Inspection history · 14
23 September 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8239430
31 July 2025
COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8192199
10 March 2025
Internal Structural Exam · Administrative Inspection · Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8091203
12 February 2025
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8078576
17 June 2024
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7937603
4 June 2021
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7215660
9 July 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7008145
15 April 2019
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6662413
13 March 2019
Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6642004
12 April 2018
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6390064
8 May 2017
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6141128
16 March 2017
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6106830
27 June 2016
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5918684
25 February 2016
Deficiency Check · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5821627
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 31 July 2025
Resolved
Any vessel of at least five net tons which engages in the fisheries on the navigable waters of the United States or in the Exclusive Economic Zone, or coastwise trade must have a Certificate of Documentation. Vessel was issued a COD, but did not have a valid COD on board.46CFR67.7
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 4 August 2025
Resolution: Valid COD is onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 31 July 2025
Resolved
Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Names need to be stenciled on life jackets.46CFR185.604
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 16 August 2025
Resolution: Vessel's name has been marked on lifejackets.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 31 July 2025
Resolved
Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name.46CFR185.604
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 16 August 2025
Resolution: Vessel's name has been stenciled on life buoys
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 31 July 2025
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 25 millimeters (1 inch) numbers and letters at the entrance. Install placard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 25 August 2025
Resolution: Placard installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 July 2025
Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Trash can was plastic.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 25 August 2025
Resolution: Noncombustible receptacle removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 July 2025
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. electrical outlets in engine room were exposed without a cover. 46CFR183.340(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 25 August 2025
Resolution: Covers installed on electrical outlets.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 31 July 2025
Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with An operable Type II or III device that has a label. Provide approval label for sewage holding tank.33CFR159.7(a)1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2025
Resolved 16 August 2025
Resolution: Label placed on MSD
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 31 July 2025
Resolved
The construction and arrangement of a vessel must allow necessary facilities for passengers and crew. Repair PVC pipe elbow for sewage system. 46CFR177.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2025
Resolved 25 August 2025
Resolution: Repair to PVC pipe elbow compelted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 April 2019
Resolved
Operator damaged bilge pump impellar due to overboard discharge valves not being in-line. Operator to make repairs to bilge pump and reschedule for inspection for testing of system prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2019
Resolution: Observed proper operation of bilge pump and bilge system.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 15 April 2019
Resolved
Did not observe abandon ship and fire drill due to lack of crew members. Operator must conduct abandon ship and fire drills prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2019
Resolution: Observed satisfactory man-overboard and fire drills.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 15 April 2019
Resolved
Vessel missing markings for adult/child life jacket stowage/location. The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 April 2019
Resolution: Observed proper markings for life jacket stowage requirements.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 15 April 2019
Resolved
Operator did not have provide a Coast Guard Light List and the vessel provided an out dated navigational charts for area of operation. Vessel must carry adequate and up to date Coast Guard Light List and navigational charts.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 April 2019
Resolution: Vessel purchased and has on board current light list and charts.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 15 April 2019
Resolved
Vessel is equipped with plastic tubular sight gauge and non-automatic shut-off valves for fuel tank sight gauge. Provide proof, installed sight gauge is heat resistant and install automatic shut-off valves. Provide proposal to be in compliance with the requirements of 46 CFR 182.440(a)(7).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 June 2019
Resolution: Vessel was provided with extension due date due to issues with availability of parts and shipping delay. The old sight gauge and associated piping system removed and replaced with electronic sensors and fuel gauge monitor at the operating station.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 8 May 2017
Resolved
Fix hand rail courses on the aft end of the upper deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Hand rail has been fixed.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 8 May 2017
Resolved
Install new batteries in life ring float lights.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: New batteries have been installed.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 8 May 2017
Resolved
Label and place retro tape on the aft life ring.
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Life rings have been properly labeled
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 8 May 2017
Resolved
Replace retro tape on the 02 child PFDs identified.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Lifejackets have new retro
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 8 May 2017
Resolved
Properly label all life jacket storage containers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Containers properly labeled.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 8 May 2017
Resolved
Affix life jacket containers to the upper deck
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Containers have been fixed.
Lifesaving › Lifebuoys › Stowage
Issued 8 May 2017
Resolved
Properly mount both port and stbd side life rings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Life rings have been mounted.
Fire Fighting › Fire Pumps › Pressure
Issued 8 May 2017
Resolved
Prove proper operation of the fixed fire pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2017
Resolution: Pump was properly run by the end of the COI inpsection.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 8 May 2017
Resolved
Blank off and label all breakers on the bridge panel
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Breakers have been fixed.
Electrical › Electrical Distribution System (service) › Switch
Issued 8 May 2017
Resolved
Label the fire pump breaker on the bridge.
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 18 May 2017
Resolution: Breaker has been labeled.
Fire Fighting › Fire Hoses › Condition
Issued 27 June 2016
Resolved
CC01: Fire hoses are unserviceable. Fire hose must be attached to each fire hydrant. Provide new fire hose. New T-46 CFR 181.320(a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2016
Resolved 28 June 2016
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 27 June 2016
Resolved
CC02: Fwd & aft bulkheads in fuel tank #3 compartment. Bulkhead penetrations are not sealed. Old T- 46 CFR 171.114(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 July 2016
Resolved 13 July 2016
Engineering › Bilge Water Management System › Strainer
Issued 27 June 2016
Resolved
CC03: Bilge pick-up in fuel tank #3 compartment is not fitted with a strainer, provide proper strainer. New T- 46 CFR 182.510(b)
Due 5 July 2016
Resolved 9 September 2016
Resolution: Received pictures/email confirmation from owner attesting to installation of new bilge pick-ups w/ strainers.
Engineering › Bilge Water Management System › Strainer
Issued 27 June 2016
Resolved
CC04: Bilge pick-up in engine room #4 compartment is not fitted with a strainer, provide proper strainer. New T- 46 CFR 182.510(b)
Due 5 July 2016
Resolved 9 September 2016
Resolution: Received pictures/email confirmation from owner attesting to installation of new bilge pick-ups w/ strainers.
Electrical › Electric Generation Source (service) › Grounding Conductor
Issued 27 June 2016
Resolved
CC05: Metallic electrical boxes are not grounded. Properly ground all electrical metallic boxes to a common ground. Old T- 46 CFR 183.10-20(g)
Condition: Improper Installation
Due 27 July 2016
Resolved 26 July 2016