Records from 2016 to 2026. Most recent: inspection, 22 June 2026.
Inspection history · 21
22 June 2026
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8410585
18 March 2026
Inclining Experiment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8328209
27 August 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8230212
28 May 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8145944
19 February 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8081253
6 March 2024
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7872576
29 May 2023
Administrative Inspection · Examination of Repairs · Damage Survey
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7700524
12 April 2023
Administrative Inspection · Annual Inspection · In-Service Inspection · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7666912
24 March 2023
Internal Structural Exam · Examination of Repairs · Hull Examination · Drydock Exam · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7656380
21 April 2022
Deficiency Check · Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7436195
8 April 2021
Administrative Inspection · Examination of Repairs · Drydock Exam · COI Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7170156
29 July 2020
Annual Inspection · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7019599
30 April 2019
Deficiency Check · Internal Structural Exam · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6674471
5 December 2018
Examination of Repairs · Drydock Exam · Deficiency Check · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6592520
29 March 2018
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6390695
6 March 2018
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6372107
27 July 2017
Deficiency Check · Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6223973
27 July 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6234671
10 April 2017
Spot Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6222427
22 March 2017
Drydock Exam · Administrative Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6108138
28 April 2016
COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5860556
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 27 August 2025
Resolved
Except as allowed by paragraphs (b), (c) and (d) of this section, each bessel certified to operate on a limited coastwise route shall be provided withthe survival craft required by 117.204 (a) through (d) of this part, as applicable. Vessel removed 02 Inflatable Buoyant Apparatus. Vessel is restricted in service to Lakes, Bays, and Sounds until full compliment of IBAs are restored.
46CFR117.205
Action required: 705 - Other - as specified
Resolved 22 June 2026
Resolution: Vessel permanently removed IBAs and had new stability performed
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 27 August 2025
Resolved
A stability test of a vessel ma be dispensed with if the Coast Guard determines that a accurate estimate of the vessel's lightweight characteristics. Vessel must submit weight-moment calculations in accordance with Marine Techical Note 4-95 to the Marine Safety Center. Vessel is restricted to Lakes, Bays, and Sounds until calculations are approved by MSC.
Action required: 705 - Other - as specified
Resolved 22 June 2026
Resolution: Vessel permanently removed IBAs and had new stability performed
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 May 2025
Resolved
Battery terminals shall be permanent type and in good condition. Batteries for M/E were corroded and secured with wing nuts.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 28 May 2025
Resolution: Corrected on the spot.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 28 May 2025
Resolved
Vessel shall be inspected with compliance with the standards required by this subchapter and for items not covered to the satisfactory of the [name withheld] bottles under galley were not secured causing a potential safety hazard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 3 June 2025
Resolution: Receieved and accepted emailed photo of repairs made.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 28 May 2025
Resolved
An exposed hazard such as gears and rotating machinery must be protected by a cover. Both generators had exposed rotating belts causing a safety hazard.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2025
Resolved 3 June 2025
Resolution: Receieved and accepted emailed photo of repairs made.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 28 May 2025
Resolved
The general construction of the vessel shall be such as to minimize fire hazards. Structural fire protection above port generator was loose/missing.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2025
Resolved 3 June 2025
Resolution: Receieved and accepted emailed photo of repairs made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 28 May 2025
Resolved
Auxiliary machinery shall be suitable in type and design for the purposes intended. Starboard generator oil pressure gauge was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2025
Resolved 3 June 2025
Resolution: Receieved and accepted emailed photo of new oil pressure gauge.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 May 2025
Resolved
Each EPIRB must be registered with NOAA before installation and that information be kept up to date. EPIRB NOAA registration did not match.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2025
Resolved 5 June 2025
Resolution: Receieved and accepted emailed photo of EPIRB registration.
14 - Pollution Prevention › 145 - MARPOL Annex V › Other (MARPOL Annex V)
Issued 28 May 2025
Resolved
The operator must secure each type III device in a manner to secure discharge. MI found no method of securing MSD, corrected on the spot.
Action required: 10 - Deficiency Rectified
Resolved 28 May 2025
Resolution: Corrected on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 May 2025
Resolved
All electrical installations shall be to the satisfaction of the OCMI. The distribution panel was not labeled correctly. 7 days.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 4 June 2025
Resolved 3 June 2025
Resolution: Receieved and accepted emailed photo of repairs made.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 May 2025
Resolved
The EPIPRB shall be logged or documented. No monthly test was logged.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2025
Resolved 30 June 2025
Resolution: 30June2025: Received and accepted emailed photo of monthly EPIRB INSPECTION log.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 28 May 2025
Resolved
Each IBA must be equipped in accordance with the manufactures approved servicing manual. Vessels IBS's were not serviced annually.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2025
Resolved 31 July 2025
Resolution: 31July2025: Based on the Naval Architects recomendations, the vessel may remove 02 Inflatable Life Rafts (1065lbs) and retain the same routes and conditions.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 May 2025
Resolved
Waste receptacles must be constructed of non-combustible materials with no openings. Several plastic receptacles were constructed of plastic and open on top. Crew removed.
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Resolved 5 June 2025
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 6 March 2024
Resolved
The master shall conduct sufficient fire drills to make sure that each crew member is familiar with his or her duties in case of a fire. Attending marine inspector did not witness satisfactory drill performance from crew. Conduct training and drills to increase crew competency.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 March 2024
Resolution: Crew demonstrated competence
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2024
Resolved
All microprocessors or computer base systems must meet the requirements of part 62 in subchapter F of this chapter. Provide line drawing of power supply to throttle controls and do DVTP in accordance with manufacturer's instructions. Provide tech report.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 March 2024
Resolved
A Voltmeter and an ammeter shall be provided that can be used for measuring voltage and current of each generator that is in operation. Make permanent repair of voltmeter and ammeter. 46 CFR 183.10-5 (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 March 2024
Resolution: equipment installled
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 March 2024
Resolved
In general the electrical source located within the vessel and distribution system shall not be grounded. Provide way to detect grounding. 46 CFR 183.10-30 (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 March 2024
Resolution: Technician demonstrated that there is no electrical ground
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 March 2024
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment. Make repair to fore-peak bilge pump.
46 CFR 182.25-1 (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 March 2024
Resolution: Forepeak bilge works
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 6 March 2024
Resolved
Each vessel is provided with safe, readily available... firefighting equipment of the type necessary to extinguish any fires... Vessel's fire hoses had pinholes and worn threads. Outfit vessel with appropriate hoses. 46 CFR 181.01-5 (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 March 2024
Resolution: Fire pumps and hoses sat
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 6 March 2024
Resolved
Each vessel certificated to operate on a rivers route within one mile of land is not required to carry survival craft. Vessel is certificated for LBS and limited coast wise route, but does not have any IBAs on board. Restricted to 1 mile of land. Outfit vessel with IBA in accordance with COI.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2024
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 6 March 2024
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be insulated where necessary to prevent injuries. Identified exposed hot surface near wet exhaust flange. Outfit exhaust piping with sufficient insulation. 46 CFR 116.970
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2024
Resolution: insulation sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 6 March 2024
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Identified missing engine mounts on port and center propulsion engine. Outfit engine with missing mount.
46 CFR 119.200
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2024
Resolution: Mounts installed
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 6 March 2024
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(1) Charts of large enough scale to make safe navigation possible... Absence of up-to-date navigational charts of an approved type.
46 CFR 121.420
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2024
Resolution: Charts acquired
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 6 March 2024
Resolved
All vessels of less than 100 GRT—one mate (except vessels on voyages not exceeding 12 hours in duration may, if the OCMI determines it to be safe, be operated without mates). IAW NVIC 1-91 and OCMI discretion, NVIC 1-91 allows for the deletion of the required mate if they have 30 days experience on board the vessel and 30 hours at the helm under supervision of a master or mate amongst other stipulations. USCG MI doubts that any of the newly hired, unlicensed personnel have met all the required and/or recommended training. Operator will provide either documentation of licensure for merchant mariners under employ or evidence that the required training to forego the requirement of a mate has been conducted for the all personnel designated in writing as "Senior Deckhand." Until at least one unlicensed crew member has documented employer training meeting the requirements of NVIC 1-91, this vessel will operate with the following manning:1) 150 or less passengers - 1 Master, 2 Deckhands2) 151 or more passengers - 1 Master, 2 Deckhands, 1 Mate 46 § 15.810(b)(4) - Mates; NVIC 1-91, Enclosure (1)(Part IV) Senior Deckhand
Action required: 705 - Other - as specified
Resolved 21 May 2024
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 6 March 2024
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2024
Resolution: All required documentation was present
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 12 April 2023
Resolved
Proper mark both emergency exits on the main deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 April 2023
Resolved 18 May 2023
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 April 2022
Resolved
install bonding strap on fule fill line at the flex joint to bond the port side proir to using the port side to fill the tank
Action required: 705 - Other - as specified
Due 21 April 2022
Resolved 20 May 2022
Resolution: bonding strap installed
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 21 April 2022
Resolved
Install guards over all rotating parts on all engines in the engine room
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 May 2022
Resolved 20 May 2022
Resolution: Guards installed
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 April 2022
Resolved
replace missing installation and metal in engine room port side aft.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 May 2022
Resolved 20 May 2022
Resolution: Missing overhead insulation replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 April 2022
Resolved
repair leaking salt water head supply line in the engine room port side aft
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 May 2022
Resolved 20 May 2022
Resolution: Leak fixed
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 8 April 2021
Resolved
02 light covers in the main accommodation area found damaged. Renew.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 April 2021
Resolution: Verified repairs to light covers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 April 2021
Resolved
STBD Laz: 02 broken welds found on exhaust. Repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2021
Resolved 13 July 2021
Resolution: Repair completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 April 2021
Resolved
ER: STBD Main Engine missing belt cover. Renew.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 April 2021
Resolution: Verified belt cover was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 April 2021
Resolved
ER: Temperature sensor wires found exposed. Properly secure wires.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 April 2021
Resolution: Verified wires secured.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 8 April 2021
Resolved
Conduct man over board and fire drill to the satisfactory of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 July 2021
Resolution: drills conducted
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 30 April 2019
Resolved
A commercial vessel over 65', self propelled shall have a type A-AIS intalled. 33CFR164
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2019
Resolved 11 June 2019
Resolution: Verified installation and operation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 April 2018
Resolved
Replace retroreflective material on aft deck lifebuoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018
Resolved 31 May 2018
Resolution: repairs satisfactory
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 27 July 2017
Resolved
Remove crank case vent piping from overboard discharge ports (port & Stbd). Blank off both overboard port. Route crank case vents to internal system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 August 2017
Resolved 3 August 2017
Resolution: Pictures received showing satisfactory resolution.
Engineering › Sea-water System (primary cooling) › Piping
Issued 27 July 2017
Resolved
Remove pvc piping from sea water systems in engine room and provide metallic piping.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2017
Resolved 6 March 2018
Resolution: Metallic piping installed.