Records from 2009 to 2026. Most recent: inspection, 23 January 2026.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 22 August 2025
Resolved
As part of a reasonable cause drug testing program established pursuant to this part, employers may test for drugs in addition to those specified in this part only with approval granted by the Coast Guard under 49 CFR part 40 and for substances for which the Department of Health and Human Services has established an approved testing protocol and positive threshold. A full DAPI audit must be conducted. 46 CFR 16.101 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 September 2025
Resolved 11 September 2025
Resolution: Full DAPI audit was successfully conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 August 2025
Resolved
STBD rudder compartment bilge suction failed to remove water from space, prove proper operation of system. 46 CFR 119.510
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 August 2025
Resolution: Vessel proved proper operation of the STBD rudder bilge system.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 13 August 2025
Resolved
As part of a reasonable cause drug testing program established pursuant to this part, employers may test for drugs in addition to those specified in this part only with approval granted by the Coast Guard under 49 CFR part 40 and for substances for which the Department of Health and Human Services has established an approved testing protocol and positive threshold. MI discovered that the vessel does not have a drug and alcohol program in place.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2025
Resolution: O/O supplied information of their DAPI to allow clearing this deficiency. Full audit will be rescheduled.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 August 2025
Resolved
Stbd rudder compartment hatch found with wasted steel knife edge and deteriorated gasket, repair both. 46 CFR 116.1160
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 5 September 2025
Resolution: Witnessed satisfactory final weld test for crop and renew.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Main deck forward bar found with daisy chained extension cords to bar cooler, provide dedicated receptacle. 46 CFR 120.200
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: At the fwd main bar the extension cord was removed, and a dedicated receptacle was installed.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Electrical or interlock devices shall be provided to prevent generators from paralleling and shore power and generators being energized simultaneously. Prove that electrical system can prevent both occurrences. 46 CFR 120.390 / 120.322
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 2 October 2025
Resolution: Received satisfactory report.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Port engine room bilge alarm switch wired with exposed wire nuts. Provide junction box for wire nuts or crimp connections and make watertight. 46 CFR 120.200
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Port engine room bilge alarm wires are no longer exposed, and the wire nuts were removed.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 13 August 2025
Resolved
Port rudder compartment bilge suction found with several inches of hydraulic oil. Remove oil and clean bilges. 46 CFR 115.830
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Port rudder bilge was free of hydraulic oil.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 13 August 2025
Resolved
Port rudder compartment hydraulic steering piping found unsupported in numerous areas. Provide proper piping supports. 46 CFR 119.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Port rudder compartment hydraulic steering piping is now supported.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 August 2025
Resolved
Main engine exhaust piping in port rudder compartment found severely corroded and wet. Needle-gun underside of piping to prove integrity.46 CFR 119.430
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Main engine exhaust pipe in the port aft compartment was needle gunned and cleaned.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Upper deck stbd equipment locker found with electrical hazards on aft bulkhead. Properly wire junction box and wiring. 46 CFR 120.200.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Upper deck stbd equipment locker now has properly wired junction box and wiring.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 August 2025
Resolved
A vessel of more than 65 feet must carry 3 ring-buoy in accordance with 46 CFR 160.050. All ring buoys onboard had lines that were deteriorated. Remove all lines/ring buoys and attached lines and replace with at least 3. 46 CFR 117.70
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Three ring life buoys were renewed.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Second deck bar was found with daisy chained surge protectors from one outlet. Hard wire in power outlet devices and remove surge protector. 46 CFR 120.200.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Surge protectors from the second deck bar were removed and power outlets installed.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Engine room workroom was found with permanent installed power tools plugged into surge protector daisy chain. Remove daisy chain and hard wire in equipment. 46 CFR 120.200.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Surge protectors from the engine room workroom were removed and power outlets installed.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Remove electrical cable on work room. 46 CFR 120.200
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Electrical cable was removed from work room.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Replace junction box in storage room on port side. 46 CFR 120.200.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: New junction box was installed in port storage room.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 13 August 2025
Resolved
Replace covers for all refrigeration units to conceal wires with covers that can be affixed and not just resting on the unit. Mount all panels, two were found resting next to the unit. 46 CFR 120.200.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: Covers were installed on all refrigeration units.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 August 2025
Resolved
Watertight door to port engine was found ajar. Repair door to ensure rapid and ease of closure. 46 CFR 122.330 (b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2025
Resolved 22 August 2025
Resolution: New hinge pins were installed on the watertight door in port engine room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 August 2025
Resolved
Vessel completed a propulsion repower of both main engines in 2023/2024, the throttle controls were upgraded to electronic at the same time. Submit QFA / DVTP to USCG MSC provided by the throttle control manufacture. Upon approval from MSC, schedule operational testing. 46 CFR 121.620.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 September 2025
Resolved 24 September 2025
Resolution: Received DVTPs and QFAs for the engines. All Sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 7 August 2024
Resolved
Vessel operator was unable to demonstrate a test of the vessel's bilge alarms. Conduct a satisfactory test of the bilge alarms in the presence of a USCG marine inspector. Hourly rounds of the bilges protected by these bilge alarms must be made while the vessel is underway and/or has passengers on board. These rounds must be logged in the vessel's log book.
Cite: 46 CFR 182.520
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2024
Resolved 23 September 2024
Resolution: Witnessed satisfactory test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2024
Resolved
Pressure vessels must be tested and inspected in accordance with part 61, subpart 61.10, of this chapter. Vessel has a hydro-pneumatic water/air tank in the engine room that is past due for internal inspection, and the data plate was found to be painted over and illegible. Remove paint from data plate and conduct hydrostatic pressure test of the tank at 125% max allowable working pressure (MAWP). Bench test the pressure vessel's relief valve in the presence of a USCG marine inspector to demonstrate that it operates at its set limit. To be rectified by 07 September 2024.
Cite: 46 CFR 176.812 & 46 CFR 61.10-5(d)&(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2024
Resolved 30 July 2025
Resolution: Receiver removed from COI, set at 83. Used for Potable water pressure.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 January 2024
Resolved
Identified two sections of bottom shell stiffeners in the port engine space and in space adjacent to stbd fresh water tank. Must crop and renew to satisfaction of attending CG Marine Inspector.
Action required: 705 - Other - as specified
Resolved 20 May 2024
Resolution: Bottom shell stiffners cropped and renewed
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 January 2024
Resolved
Identified significant wastage in bottom shell in port void space. Must conduct spot gauge of bottom shell under void and CHT space. Must crop/renew sections indicating greater than twenty-five (25) percent wastage
Action required: 705 - Other - as specified
Resolved 20 May 2024
Resolution: Port bottom shell cropped and renewed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 June 2023
Resolved
02 daisy chained power strips were found connected to an extension cord in the aft area of the wheel house. Provide dedicated receptacles for all required equipment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2023
Resolved 13 July 2023
Resolution: Daisy chained wires removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 1 June 2023
Resolved
The port engine room water tight door was found out of adjustment and difficult to open / close. Make adjustments to WTD so it can be operated easily. To be rectified by next dry docking.
Action required: 705 - Other - as specified
Due 1 July 2023
Resolved 7 August 2024
Resolution: Witnessed satisfactory test of door.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 1 June 2023
Resolved
The starboard engine room bilge float switch was found un-secured with a broken bracket. Properly mount the bilge alarm float switch.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2023
Resolved 13 July 2023
Resolution: Float switch was properly secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 June 2023
Resolved
The hot water heater in the galley was found with an un-secured disconnect switch. Properly mount the disconnect switch and permanently seal the cable penetrations leading into it.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2023
Resolved 13 July 2023
Resolution: Switch was properly secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 June 2022
Resolved
While underway with passengers vessel experience a loss
of its primary generator and main propulsion controls.
Provide repair proposal and performance diagnostics to determine cause to [email withheld].
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 29 June 2022
Resolution: Generator circuit breaker and controller replaced on both generators. Two hour operational load test; ALL SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 16 May 2022
Resolved
Engine room emergency escape found to have inadequate labeling. All escape hatches and other emergency exits are required to be marked on both sides in clearly legible letters of 2 inches high.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 July 2022
Resolution: Installed new emergency escape placards.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2022
Resolved
Junction box in pump room found to have missing faceplate allowing for exposed open wires. Replace face plate and properly secure wires inside junction box.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2022
Resolved 16 June 2022
Resolution: Installed new junction box.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2022
Resolved
Emergency escape signs do not illuminate when power is lost. Provide emergency escape lighting during loss of power.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2022
Resolved 16 June 2022
Resolution: Repaired lights to illuminate during power loss.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 16 May 2022
Resolved
VHF DSC radio found to be installed without GPS coordinates programmed. Program VHF DSC radio to include MMSI number and GPS information.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2022
Resolved 16 June 2022
Resolution: Programmed radio to include MMSI and GPS coordinates.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2022
Resolved
Ground detection system IWO Port engine room found to be inoperable. System is required to provide adequate indication of circuit status.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2022
Resolved 16 June 2022
Resolution: System repaired to show indication of circuit status.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 9 September 2021
Resolved
Portside engine room fire pump discharge gauge needle broken; replace.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 17 September 2021
Resolution: Received Photo's of corrected deficiency. [name withheld].
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 9 September 2021
Resolved
01 Deck Port and STBD side storage utility closet overhead light fixture missing light cover diffuser; Replace missing covers.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 17 September 2021
Resolution: Received Photo's of corrected deficiency. [name withheld].
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 September 2021
Resolved
Engine room STBD side vent fan controllers ( 5-P7, 6-P7, and 7-P7) indicating light covers missing; Replace missing covers.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 17 September 2021
Resolution: Received Photo's of corrected deficiency. [name withheld].
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 9 September 2021
Resolved
Galley Beverage walk-in reefer overhead light fixture inoperative. Repair / replace.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 17 September 2021
Resolution: Received Photo's of corrected deficiency. [name withheld].
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 September 2021
Resolved
Galley Beverage walk-in reefer condenser control cover hanging from wiring and not properly secured to unit. Re-install cover
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 17 September 2021
Resolution: Received Photo's of corrected deficiency. [name withheld].
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 9 September 2021
Resolved
VSL FAILED TO UNDERGO THE REQUIRED ANNUAL INSPECTION BEFORE THE 3 MONTH WINDOW EXPIRED ( 01 SEPTEMBER 2021 )
VSL SHALL NOT OPERATE WITH PASSENGERS ONBOARD UNTIL THE COMPLETION OF THE REQUIRED ANNUAL INSPECTION.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 September 2021
Resolution: CONDUCTED
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 August 2020
Resolved
Provide spanner wrench at Fire Station #7.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2020
Resolved 9 September 2020
Resolution: Vessel operator provided pictures of spanner wrench at Fire Station #7
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 August 2020
Resolved
Replace fire extinguisher brackets as identified with USCG approved type.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2020
Resolved 9 September 2020
Resolution: Vessel operator provided pictures of fire extinguisher brackets as identified with USCG approved type.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 August 2020
Resolved
Properly label life jacket storage below pilot house.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2020
Resolved 9 September 2020
Resolution: Vessel operator provides pictures of properly labeled life jacket storage below pilot house.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 14 January 2020
Resolved
Properly mount galley bilge suction pipe. Due 29Feb2020.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 21 February 2020
Resolution: Pipe was properly mounted.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 14 January 2020
Resolved
Install bilge strainer on galley bilge suction line. Due 29Feb2020.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 21 February 2020
Resolution: Bilge strainer was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 January 2020
Resolved
Provide pressure vessel measurements (Length, height, circumference) for 2 air receivers in machinery space. Due 29Feb2020.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 21 February 2020
Resolution: Pressure vessel was hydrostatically tested at 125% of MAWP.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 14 January 2020
Resolved
Drain and open-up large pressure vessel for internal inspection. Due 29Feb2020.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 21 February 2020
Resolution: Pressure vessel was hydrostatically tested at 125% of MAWP.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 14 January 2020
Resolved
Crop and renew wasted sewage line in forward machinery space located in way of water pressure tank. Due 29Feb2020.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 6 March 2020
Resolution: Repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 January 2020
Resolved
Provide repair plan for wasted deck rails. Due 29Feb2020.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 21 February 2020
Resolution: Deck rails were re-welded.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 20 August 2019
Resolved
VESSEL MUST MAINTAIN HIGH LEVEL ALARM INDICATORS IN ENGINE SPACE. AUDIBLE BILGE ALARM INDICATOR IN PORT ENGINE SPACE NOT FUNCTIONING. MUST RECTIFY DEFICIENCY TO THE SATISFACTION OF USCG MARINE INSPECTOR.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 September 2019
Resolved 17 September 2019
Resolution: CG Inspectors witnessed high level alarm operation
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 August 2019
Resolved
VESSEL MUST HAVE ELECTRICAL WIRING IN ENGINE SPACE IN ACCORDANCE WITH THE PROPER SAFETY STANDARDS. WIRING TO THE BATTERY CHARGER DOES NOT MEET THE SAFETY STANDARDS IN ACCORDANCE WITH NATIONAL/INTERNATIONAL STANDARDS. VESSEL OPERATOR MUST CHANGE WIRING TO THE SATISFACTION OF USCG MARINE INSPECTOR.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 September 2019
Resolved 17 September 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 20 August 2019
Resolved
VESSEL MUST MAINTAIN STRUCTURAL INTEGRITY. COOLANT WAS DISCOVERED LEAKING FROM KEEL COOLER TO ENGINE ROOM BILGE SPACE THROUGH A CRACKED SEAM. MUST REPAIR AND TEST SEAM FOR INTEGRITY TO THE SATISFACTION OF USCG MARINE INSPECTOR.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 September 2019
Resolved 17 September 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 August 2018
Resolved
Provide working watertight indicator light at operating station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2018
Resolved 23 August 2018
Resolution: Light remains on when doors are closed and turns off when a door is open.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 August 2018
Resolved
Replace the 06 identified broken light covers in engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2018
Resolved 23 August 2018
Resolution: Vsl replaced all lighting fixtures in engine room.
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 1 June 2017
Resolved
Make emergency lighting in galley operational.
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 13 July 2017
Resolution: New emergency lighting installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 June 2017
Resolved
Remove dead end wires under helm.
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 1 June 2017
Resolution: Wires capped.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 June 2017
Resolved
Provide light cover in tonnage space.
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 15 June 2017
Resolution: Light cover installed.
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 1 June 2017
Resolved
Beer cooler ground on 22 circut. Fix to make ground go away.
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 15 June 2017
Resolution: Ground repaired.