Inspection history · 29
22 April 2026
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8354147
15 April 2026
Administrative Inspection · Annual Inspection · Vessel Attendance
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8350678
30 January 2026
Vessel Attendance · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8303925
12 March 2025
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8094852
5 February 2024
Administrative Inspection · Deficiency Check · Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7859751
24 January 2024
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7849923
14 October 2023
Type not recorded
No type recorded · Station Destin · USCG Heartland District (CGD-H) · Activity 7808884
26 April 2023
Type not recorded
No type recorded · Station Destin · USCG Heartland District (CGD-H) · Activity 7677197
17 February 2023
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7638423
21 September 2022
Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7563658
24 May 2022
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7458035
3 March 2022
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7405389
29 May 2021
Type not recorded
No type recorded · USCGC RIDLEY (WPB 87328) · USCG Southeast District (CGD-SE) · Activity 7213017
30 March 2021
Type not recorded
No type recorded · Station Destin · USCG Heartland District (CGD-H) · Activity 7165970
26 January 2021
Examination of Repairs · Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7131024
17 March 2020
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6947307
6 February 2020
Drydock Exam · Internal Structural Exam · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6904337
29 April 2019
Type not recorded
No type recorded · Station Destin · USCG Heartland District (CGD-H) · Activity 6673846
12 February 2019
DAPI Audit · Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6624251
11 June 2018
Type not recorded
No type recorded · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6542733
24 May 2018
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6416975
16 January 2018
Administrative Inspection · Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6338288
3 August 2017
Type not recorded
No type recorded · Station Destin · USCG Heartland District (CGD-H) · Activity 6229879
26 June 2017
Type not recorded
No type recorded · Station Destin · USCG Heartland District (CGD-H) · Activity 6189062
16 May 2017
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6143137
8 December 2016
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6131273
17 May 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5882198
5 April 2016
Simplified Stability Test · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5846630
19 January 2016
Administrative Inspection · Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5799406
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 15 April 2026
Resolved
The pre-engineered fire extinguishing system must be installed in accordance with the manufacturer's instructions. The generator does not secure upon activation of the fire system.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2026
Resolved 22 April 2026
Resolution: Corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 15 April 2026
Resolved
Inflatable liferafts must be serviced within 12 months of each servicing. The raft was last serviced in Feb 2025 and is overdue.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2026
Resolved 22 April 2026
Resolution: Corrected.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 March 2025
Resolved
The following spaces must be equipped with a fire detection and alarm system of an approved type, a space containing propulsion machinery and a space containing an internal combustion engine of more than 50 hp. The engine room was not fitted with an alarm system. Install alarm system in the engine room such that the actuation of the alarm results in both audible and visual alarms in all areas required by 46CFR181.405(c).
Action required: 10 - Deficiency Rectified
Due 12 March 2025
Resolved 12 March 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 March 2025
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets. The life jacket locations were not marked. Mark life jacket stowage location.
46CFR185.604(f)
Action required: 10 - Deficiency Rectified
Due 12 March 2025
Resolved 12 March 2025
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 12 March 2025
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Light for bilge suction in forward space did not illuminate. Repair/replace light.
46CFR182.530(c)
Action required: 10 - Deficiency Rectified
Due 12 March 2025
Resolved 12 March 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 January 2024
Resolved
The vessel must be equipped with a ring life buoy that is properly maintained. The water light battery needs to be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 5 February 2024
Resolution: Corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 January 2024
Resolved
The vessel life jackets must be equipped with a light.
One (1) jacket light needs to be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 5 February 2024
Resolution: Corrected.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 24 January 2024
Resolved
The vessel must have a VHF-DSC radio that is properly installed. The radio must be GPS capable or linked to a GPS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 1 April 2024
Resolution: Corrected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 February 2023
Resolved
Inspected small passenger vessels that operate on coastwise or oceans routes must have an interconnected fire detection system installed in an all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces to be installed by December 27th, 2022. Provide evidence of installation and that the fire-detection system has been approved. Until installed, the vessel is now restricted to a Limited Coastwise route.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 February 2023
Resolved 27 February 2023
Resolution: Received photographs/video of installed fire detection equipment from the vessel Representative; satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 May 2022
Resolved
Both life-floats are damaged beyond repair. Replace in-kind
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2022
Resolved 17 February 2023
Resolution: Inspected condition and installation of newly installed life-raft; satisfactory condition.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 24 May 2022
Resolved
Properly label Escape Hatch on bow.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2022
Resolved 21 September 2022
Resolution: Vessel captain provided evidence of corrected escape hatch labeling.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 May 2022
Resolved
Provide hose for portable hand-pump.
Action required: 10 - Deficiency Rectified
Due 8 June 2022
Resolved 15 June 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 May 2022
Resolved
Provide proof of fire-servicing report.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2022
Resolved 14 July 2022
Resolution: Vessel representative provided photographic evidence of fire-servicing report.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 24 May 2022
Resolved
Provide evidence of valid FCC Radio Safety-Certificate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2022
Resolved 1 February 2023
Resolution: Received evidence of valid FCC Radio Safety Certificate.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 January 2021
Resolved
The inspected vessel's switchboard maintains un-sequential and unlabeled breakers. Properly label all breakers on forward accommodation space switchboard. Provide proof of correction.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2021
Resolved 12 July 2022
Resolution: Received photograph of corrected deficiency; satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 January 2021
Resolved
The inspected vessel currently maintains unsecured and dangling wires in the head. Properly secure wires to ensure electrical safety, provide proof of correction.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2021
Resolved 12 July 2022
Resolution: Received photograph of corrected deficiency; satisfactory.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 26 January 2021
Resolved
The inspected vessel maintains removed breakers from Bridge Switchboard. Seal or replace all missing breakers, label if needed. Provide proof of correction.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2021
Resolved 12 July 2022
Resolution: Received photograph of corrected deficiency; satisfactory.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 26 January 2021
Resolved
Repair high water alarm in Lazerrete. The current high water alarm is missing a wire, rendering the system un-operational. Provide proof of servicing report or correction of system.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2021
Resolved 12 July 2022
Resolution: Received photograph of corrected deficiency; satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 6 February 2020
Resolved
Identify leak in the FWD accomodation overhead and provide repair proposal.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 March 2020
Resolved 13 April 2021
Resolution: Identified leak in the FWD accomodation overhead and provided repair proposal.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 February 2020
Resolved
Add a valve and plug to the bow void drain.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 March 2020
Resolved 13 April 2021
Resolution: Vessel operator added a valve and plug to the bow void drain.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 February 2020
Resolved
Install proper expansion tank to exhaust piping on both engines.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 March 2020
Resolution: Piping replaced.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 6 February 2020
Resolved
Provide repair proposal for fwd accomodation decking.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 March 2020
Resolved 13 April 2021
Resolution: Vessel operator provided repair proposal for foward accomodation decking.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 February 2020
Resolved
Replace wasted port engine raw water piping just above water pump discharge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 March 2020
Resolved 4 March 2020
Resolution: Piping replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 February 2020
Resolved
Remove excessive dead wires in operating station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 March 2020
Resolved 13 April 2021
Resolution: Excessive dead wires in operating station removed.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 6 February 2020
Resolved
Provide repair proposal for pilot house overhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 March 2020
Resolved 13 April 2021
Resolution: Repair proposal for pilot house overhead provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 February 2020
Resolved
Install proper overhead insulation over both main engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 March 2020
Resolved 13 April 2021
Resolution: Insulation over both main engines provided.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 12 February 2019
Resolved
Life float epoxy and paint over cracks and exposed foam as per manufactures inst. [name withheld].
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 March 2019
Resolution: Replaced damaged with new life float 12 man.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 February 2019
Resolved
Replaced life ring at pilot house with USCG approved life ring.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 March 2019
Resolution: Replaced with new approved life ring.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 16 January 2018
Resolved
Replace both port and STBD cutlass bearing
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2018
Resolved 23 January 2018
Resolution: Vessel replaced both cutlass bearing
Stability › Watertight Integrity › Weathertight Enclosure
Issued 16 January 2018
Resolved
Remove water from rope locker compartment
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2018
Resolved 23 January 2018
Resolution: Vessel removed water from compartment
Stability › Watertight Integrity › General
Issued 16 January 2018
Resolved
Repair fwd hatch to ensure it properly opens and closes
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2018
Resolved 23 January 2018
Resolution: Vessel repaired hatch to allow proper operation
Stability › Watertight Integrity › General
Issued 16 January 2018
Resolved
Install cap on skin vlv in E/R STBD side
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2018
Resolved 23 January 2018
Resolution: Vessel installed cap on unused skin valve