Records from 1987 to 2022. Most recent: inspection, 1 November 2022.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 117
1 November 2022
Drydock Exam · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7587425
9 March 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7408524
24 February 2022
Administrative Inspection
Administrative · Activities Europe · Activity 7401137
25 October 2021
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7339393
23 September 2021
Administrative Inspection
Administrative · Activities Europe · Activity 7319414
20 August 2021
COI Inspection
Physical examination · Activities Europe · Activity 7291967
23 June 2021
Administrative Inspection
Administrative · Activities Europe · Activity 7233452
24 May 2021
Administrative Inspection · Deficiency Check
Physical examination · Activities Europe · Activity 7205009
18 February 2021
Administrative Inspection
Administrative · Activities Europe · Activity 7142393
19 January 2021
Administrative Inspection
Administrative · Activities Europe · Activity 7126486
8 December 2020
Administrative Inspection · Annual Inspection
Physical examination · Activities Europe · Activity 7108077
22 January 2020
Administrative Inspection
Administrative · Activities Europe · Activity 6893640
9 December 2019
Administrative Inspection
Administrative · Activities Europe · Activity 6869818
18 October 2019
Administrative Inspection
Administrative · Activities Europe · Activity 6837232
19 September 2019
Annual Inspection
Physical examination · Activities Europe · Activity 6804313
18 July 2019
Drydock Exam · Internal Structural Exam
Physical examination · Activities Europe · Activity 6753842
10 June 2019
Administrative Inspection
Administrative · Activities Europe · Activity 6709280
15 January 2019
Administrative Inspection
Administrative · Activities Europe · Activity 6610365
21 August 2018
Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6518375
29 July 2018
Drydock Exam · Examination of Repairs · Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6494804
11 July 2018
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6475185
28 March 2018
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6380951
24 February 2018
Deficiency Check
Physical examination · Activities Europe · Activity 6360816
21 February 2018
Administrative Inspection · Damage Survey
Physical examination · Activities Europe · Activity 6358634
29 January 2018
Administrative Inspection
Administrative · Activities Europe · Activity 6346741
23 August 2017
Annual Inspection · Administrative Inspection
Physical examination · Activities Europe · Activity 6249180
28 June 2017
Internal Structural Exam · Drydock Exam
Physical examination · Activities Europe · Activity 6189314
13 March 2017
Administrative Inspection
Administrative · Activities Europe · Activity 6103726
7 March 2017
Administrative Inspection
Administrative · Activities Europe · Activity 6100133
7 March 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6302506
12 February 2017
Administrative Inspection
Administrative · Activities Europe · Activity 6087122
29 August 2016
COI Inspection
Physical examination · Activities Europe · Activity 5987003
18 April 2016
Administrative Inspection
Administrative · Activities Europe · Activity 5856690
19 October 2015
Annual Inspection · MARPOL Annex I Examination
Physical examination · Activities Europe · Activity 5745551
15 October 2015
Type not recorded
No type recorded · Activities Europe · Activity 5747488
30 July 2015
Drydock Exam · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5201475
13 August 2014
Annual Inspection
Physical examination · Activities Europe · Activity 4936362
27 September 2011
COI Inspection · DAPI Audit
Physical examination · Activities Europe · Activity 4119108
12 September 2011
Type not recorded
No type recorded · Activities Europe · Activity 4146629
4 September 2011
Type not recorded
No type recorded · Activities Europe · Activity 4157786
28 August 2011
Type not recorded
No type recorded · Activities Europe · Activity 4142585
26 January 2011
COI Inspection
Physical examination · Activities Europe · Activity 3889671
6 December 2010
Type not recorded
No type recorded · Activities Europe · Activity 3912354
25 December 2009
Periodic Inspection · Administrative Inspection
Physical examination · Activities Europe · Activity 3655785
17 December 2008
Annual Inspection · MTSA/ISPS Verification · In-Service Inspection
Physical examination · Activities Europe · Activity 3411511
1 September 2008
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 3321455
5 August 2008
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 3441080
24 June 2008
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 3246073
13 March 2008
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 3126497
7 December 2007
Annual Inspection
Physical examination · Activities Europe · Activity 3114142
17 April 2006
Annual Inspection
Physical examination · Activities Europe · Activity 2572811
23 November 2005
Hull Examination · Inclining Experiment
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 2549714
2 October 2005
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2680838
24 February 2005
Periodic Inspection
Physical examination · Activities Europe · Activity 2281117
20 June 2004
MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2104624
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996866
26 January 2004
Annual Inspection · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 2000789
9 August 2003
Internal Structural Exam · MARPOL Annex I Examination · Hull Examination · MARPOL Annex V Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 1908342
23 June 2003
Drydock Extension
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 1831738
25 April 2003
Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1788893
24 December 2002
Damage Survey
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 1728871
21 December 2002
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 1759908
15 May 2002
In-Service Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 1619253
11 February 2002
COI Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1482504
3 July 2001
Hull Examination
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1362355
26 September 2000
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1987
17 August 2000
Deficiency Check
Physical examination · Activities Europe · Activity 1052582
3 August 2000
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1053137
29 July 2000
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 178481
27 June 2000
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 21908
3 January 2000
Deficiency Check
Physical examination · Activities Europe · Activity 812770
23 November 1999
Re-Inspection
Physical examination · Activities Europe · Activity 1420222
15 October 1999
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 86500
8 February 1999
Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1131539
28 January 1999
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1123878
2 December 1998
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 806350
4 November 1998
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 104036
26 October 1998
Administrative
Administrative · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 803105
26 October 1998
COI Inspection · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1413437
5 June 1998
Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1473594
10 September 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1190274
1 October 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 17378
23 February 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 852990
16 December 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1162504
1 June 1993
Administrative
Administrative · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 838400
14 January 1993
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 127893
12 January 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 832695
15 June 1992
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 225556
13 March 1992
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1260530
21 February 1992
Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 961627
15 October 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 943738
23 April 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 936269
21 March 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1240269
4 February 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 994351
13 January 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1299957
7 November 1990
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1226667
7 August 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 925108
6 July 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1242223
21 May 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1235296
24 April 1990
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1222021
30 March 1990
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 925273
26 March 1990
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1221396
13 March 1990
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1221096
13 February 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1221305
24 November 1989
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1224042
9 November 1989
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1211668
6 November 1989
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1230327
2 March 1989
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1045298
5 January 1989
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1205348
14 April 1988
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1203478
27 December 1987
Re-Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1016761
15 December 1987
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1009220
11 August 1987
Excursion Permit
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1030967
30 July 1987
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1007837
16 July 1987
Excursion Permit
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1021426
16 March 1987
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1017971
26 January 1987
Initial Certification
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1319592
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 9 March 2022
No resolution recorded
Discrepancies possibly found with current fire plan for BLKH 67 STBD SIDE in between Fan Room & Workshop as A60. Also fire plan needs updated after removal of equipment. Submit new Fire Control plan to the USCG Marine Safety Center for review & approval.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 May 2022 — due date passed with no resolution recorded
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 9 March 2022
No resolution recorded
Vessel removed large radar domes & multiple other pieces of equipment. ABS issued vessel's current Stability Letter. Provide information for any changes in vessel's lightship characteristics as per Marine Safety Center Note, MTN 04-95, CH-2 & conduct new stability test to
the satisfaction of class or Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 May 2022 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 March 2022
No resolution recorded
Complete load line survey & all associated steel repair in accordance with classification society's requirements.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 June 2022 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 March 2022
No resolution recorded
Due to the installed bilge piping configuration, conduct testing of all bilge pumps.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 June 2022 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 September 2021
Resolved
Where pipes, scuppers, electric cables, etc., are carried through watertight sub division bulkheads, arrangements shall be made to ensure the integrity of the watertightness of the bulkheads. ECR aft watertight bulkhead, next to watertight door has a cable pass that is not watertight. Make watertight bulkhead watertight.
SOLAS 74 II-1/13(b)(I)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 8 September 2021
Resolved 8 September 2021
Resolution: Bulkhead was sealed and air tested to the satisfaction of Marine Inspector.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 September 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. MI identified multiple small water leaks from the overhead insulation securing pins due to condensation from the above air conditioned space in the aft steering passageway. Particularly a few areas were located directly above electrical equipment in the space. Vsl will conduct rounds of the space while underway between the hours of 2100-0600 while the E/R is unmanned.
SOLAS 14 I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 October 2021
Resolved 25 October 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 20 August 2021
Resolved
Wiring shall be supported in such a manner as to avoid chafing or other injury. The steering compartment has 2 exposed wires on the aft starboard overhead. Make wires so they cannot cause injury.
74 SOLAS 74 II-1/27(a)(1)(v)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 7 September 2021
Resolved 7 September 2021
Resolution: Wires were capped and unable to cause chafing or injury.
01 - Certificates & Documentation › 013 - Documents › Unattended Machinery Spaces (UMS) Evidence
Issued 20 August 2021
Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm setpoints, the procedure to be followed, and the expected test result. The setpoints were not being logged in accordance with approved automation procedures. Log set points in accorance with approved procedures.
46 CFR 61.40-10(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 7 September 2021
Resolved 8 September 2021
Resolution: Worked with CHENG to ensure all PSTP's will be logged in accorance with approved procedures.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 October 2019
Resolved
Vessel shall be equipped with 2 independently driven fire pumps. Fire pump #2 has failed due to a frozen impeller.
Action required: 15 - Rectify deficiencies by next port
Resolved 13 November 2019
Resolution: Fire pump repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 September 2019
Resolved
At least two lifebuoys on the vessel must be fitted with a self-activating smoke signal approved under approval series 160.157. The smoke signals on the bridge wing lifebuoys are not USCG approved. UPDATE: Approved signals installed, but expire on 30 November 2019. Vessel ordered new set, to be installed by 31 December.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 10 November 2019
Resolved 16 December 2019
Resolution: Vessel installed approved smoke floats.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 19 September 2019
Resolved
Means shall be provided to close off all vents and ventilators. Vent 1-77-1 is missing its closure.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 November 2019
Resolved 6 November 2019
Resolution: Added closure device
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 21 February 2018
Resolved
Emergency Diesel Generator fuel injection pump is leaking fuel. Repair fuel leak to the satisfaction of a USCG Inspector prior to departing Mina Salman.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 March 2018
Resolved 1 March 2018
Resolution: Verified repairs.
Engineering › Lubricating Oil Service System › Cooler
Issued 21 February 2018
Resolved
Stbd propulsion motor's lube oil system is contaminated with sea water. Determine root cause and effect repairs to the satisfaction of a USCG Inspector prior to departing Mina Salman.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 March 2018
Resolved 14 March 2018
Resolution: Oil coolers on both shafts were rebuilt and hydrostatically tested to 150 psi. ABS surveyor witnessed operational testing. Very light corrosion on bearings buffed off; all sat.
Lifesaving › Launching Appliances › Davit
Issued 29 January 2018
Resolved
Davit hydraulic unit failed to achieve the 200 bar pressure instead produced only 20 bars.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 January 2018
Construction/Loadline › Structures › Superstructure
Issued 19 September 2017
Resolved
Repair/renew wasted steel in middle edge section behind the radar doom.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 9 March 2018
Resolution: Navy has concerns with welding around radar. Vessel has until next DD to fix gusset, radar dome has more than enough support. Special note added.
Electrical › Electrical Distribution System (service) › Cable
Issued 19 September 2017
Resolved
Make permanent repairs to search light wiring on the port and starboard side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 1 March 2018
Resolution: Repairs verified.
Deck/Cargo › Mooring/Anchoring › Clutch
Issued 19 September 2017
Resolved
Repair inoperable anchor windlass clutch control.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 1 March 2018
Resolution: Repairs completed.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 19 September 2017
Resolved
Repair/service port and stbd aft mooring winch motors. Provide report.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 1 March 2018
Resolution: Aft winch motors tested sat.
Electrical › Electrical Distribution System (service) › Cable
Issued 19 September 2017
Resolved
Thoroughly inspect/replace corroded or deteriorating port and stbd side aft mooring windlass cables exposed to the weather deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 1 March 2018
Resolution: Replaced corroded wiring.
Fire Fighting › Structural - A Class Divisions › Corridors
Issued 19 September 2017
Resolved
Provided proper A class fire boundary in the RIC Vestibule access way (tube) (bulkhead 1-72) IWO of bulkhead top. Use approved penetration to seal the bulkhead opening. Submit installation plan by 17 October.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 January 2018
Resolved 31 January 2018
Resolution: Rcvd service report attesting to complete repair.
Lifesaving › Immersion Suits › Not on Board
Issued 19 September 2017
Resolved
One crew member was not provided with a properly size immersion suit. Provide properly sized immersion suit prior to operating outside of area between 32N/32S longitude.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 October 2017
Resolved 18 October 2017
Resolution: Receiced notification that the crew member was provided with a properly sized immersion suit.
Communications › Radio Communications › Satellite Communications Capability
Issued 12 February 2017
Resolved
The GMDSS MF/HF receiver is not operating. Prove proper operation of the GMDSS suite no later than 12 Mar 2017.
Action required: 705 - Other - as specified
Due 12 March 2017
Resolved 11 March 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 14 September 2016
Resolved
Provide certificate of servicing for all fixed and portable fire extinguishing equipment to include the pull station for the gaylord hood system in the galley.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 September 2016
Resolved 28 September 2016
Resolution: Received report of successful servicing of required fire extinguishing items.
Lifesaving › Inflatable Liferafts › Float Free
Issued 14 September 2016
Resolved
Provide pictures of proper installation of the inflatable liferafts
Action required: 17 - Rectify deficiencies prior to departure
Due 28 September 2016
Resolved 28 September 2016
Resolution: Received required pictures showing the proper installation
Electrical › Electric Generation Source (service) › Generator
Issued 14 September 2016
Resolved
Provide CAT tech rep report of proper operation of all shut downs and alarms on # 1 SSDG.
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 22 September 2016
Resolution: Recieved report from ABS surveyor that the alarms and shut downs are fully operational.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 14 September 2016
Resolved
Demonstrate proper operation of the OWS. AMintain all oily waste onboard the vessel or discharge to a proper shore side facility.
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 25 September 2016
Resolution: Recieved report of proper operation of the OWS
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 14 September 2016
Resolved
Demonstrate proper operation of the forward mooring capstan
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 25 September 2016
Resolution: Received report of proper operation of the mooring capstan
Engineering › Bilge Water Management System › Pump
Issued 14 September 2016
Resolved
Demonstrate proper operation of the # 3 bilge pump
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 25 September 2016
Resolution: Received report of proper operation of the # 3 bilge pump
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 14 September 2016
Resolved
Remove all excess strorage from the hospital space
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 22 September 2016
Resolution: Received pictures showingt the removal of storage in the hospital space.
Navigation › Piloting/Steering › Gyro Compass
Issued 18 April 2016
Resolved
The vessel's gyro compass is not operating properly and is currently not a reliable means of navigation. Repairs shall be affected to the gyro compass prior to the departure of the next port of call, but no later than 26 Apr 2016. After this date, movement of the vessel is prohibited unless a request for a National Defense waiver has been submitted and approved.
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 24 April 2016
Navigation › Collision/Grounding Avoidance › Echo-sounding Device Recorder
Issued 13 August 2014
Resolved
Show evidence that Echo Depth Sounding history for Sperry marine ES 5100 is accessible within 30 days.
Due 13 August 2014
Resolved 13 August 2014
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 13 August 2014
Resolved
Hydrostatically test CO2 bottles at an approved DOT testing facility at next drydock.
Due 31 October 2015
Resolved 25 April 2016
Resolution: Received service report this day that the bottles were certified tested in Singapore on 24 Aug 2015.
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 13 August 2014
Resolved
Update air pollution certificate to indicate use of R134 within 30 days.
Due 18 September 2014
Resolved 21 November 2014
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 13 August 2014
Resolved
Provide new rubber mats IWO electrical panels throughout engineering space within 30 days.
Due 13 August 2014
Resolved 21 August 2014
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Emergency shutdown
Issued 13 August 2014
Resolved
Show evidence audible alarms are operational on bridge.
Due 13 August 2014
Resolved 13 August 2014
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 27 September 2011
Resolved
Hydro test four remaining portable fire extinguishers that were not serviced at present port.
Action required: 705 - Other - as specified
Due 30 November 2011
Resolved 6 December 2011
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Engineering › Generator (propulsion-electric) › Auto Transformer Circuitry
Issued 27 September 2011
Resolved
Prove proper operation of the #3 Main Diesel Generator or provide a proposal attesting to the scheduled repair of the same.
Due 30 September 2012
Resolved 26 September 2012
Resolution: MDE rebuilt, verified proper operation.
Engineering › Steering Gear System › Power Unit
Issued 27 September 2011
Resolved
Replace rejected hydraulic power unit pressure gauges on the hydraulic steering gear .
Action required: 705 - Other - as specified
Due 30 November 2011
Resolved 6 December 2011
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Lifesaving › Launching Appliances › Falls
Issued 25 January 2010
Resolved
Re-new rescue boat davit falls. After installation conduct a 1.1 load test of same. Provide CG a copy of the test results
Action required: 705 - Other - as specified
Due 26 March 2011
Resolved 2 February 2011
Lifesaving › Launching Appliances › Davit
Issued 25 January 2010
Resolved
Provide USCG approval numbers for the rescue boat davit, davit winch and hook release assembly
Action required: 705 - Other - as specified
Due 26 February 2011
Resolved 1 February 2011
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 25 January 2010
Resolved
Prove proper operation of the Marine Sanitation Device (MSD).
Action required: 705 - Other - as specified
Due 26 February 2011
Resolved 30 March 2011
Engineering › Bilge Water Management System › Manifold
Issued 25 January 2010
Resolved
Provide plan for demonstrating proper operation of the installed bilge system
Action required: 705 - Other - as specified
Due 26 February 2011
Resolved 10 February 2011
Resolution: After conversations between [name withheld] (ACTEUR CID) and [name withheld] (vessel manager) in regards to the bilge piping configuration, it was agreed that testing of the bilge pumping system would be required at all future drydocks.
Engineering › Compressed Air System (start air) › Valve
Issued 25 January 2010
Resolved
Provide approved ASME relief valves for the engine room air receivers
Action required: 705 - Other - as specified
Due 26 February 2011
Resolved 26 January 2011
Engineering › Bilge Water Management System › Valve
Issued 25 January 2010
Resolved
Install means of properly operating the emergency bilge suction in engine room
Action required: 705 - Other - as specified
Due 26 February 2011
Resolved 28 January 2011
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 25 January 2010
Resolved
Provide & prove proper operation of the required (lo lube oil, Hi O2, overspeed) alarms and shutdowns for the Emergency Diesel Generator (EDG).
Action required: 705 - Other - as specified
Due 26 May 2011
Resolved 4 May 2011
Resolution: Item cleared via email from the vessels Captain and [name withheld] that the alarms and shutdowns are verified at the next annual inspection.
Fire Fighting › Self-contained Breathing Apparatus › Hose
Issued 25 January 2010
Resolved
Properly mount EEBD in the Propulsion Motor room
Due 26 February 2011
Resolved 28 January 2011
Fire Fighting › Combustible Materials › Insulation
Issued 25 January 2010
Resolved
Repair / Replace the Structural Fire Protection (SFP) insulation above the #2 M.D.E
Action required: 705 - Other - as specified
Due 26 February 2011
Resolved 1 February 2011
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 17 December 2008
Resolved
Replace all eyewash bottles in e-gen room.
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Fire Fighting › Fixed Halon Fire Extinguishing System › Control Valve
Issued 17 December 2008
Resolved
Prove rpoper operation of the fixed halon system time delays
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 17 December 2008
Resolved
Label light panel and prove proper operation of all lights on the bridge panel.
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 17 December 2008
Resolved
Label light panel and prove proper operation of all lights on the ECR panel (completed)
Due 6 January 2009
Resolved 6 January 2009
Navigation › Electronic Positioning › Radio Direction Finding Device
Issued 17 December 2008
Resolved
Prove proper operation of the gyro and complete swing of ship.
Due 6 January 2009
Resolved 20 November 2009
Navigation › Collision/Grounding Avoidance › Radar Reflector
Issued 17 December 2008
Resolved
Prove that SARTS are on board
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Navigation › Electronic Positioning › Radio Direction Finding Device
Issued 17 December 2008
Resolved
Prove that the EPIRB is onboard with NOAA regristration
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Lifesaving › Hand Flares › Storage
Issued 17 December 2008
Resolved
Flares boxes used for training are to removed from locker and repained
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 17 December 2008
Resolved
Battery boxes outside the bridge are to have the wires replaced (current cables are cracked and corrored)
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 17 December 2008
Resolved
Prove proper operation of all "battle laterns" (e-lights throughout ship
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Electrical › Electrical Distribution System (emergency) › Switch
Issued 17 December 2008
Resolved
Rescue boat battery charger has been removed. Replace as orginial
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Lifesaving › Rescue Boat Equipment › Repair Kit (inflated rescue boat)
Issued 17 December 2008
Resolved
Replace glue for rescue boat repair kit
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 17 December 2008
Resolved
Prove proper operation of OWS
Action required: 705 - Other - as specified
Due 6 January 2009
Resolved 20 November 2009
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 7 December 2007
Resolved
PROVIDE DOCUMENTATION FOR ANNUAL FIRE FIGHTING EQUIPMENT INSPECTION.
Due 15 December 2007
Resolved 13 December 2007
Communications › Radio Communications › Satellite Communications Capability
Issued 7 December 2007
Resolved
PROVIDE DOCUMENTATION FOR GMDSS INSPECTION
Due 15 December 2007
Resolved 13 December 2007
Lifesaving › Inflatable Liferafts › Approval
Issued 7 December 2007
Resolved
PROVIDE ANNUAL LIFE RAFT SERVICING REPORTS
Due 15 December 2007
Resolved 20 December 2007
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 7 December 2007
Resolved
MAKE PROPER REPAIRS TO RESCUE BOAT DAVIT CONTROLLER
Due 31 March 2008
Resolved 31 March 2008
Resolution: Davit controller was repaired and tested.
Construction/Loadline › Hull › Bottom Plating
Issued 7 December 2007
Resolved
MAKE PERMANENT REPAIRS TO BOTTOM PLATE IN WAY OF WASTE OIL TANK 66-2 PORT
Due 31 January 2008
Resolved 1 January 2008
Resolution: Plate was renewed.
Construction/Loadline › Structures › Superstructure
Issued 18 April 2006
Resolved
Found wasted door frame to the Ratheon storage space on stern (stbd side door). Crop and renew wasted steel at next maintenance period. Temp repair installed 4/27/06. Extended item untill next maintenance availability in July 06.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 July 2006
Resolved 1 May 2006
Resolution: Temp repair completed. Vessel has already added permanent repair to next maintenance period package. Cleared def.
Engineering › Compressed Air System (start air) › Control Gear
Issued 17 April 2006
Resolved
Low pressure alarm on the start air system sticks. Replace or repair alarm.
Action required: 705 - Other - as specified
Due 30 June 2006
Resolved 18 November 2006
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 April 2006
Resolved
Propeller shaft "barring iron" switches inoperable. Replace switches and prove proper operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 May 2006
Resolved 1 June 2006
Resolution: New barring iron switches installed.
Engineering › Fuel Oil Service System › Valve, Settler Tank
Issued 17 April 2006
Resolved
Reach rod covers found painted shut. Two persons were required to pry several of the covers open. Unfreeze all covers so reach rod's have quick access.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 May 2006
Resolved 27 April 2006
Resolution: All covers were freed and cleaned. Instruction to the crew to insure covers are free after waxing the decks.
Construction/Loadline › Structures › Machinery Space Opening
Issued 17 April 2006
Resolved
Stuffing tube in water tight bulkhead between engine room and engine control room found without packing. Correct stuffing tube to maintain water tight integrity.
Action required: 705 - Other - as specified
Due 18 May 2006
Resolved 27 April 2006
Resolution: Corrected
Construction/Loadline › Structures › Scuttle
Issued 17 April 2006
Resolved
Escape hatch from auxiliary machinery space will not open.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 May 2006
Resolved 27 April 2006
Engineering › Diesel Engine (propulsion-electric) › Air Cleaner
Issued 17 April 2006
Resolved
Low lube oil pressure shutdowns on generators do not actuate until "zero". Adjust or replace switches.
Action required: 705 - Other - as specified
Due 18 May 2006
Resolved 1 May 2006
Resolution: Lube oil shutdowns reset to proper pressure - 8 psi.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 25 April 2003
Resolved
Provide copy of new Loadline certificate reflecting the new stability information.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2003
Resolution: Received copy of new Loadline certificate with new stability data.
Construction/Loadline › Structures
Issued 24 December 2002
Resolved
Provide repair proposal to cognizant [name withheld] approval, make permanent repairs to the damaged stiffeners and bulkhead plating to ballast tanks 4-6-1 and 4-6-2. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Condition: Damaged By Earlier Event
Due 30 June 2003
Resolved 19 September 2003
Resolution: Witness approved repairs.
Engineering
Issued 23 November 1999
Resolved
PROVIDE TWO NEW RELIEF VALVES FOR START AIR P/V'S WITH ASME VIII LABEL INDICATING SETPOINT. CHIEF ENGINEER MAY FAX STATEMENT OF INSTALLATION AND TESTING.
Condition: Unknown
Due 23 November 1999
Resolved 23 November 1999
Navigation
Issued 23 November 1999
Resolved
REPAIR ARPA ON 10 CM RADAR (2 ON SHIP, 3 CM ARPA/RADAR WORKING). PROVIDE COPY OF SERVICE REPORT OR STATEMENT FROM CLASS INDICATING PROPER OPERATION.
Condition: Unknown
Due 23 November 1999
Resolved 23 November 1999
Lifesaving
Issued 26 October 1998
Resolved
PROVIDE ABS APPROVED PLANS FOR THE RESCUE BOAT INSTALLATION TO INCORPORATE CHANGES "AS BUILT".
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Accommodation/Occupational Safety
Issued 26 October 1998
Resolved
MAKE PERMANENT REAPIRS TO UPPER COURSE OF FIBERGLASS RAILINGS, IN WAY OF LIFERAFTS NUMBER 3 AND 4.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Navigation
Issued 26 October 1998
Resolved
PROVIDE UPDATED DEVIATION TABLE FOR THE MAGNETIC COMPASS DUE TO NEW ADDITIONAL ELECTRONIC EQUIPMENT AND LOOSE BINNACLE ON COMPASS.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Fire Fighting
Issued 26 October 1998
Resolved
PROVIDE DOCUMENTATION THAT EXISTING FIRE STOPS ARE COAST GUARD ACCEPTED OR REPLACE EXISTING FIRE STOPS WITH COAST GUARD ACCEPTED FIRE STOP SYSTEM.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Lifesaving
Issued 16 December 1993
Resolved
REPLACE RING BUOY LOCATED PORT SIDE 02 DECK WITH CG APPROVED TYPE.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Lifesaving
Issued 16 December 1993
Resolved
PLACE ONBOARD THE REQUIRED NUMBER OF CG APPROVED INFLATABLE LIFERAFTS PRIORTO VESSEL GETTING UNDERWAY. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Electrical
Issued 16 December 1993
Resolved
TERMINATE DEAD END ELECTRICAL CABLE, CIRCUIT NO. P411-9 IN A CG ACCEPTED "J" BOX. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Fire Fighting
Issued 16 December 1993
Resolved
PROVIDE 4 CG ACCEPTED SCBA OXYGEN BOTTLES PRIOR TO VESSEL GETTING UNDERWAY.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Electrical
Issued 16 December 1993
Resolved
PROVE PROPER OPERATION OF NO. 1 GENERATOR'S REVERSE POWER RELAY. _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Fire Fighting
Issued 16 December 1993
Resolved
PROVE PROPER OPERATION OF NO. 2 FLAME SAFETY LAMP.
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Navigation
Issued 16 December 1993
Resolved
PROVE PROPER OPERATION OF THE COLLISION AVOIDANCE RADAR SYSTEMS. PRIOR TO VESSEL GETTING UNDERWAY.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Lifesaving
Issued 12 January 1993
Resolved
PROPERLY INSTALL 15 MAN INFLATABLE LIFERAFT PRIOR TO COASTWISE OR OCEANS VOYAGE. THIS REQUIREMENT MAY BE CLEARED VIA DIRECT COMMUNICATION WITH, AND THE APPROVAL OF [name withheld], TO INCLUDE FAX/LETTER STATEMENT WITH MASTER'S SIGNATURE.
Condition: Unknown
Due 11 February 1993
Resolved 11 February 1993
Electrical
Issued 12 January 1993
Resolved
PROVE PROPER OPERATION OF #1 GEN. IN PARALLEL, AND REVERSE POWER RELAY.
Condition: Unknown
Due 14 June 1993
Resolved 14 June 1993
Engineering
Issued 12 January 1993
Resolved
CONDUCT PROPULSION POWER POWER LIMITING TEST IN ACCORDANCE WITH PROCEDURE SECTIONS D1-D4 AND PROVIDE [name withheld], A COPY OF TEST RESULTS INCLUDING A LETTER FORM THE MASTER AND [name withheld] TO SATISFACTORY TEST.
Condition: Unknown
Due 14 June 1993
Resolved 14 June 1993
Electrical
Issued 12 January 1993
Resolved
REPAIR AND PROVE PROPER OPERATION OF #1 GEN. LOW LUBE OIL PRESSURE TRIP, OVERSPEED TRIP, AND HIGH TEMP TRIP.
Condition: Unknown
Due 14 June 1993
Resolved 14 June 1993
Documentation
Issued 21 March 1991
Resolved
SUBMIT TO [name withheld] A PROPOSAL FOR MANNING. CURRENT MANNING LEVEL AUTHORIZED UNTIL 30 SEPTEMBER 1991.
Condition: Unknown
Due 21 March 1991
Resolved 21 March 1991
Construction/Loadline
Issued 13 January 1991
Resolved
RENEW OR REPAIR BALL CHICK GOOSE NECK VENTS PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 13 January 1991
Resolved 13 January 1991
Lifesaving
Issued 13 January 1991
Resolved
INSTALL INFLATABLE LIFERAFTS AND HRU PRIOR TO GETTING UNDERWAY 46 CFR 194.10-55.
Condition: Unknown
Due 13 January 1991
Resolved 13 January 1991
Navigation
Issued 24 April 1990
Resolved
PROVIDE PROOF OF (TO [name withheld]) AND POST MANEUVERING CHARACTERISTICS FACT SHEET IN PILOTHOUSE AFTER APPROPRIATE VESSEL MANEUVERING TESTS ARE COMPLETED AND FACT SHEET IS CREATED IN ACCORDANCE WITH 46 CFR 97.19.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Documentation
Issued 13 February 1990
Resolved
PROVIDE [name withheld] PLANS FOR HYDROPHOR TANK SYSTEM NEW INSTALLATION.
Condition: Unknown
Due 13 February 1990
Resolved 13 February 1990
Lifesaving
Issued 24 November 1989
Resolved
PROVIDE EVIDENCE OF ACCEPTANCE OF RESCUE BOAT ILN ACCORDANCE WITH SOLAS.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Lifesaving
Issued 24 November 1989
Resolved
CONDUCT WEIGHT TEST OF RESCUE BOAT.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Deck/Cargo
Issued 24 November 1989
Resolved
PROVIDE INCREASED CONTAINMENT AROUND FUEL OIL VENTS AT NEXT REINSPECTION (MINIMUM OF 1 BARREL CONTAINMENT REQUIRED).
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Accommodation/Occupational Safety
Issued 24 November 1989
Resolved
ALTER 0-1 DECK RAILS IN WAY OF AFT EMBARKATION LADDER PORT AND STARBOARD TO ALLOW FOR PROPER ACCESS.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Lifesaving
Issued 24 November 1989
Resolved
SUPPLY RESCUE BOAT WITH EQUIPMENT AS PER SOLAS.
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Engineering
Issued 6 November 1989
Resolved
PROVIDE PLANS AND LIST OF MATERIALS FOR MODIFICATION TO BILGE PIPING IN BOWTHRUSTER ROOM.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Electrical
Issued 5 January 1989
Resolved
INSTALL AND DEMONSTRATE THE EMERGENCY GENERATOR HIGH COOLING WATER TEMP. ALARM (PRESENT SYSTEM HAS SHUTDOWN WITH INDICATOR).
Condition: Unknown
Due 5 January 1989
Resolved 5 January 1989
Unknown
Issued 5 January 1989
Resolved
CONDUCT TEST OF THE FOLLOWING AUTOMATION PROCEDURE ITEMS: II A-15, 1B-21, IIB-11 & 14, IIC - 3 & 4, IID, III A 4, 7, 8, 13 & 15. ENTER RESULTS IN OFFICIAL LOG AND NOTIFY [name withheld].
Condition: Unknown
Due 5 January 1989
Resolved 5 January 1989
Engineering
Issued 27 December 1987
Resolved
CONDUCT TESTS OF COMPUTER/CONSOLE ENGINE ROOM ALARMS, WITH ALARM INPUT STIMULATOR
Condition: Unknown
Due 27 December 1987
Resolved 27 December 1987
Engineering
Issued 27 December 1987
Resolved
TEST DEADMAN ALARM SYSTEM
Condition: Unknown
Due 27 December 1987
Resolved 27 December 1987
Electrical
Issued 27 December 1987
Resolved
PROVIDE A METAL SHIELD AROUND ENGINE ROOM SINK TO KEEP WATER FROM ENTERING INTO #4 MAIN GENERATOR
Condition: Unknown
Due 27 December 1987
Resolved 27 December 1987