MAURY USCG vessel records Sign in
← All vessels

ISLAND CLIPPER

ISLAND CLIPPER is a 1987 passenger vessel (inspected). The Coast Guard has recorded 55 inspections since 1987, most recently in June 2026, along with 110 deficiencies.

Records from 1987 to 2026. Most recent: inspection, 2 June 2026.

Built
1987
Last inspected
2 June 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDQ3746
280594
Flag
UNITED STATES
367365980, 368419560
Maury page id
psix-280594

Inspections, by type

…with no type recorded2
Years with a record 35 calendar years (1987–2026)
The 55 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)64.9 ft × 20.1 ft × 8.2 ft
Registered tonnagegross 71 / net 57
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBREAUX BROTHERS SHIPYARD · LOREAUVILLE LA · built 1987
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portALEXANDRIA BAY, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 25 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it71 - Simplified, Gross Ton
57 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDQ3746MMSI 368419560 · active · compulsorily equipped · granted 16 May 2025, expires 16 May 2035
WDE5389MMSI 367365980 · active · compulsorily equipped · granted 8 May 2018, expires 1 July 2028
WTM8783MMSI not assigned · expired · compulsorily equipped · granted 3 June 1997, cancelled 15 September 2007
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 55

2 June 2026 Vessel Attendance · Annual Inspection
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8389979
2 March 2026 Deficiency Check · Vessel Attendance · Administrative Inspection
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8318553
15 May 2025 Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8136723
4 June 2024 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7927313
7 June 2023 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7709725
26 May 2022 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7470515
6 May 2022 Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7445495
27 May 2021 COI Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7208200
11 June 2020 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6974200
30 May 2019 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6699660
1 June 2018 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6437096
31 May 2017 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6161090
24 April 2017 Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6131442
25 May 2016 Administrative Inspection · COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5886412
9 June 2014 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4883848
12 June 2012 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4336921
16 May 2012 Drydock Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4313397
5 June 2008 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3227915
4 June 2007 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2945034
3 May 2007 Hull Examination
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2922224
5 June 2006 COI Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2624909
11 April 2005 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2331573
1 June 2004 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2073980
2 June 2003 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 1802616
28 June 2002 Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 1672026
24 May 2002 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 1620170
23 April 2002 Hull Examination
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 1607892
29 June 2001 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1072897
5 June 2001 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1376622
25 May 2000 Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1050921
27 May 1999 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 800982
14 July 1998 Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 230884
3 June 1998 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1123128
21 May 1998 Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1126452
11 July 1997 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1112958
6 June 1997 Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 776949
17 April 1997 Hull Examination
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1107321
6 June 1996 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1182619
22 May 1996 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1084113
9 June 1995 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 879320
25 May 1995 Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 871844
20 September 1994 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1179840
23 June 1994 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1025070
25 May 1994 Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1428342
24 May 1993 COI Inspection
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 829717
29 May 1992 Re-Inspection
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 943118
30 April 1992 Hull Examination
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1268608
21 June 1991 Deficiency Check
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 935744
24 May 1991 Re-Inspection
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 913985
3 July 1990 Deficiency Check
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 918627
22 May 1990 COI Inspection
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1218752
24 May 1989 Re-Inspection
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1036908
20 May 1988 Re-Inspection
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1350045
11 August 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1337019
8 May 1987 Initial Certification
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1339064

Deficiency record · 110

01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 2 June 2026 Resolved
46 CFR 176.310(a): A Certification Expiration [name withheld] indicates the date upon which the vessel's Certificate of Inspection expires. The inspection sticker on the bridge was placed on top on an old inspection sticker, and the expiration date was unreadable. The inspection sticker needs to be removed.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2026
Resolved 24 June 2026
Resolution: Removed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 June 2026 Resolved
46 CFR 185.604 (b) Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. The ring life buoy location on the top deck did not have the vessel's name marked on it. Mark the vessels name on the life buoy in accordance with the requirements in this section.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2026
Resolved 24 June 2026
Resolution: Corrected
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 2 June 2026 Resolved
46 CFR 179.360(a) A hatch exposed to the weather must be watertight. The seal on the watertight hatch going into the steering gear room fell off upon opening the hatch. The seal must be replaced or reattached.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2026
Resolved 2 July 2026
Resolution: New gasket installed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 2 June 2026 Resolved
46 CFR 176.802(a)(2) Inspection and operation of all watertight closures in the hull, decks, and bulkheads including through hull fittings and sea valves. The port side intake in the engine room was leaking. Test the seal to verify watertight integrity
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2026
Resolved 24 June 2026
Resolution: Corrected
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 2 June 2026 Resolved
46 CFR 179.320 (c): A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Multiple wires penetrating through the bulkhead in the engine room were not watertight. Reseal the penetrations to be made watertight.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2026
Resolved 24 June 2026
Resolution: Corrected
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 June 2026 Resolved
46 CFR 176.802(a)(2) Inspection and operation of all watertight closures in the hull, decks, and bulkheads including through hull fittings and sea valves. Excessive water was discovered in the steering gear space. Check through hull fitting for watertight integrity.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2026
Resolved 24 June 2026
Resolution: Corrected
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 May 2025 Resolved
182.15-20(d) Where exhaust piping passes through watertight bulkheads the watertight integrity of the bulkhead shall be maintained. Non-combustible packing shall be used in bulkhead penetration glands. Water cooled exhaust pipes may be welded to steel bulkheads in way of penetrations if suitable arrangements are provided to relieve the stresses resulting from the expansion of the exhaust piping. Starboard Main Diesel Engine (MDE) exhaust is leaking water where flexible hose and aluminum exhaust port meet due to a potential crack in the aluminum or flexible hose. Identify where water intrusion is coming from and make repairs in kind. Vessel shall not operate until exhaust leak is repaired.
Action required: 60 - Rectify deficiencies prior to movement
Due 28 May 2025
Resolved 30 May 2025
Resolution: STBD MDE exhaust leak has been repaired. All sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 May 2025 Resolved
(d) Where exhaust piping passes through watertight bulkheads the watertight integrity of the bulkhead shall be maintained. Non-combustible packing shall be used in bulkhead penetration glands. Water cooled exhaust pipes may be welded to steel bulkheads in way of penetrations if suitable arrangements are provided to relieve the stresses resulting from the expansion of the exhaust piping. Generator exhaust is leaking water from fatigue cracks on the vernalift (discharge side) in the lazarette. Vernalift will need to be replaced in kind. Vessel shall not operate until exhaust leak is repaired.
Action required: 60 - Rectify deficiencies prior to movement
Due 28 May 2025
Resolved 30 May 2025
Resolution: Temp fix, permanent fix will be completed once part arrives. All sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 May 2025 Resolved
182.15-15(b)(3) That part of the exhaust system between the point of cooling water injection and the engine manifold shall be water-jacketed or effectively insulated. Exhaust insulation in engine room needs to be properly installed on exhaust piping. Wiring between insulation pieces are missing throughout engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 5 June 2025
Resolution: Insulation is properly secured. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 May 2025 Resolved
Flexible hose designed for use with hose clamps may be installed with two clamps, at both ends of the hose. Flexible hosed used on port MDE at bilge pump is missing a hose clamp, install a second hose clamp to ensure two hose clamps per fitting.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 5 June 2025
Resolution: Second hose clamp installed. All sat
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 May 2025 Resolved
Portable fire extinguishers must be located so that they are clearly visible and readily accessible from the space being protected. The installation and location must be to the satisfaction of the Officer in Charge, Marine Inspection. Portable fire extinguisher in engine room needs to be located closer to the ladder accessing the space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 5 June 2025
Resolution: Portable fire extinguisher moved to bas of ladder as entering the engine room. All sat
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 May 2025 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that meet UL 1104, “Standards for Marine Navigation Lights,” or other standard specified by the Commandant. Masthead light is frosted due to sun exposure, lens needs to be replaced. Multiple navigation lights have condensation in lens due to broken gaskets.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 17 June 2025
Resolution: New lens and gaskets installed. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 May 2025 Resolved
The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Need to update vessel hailing port.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2025
Resolved 5 June 2025
Resolution: Hailing port changed to current port. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 15 May 2025 Resolved
(a) At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Miscellaneous lights throughout vessel missing light covers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2025
Resolved 17 June 2025
Resolution: Lights have been replaced. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 May 2025 Resolved
(a) At each initial and subsequent inspection for certification and reinspection the -marine inspector shall examine and test the main and auxiliary steering apparatus to the extent necessary to determine that its condition is satisfactory and that it is fit for the service intended. The main and auxiliary steering apparatus shall be tested by operation and the inspector shall examine the mechanism thereof throughout its length. Rod end bearing on push rod where it meets the tiller arm is seized and beginning to wear on itself causing metal shavings to accumulate on tiller arm. Both rod arm bearings need to be replaced in kind.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2025
Resolved 30 June 2025
Resolution: New rod end bearings installed, op test sat.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 4 June 2024 Resolved
The life floats stored on the aft portion of the upper deck have small pinholes from birds pecking at the cover. Repair life floats with authorized repair kit prior to the carriage of passengers on a route in excess of 1 mile from shore.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 July 2024
Resolved 19 June 2024
Resolution: Vessel rep sent photographs of repaired life floats.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 7 June 2022 Resolved
Port navigational running light not illuminated. Correct as required by navigational regulations.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2022
Resolved 7 June 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 May 2022 Resolved
Retro Reflective tape on the aft Ring Buoy worn. Required renewing iaw 46 CFR 185.604
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2022
Resolved 7 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2022 Resolved
Bilge suction line for the forepeak had a tear in it due to the line not being able to properly drain. A tee will be installed during the repair to faciliate drainage.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2022
Resolved 7 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2022 Resolved
Galvanized elbow on the outboard side of the MSD was corroded. Owner to renew elbow.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2022
Resolved 7 June 2022
Resolution: Viewed elbow. O/O stated elbow was cleaned up, in good condition therefore was not renewed. Viewed, beat the galvanized elbow with an inspection hammer. Concurred elbow in good condition. Requirement cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 June 2020 Resolved
Temp repair made to the machinery space bilge piping. Make permenent repairs prior to carrying passengers in 2021.
Action required: 705 - Other - as specified
Due 1 June 2021
Resolved 27 May 2021
Resolution: repaired with new piping. verified at 2021 COI.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 11 June 2020 Resolved
Wet exhaust flexable pipe needs 2 hose clamps.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2020
Resolved 22 June 2020
Resolution: Wet exhaust hose was double clamped.
Communications › Radio Communications › EPIRB
Issued 1 June 2018 Resolved
EPIRB registration & battery are expired. Vessel is limited to no more than 3 miles from shore until a new EPRIB registration and battery are verified.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: EPRIB was replaced with new unit and battery. Registration completed.
Lifesaving › Lifefloat › Paddle
Issued 1 June 2018 Resolved
Several paddles are broken and all are far less than 4' as required. Also, paddles are not lashed to the life floats. Correct within two weeks. Until then vessel is limited to no more than 1 mile from shore.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 June 2018
Resolved 14 June 2018
Resolution: Paddles replaced and labeled.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 1 June 2018 Resolved
Two lights do not have approval numbers on them and at least one is broken and not operable. Also, lines connecting the lights to the life floats are too short and must be at least 18'. Two weeks to correct. Until then vessel is limited to no more than 1 mile from shore.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 June 2018
Resolved 14 June 2018
Resolution: Lights were replaced with new approved types which functioned properly. Lines were of proper length.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 1 June 2018 Resolved
EAP information not posted or available.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: EAP posted.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 1 June 2018 Resolved
Vessel does not have alcohol testing equipment on board for use. Provide approved means for SMI testing requirements.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: Alcohol tested devices on board and approved.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 1 June 2018 Resolved
Supervisor not trained for EAP at least one hour. Obtain at least one hour of EAP training to meet regulatory requirements.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: Supervisor has enrolled in online EAP training program.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 1 June 2018 Resolved
Vessel does not have thier drug testing program policy statement posted.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: Policy statement posted.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 1 June 2018 Resolved
Company has not submitted last years MIS reports to the CG as required. Submit MIS report within 2 weeks.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: MIS reports were preveously submitted for 3 consecutive years and company has less than 10 crewmembers. MIS reports are not requried to be submitted as long as they are maintined on board.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 1 June 2018 Resolved
Vessel does not have any MOB, Fire, Abandon ship drills logged. Also, vessel is not logging EIPRIB checks. Vessel required to have a log book or other documentation process implemented on board for the tracking of all required log entries.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: Logging of drills discussed and log book provided. Recent drills were found logged properly.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 1 June 2018 Resolved
Operator could not provide a current radio safety certificate. An expired cert from 2017 was found but no current cert could be found. Have radios serviced and provide a new safety radio certificate.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: New cert found on board and valid.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 1 June 2018 Resolved
Vessel did not have up to date nav pubs such as Coast Pilot, Light list, Notice to Mariners, or up to date charts for operating area. Provide all required nav pubs and charts.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: Nav pubs on board and new charts are ordered and in route.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 1 June 2018 Resolved
Vessel was unable to get underway at time of inspection. Drills must be conducted in presence of CG inspector for credit for annual inspection.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: Drills witnessed. MOB and fire.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 31 May 2017 Resolved
Removed one Adult life Jacket no longer in good servable condition. Renew one Type I USCG Approved Life Jacket iaw 46 CFR 180.71
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 16 June 2017
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 31 May 2017 Resolved
Noted several of the main deck interior seating/benches were loose and not properly secured. Secure all loose seating/benches in the main passenger cabin iaw 46 CFR 177.820
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2017
Resolved 31 May 2017
Resolution: Verified O/O corrected prior to CG MI departure
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 31 May 2017 Resolved
Observed loose chunks of the overhead foam in the #2 Compartment bilge. Remove loose chunks of foam iaw 46 CFR 177.700
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2017
Resolved 31 May 2017
Resolution: Verified corrected prior to CG MI departure
Electrical › Electric Supply System (service) › Cable
Issued 31 May 2017 Resolved
Observed one electrical cable suffering tube was not water tight. Properly seal the loose electrical cable penetrating thru engine room, located fwd bulkhead on port side iaw 46 CFR 179.360
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 16 June 2017
Electrical › Lighting (service) › Lighting Fixture
Issued 31 May 2017 Resolved
Observed two of the engine room florescent light fixture covers were warped. Renew covers or renew light fixtures iaw 46 CFR 183.410
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2017
Resolved 16 June 2017
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 31 May 2017 Resolved
First Aid kit, Iodine expired, renew iaw 46 CFR 184.710
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 June 2017
Resolved 16 June 2017
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 31 May 2017 Resolved
Engine room bilge alarm, faint audible indication. Repair or renew the Pilot Houses, Engine room bilge alarm iaw 46 CFR 182.530
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 June 2017
Resolved 16 June 2017
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 26 May 2016 Resolved
Items in the first aid kit were expired. Renew expired items in the first aid kit per 46 CFR 184.710
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 June 2016
Resolved 1 July 2016
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 26 May 2016 Resolved
Fire Extinguishers last serviced June 2015. After serving, submit fire extinguisher service report to attending CG [name withheld] 46CFR176.810
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 July 2016
Resolved 1 July 2016
Operations/Management › Pollution › Removal Methods/Procedures
Issued 26 May 2016 Resolved
Waste management plan not available. Draft and provide a copy of vessels waste management plan to attending CG [name withheld] 33CFR151.57
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 June 2016
Resolved 1 July 2016
Lifesaving › Buoyant Apparatus › Float-free Link
Issued 26 May 2016 Resolved
Observed weak-link for the aft life floats was rusted, broken and no longer serviceable. Renew and install an approved weak-link on the aft life floats IAW 46CFR 180.137(a).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 June 2016
Resolved 1 July 2016
Lifesaving › Buoyant Apparatus › Painter
Issued 26 May 2016 Resolved
Observed line/painter connecting each life float was of insufficient length (8ft). Re-install with adequate line/painter, 20 ft line on aft life floats and 30 ft line on pilot house life floats per 46CFR180.137(e)(3).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 June 2016
Resolved 1 July 2016
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 26 May 2016 Resolved
Observed EPIRB Hydro release expires in June 2016. Renewed EPIRB hydro static release on or before 01JULY2016.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 July 2016
Resolved 1 July 2016
Electrical › Lighting (service) › Lighting Fixture
Issued 26 May 2016 Resolved
Observed two light fixtures, one fluorescent, one incandescent, on the aft main deck in way of the aft stairs were filled with water. Repair both fixtures to prevent water intrusion per 46CFR 183.410
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Electrical › Electric Supply System (service) › Cable
Issued 26 May 2016 Resolved
Observed wires exposed on the vessels electrical shore tie cable. Make repairs to correct and eliminate the exposed wire per 46CFR183.340
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Lifesaving › Buoyant Apparatus › Float Free
Issued 26 May 2016 Resolved
Observed the pilot house life float ores/paddles were not lashed to life floats. Lash ores/paddles to the life floats per 46CFR180.175(f)(2).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 June 2016
Resolved 1 July 2016
Fire Fighting › Fire Pumps › Casing
Issued 26 May 2016 Resolved
Observed fire pump (inboard of the stbd main engine) was leaking water, and cover missing a couple of screws. Make repairs, add missing screws and eliminate water leakage from the fire pump IAW 46CFR176.816
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Engineering › Fuel Oil Service System › Hose
Issued 26 May 2016 Resolved
Observed on the generator, a fuel hose out covering was worn. Renew the worn fuel oil hose, with an approved hose IAW 46 CFR 182.720
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Electrical › Electric Generation Source (service) › Panelboard
Issued 26 May 2016 Resolved
Observed the generator frequency meter at the operating station/pilot house was reading 56 HZ. Adjust or repair the generator frequency meter per 46CFR183.200
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 26 May 2016 Resolved
EAP information is not displayed per 46 CFR 16.401
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 26 May 2016 Resolved
EAP Hotline number is not displayed per 46CFR 16.401
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 26 May 2016 Resolved
Company rep unsure if contact information for the employer substance abuse professional number is correct. Company rep to verify per 46 CFR 16.401
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 June 2016
Resolved 1 July 2016
Communications › Radio Communications › EPIRB
Issued 9 June 2014 Resolved
Replace EPRIB hydrostatic release
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2014
Resolved 30 June 2014
Resolution: Ower ordered and installed new hyrdostatic release
Communications › Radio Communications › EPIRB
Issued 12 June 2012 Resolved
Replace expired EPIRB battery prior to carrying passengers beyond 3 nautical miles from land.
Action required: 705 - Other - as specified
Resolved 26 June 2012
Resolution: New EPIRB purchased, registered, and onboard.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 5 June 2008 Resolved
Provide Proper Light on Life Float located at pilot house IAW 46 CFR 180.175(d). (Light is in-operable)
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 June 2008
Resolved 24 June 2009
Resolution: Observed proper operation water light installed.
Communications › Radio Communications › EPIRB
Issued 5 June 2008 Resolved
Provide proper EPIRB (Hydro static release) IAW 185.728 prior to 19/June/08
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 June 2008
Resolved 24 June 2009
Resolution: Observed proper hydrostatic release installed.
Engineering › Fuel Oil Service System › Hose
Issued 5 June 2008 Resolved
Provide proper fire sleeves or renew oil/fuel hoses IAW 182.40-5(b) Prior to 7/July/08.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 July 2008
Resolved 24 June 2009
Resolution: Observed proper fire sleaves installed on required hoses.
Engineering › Fuel Oil Service System › Pump
Issued 5 June 2008 Resolved
Ensure compliance with CFR 46 176. 25-50 (b) (Leaking fuel pump on generator) Prior to 7/July/08
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 July 2008
Resolved 24 June 2009
Resolution: Verified repair completed.
Navigation › Piloting/Steering › Marine Charts
Issued 1 June 2004 Resolved
Replace/Update vessels Navigation Charts
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 June 2004
Resolved 15 June 2004
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 1 June 2004 Resolved
Renew/Replace broken windon, located port side main deck in passenger cabin
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 June 2004
Resolved 15 June 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 27 May 2003 Resolved
Extinguishers all need to be serviced by a USCG approved service company. LEGACY COMPONENT DESC: Service
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2003
Resolved 13 June 2003
Resolution: Serviced by Van''s Fire Protection Company.
Fire Fighting › Fire Hoses
Issued 27 May 2003 Resolved
Fire hoses (two garden hoses) are showing signs of wear. Both need to be replaced with new industrial type non-kinking, rubber hoses. LEGACY COMPONENT DESC: Condition
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 June 2003
Resolved 13 June 2003
Resolution: Fire hoses replaced.
Documentation › Certificates/Documents
Issued 27 May 2003 Resolved
Owner had not yet received his renewal for 2003. Presented proof of a check sent to USCG for fees. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Action required: 705 - Other - as specified
Due 13 June 2003
Resolved 13 June 2003
Resolution: New COD onboard vessel.
Engineering › Bilge Water Management System
Issued 27 May 2003 Resolved
Port impeller on bilge pump is worn and in need of replacement. LEGACY COMPONENT DESC: Pump
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 June 2003
Resolved 13 June 2003
Resolution: Impeller replaced.
Communications › Radio Communications
Issued 27 May 2003 Resolved
Hydrostatic release for EPIRB expired. LEGACY COMPONENT DESC: EPIRB
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2003
Resolved 13 June 2003
Resolution: New hydrostatic release installed.
Operations/Management › Drills/Instruction
Issued 24 May 2002 Resolved
Conduct fire and person overboard drills. LEGACY COMPONENT DESC: Man Overboard Recovery
Action required: 705 - Other - as specified
Due 28 June 2002
Resolved 28 June 2002
Resolution: Witnessed satisfactory fire and person overboard drills.
Lifesaving
Issued 29 June 2001 Resolved
Replace straps and lines on all life floats during winter layup.
Condition: Unknown
Due 30 January 2002
Resolved 23 April 2002
Construction/Loadline
Issued 5 June 2001 Resolved
Ensure penetrations through wt blkd are made watertight.
Condition: Unknown
Due 5 June 2001
Resolved 5 June 2001
Lifesaving
Issued 5 June 2001 Resolved
Repair all life floats in way of belt strapping and lifelines as discussed w/CG inspector. Obtain proper repair information from manufacturer. Repair and replace oars as neccessary.
Condition: Unknown
Due 5 June 2001
Resolved 5 June 2001
Accommodation/Occupational Safety
Issued 5 June 2001 Resolved
Replace broken window on stbd side main deck accommodation area.
Condition: Unknown
Due 5 June 2001
Resolved 5 June 2001
Lifesaving
Issued 5 June 2001 Resolved
Replace expired flares by Jun 10, 2001.
Condition: Unknown
Due 5 June 2001
Resolved 5 June 2001
Lifesaving
Issued 25 May 2000 Resolved
Re-apply new retroflective tape to all bouyant apparatus/lifefloats.
Condition: Unknown
Due 25 May 2000
Resolved 25 May 2000
Lifesaving
Issued 25 May 2000 Resolved
Post emergency broadcast instructions as required by 46 CFR 184.506/.510.
Condition: Unknown
Due 25 May 2000
Resolved 25 May 2000
Fire Fighting
Issued 27 May 1999 Resolved
Portable fire extinguishers have not been hydro tested (12 yr) in accordance with NFPA-10. Conduct hydro test of all portable fire extinguishers.
Condition: Unknown
Due 27 May 1999
Resolved 27 May 1999
Lifesaving
Issued 27 May 1999 Resolved
[name withheld] with vessel's name in accordance with 46 CFR 185.604(c)
Condition: Unknown
Due 27 May 1999
Resolved 27 May 1999
Lifesaving
Issued 27 May 1999 Resolved
Mount 406 Mhz EPIRB and send registration card to manufacturer. Fax a copyto USCG.
Condition: Unknown
Due 15 June 1999
Resolved 1 June 1999
Accommodation/Occupational Safety
Issued 27 May 1999 Resolved
Vessel is equipped with first aid kit that is not approved; provide approved first aid kit or equivalent in accordance with 46 CFR 184.710.
Condition: Unknown
Due 27 May 1999
Resolved 27 May 1999
Lifesaving
Issued 21 May 1998 Resolved
Replace ring buoy waterlight prior to operating at night.
Condition: Unknown
Due 21 May 1998
Resolved 21 May 1998
Electrical
Issued 21 May 1998 Resolved
Ensure all lighting is in proper working order for all below deck spaces.
Condition: Unknown
Due 21 May 1998
Resolved 21 May 1998
Navigation
Issued 21 May 1998 Resolved
Tighten steering hydraulic ram bolt and double nut or cotter pin.
Condition: Unknown
Due 21 May 1998
Resolved 21 May 1998
Electrical
Issued 6 June 1997 Resolved
Water piping and hose connection were routed adjacant to the battery chargers on aft bulkhead of engine room. The battery chargers were not fitted with drip shields. Install drip shields onto battery chargers or reroute piping and hose connection to avoid spray ar dripping hazzard.
Condition: Unknown
Due 6 June 1997
Resolved 6 June 1997
Electrical
Issued 6 June 1997 Resolved
Lead liners for Main Engine starting batteries were wasted and corroded. Renew lead liners fro battery boxes. 46 CFR 183.350
Condition: Unknown
Due 6 June 1997
Resolved 6 June 1997
Lifesaving
Issued 6 June 1997 Resolved
Paddles for lifefloats were stowed in wheelhouse to prevent weather damage and lifefloats were removed from stowage cradles for inspection. Properly stow lifefloats, and waterlights and lash paddles to each lifefloat as per 46 CFR 180.175(e)(2).
Condition: Unknown
Due 6 June 1997
Resolved 6 June 1997
Accommodation/Occupational Safety
Issued 6 June 1997 Resolved
Mark upper deck maximum passenger capacity in accordance with stability letter as per 46 CFR 185.602(g).
Condition: Unknown
Due 6 June 1997
Resolved 6 June 1997
Electrical
Issued 6 June 1997 Resolved
Inverter mounted in engineroom for DC/AC system used to power enterrainmentequipment on dinner cruises is not U.L. listed and is not marine rated._x001C_ Provide data for same or remove/replace with proper type.
Condition: Unknown
Due 6 June 1997
Resolved 6 June 1997
Lifesaving
Issued 6 June 1997 Resolved
Pendants for 10 man lifefloat were deteriorated. Renew 10 pendants to meet requirements in subpart 46 CFR 160.010
Condition: Unknown
Due 6 June 1997
Resolved 6 June 1997
Construction/Loadline
Issued 25 May 1995 Resolved
Replace the missing gaskets on both the port pilothouse door and the port bathroom door prior to the compliance date.
Condition: Unknown
Due 25 May 1995
Resolved 25 May 1995
Lifesaving
Issued 25 May 1995 Resolved
Restencil the vessel's name on each of the lifefloats as required by 46CFR180.20-5(a) prior to the compliance date.
Condition: Unknown
Due 25 May 1995
Resolved 25 May 1995
Electrical
Issued 25 May 1994 Resolved
RENEW FRAYED CABLE TO TRACK LIGHTING LOCATED AFT OF PILOTHOUSE
Condition: Unknown
Due 25 May 1994
Resolved 25 May 1994
Electrical
Issued 25 May 1994 Resolved
TAPE ELECTRICAL WIRES WHICH ARE NOT INSULATED AND EXPOSED TO THE WEATHER ONTOP OF THE BRIDGE UNDER THE RADAR.
Condition: Unknown
Due 25 May 1994
Resolved 25 May 1994
Fire Fighting
Issued 25 May 1994 Resolved
REPLACE INADEQUATE FORWARD FIRE STATION 25 FOOT HOSE WITH 50 FOOT HOSE REQUIRED BY THE CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Navigation
Issued 25 May 1994 Resolved
REPLACE EXTINGUISHED STERN LIGHT
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Construction/Loadline
Issued 25 May 1994 Resolved
SHOW PROPER OPERATION OF THE BILGE PUMP IN THE BOW COMPARTMENT
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Electrical
Issued 25 May 1994 Resolved
REPLACE NUMEROUS EXTINGUISHED LIGHTS THROUGHOUT THE VESSEL; ENGINE RM, MEN'S HEAD, AFT DECK AREA, BRIDGE, BRIDGE NAVIGATION COMPASS, BOW COMPARTMENT.
Condition: Unknown
Due 25 May 1994
Resolved 25 May 1994
Lifesaving
Issued 29 May 1992 Resolved
INITIATE VESSEL DRUG POLICY AND TESTING PROGRAM.
Condition: Unknown
Due 29 May 1992
Resolved 29 May 1992
Electrical
Issued 24 May 1991 Resolved
Install chafing material around generator fuel lines at deck plates.
Condition: Unknown
Due 24 May 1991
Resolved 24 May 1991
Fire Fighting
Issued 24 May 1991 Resolved
Provide satisfactory hand fire pump.
Condition: Unknown
Due 24 May 1991
Resolved 24 May 1991
Navigation
Issued 24 May 1991 Resolved
Prove operation of pressure vessel relief valve.
Condition: Unknown
Due 24 May 1991
Resolved 24 May 1991
Construction/Loadline
Issued 24 May 1991 Resolved
Seal bulkhead stuffing tubes in fuel tank compartment.
Condition: Unknown
Due 24 May 1991
Resolved 24 May 1991
Construction/Loadline
Issued 24 May 1991 Resolved
Provide satisfactory operation of forepeak bilge suction reach rod.
Condition: Unknown
Due 24 May 1991
Resolved 24 May 1991
Construction/Loadline
Issued 22 May 1990 Resolved
PLUG THRU DECK AND BULKHEAD
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Navigation
Issued 22 May 1990 Resolved
INSTALL RELIEF VALVE ON AIR HORN PRESSURE VESSEL.
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Lifesaving
Issued 22 May 1990 Resolved
PROVIDE ADDITIONAL PASSENGER ORIENTATION INSTRUCTIONS.
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Lifesaving
Issued 22 May 1990 Resolved
REPLACE WATER LIGHT BATTERIES IN ALL WATER LIGHTS AND PROVE SATISFACTORY OPERATION.
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Fire Fighting
Issued 22 May 1990 Resolved
REPAIR FIRE MAIN PIPE BRACKET IN FORWARD VOID.
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Documentation
Issued 8 May 1987 Resolved
PRIOR TO PLACING VESSEL INTO SERVICE POST STABILITY LETTER IN WHEELHOUSE.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.