← All vessels
TENNA KOSAN
TENNA KOSAN is a 1998 tank ship. The Coast Guard has recorded 19 inspections since 2001, most recently in December 2021, along with 14 deficiencies and 5 operational controls.
Records from 2001 to 2021. Most recent: inspection, 18 December 2021.
- Built
- 1998
- Last inspected
- 18 December 2021
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 14 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9160475 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9HA5469
27930
Flag
ISLE OF MAN
—
Maury page id
psix-27930
Inspections, by type
…with no type recorded3
Years with a record
11 calendar years (2001–2021)
The 19 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it1623 - Convention (Subpart B), Net Ton
6095 - Dead Weight, Metric Ton
9381 - Displacement, Metric Ton
5103 - Convention (Subpart B), Gross Ton
6095 - Dead Weight, Metric Ton
9381 - Displacement, Metric Ton
5103 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 19
18 December 2021
COC-GAS Renew · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7370069
31 October 2020
Ballast Water Examination · COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7084455
8 August 2017
Deficiency Check
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6232943
13 March 2017
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6101176
6 December 2015
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5774398
13 October 2014
COC-GAS Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4999790
13 April 2009
Ballast Water Examination · ISPS I Exam · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3451536
12 April 2009
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3448878
5 October 2007
COC-GAS Annual · MARPOL Annex I Examination · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3073532
12 June 2007
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2959619
29 August 2006
Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2763482
28 August 2006
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2762521
6 October 2004
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2214199
29 April 2004
Letter of Compliance (Initial/Renewal)
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2054801
24 May 2002
Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1620487
16 May 2002
Security Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1617649
15 May 2002
Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1617640
30 May 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 290451
30 May 2001
Letter of Compliance (Initial/Renewal)
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1066207
Deficiency record · 14
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 31 October 2020
Resolved
On ships carrying Flammable of toxic products or both, a water spray system for cooling, fire prevention and crew protection are to be installed to cover exposed cargo tank domes and any exposed parts of cargo tanks. 01 nozzle on exposed deck tank were in operable.
74SOLAS(14)CH. VII Reg. 13.1
IGC 11.3.1.1
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 13 March 2017
Resolved
The fire resistance of doors shall, as far as practicable, be equivalent to that of the division in which they are fitted. PSCOS observed the paint locker door and chemical store door to be B class doors, without self-closing mechanisms. According to the ship Fire Control Plan both doors are required to be A class self-closing doors.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 13 April 2009
Resolved
Vessel waste oil incinerator tank has the capabilites to transfer waste oil to the vessel's bilge water holding tank. This equipment does not match the vessel approved drawings. Vessel shall submit a report from certificate issuing authority attesting to the modifications of the equipment. MARPOL Consol 2006 Annex I Reg 6.4.2
Documentation › Certificates/Documents › IOPP Certificate
Issued 13 April 2009
Resolved
Vessel's IOPP states the incinerator can burn sludge at 21l/hr. The vessel has a document from the administration attesting to the incinerator being able to burn at 37kg/hr. The certificate issuing authority shall reflect the new burning rate on the IOPP. MARPOL Consol. 2006 Annex I Reg 7.1
Engineering › Diesel Engine (propulsion-electric) › Governor
Issued 5 October 2007
Resolved
The vessel's #2 ship service generator has a fuel leak located at the connections of the governor.
Operations/Management › Ballast Water Managment › Mandatory Practices
Issued 29 August 2006
Resolved
Vessel unable to provide evidence of ship specfic ballast water management plan.
Electrical › Electric Generation Source (emergency) › Generator
Issued 29 August 2006
Resolved
Emergency Generator is not readily accessible from the open deck. Provide class/Administration statement verifying this is an allowed arrangement.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 29 August 2006
Resolved
Fixed gas detection sensor in Nitrogen Generator room does not provide reliable LEL reading. Until sensor is repaired or replaced, bussel is to provide portable alternative which will satisfy sampling and analysing requirements of IGC Code.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 29 April 2004
Resolved
PROVIDE SHIP WITH 33 CFR PTS 125-199, 46 CFR 140-155, AND INLAND NAVIGATIONAL RULES IN ACCORDANCE WITH SOLAS 74 AMMENDED CHAPTER V REG. 20
Lifesaving › Lifeboat Equipment › First Aid Kit
Issued 29 April 2004
Resolved
PROVIDE LIFEBOAT WITH A FIRST AID KIT IAW LSA CODE CHAPTER IV REG 4.4.8.20
Fire Fighting › Firemans Outfit
Issued 29 April 2004
Resolved
IMMEDIATELY OPEN ALL FIRE STATIONS TO ENSURE AVAILABILITY OF ALL FIRE FIGHTING GEAR IAW SOLAS 74 AMMENDED, CHP II-2 /17.4
Fire Fighting › Self-contained Breathing Apparatus › Air Bottle
Issued 29 April 2004
Resolved
HAVE AIR COMPRESSOR FOR SCBA'S SERVICED BY A THIRD PARTY EXPERT IAW IGC 14.2.6
Deck/Cargo › Holds/Tanks
Issued 29 April 2004
Resolved
HAVE CERTIFICATE ISSUING AUTHORITY PROVIDE A REPORT ATTESTING TO THE PROPER OPERATION OF ALL HIGH PRESSURE ALARMS IAW IGC 13.1.4/13.4.1 LEGACY COMPONENT DESC: Tank Pressure Monitoring Device
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 29 April 2004
Resolved
SAFETY RELIEF VALVES ON DECK TANK HAVE 2 DATA PLATES ON THEM WITH THE SAME SERIAL NUMBERS AND DIFFERENT SET POINTS. PROVIDE A REPORT ATTESTING TO THE CORRECT SET POINTS ON RELIEF VALVES IAW IGC 8.2.5 LEGACY COMPONENT DESC: Relief Valve
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.