MAURY USCG vessel records Sign in
← All vessels

MV SWITH-ABIM

MV SWITH-ABIM is a 1986 offshore supply vessel. The Coast Guard has recorded 67 inspections since 1986, most recently in March 2026, along with 54 deficiencies, 2 operational controls and 2 casualty investigations between 2012 and 2013.

Records from 1986 to 2026. Most recent: operational control imposed, 28 April 2026.

Built
1986
Last inspected
20 March 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8701973 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WTT3984
277601
Flag
UNITED STATES
366549000 (licence lapsed)
Maury page id
psix-277601

Inspections, by type

…with no type recorded11
Years with a record 31 calendar years (1986–2026)
The 67 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it1848 - Convention (Subpart B), Gross Ton
499 - Regulatory (Subpart C or D), Gross Ton
554 - Convention (Subpart B), Net Ton
339 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WTT3984MMSI 366549000 · expired · compulsorily equipped · granted 7 September 2007, cancelled 16 December 2017
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 67

20 March 2026 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8329201
28 July 2017 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6223813
5 April 2016 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5876274
10 November 2015 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5764600
6 March 2014 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4810981
26 January 2012 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4232406
24 January 2012 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4230923
15 December 2011 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4209078
11 July 2011 Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4084236
15 September 2010 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3850391
19 February 2010 Re-Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3682688
30 October 2008 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3354346
27 October 2008 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3348738
8 October 2008 Drydock Extension · Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3340739
19 September 2007 COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3061330
12 October 2006 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2798934
12 October 2006 Internal Structural Exam · Hull Examination · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2799036
16 August 2006 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2750260
7 August 2006 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2738612
7 August 2006 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2738729
31 July 2006 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2731693
31 July 2006 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2731740
26 September 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2501575
16 February 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2293926
17 December 2004 MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2261142
3 November 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1979487
21 October 2003 Hull Examination · Re-Inspection · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1932779
17 January 2003 Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1731853
23 September 2002 COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1679035
14 August 2001 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1071148
3 July 2001 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1467773
1 March 2001 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1058126
23 May 2000 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1463591
27 December 1999 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1432292
27 July 1999 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458661
12 August 1998 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1426108
9 June 1998 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1445354
22 July 1997 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1371945
30 December 1996 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1374827
10 June 1996 COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1419626
15 November 1995 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1392340
5 May 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1344107
13 April 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 846396
27 March 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1138725
11 October 1994 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1463134
1 February 1994 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 852025
23 September 1993 Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429801
1 March 1993 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1149163
13 October 1992 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1249396
24 August 1991 Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 935885
23 August 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 939129
6 February 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 931329
5 February 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1238054
18 October 1990 COI Inspection · Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 916538
20 July 1990 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 907104
21 February 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 925476
25 January 1990 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1234763
3 November 1989 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1321756
20 October 1988 Hull Examination · COI Inspection · MARPOL Annex II Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1205094
12 September 1988 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1042617
23 December 1987 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1007925
25 November 1987 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1333738
23 September 1987 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1012230
13 July 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1018482
1 June 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1335472
27 April 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1317006
21 October 1986 Initial Certification
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1323044

Deficiency record · 54

Electrical › Electrical Distribution System (service) › Wiring
Issued 10 November 2015 Resolved
Improper wiring in accommodations (berthing #s 3,4,9,10,11,13.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 November 2015
Resolved 15 November 2015
Resolution: All improper wiring for all rooms indicated above have been removed/corrected.
Operations/Management › Pollution › Compliance with Transfer Procedures
Issued 10 November 2015 Resolved
Missing transfer procedures and diagram at transfer location.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 November 2015
Resolved 15 November 2015
Resolution: Transfer procedures and diagram at transfer location added.
Accommodation/Occupational Safety › Washroom/Toilet › Shower/Bathtub
Issued 15 September 2010 Resolved
Provide P-traps in all gray water drains in accomodation spaces. Putrid fumes are backing up into the berthing/p-ways inside the vessel and poses a sanitation hazard. To be completed and checked at dry dock 2011.
Due 11 July 2011
Resolved 11 July 2011
Stability › Watertight Integrity › General
Issued 15 September 2010 Resolved
Vessel needs to add WTD indicator lights/switches IAW 46/170.270(E) to be installed at dry dock 7/11/2011.
Due 11 July 2011
Resolved 11 July 2011
Engineering › Diesel Engine (propulsion-electric) › Governor
Issued 19 February 2010 Resolved
Prove proper operation of main engine shutdowns on bridge and engine control room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 February 2010
Engineering › Diesel Engine (propulsion-electric)
Issued 21 October 2003 Resolved
Make operable Port Shaft Generator. LEGACY COMPONENT DESC: Port Shaft Generator
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2003
Resolved 28 October 2003
Engineering › Diesel Engine (auxiliary)
Issued 21 October 2003 Resolved
Make operable Stbd Ship's Service Generator. LEGACY COMPONENT DESC: Stbd Ship''s Service Generator
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2003
Resolved 28 October 2003
Communications › Internal Communications System › Sound-powered Telephone
Issued 21 October 2003 Resolved
Make repairs to forward bridge and control room sound powered phones.
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Engineering › Steering Gear System › Rudder
Issued 21 October 2003 Resolved
Adjust stbd rudder tiller to prevent from hitting stops.
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Stability › Watertight Integrity
Issued 21 October 2003 Resolved
Make repairs to wasted area on engine room escape hatch. LEGACY COMPONENT DESC: Watertight Hatches
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2003
Resolved 28 October 2003
Fire Fighting › Firemans Outfit
Issued 21 October 2003 Resolved
Provide missing axe and flashlight for fireman's outfit. LEGACY COMPONENT DESC: Axe
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 21 October 2003 Resolved
Recharge stbd engine room portable dry chemical fire extinguisher.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2003
Resolved 28 October 2003
Navigation › Emergency Steering
Issued 21 October 2003 Resolved
Provide emergency steering instructions to be located at the pilothouse. LEGACY COMPONENT DESC: Emergency Steering Instructions
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Fire Fighting › Ventilation Systems › Ducts
Issued 21 October 2003 Resolved
Make repairs to engine room fire dampers to close properly.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2003
Resolved 28 October 2003
Engineering › Diesel Engine (propulsion-electric)
Issued 21 October 2003 Resolved
Renew the following flexible hoses on the stbd main engine: governor hose and prelube gauge hose. LEGACY COMPONENT DESC: Flexible Hoses
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Engineering › Diesel Engine (propulsion-electric)
Issued 21 October 2003 Resolved
Renew the following flexible hoses on the port main engine: prelube gauge hose; start air supply hose; (2) start air pilot hoses. LEGACY COMPONENT DESC: Flexible Hoses
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Engineering › Diesel Engine (propulsion-electric)
Issued 21 October 2003 Resolved
Renew the following flexible hoses on the center main engine: prelube gauge hose; (1) start air pilot hose. LEGACY COMPONENT DESC: Flexible Hoses
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Engineering › Fuel Oil Service System
Issued 21 October 2003 Resolved
Provide metal plugs for all main engines and generator primary fuel filter bowls. LEGACY COMPONENT DESC: Filter
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Electrical › Mast
Issued 21 October 2003 Resolved
Provide covers for electrical outlets on mast. LEGACY COMPONENT DESC: Electrical Outlets
Action required: 705 - Other - as specified
Due 21 November 2003
Resolved 28 October 2003
Construction/Loadline › Structures › Door
Issued 23 September 2002 Resolved
ADJUST DOGS ON ENGINE ROOM EMERGENCY ESCAPE HATCH, PAINT LOCKER, AND FORWARD FOC'SLE DECK HATCH.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 October 2002
Resolved 24 September 2002
Construction/Loadline › Structures › Door
Issued 23 September 2002 Resolved
REPAIR GASKET FOR STARBOARD GEAR LOCKER NON-TIGHT DOOR.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2002
Resolved 24 September 2002
Construction/Loadline › Structures › Door
Issued 23 September 2002 Resolved
MAKE REPAIRS TO BOTTOM LIP OF PORT MAIN DECK WATER TIGHT DOOR.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 23 October 2002
Resolved 24 September 2002
Lifesaving › Lifebuoys › Stowage
Issued 23 September 2002 Resolved
MAKE LIFEBUOYS WITH LIFE LINES READLY DEPLOYABLE.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 23 October 2002
Resolved 23 September 2002
Navigation › Collision/Grounding Avoidance
Issued 23 September 2002 Resolved
REPAIR PORT RUNNING LIGHT. LEGACY COMPONENT DESC: Navigation Lights
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 October 2002
Resolved 24 September 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 23 September 2002 Resolved
REPAIR MAIN ENGINE REMOTE SHUT DOWNS. LEGACY COMPONENT DESC: REMOTE SHUT DOWNS
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2002
Resolved 13 January 2003
Communications › Alarms/Indicators
Issued 23 September 2002 Resolved
REPAIR FORWARD PASSAGEWAY AND RUDDER ROOM BILGE ALARMS. LEGACY COMPONENT DESC: Bilge Alarm
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 October 2002
Resolved 13 January 2003
Engineering › Steering Gear System
Issued 23 September 2002 Resolved
ADJUST LIMIT SWITCH ON PORT INBOARD RUDDER TO STOP BEFORE STRIKING RUDDER STOP. LEGACY COMPONENT DESC: Valve, Control
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 October 2002
Resolved 24 September 2002
Engineering › Compressed Air System (start air)
Issued 23 September 2002 Resolved
DEMONSTRATE PROPER OPERATION OF AIR RECEIVER RELIEF VALVE. LEGACY COMPONENT DESC: Receiver/Bottle
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 October 2002
Resolved 13 January 2003
Communications › Internal Communications System
Issued 23 September 2002 Resolved
DEMONSTRATE PROPER OPERATION OF SOUND POWER PHONE VISUAL INDICATOR ON THE FINIAL POWER SOURSE. LEGACY COMPONENT DESC: Sound-powered Telephone
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 23 October 2002
Resolved 13 January 2003
Electrical › Electric Generation Source (service)
Issued 23 September 2002 Resolved
INSTALL MISSING PORT SHAFT GENERATOR AND TEST REVERSE POWER RELAY.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 October 2002
Resolved 13 January 2003
Construction/Loadline › Hull
Issued 23 September 2002 Resolved
PROVIDE APPROVED PLANS FOR STEERING AND STRUCTURAL MODIFICATIONS. LEGACY COMPONENT DESC: PLANS
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 October 2002
Resolved 28 October 2003
Resolution: Cleared by ABS letter dated 31 OCT 2002 and CG letter dated 28 FEB 2003.
Lifesaving
Issued 27 July 1999 Resolved
DEMONSTRATE COMPLIANCE WITH 8TH COAST GUARD DISTRICT POLICY FOR RESCUE BOATREQUIREMENTS ON OFFSHORE SUPPLY VESSELS DATED 12 NOV 98 TO THE SATISFACTIONOF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 27 July 1999
Resolved 27 July 1999
Engineering
Issued 27 July 1999 Resolved
DEMONSTRATE OPERATION OF VESSELS SYSTEMS AUTOMATION CONTROLS AND MONITORINGSYSTEM IN ACCORDANCE WITH 46 CFR 61.40-1 TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 27 July 1999
Resolved 27 July 1999
Engineering
Issued 10 June 1996 Resolved
DOCK VESSEL TO PULL CENTER AND STARBOARD SHAFTS FOR EXAMINATION AND CREDIT.
Condition: Unknown
Due 10 June 1996
Resolved 10 June 1996
Engineering
Issued 11 October 1994 Resolved
REPLACE BULB FOR ENGINEROOM AUTOMATION ROTATING YELLOW LIGHT FOR ALARM.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Lifesaving
Issued 11 October 1994 Resolved
PROVIDE ONE MISSING PROJECTILE FOR LINE THROWING GUN.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Navigation
Issued 11 October 1994 Resolved
DETERMINE CAUSE OF WATER LEAK FROM PORT RUDDER POST AND TAKE NECESSARY ACTION TO CORRECT LEAK TO THE SATISFACTION OF U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Engineering
Issued 11 October 1994 Resolved
PROVIDE GUARD SCREEN AROUND AIR COMPRESSOR FOR STARBOARD START AIR RECEIVERIN THE ENGINEROOM.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Navigation
Issued 11 October 1994 Resolved
PROVIDE UPDATED COAST PILOT, LIGHT LIST, TIDE AND CURRENT TABLES, CFR'S ANDCHARTS.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Electrical
Issued 23 September 1993 Resolved
REPAIR AND PROVE PROPER OPERATION OF FORWARD S/S GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 23 September 1993
Resolved 23 September 1993
Engineering
Issued 23 September 1993 Resolved
REPAIR AND PROVE PROPER OPERATION OF STARBOARD MAIN ENGINE REMOTE SHUTDOWN SOLINOID.
Condition: Unknown
Due 23 September 1993
Resolved 23 September 1993
Navigation
Issued 23 September 1993 Resolved
RENEW IMPROPER NAVIGATION LIGHTS (SCREW BASE BULBS) WITH PROPER COAST GUARD/UL 1104 APPROVED LIGHTS.
Condition: Unknown
Due 23 September 1993
Resolved 23 September 1993
Accommodation/Occupational Safety
Issued 23 September 1993 Resolved
RENEW HOT WATER HEATER PRESSURE/TEMPERTURE RELIEF VALVE WITH PROPER ASME 100 PSI/200 DEG. TYPE VALVE ON BOTH HOT WATER HEATERS.
Condition: Unknown
Due 23 September 1993
Resolved 23 September 1993
Deck/Cargo
Issued 13 October 1992 Resolved
CLEAN AND MAKE GAS/DUST FREE ALL INTEGRAL CARGO TANKS (P-TANKS) FOR INTERNAL INSPECTION AT NEXT DRYDOCK.
Condition: Unknown
Due 13 October 1992
Resolved 13 October 1992
Engineering
Issued 13 October 1992 Resolved
INSTALL ASME APPROVED PRESS RELIEF VALVES ON ALL (3) S/S AIR RECEIVERS IN ENGINE ROOM. MASTER TO ENSURE TEST ARE CONDUCTED AND LOGGED IN VESSEL LOG AND COPY FAXED TO [name withheld]._x001C_ _x001C_
Condition: Unknown
Due 13 October 1992
Resolved 13 October 1992
Lifesaving
Issued 13 October 1992 Resolved
PROVE PROPER OPERATION OF #2 S/S GEN. AND PROPER OPERATION OF OVERSPEED TRIPS AND ALL ALARMS ON BOTH S/S GENS. MASTER TO INSURE TEST ARE CONDUCTEDAND LOGGED IN VESSEL LOG AND FAXED TO [name withheld].
Condition: Unknown
Due 13 October 1992
Resolved 13 October 1992
Engineering
Issued 13 October 1992 Resolved
PROVE PROPER OPERATION OF CPV AND AUTOMATION SYSTEM. MASTER TO INSURE ALL TESTS ARE CONDUCTED AND LOGGED IN VESSEL LOG AND COPY FAXED TO [name withheld].
Condition: Unknown
Due 13 October 1992
Resolved 13 October 1992
Engineering
Issued 18 October 1990 Resolved
PROVIDE PROPER RELIEF VALVES WITH POPPING PRESSURE OF 200 PSI OR LESS FOR ALL THREE S/S AIR RECIEVERS.
Condition: Unknown
Due 18 October 1990
Resolved 18 October 1990
Documentation
Issued 18 October 1990 Resolved
PROVIDE FCC SAFETY RADIO TELEPHONE CERTIFICATE AND PROPER FCC STATION_x001C_ LICENSE AS REQUIRED BY FCC RULES.
Condition: Unknown
Due 18 October 1990
Resolved 18 October 1990
Electrical
Issued 18 October 1990 Resolved
PROVIDE TEST OF OVERSPEED TRIPS AND REVERSE POWER RELAY FOR BOTH S/S GENERATORS.
Condition: Unknown
Due 18 October 1990
Resolved 18 October 1990
Construction/Loadline
Issued 18 October 1990 Resolved
PROVIDE FIXED 1/2 BARREL CONTAINMENT UNDER ALL FUEL OIL AND LUBE OIL VENTS AS REQUIRED BY 33 CFR 155.20.
Condition: Unknown
Due 18 October 1990
Resolved 18 October 1990
Fire Fighting
Issued 25 January 1990 Resolved
SUBMIT PLANS OF THE FIXED CO2 SYSTEM IN MACHINERY SPACE TO [name withheld].
Condition: Unknown
Due 25 January 1990
Resolved 25 January 1990
Fire Fighting
Issued 25 November 1987 Resolved
PROVIDE APPROVED PLANS/CALCULATIONS FOR ENGINE ROOM CO2 SYSTEM.
Condition: Unknown
Due 25 November 1987
Resolved 25 November 1987
Electrical
Issued 21 October 1986 Resolved
SATISFY ANY OUTSTANDING COMMENTS ON ELECTRICAL PLANS AS REVIEWED BY COAST GUARD REGULATIONS.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986

Casualty record · 2

24 January 2012Routine · role: Involved in a Marine Casualty · activity 4230923
12 June 2013Routine · role: Involved in a Marine Casualty · activity 4625928
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

DAMON CHOUEST (2012–2013). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.