ENGLISH STAR

ENGLISH STAR is a 1986 freight ship. The Coast Guard has recorded 15 inspections since 1987, most recently in July 2009, along with 17 deficiencies — 1 with no resolution recorded — and 2 operational controls.

Records from 1987 to 2009. Most recent: operational control imposed, 28 July 2009.

Built
1986
Last inspected
22 July 2009
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8315982 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
279202
Flag
UNITED KINGDOM
—
Maury page id
psix-279202

Inspections, by type

…with no type recorded14
Years with a record 9 calendar years (1987–2009)
The 15 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 17 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it10291 - Regulatory (Subpart C or D), Gross Ton
4672 - Regulatory (Subpart C or D), Net Ton
11434 - Dead Weight, Ton
17454 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 15

22 July 2009 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3542352
4 May 2004 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2058898
25 April 2004 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2052285
25 June 2003 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1826564
16 February 2001 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 286862
10 November 1992 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 505054
26 May 1992 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 516204
17 March 1992 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 349436
30 December 1991 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 347942
10 October 1991 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 671244
24 September 1991 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 534189
3 January 1990 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 334555
7 December 1989 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 334134
20 April 1987 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 315554
25 March 1987 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 315065

Deficiency record · 17

Fire Fighting › Fixed Fire Detection System › Alarms
Issued 24 July 2009 Resolved
24 volt electrical system for controls and alarms is inoperable. This system serves the bridge controls for main engine and steering, fire detection system and quick acting valves for oil distribution system. System failed during port call. Will be fixed prior to departure to the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 July 2009
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 24 July 2009 Resolved
Saftey valves on Economizer appear to be inoperable due to missing and stuck actuating pin.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 July 2009
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 24 July 2009 No resolution recorded
Vessel does not have an operational depth sounding device. Shall be fixed to the satisfaction of the Coast Guard.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Fire Fighting › Miscellaneous Items › Insulation (Penetration of Oil/Oil Vapors)
Issued 24 July 2009 Resolved
Aft port diesel generator has oil soaked lagging around fuel supply and fuel return. There is also buildup of oil under thhe generator. This condition creates a fire hazard and shall be fixed to the satisfaction of the Coast Guard
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 July 2009
Electrical › Electric Supply System (service) › Cable
Issued 24 July 2009 Resolved
Numerous exposed wiring in engine room including electrical temperature sensors on main engine, open control panel near boiler, missing switch covers on control panels and unsecured wiring near engine control room. These deficiencies shall be fixed to satisfaction of the RO.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 July 2009
Engineering › Sea-water System (primary cooling) › Pump
Issued 24 July 2009 Resolved
The mechanical seal on the #2 sea water supply pump is leaking heavily and flooding the forward bilge. This shall be fixed to the satisfation of the RO.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 July 2009
Engineering › Diesel Engine (propulsion-direct drive) › Crankcase
Issued 24 July 2009 Resolved
Collecting drains on main engine are clogged and do not allow for proper collection of leaking oil. This condition is a fire hazard and shall be fixed to satisfaction of the RO.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 July 2009
Engineering › Steam Boiler (propulsion) › Superheater Tube
Issued 24 July 2009 Resolved
There are 2 steam leaks at the boiler in the steam distribution lines near the walkway. This condition is a saftey hazard and shall be fixed to the satisfaction of the RO.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 July 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 24 July 2009 Resolved
Numerous lights inoperable along the catwalk leading from the boiler to the exhaust stack. This shall be fixed to the satisfaction to the RO.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 July 2009
Engineering › Steering Gear System › Follow-up Assembly
Issued 22 July 2009 Resolved
Means of Auxiliary steering control from remote and local positions are not functional. #2 steering pump must be repaired prior to departure to the satisfaction of class.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 July 2009
Lifesaving › Lifeboat › Carriage Requirement
Issued 22 July 2009 Resolved
Ship has flag dispensation to operate with inflatable life raft substitution of Port Lifeboat. Starboard lifeboat winch has been repaired, but crew must demonstrate launching/recovery capability and conduct load test to the satisfaction of class prior to departure.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 July 2009
Engineering › Shafting/Propeller Arrangements
Issued 25 April 2004 Resolved
Provided class report addressing the proper operations of the Vsl Propeller. LEGACY COMPONENT DESC: Propeller (controllable pitch)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 27 April 2004
Resolved 27 April 2004
Resolution: DNV provided report attesting to the vessel parameters being normal and and conditions for permanent repairs of the propeller have been imposed.
Engineering
Issued 7 December 1989 Resolved
THE BILGE MONITOR WAS INOPERABLE AND REMOVED FOR REPAIRS. REPLACEMENT PARTS WERE ON ORDER AT TIME OF BOARDING AND WERE EXPECTED TO BE RECEIVED ATNEXT U.S. PORT CALL. IAW 33CFR 155.370 33USC 1908(B)(1)
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Navigation
Issued 25 March 1987 Resolved
A VIO OF 33CFR164.30 IN THAT B.A. CHARTS 2563, 2603, AND 2604, USED BY THE VSL, WERE NOT CORRECTED, WHICH WAS REASONABLY AVAILABLE AND CONTAINED CORRECTIONS APPLICABLE TO THE VSL'S ROUTE FROM CAPE HENLOPEN TO TIOGA MARINE TERMINAL.
Condition: Unknown
Due 25 September 1991
Resolved 25 September 1991
Navigation
Issued 25 March 1987 Resolved
A VIO OF 33CFR164.30 IN THAT THE STEERING GEAR OPERATING AND CHAGEOVER INSTRUCTIONS AND STEERING GEAR BLOCK DIAGRAM REQ BY 33CFR164.35(K) WERE NOTPERMANENTLY DISPLAYED ON THE BRIDGE OR STEERING GEAR COMPARTMENT.
Condition: Unknown
Due 25 September 1991
Resolved 25 September 1991
Documentation
Issued 25 March 1987 Resolved
A VIO OF 33CFR156.170 IN THAT THE EQUIP TEST AND INSPECTIONS REQ IAW 33CFR 156.170(F)(2) WERE NOT CONDUCTED BY THE VSL.
Condition: Unknown
Due 25 September 1991
Resolved 25 September 1991
Navigation
Issued 25 March 1987 Resolved
A VIO OF 33CFR164.30 IN THAT THE VSL DID NOT HAVE O/B U.S. CHART 12304 OR ITS FOREIGN EQUIV WHICH WERE REQ FOR THE VSL'S ROUTE FROM CAPE HENLOPEN TO ARNOLD PT.
Condition: Unknown
Due 25 September 1991
Resolved 25 September 1991

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.