MAURY USCG vessel records Sign in
← All vessels

HAENDEL

HAENDEL is a 1965 passenger vessel (inspected). The Coast Guard has recorded 53 inspections since 1986, most recently in November 2025, along with 89 deficiencies.

Records from 1986 to 2025. Most recent: inspection, 4 November 2025.

Built
1965
Last inspected
4 November 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDM5440
274413
Flag
UNITED STATES
368215950
Maury page id
psix-274413

Inspections, by type

…with no type recorded1
Years with a record 34 calendar years (1986–2025)
The 53 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)44.8 ft × 12.5 ft × 6.0 ft
Registered tonnagegross 22 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPAASCH MARINE SERVICE · ERIE, PA, UNITED STATES · built 1965
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portHUDSON, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 29 October 2025 · expires 30 November 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it22 - Simplified, Gross Ton
18 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDM5440MMSI 368215950 · active · compulsorily equipped · granted 23 August 2021, expires 23 August 2031
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 53

4 November 2025 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8264217
13 November 2024 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8034004
20 November 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7826648
1 November 2023 Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7818267
27 March 2023 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7657982
7 January 2023 Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7617978
8 November 2022 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7583425
7 September 2021 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7290097
26 April 2021 Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7183518
14 April 2021 Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7175006
3 August 2020 Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7018235
29 May 2019 Internal Structural Exam · Annual Inspection · Drydock Exam · Administrative Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6704936
10 July 2018 Deficiency Check · DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6473830
15 February 2017 Administrative Inspection · Deficiency Check · DAPI Audit · In-Service Inspection · Examination of Repairs · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6223326
14 April 2016 Examination of Repairs · DAPI Audit · COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5854401
21 October 2014 Administrative Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5009084
21 August 2014 Deficiency Check · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4972286
12 August 2014 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5005359
6 August 2014 DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4951556
15 December 2011 Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4208885
11 December 2008 Internal Structural Exam · Hull Examination
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3400372
21 July 2008 Re-Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3357046
22 October 2007 Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3084438
10 May 2006 COI Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2646043
12 July 2005 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2422625
7 October 2004 Periodic Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2256974
2 February 2004 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1998544
2 July 2003 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1852769
21 May 2003 Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1794843
31 May 2001 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1466780
17 October 2000 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 823979
8 June 2000 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1376230
25 May 1999 Hull Examination · Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1421675
10 August 1998 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 800333
26 May 1998 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1378388
18 June 1997 Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 778266
12 November 1996 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1172609
29 May 1996 MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1084752
30 June 1995 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 883951
26 May 1995 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1185204
1 June 1994 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1173483
24 May 1994 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 863555
17 June 1993 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1156236
28 May 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1259429
10 June 1991 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 940104
31 May 1990 Re-Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 920785
19 April 1990 Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1216568
1 June 1989 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 921954
1 June 1989 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1345371
10 June 1988 Deficiency Check · Damage Survey · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1195994
8 June 1987 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1029853
27 June 1986 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1008454
5 June 1986 Initial Certification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1008450

Deficiency record · 89

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 November 2024 Resolved
(b) Gages to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as to be in view of the operator. Stbd engine oil gauge (pressure) at op station does not work. 46CFR182.20-5(b) OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 24 November 2024
Resolution: recieved objective photographic evidence of correction
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 November 2024 Resolved
(a) All wiring and cables shall be suitable for marine service and for the particular installation used. Electrical connections - Lazzarette heat shrink connections, light bulb socket wires in engine room, and screw-type wire caps under pilot house console. 46CFR183.10-20(a) OLD T
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 24 November 2024
Resolution: recieved objective photographic evidence of correction
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 13 November 2024 Resolved
A vessel at anchor shall exhibit where it can best be seen:(i) In the fore part, an all-round white light... Anchor light was not working. 33CFR83.30(a)(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 24 November 2024
Resolution: recieved objective photographic evidence of correction
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 November 2024 Resolved
Each ring life buoy on a vessel must:(1) Be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150; MI observed hole in life ring. Patch or replace life ring. 46CFR180.70(b)(1)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 24 November 2024
Resolution: recieved objective photographic evidence of correction
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 November 2023 Resolved
The marine inspector shall examine all accessible parts of the vessels hull, machinery, and equipment to be assured that they are in a satisfactory condition. Vessels steering space shows signs of hull deterioration. Port outboard hull plating has a hole above waterline where rub rail is fastened. STBD outboard hull plating above the waterline has significant wastage. Submit a repair plan proposal to the local OCMI, once approved make repairs in accordance with approved plan. 46 CFR 176.10-5(b)
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 December 2023
Resolved 7 March 2024
Resolution: Completed during ddx.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 November 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. STBD overhead junction box in engine room has no cover. Vessel needs to install junction box cover. 46 CFR 183.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2023
Resolved 15 November 2023
Resolution: Vessel provided photo of junction box repairs. Deficiency has been resolved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 November 2023 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. Vessel has expired items in first aid kit. Vessel must replace all expired items in first aid kit. 46 CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2023
Resolved 15 November 2023
Resolution: Vessel provided photo of replacement first aid kit. Deficiency has been resolved.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 8 November 2022 Resolved
A vessel must comply with the applicable requirements for any radio installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission as set forth in 47 CFR part 80. Vessel could not provide an FCC Radiotelephony Certificate.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 November 2022
Resolved 7 January 2023
Resolution: Vessel provided copy of FCC Certs.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 8 November 2022 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Vessel does not have up-to-date charts. Rectify w/in 7 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 November 2022
Resolved 15 November 2022
Resolution: Updated charts placed onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 29 May 2019 Resolved
Replace the gaskets for the forward and lazeratte hatches.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 June 2019
Resolved 23 July 2019
Resolution: Gasket replaced.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 29 May 2019 Resolved
Clean steering pump oil from surfaces.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 June 2019
Resolved 23 July 2019
Resolution: Oil cleaned from surfaces - no leaks identified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 May 2019 Resolved
Replace port secondary cutlass bearing and determine cause of uneven ware.
Action required: 705 - Other - as specified
Due 1 May 2020
Resolved 10 August 2020
Resolution: Replaced port secondary cutlass bearing, reviewed installment during annual inspection and found to be satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 10 July 2018 Resolved
Replace leaking port hydraulic steering ram seal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2018
Resolved 27 August 2018
Resolution: Received statement from POC attesting to sat replacement of o-ring seal
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 July 2018 Resolved
Mark fuel shutoff as required by cite.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 August 2018
Resolved 27 August 2018
Resolution: Received email photo showing appropriate markings.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 10 July 2018 Resolved
Post emergency instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2018
Resolved 27 August 2018
Resolution: Email photo provided of posted doc.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 July 2018 Resolved
Replace plastic 90 piping in fire main at nozzle connection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 July 2018
Resolved 27 August 2018
Resolution: Received email notification of installation of metallic piping installed with follow up emailed photo.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 7 August 2017 Resolved
Provide on board prior to underway operation the original COD. POC has filed with NMC for duplicate.
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 9 August 2017
Resolution: Received emailed copy of COD from NMC provided to POC. POC provided copy of COD replacement documentation.
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 7 August 2017 Resolved
Correct oil leak from the port engine oil line return line.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 August 2017
Resolved 9 August 2017
Resolution: Received email statement from POC that requirement corrected with deficiency check sked for 8/24/2017. -- Verification complete.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 7 August 2017 Resolved
Vessel is limited to 35 passengers until three (03) additional approved type I life jackets marked accordingly.
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 24 August 2017
Resolution: Visited vessel witnessing 3 additional adult jackets and 4 child.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 7 August 2017 Resolved
Vessel is limited to day time operations until appropriate battery is provided for ring buoy light.
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 9 August 2017
Resolution: Battery replaced with the appropriate battery with operation verified. Deficiency check sked for 8/24/2017 to verify. -- Verification complete.
Electrical › Electric Supply System (service) › Battery Installation
Issued 7 August 2017 Resolved
Provide appropriate sized and constructed battery boxes see the provided cite (46 CFR 183.350(e)) for amplification.
Action required: 705 - Other - as specified
Due 24 August 2017
Resolved 24 August 2017
Resolution: Visited vessel witnessing appropriate battery boxes installed with appropriate covers.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 7 August 2017 Resolved
Provide guards for rotating machinery (shafts and belts) by specified date.
Due 24 August 2017
Resolved 24 August 2017
Resolution: Visited vessel witnessing guards in place.
Communications › Alarms/Indicators › Bilge Alarm
Issued 7 August 2017 Resolved
Secure lazarette bilge alarm switch.
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 9 August 2017
Resolution: Received email notification from POC that switch had been mounted to bilge frame. Deficiency check sked for 08/24/2017 to verify. -- Verification complete.
Lifesaving › Hand Flares › Expired
Issued 7 August 2017 Resolved
Provide appropriate quantity of approved hand flares prior to commercial operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 August 2017
Resolved 7 August 2017
Resolution: Appropriate flares provided prior to our departures.
Electrical › Electric Supply System (service) › Cable
Issued 7 August 2017 Resolved
Remove positive cable from engine room switch box.
Action required: 705 - Other - as specified
Due 24 August 2017
Resolved 9 August 2017
Resolution: Received email notification from POC that cable had been removed. Deficiency check sked for 08/24/2017 to verify. -- Verification complete.
Electrical › Electric Generation Source (service) › Conductor
Issued 7 August 2017 Resolved
General requirement: Provide chaffing gear for electrical wiring within engine room and remove all dead ended wiring.
Action required: 705 - Other - as specified
Due 24 August 2017
Resolved 24 August 2017
Resolution: Visited vessel witnessing chaffing gear provided and dead ended wires removed.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 7 August 2017 Resolved
Provide on board vessel the name and contact information for SAP
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 24 August 2017
Resolution: Visited vessel finding required information posted and made available to crew.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 7 August 2017 Resolved
Provide proof of supervisor training.
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 24 August 2017
Resolution: Visited vessel witnessing log entry and signed letter on file attesting to master completing required training.
Documentation › Certificates/Documents › Stability Letter
Issued 13 June 2016 Resolved
Post all pages of vessels stability letter.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: All pages posted.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 13 June 2016 Resolved
Vessel is limited to 38 total persons until additional approved type I life jackets are provided. Normal complement is 40 total persons.
Action required: 705 - Other - as specified
Due 13 June 2016
Resolved 30 June 2016
Resolution: Additional life jackets provided.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 13 June 2016 Resolved
Replace battery for ring buoy water light & prove proper operations. Vessel is limited to day time operations.
Action required: 705 - Other - as specified
Due 13 June 2016
Resolved 30 June 2016
Resolution: New battery provided light ops sat.
Deck/Cargo › Mooring/Anchoring › Anchor Shackle
Issued 13 June 2016 Resolved
Anchor shackles pins require mousing.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 13 June 2016
Resolution: Corrected prior to MI's departure.
Engineering › Bilge Water Management System › Interface Detector
Issued 13 June 2016 Resolved
Prior to commercial passenger vessel operations prove proper operations of bilge high water alarm system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: Witnessed proper operations.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 13 June 2016 Resolved
Remove oil from engine room bilge, chance absorbents as appropriate. de-water & maintain dry & clean as stability letter provides. Excessive water & oil in bilge providing an unsafe condition for stability & fire/pollution.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: Witnessed bilges clean and dry.
Engineering › Bilge Water Management System › Strainer
Issued 13 June 2016 Resolved
Tighten/replace bilge pickup strainer basket for engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: Witnessed new strainer installed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 13 June 2016 Resolved
Clean batteries, connections & install covers for all batteries.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: Maintenance completed on all batteries with corrosion removed and sealant applied.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 13 June 2016 Resolved
Install guards for rotating machinery; starboard side forward engine room.
Action required: 705 - Other - as specified
Due 13 July 2016
Resolved 1 August 2016
Resolution: Received photo of guard installed.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 13 June 2016 Resolved
Mark direction of operation of the fuel shut off valves.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: Witnessed appropriate marking.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 13 June 2016 Resolved
Correct prior to commercial passenger vessel operation excessive leaking of the starboard shaft seal.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: Packing tightened with sufficient water for cooling bearing.
Engineering › Steering Gear System › Rudder Bearing
Issued 13 June 2016 Resolved
Correct prior to commercial passenger vessel operation leaking of the port & starboard rudder post. De-water space & maintain dry & clean.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 13 June 2016
Resolution: Packing tightened.
Operations/Management › Drills/Instruction › Not Conducted
Issued 13 June 2016 Resolved
Complete crew training for all required emergencies & knowledge of installed systems. Schedule additional date to complete underway demonstration of crew/masters required skills.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 30 June 2016
Resolution: Completed satisfactory drills.
Documentation › Manuals/Policy Documentation › Bridge Resource Management Policy/Procedures
Issued 13 June 2016 Resolved
Provide on board up to date Navigation Rules Handbook.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 June 2016
Resolved 30 June 2016
Resolution: Copy of NavRulesHandbook
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 13 June 2016 Resolved
DAPI; Provide MIS report for 2015.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 13 June 2016
Resolution: Copy provided prior to MI's departure.
Engineering › Bilge Water Management System › Piping
Issued 13 June 2016 Resolved
Void #2; port side aft through bulkhead penetration required to be of a welded pipe or fitting. Deferred completion prior to 2017 operating season.
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 24 August 2017
Resolution: satisfied to the USCG marine inspector (activity 6223326)
Construction/Loadline › Hull › Side Shell
Issued 25 April 2016 Resolved
C/r of starboard side chine 33 foot aft of bow holed. Location identified within engine room horizontal flat chine and side shell. SS insert to start 6 inches forward of the #5 vertical and 23 inches aft of the #5 vertical, with the same area of the flat chine to be cropped. Required material data sheets and welding material to be provided.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2016
Resolved 7 June 2016
Resolution: Complete visual examination and air testing of completed repairs with sat results.
Construction/Loadline › Hull › Bottom Plating
Issued 25 April 2016 Resolved
C/r wasted hull material of portside bottom plating commencing at 13 foot aft from bow, from keel out approximately 20 inches to mate with previous inserted plating and lead aft to 26 foot which is within the first bay of the engine room. Required material data sheets and welding material to be provided.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2016
Resolved 7 June 2016
Resolution: Complete visual examination and air testing of completed repairs with sat results.
Construction/Loadline › Hull › Transverse Frame
Issued 25 April 2016 Resolved
C/r wasted transverse hull supports ivo the #5 & #6 vertical supports both port and starboard sides. Required material data sheets and welding material to be provided.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 24 August 2017
Resolution: satisfied to the USCG marine inspector (activity 6223326)
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 6 August 2014 Resolved
Complete all requirements from DAPI Audit.
Action required: 705 - Other - as specified
Due 12 September 2014
Resolved 15 September 2014
Resolution: Received an email from the Master attesting to the completion of all DAPI requirements with attached pic of MIS and company policy, signed by Masters and Owners.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 6 August 2014 Resolved
Provide on board all required items for the First Aid Kit.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance.
Communications › Radio Communications › VHF Radiotelephone
Issued 6 August 2014 Resolved
Provide valid radio station license.
Action required: 705 - Other - as specified
Due 31 October 2014
Resolved 21 October 2014
Resolution: Rescinded requirement as vsl route within canal and finger lakes therefore exempt from fcc requirements.
Engineering › Bilge Water Management System › Pump
Issued 6 August 2014 Resolved
Prove proper operations of fixed bilge system / fire pump. (Jabco pump impeller failed).
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 August 2014
Resolved 15 August 2014
Resolution: Email from Master: Bilge impeller replaced, all inlets and discharges including fire hose tested successfully after installation. MI to attended vessel next week to witness ops.
Fire Fighting › Fire Hoses › Number
Issued 6 August 2014 Resolved
Provide on station fire hose.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 August 2014
Resolved 15 August 2014
Resolution: Email from Master provides: fire hose tested successfully after installation. MI intends to attended vessel next week to witness installation.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 6 August 2014 Resolved
Replace 60' of line for ring buoy.
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 August 2014
Resolved 15 August 2014
Resolution: Email from Master: New 60'' line installed on life ring buoy. MI intends to attend vessel next week to witness.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 6 August 2014 Resolved
Replace water light battery with correct type.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 6 August 2014 Resolved
Install required amount of retro reflective tape for ring buoy.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance.
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 August 2014 Resolved
Install permanent type connectors on all batteries.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance wing nuts replaced with double nuts.
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 6 August 2014 Resolved
Secure all loose engine mounts.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance with all fasteners tightened/replaced.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 6 August 2014 Resolved
Install at a minimum 8 gage wire for fuel fill bonding straps. Clean all bonding surfaces to bare metal.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance with appropriate wire and installation.
Electrical › Electric Supply System (service) › Cable
Issued 6 August 2014 Resolved
Provide supports for battery cables ever 24" to maintain cables out of bilge and protected from chaffing.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance with supports for all cables and wires within the engine space.
Electrical › Lighting (service) › Conductor
Issued 6 August 2014 Resolved
In forward engine room; secure wiring within junction box.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 6 August 2014 Resolved
Label pilot house electrical breakers.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 6 August 2014 Resolved
Properly mark remote fuel shutoff valves as required within 46CFR185.30-20.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 6 August 2014 Resolved
Tighten the port engine throttle cable jam nut.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 August 2014
Resolved 15 August 2014
Resolution: Email from Master provides: Starboard steering hydraulic connection is loose at rudder tightened and system tested sat. MI intends to attend next week to witness.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (hydraulic)
Issued 6 August 2014 Resolved
Properly secure the port engine throttle controls to the pilot station mounting surface.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 August 2014
Resolved 15 August 2014
Resolution: Email from Master provides: Helm joint secured with large washers above and below connecting bearing, new helm joint on order from Wagner. MI intends to attend next week to witness.
Engineering › Steering Gear System › Hydraulic Hose
Issued 6 August 2014 Resolved
Tighten the nylock nuts for the starboard steering hydraulic connection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 August 2014
Resolved 15 August 2014
Resolution: Email from Master provides: Jam nut tightened and locked in place. [name withheld] to attend vessel next week to witness.
Engineering › Bilge Water Management System › Manifold
Issued 6 August 2014 Resolved
Provide operating instructions for bilge/fire pump system and complete crew training on same.
Action required: 705 - Other - as specified
Due 21 August 2014
Resolved 21 August 2014
Resolution: Attended vessel and witnessed satisfactory compliance with crew training ongoing and being logged as required.
Fire Fighting › Fire Pumps › Arrangement
Issued 6 August 2014 Resolved
Provide on board 3 fire buckets, portable fire pump which produces 5 gpm.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 August 2014
Resolved 15 August 2014
Resolution: Item rescinded as o/o made notification that they will be correcting issues with the installed fire pump.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 6 August 2014 Resolved
Vessel operator failed to complete annual inspection within 3 months of COI Anniversary Date.
Action required: 705 - Other - as specified
Due 14 August 2014
Resolved 14 August 2014
Resolution: Inspection completed.
Documentation › Certificates/Documents › Stability Letter
Issued 15 December 2011 Resolved
No valid Stability Letter on file for vessel to comply with AAWPP Provide proof of compliance
Action required: 705 - Other - as specified
Due 1 July 2012
Resolved 19 April 2012
Resolution: Witnessed successful Simplified Stability Test conducted IAW 46 CFR 178.330 for 38 passengers and 2 crew, partially protected waters.
Lifesaving › Lifebuoys
Issued 21 May 2003 Resolved
Provide proper lifering bracket and location for life ring.
Due 21 June 2003
Resolved 2 July 2003
Lifesaving › Lifebuoys
Issued 21 May 2003 Resolved
Ensure life ring has vessel name and 4 strips of retro reflective tape on both sides of life ring buoy. Ensure life ring has 60 feet of floatable line and water light.
Due 21 June 2003
Resolved 2 July 2003
Lifesaving › Lifejacket/PFD (General)
Issued 21 May 2003 Resolved
Label life jacket locations both adult and child sizes.
Due 21 June 2003
Resolved 2 July 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 21 May 2003 Resolved
Provide first aid kit and medical supplies as per 46 CFR 160.041.
Due 21 June 2003
Resolved 2 July 2003
Engineering › Bilge Water Management System
Issued 21 May 2003 Resolved
Provide hand bilge pump IAW 46 CFR 182.520
Due 21 June 2003
Resolved 2 July 2003
Lifesaving
Issued 8 June 2000 Resolved
Replace inop relief valve for UPV with valve with nmt 125 psi release setting.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Construction/Loadline
Issued 25 May 1999 Resolved
Provide written repair proposal for replacement of doublers and tripler on vessel sideshell and bottom. Repairs to be completed over next 3 winters and finished by May 2002.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 26 May 1998 Resolved
REPAIR TOP OF THE FORE PEAK TANK VENT PIPE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 29 May 1996 Resolved
PROVIDE PROPER LINE AND LANYARD FOR RING BUOY.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Lifesaving
Issued 29 May 1996 Resolved
PROVIDE WATERLIGHT FOR LIFE FLOAT, VESSEL IS RESTRICTED TO DAYLIGHT OPS_x001C_ UNTIL CLEARED.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Lifesaving
Issued 29 May 1996 Resolved
POST EMERGENCY BROADCAST PLACARD IN PILOT HOUSE.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Engineering
Issued 29 May 1996 Resolved
POST POLLUTION PREVENTION PLACARD.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Lifesaving
Issued 26 May 1995 Resolved
REPLACE WATER LIGHT ON RING BOUY VESSEL IS RESTRICTED TO DAYLIGHT OPERATIONS UNTIL REQUIREMENT IS CLEARED.
Condition: Unknown
Due 25 July 1995
Resolved 25 July 1995
Lifesaving
Issued 31 May 1990 Resolved
PROVIDE 6 RED AND 6 ORANGE OR 12 COMBINATION TYPE DISTRESS SIGNALS.
Condition: Unknown
Due 31 May 1990
Resolved 31 May 1990
Accommodation/Occupational Safety
Issued 10 June 1988 Resolved
PROVE PROPER OPERATION OF PRESSURE VESSEL RELIEF VALVE NOT MORE THAN 200 PSI
Condition: Unknown
Due 10 June 1988
Resolved 10 June 1988
Lifesaving
Issued 10 June 1988 Resolved
REPLACE ONE RINGBUOY WITH WORN STRAPS WITH NEW IN KIND.
Condition: Unknown
Due 10 June 1988
Resolved 10 June 1988
Lifesaving
Issued 8 June 1987 Resolved
PROVIDE ONE ADDITIONAL RING BUOY AS SUBSTITUTE FOR PRIMARY LIFESAVING EQUIPMENT.
Condition: Unknown
Due 8 June 1987
Resolved 8 June 1987
Documentation
Issued 8 June 1987 Resolved
PROVIDE VALID FCC LICENSE FOR VHF-FM RADIO.
Condition: Unknown
Due 8 June 1987
Resolved 8 June 1987
Accommodation/Occupational Safety
Issued 5 June 1986 Resolved
HYDROSTATICALLY TEST AIR RECEIVER TO 1 1/4 MAWP (250 PSI) OR MAKE AVAILABLEFOR INTERNAL EXAMINATION.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Accommodation/Occupational Safety
Issued 5 June 1986 Resolved
SATISFACTORILY TEST AIR RECEIVER RELIEF VALVES.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.