Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)52.5 ft × 16.0 ft × 6.0 ft
Registered tonnagegross 33 / net 27
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderYANKS BOAT WORKS · TUCKAHOE, NJ, UNITED STATES · built 1986
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portOCEAN CITY, MD
Endorsements, as the file codes themcw_un, fi, rec
DocumentationValid · issued 5 September 2025 · expires 31 August 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it33 - Simplified, Gross Ton 27 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 22 inspections, each with its date, unit and type; 11 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 22
13 May 2026Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8372588
23 March 2026Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8332455
2 June 2025Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8150099
13 May 2025Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8135260
19 September 2024Deficiency Check · Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8006294
14 May 2024Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7915660
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 13 May 2026Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessel's hydrostatic release on the EPIRB was expired.
46CFR 180.64
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 May 2026
Resolution: New EPIRB hydrostatic release was added.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 13 May 2025Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Hydrostatic release was expired on vessels EPIRB.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2025
Resolved 2 June 2025
Resolution: Recieved photo evidence of new hydrostatic release.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 September 2024Resolved
Repairs and alterations to the hull, machinery, or equipment including repairs or re-fastening of decks, frames, internal structural members, rigging mmust not be made without approval of the cognizant [name withheld] fuel tank fill broke off at tank top.
Provide proper repairs as original construction to satisfaction of attending marine inspector and provide satisfactory hydrostatic test / inspection of repair and tank in accordance with 46 CFR 440 (c)(1)
All repair to be complete and verified prior to passenger carriage.
46CFR177.300, 46CFR176.700, 46CFR182.440,
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2024
Resolution: Vessel owner completed repairs with satisfactory NDT.
An internal structural examination conducted in compliance with 176.600 may be conducted while vessel is afloat or out of the water and consists of complete examination of the vessels main strength members, including main internal framing, hull plating and planking, voids, and ballast, cargo, and fuel oil tanks. 46 CFR 176.610 (b)
Repair / repalce as origional the following:
- Treat and arrest angel hair in way of the machinery compartment in way of port side overhead and leading forward throughout the adjacent space including deck beams and overhead covering leading forward into the forepeak overhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2024
Resolved 20 May 2024
Resolution: Angel hair was treated and arrested. (attended vessel)
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 5 April 2024Resolved
An internal structural examination conducted in compliance with 176.600 may be conducted while vessel is afloat or out of the water and consists of complete examination of the vessels main strength members, including main internal framing, hull plating and planking, voids, and ballast, cargo, and fuel oil tanks.
Remove wood beam contact / obstruction in way of the starboard MDE turbo. The soft patch deck covering is resting on the turbo oil hose and fitting. 46 CFR 176.610(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2024
Resolution: The wood beam contact was removed. (attended vessel)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2024Resolved
An internal structural examination conducted in compliance with 176.600 may be conducted while vessel is afloat or out of the water and consists of complete examination of the vessels main strength members, including main internal framing, hull plating and planking, voids, and ballast, cargo, and fuel oil tanks.
Copper fuel lines in fuel tank space ear failing and show signs of pin-hole weeping and gray and flaking corrosion. Replace as original the fuel lines in fuel tank space.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2024
Resolution: Attended vessel to verify repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 April 2022Resolved
46 CFR 176.610
All underwater body and all through hull fitting, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves and sea strainers shall be made available for examination. Vessel cutlass bearing were worn beyond 50% on both shafts. Replace as original.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 May 2022
Resolution: Cutlass bearing was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 April 2022Resolved
46 CFR 176.610
All underwater body and all through hull fitting, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves and sea strainers shall be made available for examination. Both shafts were rubbing against shaft log. Reposition engine mounting and repair shaft log.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 May 2022
Resolution: Engine mounts were adjusted for proper fit of shaft through shaft log.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 April 2022Resolved
46 CFR 182.510(d)
A bilge pipe piercing the collision bulkhead...if it is readily accessible under service conditions, a screw-down valve without a reach rod may be fitted to the bilge line on the after side of the collision bulkhead. Collision bulkhead valve was corroded and seized.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2022
Resolution: O/O replaced collision bulkhead valve.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 April 2022Resolved
46 CFR 176.804
Owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel and piping systems, including the following: External inspection of fuel tanks and inspection of tank vents, piping, and pipe fittings. Vessel port fuel tank fill had temporary patch and both fuel supply valves were corroded. Repair as original or replace fuel tanks. See misle activity.
Action required: 705 - Other - as specified
Resolved 21 April 2023
Resolution: New fuel tank satisfactory installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 26 April 2022Resolved
46 CFR 171.114(a)(2)
Penetrations and openings in watertight bulkheads must have means to make them watertight. Identified approx. 1" hole in watertight bulkhead adjacient to port engine fuel filter. Seal existing hole.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 May 2022
Resolution: Hole in bulkhead was filled.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.