 10 person B/A
Fire Fighting
Issued 13 April 1999
Resolved
Install galley hood fire extinguishing system IAW 46 CFR 181.400/181.425 and NFPA 17 or 17A.
Lifesaving
Issued 13 April 1999
Resolved
Replace retro on child life jackets
Lifesaving
Issued 13 April 1999
Resolved
Replace life line on perimeter of 12 person B/A.
Fire Fighting
Issued 22 January 1999
Resolved
Submit plans for review and approval for the installation of a Fixed Fire Fighting System in the machinery spaces in accordance with 46 CFR 181.115(b) and 46 CFR 181.400
Fire Fighting
Issued 22 January 1999
Resolved
Install a Fixed Fire Fighting System in machinery spaces in accordance withU.S. Coast Guard approved plans.
Fire Fighting
Issued 22 January 1999
Resolved
Vessel is not to be operated with passengers for hire after March 11, 1999,until the above requirements have been cleared to the satisfaction of an attending U.S. Coast Guard Marine Inspector.
Unknown
Issued 29 April 1997
Resolved
Display EAP employer policy for drug & alcohol program.
Unknown
Issued 29 April 1997
Resolved
Mark flare container "Distress Signals".
Lifesaving
Issued 29 April 1997
Resolved
Provide waterlights for 3 bouyant apparatus.
Lifesaving
Issued 10 April 1996
Resolved
REPAIR GOUGE IN 20 PERSON B/A AND RECOAT 10 PERSON B/A.
Fire Fighting
Issued 10 April 1996
Resolved
REPAIR FIREMAIN PIPE LEADING FROM ELECTRIC FIRE PUMP.
Construction/Loadline
Issued 13 March 1996
Resolved
STENCIL BILGE SUCTION VALVES TO IDENTIFY WHICH SERVES WHICH SPACE.
Deck/Cargo
Issued 13 March 1996
Resolved
REPLACE BACKING WASHERS ON ANCHOR WINDLASS MOUNTING BOLTS.
Documentation
Issued 12 April 1995
Resolved
POST 2 SIGNS, ONE ON EACH LADDER TO 01DEC18 STATING 77 MAX PASSENGERS ON UPPER DECK. COMPLIANCE DATE 26APR96.
Documentation
Issued 12 April 1995
Resolved
PROVIDE FWD AND AFT DRAFT MARKINGS AT NEXT HAULOUT OR SCHEDULED DRYDOCK. COMPLIANCE DATE NLT 30APR96.
Lifesaving
Issued 10 May 1994
Resolved
STENCIL ALL BUOYANT APPARATUS WITH CAPACITY.
Engineering
Issued 10 May 1994
Resolved
REPAIR LEAKING RETURN FUEL LINES ON PORT AND CENTER MAIN DIESEL ENGINES.
Engineering
Issued 10 May 1994
Resolved
REPAIR LEAKING COOLANT RETURN LINE ON STARBOARD MAIN DIESEL ENGINE.
Unknown
Issued 10 May 1994
Resolved
PROVE PROPER OPERATION OF SAFETY RELIEF VALVES ON BOTH AIR COMPRESSORS.
Engineering
Issued 10 May 1994
Resolved
PROVE PROPER OPERATION OF ANCHOR WINDLASS.
Lifesaving
Issued 10 May 1994
Resolved
REPLACE BOTH 20 PERSON BUOYANT APPARATUSES WITH NEW APPROVED 20 PERSON BUOYANT APPARATUS (ALREADY ON ORDER).
Lifesaving
Issued 10 May 1994
Resolved
REPLACE LIFELINE ON 12 PERSON BOUYANT APPARATUS.
Lifesaving
Issued 10 May 1994
Resolved
RECOAT CRACKED AREAS ON 10 PERSON APPARATUS.
Unknown
Issued 12 May 1993
Resolved
PROVIDE PROOF OF ENROLLMENT IN CHEMICAL TESTING PROGRAM IAW 46 CFR 16.260._x001C__x001C_ _x001C_ _x001C_
Navigation
Issued 12 May 1993
Resolved
PROVIDE PROOF OF AQUIRING A DEVIATION TABLE FOR THE MAGNETIC COMPASS._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 15 June 1992
Resolved
PROVIDE APPROVED STABILITY CALCULATIONS TO INCLUDE CANOPY ON UPPER DECK, TOLOCAL [name withheld] ARCHITECT INFORMATION CANOPY MAY BE INSTALLED UNTIL COMPLETION OF THIS REQUIREMENT.
Engineering
Issued 10 May 1991
Resolved
DEMONSTRATE PROPER OPERATION OF PORT MAIN DIESEL ENGINE LOW OIL PRESSURE ALARM.
Lifesaving
Issued 10 May 1991
Resolved
REPLACE LIFETIME ON FOUR B.A'S.
Navigation
Issued 9 May 1990
Resolved
PROVIDE DOCUMENTATION THAT PORT AND STARBOARD LIGHTS MEET COLREGS/INLAND RULES.
Lifesaving
Issued 9 May 1990
Resolved
RENEW REFLECTIVE TAPE FOR ALL (4) BUOYANT APPARATUS.
Electrical
Issued 9 May 1990
Resolved
ENCLOSE 220V CIRCUIT BREAKER FOR A/C TO PREVENT SHCOK HAZARD.
Accommodation/Occupational Safety
Issued 9 May 1990
Resolved
MODIFY PIPING SYSTEM FOR GARBAGE DISPOSAL TO PREVENT DISCHARGE IN PROHIBITED AREAS.
Electrical
Issued 9 May 1990
Resolved
LABEL CIRCUIT BREAKERS IN 110V PANEL FOR GALLEY AND 110 V PANEL AT ELECTRICAL TRANSFER STATION.
Electrical
Issued 9 May 1990
Resolved
INSTALL RELAY TO ENERGIZE EMERGENCY LIGHTING AUTOMATICALLY UPON POWER FAILURE.
Construction/Loadline
Issued 9 March 1989
Resolved
PROVIDE APPROVED PLANS FOR INSTALLATION OF DECDK ENCLOSURE ON AFT SECTION OF MAIN DECK.
Electrical
Issued 9 March 1989
Resolved
BLOCK BATTERIES IN PLACE SO THE CAN NOT SHIFT.
Electrical
Issued 9 March 1989
Resolved
REMOVE SMALL WIRES WHICH ARE TAPPED DIRECTLY TO BATTERIES AND RECONNECT THEM AFTER THE MAIN DISCONNECT SWITCH AN INSURE ADEQUATE OVERCURRENT PROTECTION IS PROVIDED.
Construction/Loadline
Issued 9 March 1989
Resolved
REPAIR ROTTED AREA OF 01 DECK AT STERN.
Construction/Loadline
Issued 4 April 1988
Resolved
INSTALL OR MODIFY WATERTIGHT ENGINEROOM DOOR TO MAKE IT QUICK ACTING FROM BOTH SIDES.
Construction/Loadline
Issued 4 April 1988
Resolved
INSTALL PILOTHOUSE ALARMS/INDICATOR LIGHTS TO INDICATE DOOR POSITIONS FOR BOTH BELOW DECK WATERTIGHT DOORS.
Construction/Loadline
Issued 4 April 1988
Resolved
LABEL BOTH SIDES OF THE WATERTIGHT DOOR BETWEEN GALLEY AND DINING ROOM.
Construction/Loadline
Issued 22 August 1986
Resolved
REPLACE WATER TIGHT DOOR BETWEEN THE GALLEY AND ACCOMMODATION LOUNGE WITH CLASS 1 QUICK ACTING TYPE.
Accommodation/Occupational Safety
Issued 22 August 1986
Resolved
SUBMIT PLANS TO INSTALL A GALLEY HOOD VENT SYSTEM TO BE APPROVED BY PLAN REVIEW, [name withheld].
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.