Records from 1986 to 2016. Most recent: inspection, 27 September 2016.
Inspection history · 42
27 September 2016
ISPS II Exam · PI Safety Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6010460
5 December 2011
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4193235
7 November 2010
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3886547
30 December 2002
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1724194
26 December 2002
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1722942
14 May 2002
Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1616621
7 July 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 166828
21 April 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 289223
21 April 2001
Tank Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1061701
22 February 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 129490
12 April 2000
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 276850
12 April 2000
Tank Vessel Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 817304
31 October 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 434383
23 March 1999
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 426809
13 January 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 424689
5 January 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 425032
11 October 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 421375
29 July 1998
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 412770
18 April 1998
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 414708
12 January 1998
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 411830
12 January 1998
Tank Vessel Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 776927
11 February 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 493461
1 June 1996
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 391696
12 January 1996
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 387231
3 January 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 386496
17 January 1993
Certificate of Compliance · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1138498
24 September 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 162652
12 May 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 442039
6 November 1991
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 346891
6 November 1991
Certificate of Compliance
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1248830
2 May 1991
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 436400
8 November 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 340471
8 November 1990
Certificate of Compliance
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 921506
22 August 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 521021
22 January 1990
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 443556
16 November 1989
Certificate of Compliance
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 903180
27 April 1989
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 329978
27 April 1989
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 890474
30 October 1988
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 326452
30 October 1988
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 891095
11 March 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 314692
16 July 1986
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 310263
Construction/Loadline › Markings › Load Line Mark
Issued 5 December 2011
Resolved
The lines and letters shall be painted white or yellow on a dark ground. The load lines and deck line are not in contrasting color.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 September 2016
Resolution: Reviewed class society report from 16 February 2016 and the ship's load line appeared to be present and of a contrasting color to the hull.
Navigation › Collision/Grounding Avoidance › Radar
Issued 24 December 2002
Resolved
PRIMARY AND SECONDARY RADAR INOP, A THIRD RADAR EQUIPED WITH ARPA IS ON BOARD AND FULLY OPERATIONAL.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 24 December 2002
Resolved 27 December 2002
Resolution: RECEIVED CERTIFIED TECHNICIANS REPORT ATTESTING TO THE PROPER OPERATION OF BOTH RADARS.
Construction/Loadline › Hull
Issued 31 May 2002
Resolved
Damaged Side Shell Plate, PortSide, Frame 58/59, leaking IGS gas from #5P Cargo Tk. SOLAS 74(Amend) CH I Reg II/ILLC 66 Annex I Reg 1. Remove all cargo from #5P. Repairs to be attended by class surveyor & USCG inspector. No cargo authorized in #5P until permanent repairs completed. LEGACY COMPONENT DESC: Side Shell
Action required: 15 - Rectify deficiencies by next port
Due 5 June 2002
Resolved 1 June 2002
Resolution: On 1 JUNE 2002, received class report attesting to repairs specified in outstanding deficiency. USCG marine inspector boarded vsl and verified that repairs were made.
Deck/Cargo
Issued 31 October 1999
Resolved
CARGO PIPING HAS NOT BEEN HYDROSTATICALLY TESTED TO MAWP (LAST TESTED 24SEP98) IAW 46CFR35.35-70 TEST/PROVIDE ASTESTATION PRIOR TO LOADING /DISCHARGING ANY CARGOES
Condition: Unknown
Due 1 November 1999
Resolved 2 November 1999
Accommodation/Occupational Safety
Issued 5 January 1999
Resolved
repair the wasted supports for the deck storm lines. ICLL 66 II/25
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Deck/Cargo
Issued 5 January 1999
Resolved
Provide a label for the deck high level alarm. 33 CFR 155.480
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Deck/Cargo
Issued 5 January 1999
Resolved
Repair the speed control for the #1 cargo oil pump in the control room. SOLAS 74 I/11
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Accommodation/Occupational Safety
Issued 5 January 1999
Resolved
Replace the worn wires on both accommodations ladders. SOLAS 74 amd V/17
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Electrical
Issued 5 January 1999
Resolved
Replace all missing bonding straps on the deck cargo & vent lines. SOLAS 74 II-1/27
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 5 January 1999
Resolved
Repair the leaking steam lines on deck (locations with holes) SOLAS 74 I/11
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 5 January 1999
Resolved
Make permanent repairs to the inoperative OWS MARPOL 73/78 I/16
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Lifesaving
Issued 5 January 1999
Resolved
Replace the expired batteries in the SARTs and the lifeboat radios. SOLAS 74 amd III/2.2
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Fire Fighting
Issued 5 January 1999
Resolved
Provide recent servicing certificates for the air tanks for the fire fighting suites. SOLAS 74 II-2/14
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Construction/Loadline
Issued 5 January 1999
Resolved
Have class enter & examine #4 port ballast tank and provide report on condition (excessive wastage noted at entrance.) ICLL 66 I/11
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 5 January 1999
Resolved
Clean the excessive oil from the steering gear, generator engines and purifier space. SOLAS 74 II-1/28
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Navigation
Issued 5 January 1999
Resolved
The phone in the steering gear space is difficult to hear. Make repairs asnecessary. SOLAS 74 II-1/29
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Construction/Loadline
Issued 5 January 1999
Resolved
Make permanent repairs to the fracture in the hull in way of the machinery space per class requirements (port, aft of the MDE at the bilge tank top 45patched with cement). ICLL 66 I/1
Condition: Unknown
Due 3 November 1999
Resolved 3 November 1999
Deck/Cargo
Issued 5 January 1999
Resolved
Overhaul the mechanical PV breaker and prove proper operation of the reliefvalve prior to departure. SOLAS 74 amd II-2/62.11.3
Condition: Unknown
Due 28 January 1999
Resolved 28 January 1999
Fire Fighting
Issued 5 January 1999
Resolved
Repair the inoperative emergency fire pump vacuum pump and prove proper operation of system prior to departure. SOLAS 74 II-2/5
Condition: Unknown
Due 28 January 1999
Resolved 28 January 1999
Deck/Cargo
Issued 5 January 1999
Resolved
Provide a report on the proper content of the liquid in the liquid PV breaker and prove proper operation prior to departure. SOLAS 74 amd II- 2/62.11.3
Condition: Unknown
Due 28 January 1999
Resolved 28 January 1999
Engineering
Issued 5 January 1999
Resolved
Repair wasted lines on the MDE air box cooling generator engine heat exchanger (stbd) and eductor lines from the fire pumps. SOLAS 74 II-1/28
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 5 January 1999
Resolved
Repair the inoperative flame sensor on the auxiliary boiler. SOLAS 74 II-1/28
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 5 January 1999
Resolved
Repair the L/O heat exchanger on the center generator engine (where held together with a C clamp) prior to departure. SOLAS 74 I/11
Condition: Unknown
Due 28 January 1999
Resolved 28 January 1999
Lifesaving
Issued 5 January 1999
Resolved
Repair or replace the leaking fue oil tanks in the port lifeboat. SOLAS 74I II/9
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Deck/Cargo
Issued 5 January 1999
Resolved
Locate all crude oil leaks from the cargo man hole covers and repair seals prior to departure. (tanks 4C & 1S were noted) ICLL 66 II/14
Condition: Unknown
Due 28 January 1999
Resolved 28 January 1999
Deck/Cargo
Issued 5 January 1999
Resolved
Locate all sections of the inert gas system piping that are patched with liquid metal and make permanent repairs prior to return to a U. S. port. SOLAS 74 II-2/62
Condition: Unknown
Due 23 March 1999
Resolved 23 March 1999
Navigation
Issued 5 January 1999
Resolved
Make permanent repairs to the solenoids on the stbd telemotor on the steering gear (chattering during operation). Complete prior to departure from the port. SOLAS 74 II-1/29
Condition: Unknown
Due 28 January 1999
Resolved 28 January 1999
Construction/Loadline
Issued 5 January 1999
Resolved
Overhaul the mechanical PV breaker and prove proper operation of the reliefvalve prior to departure. SOLAS 74 amd II-2/62.11.3
Condition: Unknown
Due 23 March 1999
Resolved 23 March 1999
Fire Fighting
Issued 11 October 1998
Resolved
Provide deck firefighting foam analysis prior to next U.S. port call.
Condition: Unknown
Due 19 January 1999
Resolved 19 January 1999
Deck/Cargo
Issued 11 October 1998
Resolved
Provide two 12" to 6" emergency lightering reducers prior to the next U.S. port.
Condition: Unknown
Due 19 January 1999
Resolved 19 January 1999
Engineering
Issued 11 October 1998
Resolved
Repair and prove operation of the 15ppm oily water separator alarm prior tothe next U.S. port.
Condition: Unknown
Due 19 January 1999
Resolved 19 January 1999
Deck/Cargo
Issued 11 October 1998
Resolved
Repair and prove operation of the audible alarms for the oil discharge monitor and control system prior to the next U.S. port.
Condition: Unknown
Due 19 January 1999
Resolved 19 January 1999
Engineering
Issued 12 January 1998
Resolved
REMOVE/REPLACE OIL SOAKED LAGGING IN WAY OF FUEL OIL LINE SOFT PATCH.
Condition: Unknown
Due 20 April 1998
Resolved 20 April 1998
Deck/Cargo
Issued 12 January 1998
Resolved
PUMP ROOM DOOR NOT VAPOR TIGHT, DOOR WASTED AT BOTTOM.
Condition: Unknown
Due 15 January 1998
Resolved 15 January 1998
Lifesaving
Issued 12 January 1998
Resolved
PORT AND STB LIFEBOATS HAVE ROTTING WOOD IN WAY OF SEATS, DECK PLANKING, EXTERIOR LIFELINE ATTACHMENTS, AND DECK NEAR FWD HOOK ASSEMBLY. WASTED CANOPY TIES, WASTED STANCHON BRACKETS, WASTED PINS ON AFT HOOK ASSEMBLY, BILGE SUCTION HOSES ROTTON, FAULTY EQUIPMENT ON BOARD.
Condition: Unknown
Due 15 January 1998
Resolved 15 January 1998
Fire Fighting
Issued 12 January 1998
Resolved
EMERGENCY FIRE PUMP UNABLE TO TAKE SUCTION
Condition: Unknown
Due 15 January 1998
Resolved 15 January 1998
Engineering
Issued 12 January 1998
Resolved
MAKE PERMENANT REPAIRS TO SOFT PATCHES IN FUEL LINE AT FUEL MANIFOLD INBOARD OF #1 FIRE PUMP AFT OF FUEL OIL TRANSFER PUMP.
Condition: Unknown
Due 20 April 1998
Resolved 20 April 1998
Unknown
Issued 12 January 1998
Resolved
MAKE REPAIRS IN DECK LOCATEDD UPPER LEVEL MACHINERY SPACE, AFT OF AUX BOILER.
Condition: Unknown
Due 20 April 1998
Resolved 20 April 1998
Unknown
Issued 12 January 1998
Resolved
MAKE REPAIRS TO OVERHEAD OF FUEL PURIFIER ROOM. (WATER IS LEAKING THROUGH OVERHEAD ON ELECTRICAL WIRING)
Condition: Unknown
Due 20 April 1998
Resolved 20 April 1998
Accommodation/Occupational Safety
Issued 12 January 1998
Resolved
MAKE REPAIRS TO GASKET ON DOORS TO HOUSE, MAIN DECK STB SIDE. (DAY LIGHT SHOWING THROUGH FROM INSIDE)
Condition: Unknown
Due 20 April 1998
Resolved 20 April 1998
Fire Fighting
Issued 12 January 1998
Resolved
REPLACE BOOTS TO FIREMANS OUTFIT FOR #1 NOZZLEMAN_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 April 1998
Resolved 20 April 1998
Deck/Cargo
Issued 12 January 1998
Resolved
MAKE REPAIRS TO STRUCTURAL DAMAGE TO STB CHAIN LOCKER, WHERE THE LAST LINK OF ANCHOR CHAIN IS ATTACHED.
Condition: Unknown
Due 19 January 1999
Resolved 19 January 1999
Navigation
Issued 1 June 1996
Resolved
VESSEL ARRIVED TO THE PORT OF NEW YORK WITH CHARTS #12333 AND #12334 NOT CORRECTED UP TO DATE AS REQUIRED BY 33 CFR 164.33(a)(1)(ii).
Condition: Unknown
Due 3 June 1996
Resolved 3 June 1996
Navigation
Issued 12 January 1996
Resolved
Vessel requested and received a letter of deviation to enter the Port of Corpus Christi, TX with an inoperable gyrocompass. Gyrocompass was repaired prior to departing the Port of Corpus Christi, TX.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Fire Fighting
Issued 8 November 1990
Resolved
PROVIDE PRIOR TO RETURN U.S. WATERS A CERTIFICATE THAT THE DECK FOAM SYSTEMHAS BEEN TESTED BY A LABORATORY._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 November 1991
Resolved 7 November 1991
Navigation
Issued 16 November 1989
Resolved
PROVIDE COPY OF 33CFR PARTS 1-199
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Navigation
Issued 16 November 1989
Resolved
CLEAN HYDRAULIC FLUID FROM STEERING COMPARTMENT.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Navigation
Issued 16 November 1989
Resolved
PROVIDE COPY OF 46 CFR PARTS 1-40.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Deck/Cargo
Issued 16 November 1989
Resolved
MAKE REPARIS TO PERMANENT RECORDER ON IGS SYSTEM PRIOR TO RETURNING TO U.S
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Fire Fighting
Issued 16 November 1989
Resolved
LABEL AND PAINT RED HOLDER FOR FIRE CONTROL PLAN.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Fire Fighting
Issued 16 November 1989
Resolved
PROVIDE 4 FIREPROOF LIFELINES FOR FIREMAN'S OUTFITS.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Fire Fighting
Issued 16 November 1989
Resolved
PROVIDE 4 ASTM TYPE 2 OR 3 SAFETY LANTERNS
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Deck/Cargo
Issued 16 November 1989
Resolved
CONDUCT HYDROSTATIC TEST OF CARGO LINES. UNTIL LINES ARE TESTED, TRANSFER PRESSURE IS LIMITED TO 6.5 KG/CM2.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Engineering
Issued 16 November 1989
Resolved
CONDUCT HYDROSTATIC TEST OF BUNKER LINES.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Navigation
Issued 16 November 1989
Resolved
PROVIDE COPY OF U.S. COAST PILOT VOL 3.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Navigation
Issued 16 November 1989
Resolved
PROVIDE COPY OF U.S. LIGHT LIST VOL 2.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Documentation
Issued 30 October 1988
Resolved
33CFR155.740(A) OIL TRANSFER PROCEDURES REQUIRED BY 155.720 MUST BE AVAILABLE FOR INSPECTION BY COTP
Condition: Unknown
Due 31 October 1988
Resolved 30 October 1988
Navigation
Issued 30 October 1988
Resolved
EVERY TANK VESSEL OF 10,000 GT AND OVER CONSTRUCTED BEFOR 1 SEPT 84 SHALL COMPLY WITH SOLAS REGULATION II-1/29.12 AND 29.13, IMPROVED STEERING GEAR STANDARDS, NOT LATER THAN 1 SEPT 86
Condition: Unknown
Due 30 October 1988
Resolved 30 October 1988
Navigation
Issued 30 October 1988
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 30 October 1988
Resolved 30 October 1988
Navigation
Issued 30 October 1988
Resolved
33CFR164.11(G) VSL DID NOT CONDUCT PRE ARRIVAL TEST AS REQUIRED BY 333CFR164.25
Condition: Unknown
Due 30 October 1988
Resolved 30 October 1988
Construction/Loadline
Issued 30 October 1988
Resolved
TANK VESSEL SHALL CONTROL THE QUANTITY OF OIL DISCHARGED INTO THE SEA AS REQUIRED BY ANNEX 1 OF MARPOL 73/78 REGULATION 9
Condition: Unknown
Due 30 October 1988
Resolved 30 October 1988
Navigation
Issued 16 July 1986
Resolved
33 CFR 164.33(A)(1)(II) THE MARINE CHARTS ON BOARD THE VESSEL USED TO TRANSIT THE AREA (BOSTON HARBOR & APPROACHES) WERE NOT CURRENTLY CORRECTED (I.E.: NOAA CHART 13267, 1981 EDITION, NO CORRECTIONS; NOAA CHART 13270, 1985 EDITION, NO CORRECTIONS).
Condition: Unknown
Due 16 July 1986
Resolved 16 July 1986
Documentation
Issued 16 July 1986
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 16 July 1986
Resolved 16 July 1986
Navigation
Issued 16 July 1986
Resolved
33 CFR 164.35(K) THE VESSEL DID NOT HAVE SIMPLE OPERATING INSTRUCTIONS WITH A BLOCK DIAGRAM, SHOWING THE CHANGE-OVER PROCEDURES FOR REMOTE STEERING GEAR CONTROL SYSTEMS AND STEERING GEAR POWER UNITS, PERMINENTLY DISPLAYED ON THE NAVIGATION BRIDGE.
Condition: Unknown
Due 16 July 1986
Resolved 16 July 1986
Documentation
Issued 16 July 1986
Resolved
33 CFR 155.450(A) THE VESSEL DID NOT HAVE THE REQUIRED PLACARD ON BOARD.
Condition: Unknown
Due 16 July 1986
Resolved 16 July 1986
Documentation
Issued 16 July 1986
Resolved
33 CFR 155.700 THE OPERATOR OF THE VESSEL WITH A CAPACITY OF 250 BARRELS OR MORE OF OIL (THE VESSEL HAD THE CAPACITY OF APPROX. 623,848 BARRELS OF OIL), DID NOT DESIGNATE THE PERSON OR PERSONS IN CHARGE OF EACH TRANSFER OF OIL TO OR FROM THE VESSEL.
Condition: Unknown
Due 16 July 1986
Resolved 16 July 1986