Records from 2016 to 2026. Most recent: inspection, 24 June 2026.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 24 June 2026
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. The COD on board the vessel had expired in January of 2026. Provide proof of valid COD to the satisfaction of MI.
46CFR67.313(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2026
Resolution: Valid COD has been received and on board
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 24 June 2026
Resolved
Vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry six red hand distress signals and six hand orange smoke distress signals. Vessel was missing 03 distress signals. Provide proof of 12 required distress signals to satisfaction of MI.
46CFR180.68
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2026
Resolved 8 July 2026
Resolution: 03 additional distress signals were purchased and onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 24 June 2026
Resolved
Glass and other glazing material used in windows accessible to passengers and crew must be of material that will not break into dangerous fragments if fractured. Port side window in cabin had multiple cracks. Replace window to the satisfaction of MI.
46CFR177.1010
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2026
Resolved 8 July 2026
Resolution: window was replaced to satisfaction of MI
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 25 June 2025
Resolved
Sidelights mean a green light on the starboard side and a red light on the port side.... Vessels port side navigation light was inoperable. Replace port nav light to satisfaction of attending marine inspector. Vessel is restricted to daylight operation until new nav light is installed.
33 CFR 83.21(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2025
Resolved 27 June 2025
Resolution: Verified corrections
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2025
Resolved
At least one ring life buoy must be fitted with a lifeline. Vessels ring life buoy did not have a lifeline attached. Attach lifeline to the satisfaction of attending marine inspector.
46 CFR 180.70(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2025
Resolved 21 July 2025
Resolution: Verified def correction
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2025
Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 3 feet in length, but not more than 6 feet, securing the waterlight around the body of the ring life buoy. Vessels waterlight was unable to be attached around the body of the life buoy. Replace with a lanyard which can attach around the body of the life buoy to the satisfaction of attending marine inspector.
46 CFR 180.70(d)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2025
Resolved 21 July 2025
Resolution: Verified def correction
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 June 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Vessels stereo and television system on the bridge had multiple exposed wires. Remove any unused wires and correct any exposed wires to the satisfaction of the attending marine inspector.
46 CFR 183.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2025
Resolved 21 July 2025
Resolution: Verified def correction
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 June 2025
Resolved
The EPIRB test shall be logged or otherwise documented, as applicable. Vessel did not have logs of monthly testing of EPIRB. Log monthly test of EPIRB in logbook.
46 CFR 185.728(c)
Action required: 10 - Deficiency Rectified
Due 9 July 2025
Resolved 25 June 2025
Resolution: EPIRB test was complete and logged during inspection
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 June 2025
Resolved
Crew training shall be logged or otherwise documented for review by the Coast Guard upon request. The training entry shall include the following information.(1) Date of the training; and(2) General description of the training topics. Vessel did not have logs of any drills conducted. Log all trainings in accordance with 46 CFR 185.420.
46 CFR 185.420(d)
Action required: 10 - Deficiency Rectified
Due 9 July 2025
Resolved 25 June 2025
Resolution: Drill were conducted and logged during inspection
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 July 2024
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. All visual indicators were inoperable for the automatic operation of the bilge pumps. Arrange all bilge pumps to make a visual indications at the operating station upon automatic operation. 46 CFR 182.530(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2024
Resolved 28 August 2024
Resolution: vsl installed indicator light for the auto bigle pumps.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 10 July 2024
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”. The secondary emergency exit located the forward port window on the main deck was not suitably marked on both sides of the exit. Suitably mark all emergency exits on both sides of the exit. 46 CFR 185.606
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2024
Resolved 29 July 2024
Resolution: Received photographic evidence of emergency exit label attatched.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 July 2024
Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the waterlight around the body of the ring life buoy. The waterlight lanyard was less than 3 feet long for the lifebuoy. Replace waterlight lanyard with a lanyard of suitable length.46 CFR 180.70(d)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2024
Resolved 11 July 2024
Resolution: Floating Water light lanyard of sufficient length was installed the body of the life ring during inspection.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 10 July 2024
Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. The hydrostatic release for the EPIRB was found unmarked and confirmed to be expired. Replace hydrostatic release with a serviceable unit. 46 CFR 185.740(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2024
Resolved 11 July 2024
Resolution: Hydrostatic release was installed during inspection.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 July 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. Vessel had 3 first aid kits on board, none of which met the appropriate requirements. Replace first aid kit, or replace required items as appropriate.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2023
Resolved 6 July 2023
Resolution: Recieved pictures and verification that the appropriate First Aid kit was purchased and replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 July 2023
Resolved
Electrical installations shall be installed as to be reasonably safe from fire or shock to personnel. 01 blank slot on a distribution panel on the starboard bulkhead of the wheelhouse was open. 110 volt electrical panel in engine room is not labeled. Label,cover or replace as appropriate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 July 2023
Resolved 21 July 2023
Resolution: recieved picture verification that deficiencies had been rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 July 2023
Resolved
Vessel shall be equipped with adequate steering arrangements. Starboard side bolt attaching the rudder post to the steering piston is rubbing on a longitudinal, creating a groove and wearing through both FRP and Wood. Submit plans for repair of both rudder post and damaged longitudinal prior to implementation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2023
Resolved 9 August 2023
Resolution: repaired
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 May 2022
Resolved
A penetration in a watertight bulkhead must be made
watertight. The bilge suction line that penetrates the
watertight bulkhead from the lazarette to the tank space
is not watertight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2022
Resolution: Vessel provided pictures of the repair to make bulkhead penetration watertight.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 May 2022
Resolved
Machinery must be suitable in type and design for which
it is installed and capable of operating at constant
marine load. Identified a small ingress of water leaking
up through the port and starboard rudder posts while
underway.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2022
Resolved 1 June 2022
Resolution: Rudder post seal were adjusted and repacked
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 May 2022
Resolved
A vessel not required to have a power-driven fire pump
must have three 2 1/2 gallon fire buckets. Vessel only
provided one fire bucket of required size.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2022
Resolved 1 June 2022
Resolution: Fire buckets replaced
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 16 May 2022
Resolved
Arrangement of a vessel must provide for safe operation
of the vessel. The starboard running light was
obstructed by an antennae.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2022
Resolved 1 June 2022
Resolution: Antennae was moved.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 23 March 2022
Resolved
Anchor line deck pipe covers for FWD peak are missing, reducing watertight integrity for the space. 46CFR176.25-50 "Old T"
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 April 2022
Resolved 16 May 2022
Resolution: Anchor line deck covers installed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 23 March 2022
Resolved
Vessel operates on oceans route and is required to have life floats that will accommodate at least 100% of the total persons permitted on board. One of the 22 person life floats is degraded and needs significant repairs. Complete approved repairs on the life float to satisfaction of the Marine Inspector, while awaiting the delivery of a new 22 person life float. Maximum persons allowed on board reduced to 22 persons. 46CFR180.202(a)(2)
Action required: 705 - Other - as specified
Due 23 March 2022
Resolved 16 May 2022
Resolution: Satisfactory 22 person life float installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 July 2021
Resolved
A vessel must carry one floating waterlight attached by lanyard to the ring buoy and life floats. The batteries for all waterlights were expired. Replace the waterlight batteries with unexpired batteries.
Action required: 10 - Deficiency Rectified
Due 5 August 2021
Resolved 21 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 July 2021
Resolved
Each PFD carried on a vessel must have Type I retro-reflective material that is approved under sub part 164.018 of this chapter. The retro-reflective material on (2) adult PFDs was no longer reflective. Replace worn retro-reflective material on (2) adult PFDs.
CITE: 46 CFR §25.25
Action required: 10 - Deficiency Rectified
Due 5 August 2021
Resolved 21 July 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 July 2021
Resolved
Hoses clamps attached to the fuel tank must be secured by proper fittings; double hose clamping is required if clamps are the method used. Only one clamp is holding the fuel vent hose to the top of the fuel tank. Install double hose clamps on fuel vent hose to top of fuel tank.
CITE: 46 CFR §182.435
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 August 2021
Resolved 16 May 2022
Resolution: Verified proper hose clamps on fuel vent
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 July 2021
Resolved
Extensions cords are not to be used to power permanently installed equipment. The TV and refrigerator in the
pilot hose are powered by an extension cord. Remove the
cord and properly wire these devices.
CITE: 46 CFR §176.830
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 August 2021
Resolved 16 May 2022
Resolution: Extension cords removed and new outlets installed for fridge and tv.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 21 July 2021
Resolved
Watertight doors must have an indicator light at the operating station showing whether the door is open or closed. The light at the operating station was inop. Repair/replace the WTD indicator light.
CITE: 46 CFR §179.330(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2021
Resolved 16 May 2022
Resolution: WTD indicating light replaced and working
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 July 2021
Resolved
Melted/burned outlets present an undue safety risk. The outlet on the bridge next to the help was melted and with scorch marks. Replace the damaged outlet.
CITE: 46 CFR §176.830
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 August 2021
Resolved 16 May 2022
Resolution: Damaged outlet replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 21 July 2021
Resolved
Life floats must be in serviceable condition. The cover of the oldest lifefloat has been repaired numerous times and now shows signs of further degradation. The lifefloat will need to be replaced at the end of this season.
CITE: 46 CFR §180.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 August 2021
Resolved 23 March 2022
Resolution: Refer to activity #7416766
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 25 August 2020
Resolved
The hyrdostatic release for the vessel's EPIRB was expired. Vessel is restricted to 03 NM until unit is replaced.
Action required: 705 - Other - as specified
Due 25 August 2020
Resolved 25 August 2020
Resolution: Vessel was able to purchase and replace hydrostatic release unit prior to the completeion of the exam.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 25 August 2020
Resolved
The last documented test of the EPIRB was in May 2020. EPIRB tests are required to be done monthly, and documented.
Action required: 10 - Deficiency Rectified
Due 25 August 2020
Resolved 25 August 2020
Resolution: O/O conducted an EPIRB test in the presence of MI's and documented the test in his logbook.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 August 2020
Resolved
Vessel did not have sufficient documentation to show that the marine employer had an established chemical testing program, or that vessel crew members were currently enrolled in a consortium to conduct the chemical testing required.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2020
Resolved 25 August 2020
Resolution: O/O was able to get an email confirmation letter from vessel consortium to prove that vessel is currently enrolled.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 25 August 2020
Resolved
Vessel had expired alcohol testing equipment on board and conducts operations outside of the two hour testing requirement. Provide valid alcohol tests.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2020
Resolved 25 August 2020
Resolution: O/O was able to purchase the required testing equipment and replace expired tests prior to the completion of the exam.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 26 August 2019
Resolved
Seal bulkhead penetrations between the engine room and accommodation space with fire resistant material. - 46 CFR 181.410(f)(4)(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2019
Resolved 5 November 2019
Resolution: Received photographs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 August 2019
Resolved
Provide a cover for the 110V breaker box, in the accommodation/sewage tank space. - 46 CFR 183.10-10(a) Old T
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2019
Resolved 5 November 2019
Resolution: Received photographs.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 26 August 2019
Resolved
Replace or repair gaskets on the two stern watertight hatches. - 46 CFR 171.124 Old S
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2019
Resolved 5 November 2019
Resolution: Received photographs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 August 2019
Resolved
Bolt down or otherwise secure the battery installations for the generators. - 46 CFR 183.05-20 (b) Old T
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2019
Resolved 5 November 2019
Resolution: Received photographs.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 29 August 2018
Resolved
Install a smoke detector in the main and lower accommodation space that meets UL 217.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 13 September 2018
Resolution: The owner installed the required smoke detector.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 29 August 2018
Resolved
Prove that emergency lighting in the accommodation space below deck automatically actuates upon failure of the main lighting system.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 13 September 2018
Resolution: The owner installed the required emergency lighting.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 29 August 2018
Resolved
Install a general alarm in overnight accommodation spaces. The public address system required by 184.610 of this chapter may be sued to sound the general alarm.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 13 September 2018
Resolution: The owner installed a PA system which also had a general alrarm on it.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 28 August 2018
Resolved
Repair or replace life float on top of the pilot house IAW manufactures instructions.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 24 September 2018
Resolution: The owner made repairs to the life float on top of the pilot house. At our last conversation he mentioned he intended to replace it before the next operating season. Before and after photos have been added to this activity.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 28 August 2018
Resolved
Repair or replace water light on forward life float.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 13 September 2018
Resolution: The owner replaced the waterlight.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 28 August 2018
Resolved
Update emergency instruction to include current procedures and heavy weather instructions
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 13 September 2018
Resolution: The owner updated the emergency procedures to reflect what was being done during operations.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 28 August 2018
Resolved
Tighten packing on starboard rudder post.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 13 September 2018
Resolution: The owner tightened the packing on his rudder post.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 August 2018
Resolved
Repair or replace light fixture in accommodation space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 28 August 2018
Resolution: Master repaired the light fixture.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 August 2018
Resolved
Replace 01 life jackets, passenger count is reduced to 46 until its onboard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 28 August 2018
Resolution: Master procured a new life jacket and provided photos of it to the attending inspector.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 28 August 2018
Resolved
Install PA (public address) system in accommodation space.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2018
Resolved 13 September 2018
Resolution: The PA system was attached to the speakers inside the cabin. It was sufficient for it's intended purpose.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 31 May 2017
Resolved
Provide FCC Safety Cert which accounts for MF installation.
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 3 July 2017
Resolution: Received e-mail in photo with updated cert
Lifesaving › Lifefloat › Serviceable
Issued 31 May 2017
Resolved
Make repairs to lifefloat above operating station in accordance with manufacturer's instructions.
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 3 July 2017
Resolution: Received e-mail with photos of the repairs life float.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 31 May 2017
Resolved
Conduct annual drug/alcohol training with all crewmembers.
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 3 July 2017
Resolution: Received e-mail with photo of vessel's log of training.
Engineering › Fuel Oil Service System › Piping
Issued 31 May 2017
Resolved
Repair leaks on fuel piping in way of center fuel tank.
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 3 July 2017
Resolution: Received e-mail with report from Ocean Power which change out the leaking piping with flex hose.
Construction/Loadline › Structures › Deck Plating
Issued 31 May 2017
Resolved
Make repairs to delaminated deck, port side aft, in way of freeing port. Area must be made available for inspection after grinded and a repair plan submitted.
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 27 November 2019
Resolution: Emailed the O/O. Found the deficiency was rectified during the last drydock. Administratively cleared the deficiency.
Lifesaving › Lifefloat › Serviceable
Issued 4 August 2016
Resolved
KG01: Repair lifefloat on upper deck IAW manufacturer instructions. 46 CFR 180.200(c). Restricted to 22 total persons on oceans route & 44 total persons on limited coastwise route.
Action required: 705 - Other - as specified
Resolved 23 August 2016
Resolution: Received email detailing repairs down to lifefloat including pictures.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 4 August 2016
Resolved
Repair or replace lifelines on ring bouy and ring buoy material. 46 CFR 180.70(a)(2). Corrected on the spot
Action required: 705 - Other - as specified
Resolved 4 August 2016
Resolution: Corrected on the spot
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 4 August 2016
Resolved
KG03: Replace 9 lifejackets and 2 child lifejackets. 46 CFR 180.71. Restricted to 40 persons on limited coastwise route and restricted to 22 persons on oceans route.
Action required: 705 - Other - as specified
Resolved 23 August 2016
Resolution: Replaced lifejackets.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 4 August 2016
Resolved
KG04: Retain copy of US Coast Pilot onboard to most current edition. 46 CFR 184.420. Due 18AUG16.
Action required: 705 - Other - as specified
Due 18 August 2016
Resolved 23 August 2016
Resolution: Purchased new copy.
Documentation › Certificates/Documents › FCC SSL
Issued 4 August 2016
Resolved
Master of vessel must obtain radio perator permit. 47 CFR 80.159(e) Due 04SEP16.
Action required: 705 - Other - as specified
Due 4 September 2016
Resolved 23 May 2017
Resolution: Vessel operator rarely operates the vessel and is enrolled in the course to get the permit. He will email once the permit is obtained.
Electrical › Electrical Distribution System (service) › Switch
Issued 4 August 2016
Resolved
Replace switch cover on A/C switch. 46 CFR 183.200(c). Due 18 AUG 2016
Action required: 705 - Other - as specified
Due 18 August 2016
Resolved 23 August 2016
Resolution: Replaced cover
Engineering › Fuel Oil Service System › Filter
Issued 4 August 2016
Resolved
Replace racor flame shield under stbd generator racor filter. 46 CFR 182.455(b)(6). Due 18 AUG 2016.
Action required: 705 - Other - as specified
Due 18 August 2016
Resolved 23 August 2016
Resolution: Replaced shield
Construction/Loadline › Penetrations › Gasket
Issued 4 August 2016
Resolved
KG08: Repair or replace gasket material on hatches to tank and lazarette compartments to make watertight. 46 CFR 179.360. Due 18 AUG 2016.
Action required: 705 - Other - as specified
Due 18 August 2016
Resolved 23 August 2016
Resolution: Made hatches watertight