Records from 2016 to 2017. Most recent: inspection, 10 October 2017.
Documentation record
Registered dimensions (L × B × D)63.8 ft × 18.0 ft × 6.8 ft
Registered tonnagegross 52 / net 41
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSARASOTA MARINE/BAY BOAT · BRADENTON, FL, UNITED STATES · built 1987
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portPONCE, PR
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it52 - Simplified, Gross Ton
41 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 9
10 October 2017
Damage Survey
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6291962
20 September 2017
Type not recorded
No type recorded · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6291913
9 September 2017
Administrative Inspection
Administrative · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6263081
3 May 2017
Damage Survey
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6139042
2 May 2017
Deficiency Check · Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6138674
6 September 2016
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5993228
25 April 2016
Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5862419
26 March 2016
Administrative Inspection · Damage Survey
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5841332
29 February 2016
Deficiency Check · Hull Examination
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5823977
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 2 May 2017
Resolved
Hydrostatically test one identified portable fire extinguisher
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2017
Resolution: Replaced one identified portable fire extinguisher
Communications › Radio Communications › EPIRB
Issued 2 May 2017
Resolved
Replace the expired EPIRB hydrostatic release
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2017
Resolution: Replaced the expired EPIRB hydrostatic release
Operations/Management › Equipment Service/Testing › EPIRB
Issued 2 May 2017
Resolved
Register EPIRB with NOAA.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2017
Resolution: Registered EPIRB with NOAA.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 May 2017
Resolved
Post all pages of the COI
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2017
Resolution: Posted all pages of the COI
Documentation › Certificates/Documents › Stability Letter
Issued 2 May 2017
Resolved
Post Stability letter at operating station.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2017
Resolution: Posted Stability letter at operating station.
Engineering › Bilge Water Management System › Piping
Issued 2 May 2017
Resolved
Install double clamps on all bilge pedro hoses.
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 4 May 2017
Resolution: Installed double clamps on all bilge pedro hoses.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 May 2017
Resolved
Remove the solid core wire from electrical circuit on board in the void under bar.
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 5 May 2017
Fire Fighting › Fire Pumps › Power Source
Issued 2 May 2017
Resolved
Prove proper operation of the vessels fire pump
Action required: 705 - Other - as specified
Resolved 5 May 2017
Resolution: Proved proper operation of the vessels fire pump
Fire Fighting › Fire Pumps › Power Source
Issued 6 September 2016
Resolved
Prove proper operation of vessel's fixed fire pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2016
Resolution: Proved proper operation of vessel's fixed fire pump both locally and remotley from Operating Station.
Documentation › Certificates/Documents › FCC SSL
Issued 25 April 2016
Resolved
Obtain valid FCC Station license
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 6 September 2016
Resolution: Obtained a valid FCC Station License
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 25 April 2016
Resolved
Conduct and log drills IAW 46 CFR 185.728 /.520 /.524
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 6 September 2016
Resolution: Satisfactory drill log onboard
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 25 April 2016
Resolved
Prove proper operation of the engine room fire dampeners
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2016
Resolution: Proved proper operation of engine room ventilation dampners
Lifesaving › Lifefloat › Float-free Link
Issued 25 April 2016
Resolved
Obtain and properly install three Coast Guard approved Life float weak links
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 September 2016
Resolution: Three CG approved weak links have been installed for L/F's
Documentation › Markings/Placards › Lifejacket Placard
Issued 25 April 2016
Resolved
Post Lifejacket donning placard
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 6 September 2016
Resolution: A life jacket donning plackard has been posted on the main deck
Fire Fighting › Fire Pumps › Pressure
Issued 25 April 2016
Resolved
Install fire pump activation switch at operating station
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 6 September 2016
Resolution: Satisfactorily tested fire pump activation from operating station.
Documentation › Certificates/Documents › Stability Letter
Issued 25 April 2016
Resolved
Post upper deck passenger limit IAW vessel's stability letter
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 6 September 2016
Resolution: Upper deck passenger limit marked IAW stability letter.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 25 April 2016
Resolved
Obtain a valid FCC Operators Permit
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 6 September 2016
Resolution: Operator has obtained a valid FCC operators permit.
Engineering › Bilge Water Management System › Strainer
Issued 17 March 2016
Resolved
Install bilge strainer on all bilge pickup points.
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 1 September 2016
Resolution: Installed bilge strainer on all bilge pickup points.