LEWESTOWN LADY is a 1986 passenger vessel (inspected). The Coast Guard has recorded 61 inspections since 1987, most recently in September 2025, along with 119 deficiencies — 1 with no resolution recorded —.

Records from 1987 to 2025. Most recent: inspection, 4 September 2025.

Built
1986
Last inspected
4 September 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDJ6356
280569
Flag
UNITED STATES
367796930
Maury page id
psix-280569

Inspections, by type

…with no type recorded3
Years with a record 37 calendar years (1987–2025)
The 61 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)42.0 ft × 16.0 ft × 8.0 ft
Registered tonnagegross 36 / net 28
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSLEEPY CREEK BOAT WORKS · MARSHALLBERG, NC, UNITED STATES · built 1986
Hull materialWood
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portLEWES, DE
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 7 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it36 - Simplified, Gross Ton
28 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDJ6356MMSI 367796930 · active · compulsorily equipped · granted 27 June 2017, expires 27 June 2027
WCX4225MMSI 367193980 · expired · compulsorily equipped · granted 12 June 2007, cancelled 19 August 2017
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 61

4 September 2025 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8218498
17 September 2024 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8004484
25 June 2024 Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7941898
20 September 2023 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7791663
9 June 2022 Deficiency Check · Hull Examination · COI Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7473134
1 September 2021 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7300488
19 May 2021 Administrative Inspection
Administrative · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7201153
14 September 2020 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7056150
4 June 2020 Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6967318
29 October 2019 Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6895004
13 September 2019 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6811197
2 October 2018 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6553017
19 June 2018 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6605721
12 June 2017 Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6167406
9 September 2016 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6001242
15 June 2016 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5916615
10 September 2015 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5755729
5 August 2014 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4937435
3 June 2014 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4877984
11 June 2012 DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4337286
17 May 2012 Drydock Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4313650
13 September 2011 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4143776
14 September 2010 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3848817
24 June 2008 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3246144
24 June 2008 Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3246614
12 June 2007 Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2959078
21 August 2006 Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2754882
12 July 2006 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2710071
1 November 2005 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2522838
28 June 2005 Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2398791
12 May 2004 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2065416
29 July 2003 Annual Inspection · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1861023
26 June 2002 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1655267
6 May 2002 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1613414
1 June 2001 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1425139
17 May 2000 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1445686
1 May 2000 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1467661
12 May 1999 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1404783
21 October 1998 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 806817
17 June 1998 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 792170
7 May 1998 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1428953
28 April 1998 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1364719
8 October 1997 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1434626
24 June 1997 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 777156
9 May 1996 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1253168
6 May 1996 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1082842
27 April 1995 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 834188
2 May 1994 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1169617
19 April 1994 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1167496
11 April 1994 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 856197
22 April 1993 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 826858
14 April 1993 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 839364
6 March 1992 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1254539
2 July 1991 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 933548
11 June 1991 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1215134
15 October 1990 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1231282
17 April 1990 COI Inspection · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1228604
31 March 1989 Re-Inspection · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1194787
16 May 1988 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 889486
29 April 1987 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1337827
20 April 1987 Initial Certification · Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1328366

Deficiency record · 119

01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 October 2025 Resolved
Vessel shall undergo an annual inspection. Vessel has 07 outstanding deficiencies that are overdue. Vessel restricted from operating with passengers until all deficiencies are cleared. 46CFR176.500
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2026
Resolution: Annual inspection complete.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 September 2025 Resolved
Propulsion machinery shall be suitable and capable of operating at constant load. Port engine exhaust leak. 46CFR182.05-1, 46CFR182.20-10
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2025
Resolution: O/O replaced flexible hose joining two sections of the port exhaust and attached with double clamps. MI verified port exhaust was gas and watertight under operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 September 2025 Resolved
Propulsion machinery shall be suitable under all operating conditions. Flex hose connecting hard pipe on both port and starboard engine at the air filter are compromised and not attached effectively. 46CFR182.15-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 July 2026
Resolution: Compromised hose connection on both engines air filter replaced with new flex hose and secured with clamps.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 September 2025 Resolved
The condition of the vsl and it's equipment shall be acceptable to the [name withheld] shaft appears to be out of allignment causing excessive water spray into the E/R bilge. 46CFR176.10-10
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 July 2026
Resolution: Shaft found in better allignment and no longer excessively spraying water in the engine room.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 4 September 2025 Resolved
At each inspection MI shall inspect exterior and interior of the hull. Delaminated outer shell on fwd cabin below the operating station. 46CFR176.25-5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 21 July 2026
Resolution: FRP outer shell good adhesion below operating station.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 September 2025 Resolved
Visual and audible alarm shall be provided at the operating station. Visual alarm in inoperable. 46CFR182.520
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 July 2026
Resolution: Bilge high level alarms tested in each space and found visual and audible alarms are fully operational.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 4 September 2025 Resolved
The condition of the vessel and its equipment shall be accepted by the [name withheld] sewage holding tank has a hole toward the top of the tank. Repair sewage tank to original design. Secure heads until greater than 3NM from shore. 46CFR176.01-10
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 July 2026
Resolution: Sewage tank hole was plugged with a plastic fitting.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 4 September 2025 Resolved
VSL req'd to carry 12 distress flares. VSL had 06 in-date distress flares on-board at time of inspection. VSL added an additional 06 distress signals to the boat during the inspection. 46CFR180.35-5
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 21 July 2026
Resolution: 12 flares on board are in date and readily available.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 September 2025 No resolution recorded
Fire systems shall meet the requirements of this section. VSL halocarbon fireboy in the E/R is past due for its internal examination. 46CFR181.20-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 September 2024 Resolved
At each inspection the MI tests main and auxiliary steering. Port rudder post had excessive water leak at packing gland. 46CFR176.25-35
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 October 2024
Resolved 10 October 2024
Resolution: Port rudder post packing gland tightened by crew. MI witnessed operation, no long excessively leaking water.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 September 2024 Resolved
The MI inspects ahead and astern operation of main propulsion. Port and starboard shaft log excessively leaking water. 46CFR176.25-10
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 October 2024
Resolved 10 October 2024
Resolution: Port and starboard shaft log at stuffing box where the stern tube passes through the hull is no longer excessively leaking water. O/O adjusted the allignment of the shaft to reduce play in the shaft.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 23 September 2024 Resolved
The master shall conduct drills and give instructions to ensure all crew are familiar with their duties. Vessel did not log drill in on-board log book. 46CFR185.25-10
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 September 2024
Resolved 24 September 2024
Resolution: Vessel master conducted a MOB drill and logged in on-board log book.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 20 September 2023 Resolved
Each vessel that operates on the high seas must have an EPIRB installed to automatically float free and activate. Vessels hydrostatic release unit for EPIRB is expired. Vessel restricted to operating within 03 miles of coastline until HRU is purchased, installed, and verified by MI. 46CFR180.64
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 5 October 2023
Resolution: HRU purchased and placed in service.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 20 September 2023 Resolved
The master shall conduct sufficient drills and give instruction to make sure all crew members are familiar with their duties during emergencies. Crew unfamiliar with man overboard drill and fire drill. Crew shall practice drills and conduct to satisfaction of MI. 46CFR185.520
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 October 2023
Resolution: Crew ran a successful MOB and fire drill.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 20 September 2023 Resolved
Once a month, if practical, but at least once within a 3 months period before vessel gets underway with pax, abandon ship and MOB drils and training shall be logged and reviewed by the CG. Drill entry shall include date of drill and training, general description. Vessel did not provide documentation of MOB/Abandon ship drill and training. Provide training and conduct drill and log in vessel records for MI review. 46CFR185. 520
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 October 2023
Resolution: MOB and fire drill training conducted, and logged in ships logs.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 20 September 2023 Resolved
Provisions shall be made by means of plugs, covers, etc. to prevent the admission of air into the protected space. E/R missing air vent closing device. 46CFR181.20-35
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 October 2023
Resolution: Air vent closing devices installed on vents exiting the E/R.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 20 September 2023 Resolved
MI shall require all observed unsafe practices and hazardous situations be corrected. Diesel fuel leak on the STBD engine hose. 46CFR176.830
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 October 2023
Resolution: STBD engine hose leak secured.
01 - Certificates & Documentation › 011 - Ships Certificates › Passenger Ship Safety (including exemption)
Issued 9 June 2022 Resolved
A vessel to which this sub-chapter applies may not be operated without having on board a valid Certificate of Inspection. Vessel's COI expires 14 JUNE 2022 and cannot be operated beyond this date until satisfactorily completing a COI.
Action required: 60 - Rectify deficiencies prior to movement
Due 14 June 2022
Resolved 21 June 2022
Resolution: COI conducted and endorsed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 June 2022 Resolved
Vessels not greater than 49 passengers must have two independent bilge pumps, one of which may be a portable hand pump. Marine Inspector observed portable hand pump was not creating a prime. 46 CFR 182.520
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 June 2022
Resolved 21 June 2022
Resolution: O/O fixed the portable bilge pump. MI observed proper priming and operation.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2022 Resolved
Areas of soft planking were discovered on the port bow below the waterline. Submit a repair proposal for repairs to Marine Inspector prior to movemeent of the vessel. 46CFR176.25-5(1)
Action required: 10 - Deficiency Rectified
Due 9 June 2022
Resolved 12 July 2022
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2022 Resolved
Upon receiving approval of submitted repair proposal, make repair. After completing repairs, make vessel available for visual inspection, followed by sea trials while underway prior to carrying passengers. 46 CFR 176.25-5(1)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 9 June 2022
Resolved 15 July 2022
Resolution: Repair inspected and appeared to be satisfactory. Repair held up during sea trials, no water intrusion at repair site.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 2 September 2021 Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible onboard the vessel to determine the presence of alcohol in the system of each individual who was directly involved in the Serious Marine Incident (SMI), unless the required alcohol tests can be accomplished within 2 hours from the time of occurrence of the SMI. Vessel's COI authorizes operations on an Oceans Route and the alcohol testing devices provided are expired. Vessel is limited to a route and time where alcohol testing can be completed within 2 hours of an SMI. 46 CFR 4.06-15
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2021
Resolved 21 June 2022
Resolution: Verified vessel had 3 alcohol testing devices onboard that were not expired.
14 - Pollution Prevention › 145 - MARPOL Annex V › Placards
Issued 2 September 2021 Resolved
A vessel must comply with the applicable design, equipment, personnel, procedures, and record requirements of 33 CFR 151, 155, and 156. Vessel is missing a posted garbage placard IAW 33 CFR 151.59 46 CFR 184.702
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2021
Resolved 21 June 2022
Resolution: Garbage placard posted
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 2 September 2021 Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard (MOB) drill be held under simulated emergency conditions specified by the inspector. Vessel unable to complete MOB drill this date due to poor weather conditions. Complete a satisfactory MOB drill in the presence of an attending CG Marine Inspector. 46 CFR 176.808
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2021
Resolved 21 June 2022
Resolution: Completed a successful MOB drill.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 September 2021 Resolved
Portable and semi portable extinguishers must be inspected and maintained in accordance with NFPA 10. Vessel’s portable and pre-engineered system are overdue for inspection. Correct prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 September 2021
Resolved 2 September 2021
Resolution: Fire systems were serviced this date and tags provided on portables and fixed system.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 1 September 2021 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the navigation rules. Vessel’s anchor/masthead light is off station and has one half of the lights not operational. Correct to the satisfaction of the attending marine inspector prior to operating at night or during times of limited visibility.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 September 2021
Resolved 2 September 2021
Resolution: Combination navitgation light was repaired and is operating properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 September 2021 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than small buoyancy compartments, under all practical conditions. Fixed bilge system unable to adequately drain bilge Fromm forward passenger compartment.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 September 2021
Resolved 2 September 2021
Resolution: Witnessed satisfactory operation of fixed bilge pumping from number 2 compartment.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 1 September 2021 Resolved
Life float platforms must be suspended from the body of the float by a net or an equivalent arrangement, which when fully extended, holds the top of the platform approximately 900 mm (36 in.) below the center of the float body. Vessel’s life float is not equipped with a net or equivalent.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2021
Resolved 2 September 2021
Resolution: Netting was installed around the drop down platform for the life float.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 14 September 2020 Resolved
At each subsequent inspection for certification the marine inspector shall examine the the watertight closures in bulkheads. The engine room's forward bulkheads has a penetration with a wire penetrating the bulkhead and gaps where a pipe penetrated the forward bulkhead make repairs to the satisfaction of the attending marine inspector. 46 CFR 176.25-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2020
Resolved 24 September 2020
Resolution: Penetrations in engine room forward bulkhead have been sealed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 September 2020 Resolved
Means shall be to taken ensure the vessel is reasonably safe from fire caused by and or originating in electrical equipment and reasonably safe from electrical shock of personnel. Numerous dead-end wires unused electrical equipment were found throughout the engine room. Including wires on top of the port engine, a red line that used to connect to the starboard alternator, and a white coil of wire located near the starboard shaft. Remove or terminate in an approved junction box all dead-end wires and unused electrical equipment to the satisfaction of the attending marine inspector. 46 CFR 183.01-15
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2020
Resolved 24 September 2020
Resolution: Deadend wires capped with wirenuts and electrical tape.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 September 2020 Resolved
All cable wires must be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damages. The use of plastic tie wraps are to not to be used as a means of support.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2020
Resolved 24 September 2020
Resolution: All wires in the engine room suppported by metal supports at least every 24".
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 September 2020 Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. Wires serving the vessel's starboard side alternator and battery isolator were not suitable for marine service as they are marked "welding cable". Replace wires with marine type wires of the suitable size and capacity to the satisfaction to the attending marine inspector. 46 183.10-20
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2020
Resolved 24 September 2020
Resolution: Non-marine grade wires were replaced with marine grade wires.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 14 September 2020 Resolved
Examine all weather tight closures above weather deck and inspect the provisions for drainage of seawater from the exposed decks. In the accommodations space the port and starboard side Forward windows and the port side aft window are not properly sealed. Make repairs to the satisfaction of the attending marine inspector. 46 CFR 126.25-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2020
Resolved 24 September 2020
Resolution: All windows in accomadations space has been resealed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 September 2020 Resolved
Submit a repair proposal for permanent repairs to the vessel's port bow to be completed prior to operating the vessel in the 2021. (This deficiency is re-issued and supersedes the deficiency issued on 04 JUN 2020) 46 CFR 176.25-5
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 March 2021
Resolved 19 May 2021
Resolution: Temporary repair is considered adequate for permanent repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 September 2019 Resolved
Auxiliary machinery shall be suitable for its intended purpose. Operation of generator could not be proven during inspection. Prior to using generator, prove proper operation to attending CG Marine Inspector. 46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 September 2019
Resolved 9 January 2020
Resolution: Generator is now tagged out. Vessel captain was informed that even though this CG835 is cleared, generator operation must be verified by CG MI prior to operating it with passengers onboard. Special note added to vessel profile.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 September 2019 Resolved
Flexible hose may be used in diesel fuel supply provided it complies with 46 CFR 182.20-40(a)(2). Flexible Parker hose is not USCG approved hose for use in fuel systems. 46 CFR 182.20-40
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2019
Resolved 29 October 2019
Resolution: Verified flexible hose is now USCG type A1 hose.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 September 2019 Resolved
Flexible hose may be used in diesel fuel supply provided it complies with 46 CFR 182.20-40(a)(2). Flexible fuel hose used for fuel return to stbd fuel tank penetrates the bulkhead separating the engine room and tank room. 46 CFR 182.20-40
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2019
Resolved 9 January 2020
Resolution: Verified hard pipe is installed where flexible hose meets the blkhd.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 24 September 2019 Resolved
Machinery shall be installed in such a manner as to afford adequate protection against personnel injury. The alternator and PTO pump for the port engine present an exposed hazard to personnel. 46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2019
Resolved 29 October 2019
Resolution: Verified two new engineered guards are in place.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 24 September 2019 Resolved
Vessels shall be equipped with a suitable number of portable battery lights. Flashlight provided for the operating station is inoperable. 46 CFR 184.30-1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2019
Resolved 29 October 2019
Resolution: Two portable flashlights are now provided.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 24 September 2019 Resolved
Remote fuel shutoff stations shall marked in at least one inch letters indicating purpose of the valve. Emergency fuel shutoff valve location is not properly marked. 46 CFR 185.30-20
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2019
Resolved 29 October 2019
Resolution: Remote fuel shut off valves are properly marked.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 18 September 2019 Resolved
Each survival craft must be stowed so that when the vessel sinks the survival craft floats free. Vessel's life float was secured to the deck by two lines. 46 CFR 180.130
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 18 September 2019
Resolved 18 September 2019
Resolution: Vessel captain removed tie downs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 September 2019 Resolved
Each life jacket carried on a vessel on an oceans route must have a life jacket light approved in accordance with 46 CFR 161.012 that is securely attached to the front shoulder area of the life jacket. All required child size life jackets are missing lights. 46 CFR 180.25-20
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 18 September 2019
Resolved 18 September 2019
Resolution: All child life jackets are now fitted with approved lights.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 18 September 2019 Resolved
Each item of lifesaving equipment with an expiration date on it must be replaced if the expiration date has passed. Battery for the life float's water light is expired. 46 CFR 176.808
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 September 2019
Resolved 18 September 2019
Resolution: New battery installed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 18 September 2019 Resolved
Fixed-gas fire extinguishing systems shall be inspected and tested in accordance with Table 176.810(b) and in accordance with 46 CFR 147.60 and 147.65. The fixed-gas extinguishing system's storage cylinder is overdue for it's second visual examination in lieu of hydrostatic testing. 46 CFR 176.810(b)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 September 2019
Resolved 24 September 2019
Resolution: Requalification of fixed system cylinder completed.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 18 September 2019 Resolved
All vessels shall be provided with not less than two avenues of escape from all general areas accessible to the passengers. Forward escape hatch is sealed closed with tape and silicone. 46 CFR 177.15-1
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 September 2019
Resolved 24 September 2019
Resolution: Escape hatch made operable.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 18 September 2019 Resolved
At each inspection the owner or operator shall be prepared to conduct operational tests of all overboard discharge and intake valves... Raw water intake valve for the starboard engine could not be closed. 46 CFR 176.804
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 September 2019
Resolved 24 September 2019
Resolution: Verified operation of new raw water intake valve.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 September 2019 Resolved
A vessel not required to have a power driven fire pump must have at least three 2.5 gallon buckets, with an attached lanyard and with the words "Fire Bucket" stenciled in contrasting color. Vessel is missing two fire buckets. 46 CFR 181.610
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 September 2019
Resolved 24 September 2019
Resolution: Two addtional fire buckets now onboard.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 18 September 2019 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Donning placards are not posted. 46 CFR 185.516
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 September 2019
Resolved 24 September 2019
Resolution: Placards now posted.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 18 September 2019 Resolved
A life float platform must be suspended from the body of the float by a net or an equivalent arrangement, which when fully extended, holds the top of the platform approximately 36 inches below the center of the float body. Life float platform does not meet the 36 inch requirement. 46 CFR 160.027
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 October 2019
Resolved 29 October 2019
Resolution: Verified platform now extends the proper length.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 18 September 2019 Resolved
The number and identification of life jackets stowed inside each container must be marked in two inch letters and numbers. Forward stowage location is not marked. 46 CFR 185.604
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 October 2019
Resolved 24 September 2019
Resolution: Stowage location is properly marked.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 September 2019 Resolved
The COI must be posted under glass such that all pages are visible and in a conspicuous place where observation by passengers is likely. COI is not posted. 46 CFR 176.302
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 October 2019
Resolved 24 September 2019
Resolution: COI is now posted in a conspicuous location.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 September 2019 Resolved
Vessels must undergo/complete an annual inspection within the three months before or after each anniversary date. Vessel is overdue in completing its annual inspection. 46 CFR 176.500
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2019
Resolved 24 September 2019
Resolution: Vessel completed annual inspection.
Engineering › Bilge Water Management System › Pump
Issued 13 September 2011 Resolved
Repair/test bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2011
Resolution: Bilge pump repaired and tested satisfactorily.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 13 September 2011 Resolved
Hydrostatically test FIREBOY bottle.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2011
Resolution: Visual external inspection of FIREBOY bottle was completed in lieu of hydro as per 49 CFR and CGA 6.0.13
Operations/Management › Pollution › Removal Methods/Procedures
Issued 13 September 2011 Resolved
Clean out fuel tank compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2011
Resolution: Fuel tank compartment cleaned out.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 13 September 2011 Resolved
Repair anchor light.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2011
Resolution: Anchor light repaired and tested satisfactorily.
Engineering › Steering Gear System › Hydraulic Hose
Issued 14 September 2010 Resolved
Replace rusted hydraulic fittings on steering cables in lazarette within 30 days
Action required: 705 - Other - as specified
Due 14 October 2010
Resolved 1 September 2011
Resolution: Fitting replaced and satisfactory.
Lifesaving › Lifefloat › Painter
Issued 14 September 2010 Resolved
Replace painter for life float
Action required: 705 - Other - as specified
Due 21 September 2010
Resolved 16 November 2010
Resolution: The painter was properly replaced and properly attached to both main deck and lifefloat itself.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 14 September 2010 Resolved
Replace line on water light
Action required: 705 - Other - as specified
Due 21 September 2010
Resolved 14 September 2010
Resolution: Line replaced
Lifesaving › Lifefloat › Platform
Issued 14 September 2010 Resolved
Conduct preventative maintenance on life float and provide paddles
Action required: 705 - Other - as specified
Due 14 October 2010
Resolved 1 September 2011
Resolution: Paddles provided and Life float repaired satisfactorily.
Communications › Radio Communications › EPIRB
Issued 14 September 2010 Resolved
Relocate EPIRB to a location that will allow for float free operation within 7 days. Vessel will be restricted to 3 NM if not completed
Action required: 705 - Other - as specified
Due 14 September 2010
Resolved 14 September 2010
Resolution: EPIRB moved to front of pilothouse
Fire Fighting › Fire Hoses › Material
Issued 24 June 2008 Resolved
fire hose is NOT a commercial grade garden hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 June 2008
Resolution: fire hose was replaced with commercial grade hose.
Engineering › Bilge Water Management System › Interface Detector
Issued 24 June 2008 Resolved
fwd compartment high level alarm in-op.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2008
Resolution: fwd compartment high level alarm replaced tested, all sat.
Construction/Loadline › Penetrations › Pipe Flange
Issued 24 June 2008 Resolved
bulkhead penetrations made with PVC pipe have to shut off valves 182.40-1/ 40-5.
Action required: 705 - Other - as specified
Due 30 June 2009
Resolved 11 August 2009
Resolution: Continuing to research deficiency
Documentation › Certificates/Documents › Stability Letter
Issued 12 June 2007 Resolved
Post stability letter, or be subject to new stability test.
Action required: 705 - Other - as specified
Due 12 July 2007
Resolved 24 June 2008
Resolution: vessel does not possess nor is required to possses stability letter.
Lifesaving › Lifefloat › Lifeline
Issued 12 June 2007 Resolved
Double webbing that secures lifeline, pendant and seine net chafed through polypropylene pendant on three or more points on all 4 rafts rendering them unserviceable. Reduced route to warm water, Limited Coastwise, no more than 3 miles from shore.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 19 June 2007
Resolution: replaced in kind.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 12 July 2006 Resolved
Provide positive no return devices for bilge pump discharges.
Condition: Improper Installation
Due 30 June 2007
Resolved 12 June 2007
Resolution: Found discharge port to be more than 6" above waterline.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 12 July 2006 Resolved
Seal aft engine room bulkhead to make watertight.
Condition: Improper/Lack of Maintenance
Due 12 August 2006
Resolved 21 August 2006
Resolution: Aft engine room bulkhead sealed.
Navigation › Piloting/Steering › Marine Charts
Issued 12 July 2006 Resolved
Provide marine charts for vessel's cerfificated route: 12214,12200, and 12304.
Condition: Improper/Lack of Maintenance
Due 12 July 2006
Resolved 19 July 2006
Resolution: Charts provided for vessel''s operational route.
Lifesaving › Lifefloat › Serviceable
Issued 12 July 2006 Resolved
Repair onboard lifefloat by providing satisfactory maintenance.
Condition: Improper/Lack of Maintenance
Due 12 August 2006
Resolved 21 August 2006
Resolution: Maintenance provided to onboard lifefloat.
Communications › Radio Communications › EPIRB
Issued 12 July 2006 Resolved
Provide hydrostatic release for vessel's EPIRB.
Condition: Improper/Lack of Maintenance
Due 12 August 2006
Resolved 12 July 2006
Resolution: Procured and installed.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 12 July 2006 Resolved
Repair vessel's anchor light.
Condition: Improper/Lack of Maintenance
Due 12 August 2006
Resolved 21 August 2006
Resolution: Vessel''s anchor light repaired.
Lifesaving › Lifefloat › Paddle
Issued 1 November 2005 Resolved
Provide and attach 4' paddle to vessel's lifefloat.
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 9 November 2005
Resolution: Owner''s representative provided and attached 4'' paddle to lifefloat.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 1 November 2005 Resolved
Provide new 18' 3/8" Polypropylene line for Lifefloat float light.
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 23 November 2005
Documentation › Certificates/Documents › Stability Letter
Issued 1 November 2005 Resolved
Provide and post the vessel's Stabiliy letter.
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 12 July 2006
Resolution: Vessel''s stability letter Posted.
Documentation › Safety/Response Plans/Programs › Waste Management Plan
Issued 1 November 2005 Resolved
Provide and post vessel's Waste Management Plan.
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 9 November 2005
Resolution: Owner''s representative provided and posted a Waste Management Plan for the vessel.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 1 November 2005 Resolved
Provide 2 ounces of eyewash, aspirin, and splint for vessel's first aid kit.
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 23 November 2005
Operations/Management › Drills/Instruction › Safety Orientation
Issued 1 November 2005 Resolved
Provide and post emergency instructions
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 9 November 2005
Resolution: Owner''s representative provided and posted emergency instructions for the vessel.
Operations/Management › Drills/Instruction › Fire
Issued 1 November 2005 Resolved
Conduct training and log in Drill and Training record book.
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 23 November 2005
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 1 November 2005 Resolved
Label Bilge alarm panel and Repair all high level bilge alarms.
Condition: Improper/Lack of Maintenance
Due 18 November 2005
Resolved 23 November 2005
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 12 May 2004 Resolved
PROVE PROPER OPERATION OF BILGE HIGH LEVEL ALARMS.
Condition: Improper/Lack of Maintenance
Due 20 May 2004
Resolved 19 May 2004
Resolution: TEST OF BILGE HIGH LEVEL ALARMS, SAT.
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 29 July 2003 Resolved
PROVE PROPER OPERATION OF SSB RADIO.
Condition: Improper/Lack of Maintenance
Due 16 August 2003
Resolved 8 August 2003
Lifesaving
Issued 29 July 2003 Resolved
PROVIDE SAFETY HARNESS FOR MAN OVERBOARD RETRIEVAL LEGACY COMPONENT DESC: SAFETY HARNESS
Condition: Unknown
Due 16 August 2003
Resolved 8 August 2003
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 29 July 2003 Resolved
PROVE PROPER OPERATION OF FIXED EXTINGUISHING M/E SHUT DOWNS.
Condition: Improper/Lack of Maintenance
Due 16 August 2003
Resolved 8 August 2003
Engineering
Issued 1 June 2001 Resolved
SHUT OFF VALVES FOR BOTH PORT & STBD FUEL TANKS WASTED/WORN DUE TO CORROSION.
Condition: Unknown
Due 21 August 2001
Resolved 21 August 2001
Construction/Loadline
Issued 1 June 2001 Resolved
PORTABLE HAND BILGE PUMP WAS OF INADEQUATE GPM CAPABILITY AND HOSE LENTH.
Condition: Unknown
Due 11 June 2001
Resolved 11 June 2001
Lifesaving
Issued 1 June 2001 Resolved
RETRO-REFLECTIVE TAPE ON ALL THE VESSEL'S PFD'S WERE WASTED AND/OR WORN.
Condition: Unknown
Due 11 June 2001
Resolved 11 June 2001
Engineering
Issued 1 June 2001 Resolved
NON-METALIC FUEL FILL HOSE FOR BOTH PORT & STBD TANKS WASTED/WORN DUE TO CORROSION.
Condition: Unknown
Due 21 August 2001
Resolved 21 August 2001
Construction/Loadline
Issued 17 May 2000 Resolved
REPAIR/REPLACE BILGE PUMP IN FORWARD SPACE.
Condition: Unknown
Due 4 September 2000
Resolved 4 September 2000
Navigation
Issued 17 May 2000 Resolved
REPAIR LIGHT ON COMPASS.
Condition: Unknown
Due 4 September 2000
Resolved 4 September 2000
Construction/Loadline
Issued 17 May 2000 Resolved
REPAIR ALL BILGE HIGH LEVEL ALARMS.
Condition: Unknown
Due 4 September 2000
Resolved 4 September 2000
Lifesaving
Issued 17 May 2000 Resolved
REPAIR WATERLIGHTS ON 7 ADULT LIFE JACKETS.
Condition: Unknown
Due 4 September 2000
Resolved 4 September 2000
Documentation
Issued 17 May 2000 Resolved
POST CURRENT CERTIFICATION OF INSPECTION.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Documentation
Issued 17 May 2000 Resolved
OBTAIN CURRENT DOCUMENTATION RENEWAL STICKER.
Condition: Unknown
Due 23 October 2000
Resolved 23 October 2000
Navigation
Issued 17 May 2000 Resolved
REPAIR ALL NAVIGATION LIGHTS.
Condition: Unknown
Due 4 September 2000
Resolved 4 September 2000
Lifesaving
Issued 17 May 2000 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 17 May 2000 Resolved
OBTAIN CURRENT EPRIP REGISTRATION.
Condition: Unknown
Due 23 October 2000
Resolved 23 October 2000
Construction/Loadline
Issued 12 May 1999 Resolved
REPAIR/REPLACE 3 INOPERABLE BILGE PUMPS.
Condition: Unknown
Due 15 July 1999
Resolved 15 July 1999
Lifesaving
Issued 12 May 1999 Resolved
REPAIR STRAPS ON LIFE FLOAT.
Condition: Unknown
Due 15 July 1999
Resolved 15 July 1999
Fire Fighting
Issued 12 May 1999 Resolved
RENEW BRACKET ON 1 FIRE EXTINGUISHER.
Condition: Unknown
Due 15 July 1999
Resolved 15 July 1999
Electrical
Issued 12 May 1999 Resolved
OBTAIN COVER FOR BATTERY BOX._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 July 1999
Resolved 15 July 1999
Lifesaving
Issued 12 May 1999 Resolved
OBTAIN HYDROSTATIC RELEASE AND REGISTRATION FOR EPIRP.
Condition: Unknown
Due 28 June 1999
Resolved 28 June 1999
Fire Fighting
Issued 12 May 1999 Resolved
OBTAIN CLOSURE DEVICES FOR ENGINE ROOM VENTS.
Condition: Unknown
Due 15 July 1999
Resolved 15 July 1999
Construction/Loadline
Issued 12 May 1999 Resolved
LABEL HIGH WATER ALARMS.
Condition: Unknown
Due 28 June 1999
Resolved 28 June 1999
Lifesaving
Issued 28 April 1998 Resolved
OBTAIN CG APPROVED FIRST AID KIT.
Condition: Unknown
Due 28 April 1998
Resolved 28 April 1998
Navigation
Issued 8 October 1997 Resolved
PROVIDE ON BOARD A COPY OF NAVIGATION RULES.
Condition: Unknown
Due 10 November 1997
Resolved 10 November 1997
Lifesaving
Issued 24 June 1997 Resolved
PROVIDE NEW BATTERY FOR EPIRB.
Condition: Unknown
Due 24 June 1997
Resolved 24 June 1997
Engineering
Issued 24 June 1997 Resolved
PROVIDE PROPER FLAME SCREENS FOR F.O. TANK VENTS.
Condition: Unknown
Due 24 June 1997
Resolved 24 June 1997
Electrical
Issued 24 June 1997 Resolved
INSTALL PROPER BATTERY BOX FOR GENERATOR BATTERY.
Condition: Unknown
Due 24 June 1997
Resolved 24 June 1997
Accommodation/Occupational Safety
Issued 19 April 1994 Resolved
PRIOR TO CARRYING PASSENGERS ON VOYAGES LONGER THAN 30 MINUTES, RE-INSTALL A SEWAGE HOLDING TANK OR INSTALL A TYPE II MARINE SANITATION DEVICE.
Condition: Unknown
Due 19 April 1994
Resolved 19 April 1994
Fire Fighting
Issued 14 April 1993 Resolved
PRIOR TO CARRYING PASSENGERS, PROPERLY SERVICE DRY CHEMICAL B-II FIRE EXTINGUISHER LOCATED IN WAY OF VESSEL'S FORWARD CABIN AREA.
Condition: Unknown
Due 14 April 1993
Resolved 14 April 1993
Fire Fighting
Issued 14 April 1993 Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE OPERATIONAL TEST OF VESSEL'S MAIN ENGINE DRIVEN FIRE/WASHDOWN PUMP.
Condition: Unknown
Due 14 April 1993
Resolved 14 April 1993
Navigation
Issued 11 June 1991 Resolved
VESSEL IS RESTRICTED TO COASTWISE ROUTE UNTIL EPIRB IS REPAIRED.
Condition: Unknown
Due 11 June 1991
Resolved 11 June 1991
Navigation
Issued 11 June 1991 Resolved
CHARTS AND COAST PILOT MUST BE REPLACED PRIOR TO OPERATION.
Condition: Unknown
Due 11 June 1991
Resolved 11 June 1991
Electrical
Issued 11 June 1991 Resolved
PROVE OPERATION OF VESSELS GENERATOR WITHIN 30 DAYS.
Condition: Unknown
Due 11 June 1991
Resolved 11 June 1991
Construction/Loadline
Issued 17 April 1990 Resolved
FOUND AREA OF DELAMINATION OF FIBERGLASS LOCATED ON PORT & STBD GUNWALE FORWARD BOW AREA.
Condition: Unknown
Due 17 April 1990
Resolved 17 April 1990
Navigation
Issued 17 April 1990 Resolved
COAST PILOT OUTDATED.
Condition: Unknown
Due 17 April 1990
Resolved 17 April 1990
Construction/Loadline
Issued 31 March 1989 Resolved
REPAIR DELAMINATED AREAS IN WAY OF PORT GUNWHALE FORWARD AND STARBOARD GUNWHALE MIDSHIPS.
Condition: Unknown
Due 31 March 1989
Resolved 31 March 1989
Documentation
Issued 20 April 1987 Resolved
OBTAIN FCC RADIO TELEPHONE SAFETY CERTIFICATE.
Condition: Unknown
Due 20 April 1987
Resolved 20 April 1987