MAURY USCG vessel records
← All vessels

CAROLINE

Built
1987
Last inspected
12 February 2025
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 12 February 2025
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCY5169
278548
Flag
UNITED STATES
Maury page id
psix-278548

Documentation record

Registered dimensions (L × B × D)50.0 ft × 15.8 ft × 7.6 ft
Registered tonnagegross 40 / net 32
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDELTA MARINE INDUSTRIES · SEATTLE, WA, UNITED STATES · built 1987
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portMONTEREY, CA
Endorsements, as the file codes themcw_un, fi, reg
DocumentationValid · issued 20 March 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it40 - Simplified, Gross Ton
32 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 18 inspections, each with its date, unit and type; 69 deficiencies with the resolution recorded against each, 1 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 18

12 February 2025 Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8069249
26 February 2024 Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7862018
29 January 2024 Drydock Exam · Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7855811
26 January 2023 Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7620623
23 December 2022 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7612393
25 January 2022 Deficiency Check · Internal Structural Exam · Hull Examination · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7383838
4 January 2022 Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7375449
12 February 2021 Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7140139
20 March 2020 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6931105
20 March 2020 Simplified Stability Test · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6931559
17 January 2020 Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6891556
17 January 2020 Administrative Inspection · Plan Review "T" Boat
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6891600
7 January 2019 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6600813
12 March 2018 Administrative Inspection · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6370260
5 March 2018 DAPI Audit · COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6364345
7 February 2017 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6082022
3 February 2016 Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5808705
11 January 2016 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5795031

Deficiency record · 69

01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 February 2025 Resolved
The owner or operator must conduct all tests as required by the OCMI, and make the vessel available for all specific inspections and drills required by subpart H of this part. In addition, the OCMI may require the vessel to get underway. Vessel was unable to get underway to test operation of the main propulsion machinery or man overboard and fire drills during annual inspection due to starboard engine inoperability. Conduct drills in presence of MI.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2025
Resolved 13 March 2025
Resolution: Got underway with crew and witnessed engines operating.
05 - Radio Communications › N/A - No Subsystem › MF Radio installation
Issued 12 February 2025 No resolution recorded
Vessels operated beyond the 20 nautical mile limitation specified in paragraph (a)(1) of this section, but not more than 100 nautical miles from the nearest land, must be equipped with a MF-DSC frequency transmitter. Vessel does not have an operable SSB or SAT phone onboard. Vessel route restricted to within 20NM of land until required radio equipment is onboard.
Condition: Improper Installation
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 February 2025 Resolved
Each door, hatch, or scuttle, used as a means of escape, must be capable of being opened by one person, from either side. Forward escape hatch was unable to be opened from the outside. Replace escape hatch.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2025
Resolved 13 March 2025
Resolution: Operator installed new escape hatch that is operable from both sides.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 12 February 2025 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2025
Resolved 13 March 2025
Resolution: Observed EAP poster posted onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 February 2025 Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Vessel is not equipped with a bilge pump visual indicator. Install visual indicator.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2025
Resolved 21 March 2025
Resolution: Visual indicator installed.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 12 February 2025 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Vessel's anchor light is inop. Replace anchor light.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2025
Resolved 13 March 2025
Resolution: Verified anchor light operable.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 12 February 2025 Resolved
Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Vessel's name on lifering and lifefloat paddle is faded. Write vessel's name on life r ring and paddle.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2025
Resolved 13 March 2025
Resolution: Verified vessel name written on paddles and lifering.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 12 February 2025 Resolved
A hatch exposed to the weather must be watertight. Engine room hatch cover seal is deteriorated. Replace and/or repair seal.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2025
Resolved 13 March 2025
Resolution: Verified repairs to engine room hatch seal.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 24 March 2024 Resolved
A hatch exposed to the weather must be watertight. Port and starboard fuel shutoff valves are located on aft weatherdeck in a sealed bowl enclosure. Both enclosures are allowing deck water in which is seeping into the engine room.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2024
Resolved 14 May 2024
Resolution: New caps were placed on deck level satisfactorily preventing further water intrusion
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 February 2024 Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). A second power pump is an acceptable alternative to a hand pump if it is supplied by a source of power independent of the first power bilge pump. Individual power pumps used for separate spaces are to be controlled from a central control point and must have a light or other visual means at the control point to indicate operation. Bilge pumping arrangements failed to actuate on initial and multiple subsequent attempts, bilge piping was found disconnected to lazarette and suction in engine room was clogged with debris.
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Due 11 March 2024
Resolved 26 February 2024
Resolution: Corrected during exam. Piping in the laz was connected and debris from engine room was removed. Suction was optained in each area.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 26 February 2024 Resolved
A hatch exposed to the weather must be watertight. The latching mechanism seal of the watertight hatch to the lazarette allows passage of water.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified watertight integrity of hatch with spray test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 February 2024 Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each normally unmanned space. High level alarm panel not connected, high level alarms not providing audible or visual signals to bridge.
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified operation of high level alarm in all spaces.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 February 2024 Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Port side tail shaft bolts are not tightened completely.
Condition: Design Flaw
Action required: 60 - Rectify deficiencies prior to movement
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified bolts properly secured.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 26 February 2024 Resolved
Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. Records of drills provided to Coast Guard were minimal and non descriptive. No drill records were available for significant time periods.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Vessel unable to complete drills due to being no sailed. Reviewed new log prepared to capture all required drills in the future.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 February 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. There are unterminated wires in the forward compartment, as well as disconnected grounding cables for the anode in lazarette.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 14 May 2024
Resolution: grounding wires reconnected
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 26 February 2024 Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. There is a pinhole opening in the watertight bulkhead between the engine room and the lazarette.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified closure of pinhole.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 February 2024 Resolved
A pre-engineered fixed gas fire extinguishing system must have a means to reset devices used to automatically shut down ventilation systems and engines as required by paragraph (a)(3) of this section. Main engines could not actuate despite Fireboy override enabled. After troubleshooting discovered fireboy override connection was disconnected.
Condition: Design Flaw
Action required: 30 - Ship detained
Due 11 March 2024
Resolved 26 February 2024
Resolution: Corrected during exam. Wires to fireboy control panel were found to be disconnected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 February 2024 Resolved
A bilge pipe in a vessel of not more than 19.8 meters (65 feet) in length must be not less than 25 millimeters (1 inch) nominal pipe size. A bilge pipe in a vessel of more than 19.8 meters (65 feet) in length must be not less than 40 millimeters (1.5 inches) nominal pipe size. A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Engine room bilge suction filled with debris and missing strainer.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified operation of e/r bilge system and strainer.
05 - Radio Communications › N/A - No Subsystem › Distress messages: obligations and procedures
Issued 26 February 2024 Resolved
Vessels subject to part III of title III of the Communications Act that operate in the waters described in § 80.901 must, at a minimum, be equipped as follows: (1) Vessels operated solely within 20 nautical miles of land must be equipped with a VHF–DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2), except that a VHF radiotelephone installation without DSC capability is permitted until one year after the Coast Guard notifies the Commission that shore-based sea area A1 coverage is established. Vessels in this category must not operate more than 20 nautical miles from land. Vessel’s VHF Radio is not equipped with MMSI or GPS positioning to meet DSC signaling requirements. 47 CFR 80.905(a)(1)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified MMSI/DSC capability.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 26 February 2024 Resolved
A vessel with installed toilet facilities must have a marine sanitation device that complies with 33 CFR part 159. No person may operate any vessel equipped with installed toilet facilities unless it is equipped with: An operable Type II or III device that has a label on it under § 159.16 or that is certified under § 159.12 or § 159.12a; or An operable Type I device that has a label on it under § 159.16 or that is certified under § 159.12, if the vessel is 19.7 meters (65 feet) or less in length. Vessels toilets are not connected to marine sanitation device.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified plumbing for toilets connected.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 26 February 2024 Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Vessel has a detached, too short, unused shifter cable in engine space that is planned for removal.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified cable removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 February 2024 Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. Port side wet exhaust is leaking minimal water and exhaust support structure on starboard side has deteriorated significantly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified no leakage on port exhaust and new support for starboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 February 2024 Resolved
A suitable metal marine type strainer, meeting the requirements of the engine manufacturer, must be fitted in the fuel supply line in the engine compartment. Starboard Racor filter is in extremely poor condition, as well as couplings leading to both starboard and port RACOR filters.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified replacement of both filters and associated fuel piping.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 26 February 2024 Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Electric solenoid valves must not be used, unless used in addition to the manual valve. Port and Starboard fuel lines are corroded around the fuel shut offs.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified replacement of fuel lines.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 February 2024 Resolved
The owner or managing operator of a vessel shall ensure that the vessel complies with the laws and regulations applicable to the vessel and that the vessel is otherwise satisfactory for the intended service. Life Float mounting brackets are cracked at the base and allowing water intrusion into deck house.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2024
Resolved 24 March 2024
Resolution: Wasted brackets removed and new brackets installed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 26 February 2024 Resolved
For a life float—Approved under approval series 160.027 or other standard specified by the Commandant. Forward 15-person life float has broken line attachments. Aft 15-person life float has broken attachments, separation, deterioration and discoloration of cover.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 March 2024
Resolved 24 March 2024
Resolution: Verified repairs to life float.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 26 January 2023 Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Electric solenoid valves must not be used, unless used in addition to the manual valve. Port fuel shutoff valve coming from main deck is connected via a reach rod and is showing signs of breaking. Replace reach rod.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Replaced reach rod. Conducted satisfactory operational test of PORT fuel shutoff.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 26 January 2023 Resolved
The lights prescribed in these Rules (Subpart C) shall have an intensity as specified in Annex I to these Rules (33 CFR part 84), so as to be visible at the following minimum ranges: (b) In a vessel of 12 meters or more in length: (i) A masthead light, 5 miles; except that where the length of the vesell is lass than 20 meters, 3 miles; (ii) A sidelight, 2 miles; (iii) A sternlight, 2 miles. Navigation light covers for the following lights found worn to the point where visibility is reduced: port sidelight, masthead, and stern. Replace covers for lights.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Covers replaced. Operational check of Navigational Lights satisfactory.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 26 January 2023 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. Vessel's first-aid kit contained multiple expired items. Discard expired items and provide a first-aid kit where all items are in serviceable condition.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Provided servicible, valid, approved first-aid kit.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 26 January 2023 Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radiobeacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. NOAA EPIRB registration paperwork was not available for inspection. Provide copy of current NOAA EPIRB registration.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Provided copy of NOAA EPIRB Registration.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 January 2023 Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. Where flexibility is necessary, a section of flexible metallic hose may be used. Nonmetallic hose may be used for wet exhaust systems provided it is especially adapted to resist the action of oil, acid, and heat, has a wall thickness sufficient to prevent collapsing or panting, and is double clamped where practicable. Port engine exhaust has slow leak near muffler and supports in engine room are wasted. STBD engine exhaust has extensive salt build-up in several locations indicating a leak is present. Repair both exhausts to ensure no leakage and properly supported.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Extensive salt build-up removed. Satisfactory operational check conducted with engines running indicating no current leaks of wet exhausts. Exhaust supports were cleaned of surface corrosion and secured to provide satisfactory proper support.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 January 2023 Resolved
Each lighting fixture globe, lens, or diffuser must have a guard or be made of high strength material, except in an accommodation space, radio room, galley, or similar space where it is not subject to damage. Several lights through engine room, heads, and sewage void did not have proper guards. Ensure all lights on vessel have proper guards.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Installed adequate guards on all exposed lighting listed.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 26 January 2023 Resolved
At each inspection for certification and at every other vessel inspection, quarters, toilet and washing spaces, galleys, serving pantries, lockers, and similar spaces may be examined to determine that they are serviceable and in a sanitary condition. Sewage void had multiple hoses connected to the sewage system that were no longer sufficiently connected with clamps. Ensure all sewage system connections are secure.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Connections in sewage void secured with double hose clamps. All connections secure.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 26 January 2023 Resolved
Each window, port hole, and its means of attachment to the hull or deck house, must be capable of withstanding the maximum load from wave and wind conditions expected due to its location on the vessel and the authorized route of the vessel. 3 of vessels port light covers are missing fasteners to provide proper weather-tight closure. Provide means to properly close covers.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Installed proper fasteners to ensure all 3 port light covers can be made weather-tight.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 January 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to: (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, cause by or originating in electrical equipment, and electrical shock. FWD Bulkhead in engine room electrical junction box has exposed dead-end wires. Properly cap or remove unused or existing wires.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Exposed dead end wires in FWD Bulkhead junction box removed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 January 2023 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. FWD accommodation space closets contained flammable liquids, including solvents and paints. Remove all hazardous flammable liquids from vessel.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Hazards removed from vessel.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Risk evaluation, training and instruction to seafarers
Issued 26 January 2023 Resolved
For a vessel described by 46 CFR175.110(c), the training program in paragraph (a) of this section must address firefighting proficiency and must include all items referenced in this part. Provide required training and log into vessels training/drills logs. Federal Register/V.86 No. 245 46 CFR 185.420.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Vessel provided log documenting required training complete.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 26 January 2023 Resolved
Except as otherwise provided in this section, rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers or crew. Equivalent protection may include lifelines, wire rope, chains, and bulwarks, which provide strength and support equivalent to fixed rails. Deck rails must include a top rail with the minimum height required by this section, and lower courses or equivalent protection as required by this section. Vessel's rails have excessively loose wire rail courses. Tighten wire cable rail courses around entirety of vessel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Rail course wires sufficiently tightened to provide adequate protection.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 26 January 2023 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including the following: (g) Operational test of all overboard discharge and intake valves and watertight bulkhead pipe penetration valves. Marine Sanitation Device overboard discharge valve has vice grips installed in lieu of a valve handle. Unable to provide visual confirmation of open closed status. Provide proper valve handle to OVBD discharge valve.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2023
Resolved 30 March 2023
Resolution: Installed new ball valve for OVBD discharge. Secured handle in the closed position with proper wire ties required by 33 CFR 159.7 (b) to secure TYPE-III MSD overboard discharge valve.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 26 January 2023 Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Electric solenoid valves must not be used, unless used in addition to the manual valve. Housing around stbd fuel shutoff on main deck was disconnected from the deck and allowing water ingress into the engine room.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 26 January 2023
Resolved 26 January 2023
Resolution: Repaired STBD fuel shutoff housing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 January 2023 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including the following: (h) Operational test of the means provided for pumping bilges. Pumping of fore-peak bilge space inoperable.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 January 2023
Resolved 26 January 2023
Resolution: Vessel cleared debris from fore-peak bilge suction line and performed satisfactory operational test.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 January 2022 Resolved
Adult lift jackets must be provided for each person onboard a vessel. Vessel had 21 condemned kapok pfd's. Restricted to carrying 26 adult passengers for hire.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 January 2022
Resolved 25 January 2022
Resolution: MIs verified new life jackets at drydock inspection.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 12 January 2022 Resolved
Vessel must carry first aid kit approved under 160.041. First aid kit expired. Replace to satisfaction of MI.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2022
Resolved 2 February 2022
Resolution: Operator procured approved first aid kit
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 January 2022 Resolved
At each inspection, bilges must be free from excessive oil in the bilges. Excessive oil under port main diesel engine. Determine cause of leak and clean oil from bilge.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2022
Resolved 26 January 2022
Resolution: Operator sent pictures of cleaned bilge. Def cleared
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 12 January 2022 Resolved
Vapor barriers must be provided in machinery spaces. Forward engine room bulkhead not vapor tight. Seal to satisfaction of marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2022
Resolved 25 January 2022
Resolution: MIs verified vapor tight bulkheads at drydock inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 January 2022 Resolved
Electrical equipment installed must minimize accidental contact with electrical hazards. Dead end wires in sewage compartment. Remove or properly terminate.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2022
Resolved 26 January 2022
Resolution: Operator sent pictures of properly terminated wires in sewage tank space.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 January 2022 Resolved
Each electrical connection must be spliced IAW 46 CFR 183.340. Macerator pump wiring incorrectly spliced. Repair to satisfaction of MI.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2022
Resolved 26 January 2022
Resolution: Operator sent pictures of correctly spliced wires on macerator pump.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 12 January 2022 Resolved
VHF Radio capable of DSC must have MMSI and Lat/Long input. MMSI and Lat/Long missing. 47CFR80
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2022
Resolved 25 January 2022
Resolution: MI verified MMSI & Lat/Long input at drydock inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 16 February 2021 Resolved
The float free link required by 180.130(a)(1) must be: Secured to the painter at one end and to the vessel on the other end. The life float lines need to be re-rigged so that all 4 life floats each connect to the painter.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 February 2021
Resolved 19 February 2021
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 16 February 2021 Resolved
Each survival craft must be secured to the vessel by a painted with a float free link. The lines that connect the life floats to the painter and the lines that connect the lights to the life floats are deteriorated and need to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2021
Resolved 5 March 2021
Resolution: Verified proper rigging as well as replacement of all life float lines.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 16 February 2021 Resolved
Each vessel that operates on the high seas must have on board an FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. The EPIRB needs to be installed so that it can float free and activate.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 February 2021
Resolved 19 February 2021
Resolution: EPIRB Installation verified by [name withheld] and found to be satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 16 February 2021 Resolved
Each life float must be fitted with a lifeline, pendants, a painter, and a light. The lights attached to two of the Life Floats have expired batteries that need to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 February 2021
Resolved 17 February 2021
Resolution: Deficiency corrected on the spot
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 16 February 2021 Resolved
Each ring life buoy on a vessel must be readily accessible and slower in a way that it can be rapidly cast loose. The mount for the ring buoy’s light is loose and needs to be repaired/tightened.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2021
Resolved 22 February 2021
Resolution: Proper installation verified by [name withheld], found to be satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 February 2021 Resolved
A suitable metal type strainer, meeting the requirements of the engine manufacturer, must be fitted in the fuel supply line in the engine compartment. Strainers must be leak free. There is a leak on the supply connection to the fuel filter that needs to be repaired.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2021
Resolved 5 March 2021
Resolution: Operator corrected fuel leak by replacing fuel filter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 February 2021 Resolved
46 CFR 182.05-1(a) Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The shaft seal packing on the port engine is leaking water and needs to be repaired.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2021
Resolved 5 March 2021
Resolution: Operator repaired engine leak by tightening the packing gland.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 20 March 2020 Resolved
All vessels must have navigation lights that are in compliance with the International and Inland Navigation Rules. The vessel's stern light is inoperable. The vessel is currently restricted to operating in daylight hours only. During periods of reduced visibility, the vessel is prohibited from operating. 46CFR183.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 April 2020
Resolved 26 March 2020
Resolution: Stern nav light repaired to the satisfaction of the MI.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 25 February 2020 Resolved
Repairs or alterations to the machinery or equipment that affect the safety of the vessel without approval of the cognizant [name withheld] vessel repower, new engines and reduction gears are 600 pounds lighter requiring a new simplified stability test. Vessel required to maintain 300 pounds in bilge beneath port engine and 300 pounds in bilge beneath starboard engine and reduce maximum allowable passengers by 10 passengers until satisfactory simplified stability Test completion is witnessed by an attending qualified Marine Inspector.46 CFR 176.700 (a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 March 2020
Resolution: SST completed to the satisfaction of attending MI.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 25 February 2020 Resolved
A propulsion engine control system, including pilothouse control must be designed so that a loss of power to the control systems does not result in an increase in shaft speed. Engine was repowered and power to ECM was not disconnected to prove increase in shaft speed does not happen when power is lost.46 CFR 184.620 (c)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 March 2020
Resolved 20 March 2020
Resolution: ECU loss of power test conducted during annual inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 10 February 2020 Resolved
Repairs or alterations to the machinery or equipment that affect the safety of the vessel without approval of the cognizant OCMI. Vessel propulsion machinery has been replaced. Stability test, machinery test, and sea trials must be completed prior to the carriage of passengers. 46 CFR 176.700 (c).
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 February 2020
Resolution: Plan Review completed, weight differences mitigated until SST can be completed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 13 March 2019 Resolved
Rails on vessels engaged in excursion trips must be at least 39 1/2 inches high. Rail courses or equivalent must have bulwarks, chain link fencing or wire mesh with openings of not more than 4 inches or bar slats, rail courses or an equivalent spaced at intervals not more than 4 inches. Rails are not 39 1/2 inches and are gapped greater than 4 inches. Vessel is engaged in whale watching excursions.46 CFR 177.900
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 2 March 2020
Resolution: Rail Heights were raised to 39 1/2 inches and gaps spaced to 4 inches.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 13 March 2019 Resolved
All machinery must be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure, and personnel injury. Fuel filter outboard fittings have fuel soaked tape on them. Remove tape and repair leak. 46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 March 2019
Resolution: Wet tape removed valves resealed.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 13 March 2019 Resolved
All machinery shall be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure and personnel injury. Port Engine outboard exhaust non-metalic hose is crushed. 46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 March 2019
Resolution: New exhaust hose installed on port outboard exhaust line.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 March 2019 Resolved
An adult life jacket must be provided for each person carried on board a vessel. Three adult lifejackets were condemned and in need of replacement.46 CFR 180.71
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 13 March 2019
Resolution: 3 Adult Life Jackets added.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 January 2019 Resolved
Each item of survival craft equipment must be of good quality. 3 of 4 life lights were cracked and not servicable.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 13 March 2019
Resolution: 3 Life Float lights replaced.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 5 March 2018 Resolved
07 PFDs found in poor, unserviceable condition & require replacement IAW 46 CFR 180.71.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 7 March 2018
Resolution: Operator provided photographic evidence of corrective action.
Construction/Loadline › Penetrations › Gasket
Issued 5 March 2018 Resolved
04 holes identified in bulkhead between engine room & sewage compartment that require corrective actions to make vapor tight IAW 46 CFR 177.405(e).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 15 March 2018
Resolution: During credit drydock, verified that bulkhead penetrations were vapor tight.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 7 February 2017 Resolved
Replace life jacket lights on PFDs. Vessel is restricted to carrying 21 pax. 46CFR180.75
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 February 2017
Resolved 13 February 2017
Resolution: Verified proper operation of new lights.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 7 February 2017 Resolved
Make collision bulkhead watertight. Needs more sealant on bunk room side of bulkhead. 46CFR171.085(h)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 13 February 2017
Resolution: Owner satisfactorily sealed bulkhead with sealant.
Engineering › Bilge Water Management System › Not Operational
Issued 7 February 2017 Resolved
Repair bilge high level alarm in aft lazarette. 46CFR182.115
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 13 February 2017
Resolution: Verified proper operation of lazarette bilge alarm.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.