Records from 2016 to 2026. Most recent: inspection, 23 January 2026.
Inspection history · 14
23 January 2026
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8300662
7 November 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8264419
29 October 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8026568
15 December 2023
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7844755
7 November 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7821353
4 August 2022
Administrative Inspection · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7524548
8 November 2021
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7347478
21 January 2021
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7131692
6 November 2020
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7126767
18 September 2019
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6810856
18 June 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6450572
28 July 2017
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6223377
18 May 2016
DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5973653
8 January 2016
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5795453
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 23 January 2026
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] and DD Exam, MI discovered several holes in the hull that need to be addressed prior to carry of passengers. There are several areas on the hull that need to be repaired. Submit repair plan to local OCMI for approval.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 February 2026
Resolution: Received photo evidence repairs were made all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 January 2026
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] and DD Exam, MI discovered that both the rudder and shaft bearing are in need of repair along with the propeller being damaged and cotter pin missing. Make repairs to the satisfaction of the attending MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 February 2026
Resolution: Received photo evidence repairs were made all sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 November 2025
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction, and a uniform load of 74 kilograms per meter (50 pounds per foot) applied to the top rail in any direction. The point and uniform loads do not need to be applied simultaneously. Port aft rail was found to have a cracked weld.
46CFR177.900(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 November 2025
Resolved 14 November 2025
Resolution: Railing repaired. All sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 29 October 2024
Resolved
07109 - A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. The pre-engineered fixed fire extinguishing system did not shut down the engines when tested.
46 CFR 181.420(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 October 2024
Resolution: Vessel operator sent a video showing proper operation of the system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 October 2024
Resolved
13104 - A visual and audible alarm must be provided at the operating station to indicate a high water level. The visual indicator for the high level alarm was inoperable.
46 CFR 182.530(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 November 2024
Resolution: Received video showing proper operation of high level alarm
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 29 October 2024
Resolved
09232 - At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil. There was excess oil accumulation in the engine compartment.
46 CFR 176.830(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 October 2024
Resolution: Verified the excessive oil was cleaned in the engine compartment.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 November 2023
Resolved
33 CFR 174.19(a(6) - Except as allowed in paragraph (b) of this section, each certificate of number must contain the following information:Primary operation: Authorized terms are, “charter fishing”, “commercial fishing”, “commercial passenger carrying”, “dealer or manufacturer demonstration”, “other commercial operation”, “pleasure”, or “rent or lease”. Vessel is state licensed for pleasure use only and not commercial.
Vessel to be properly registered as a Commercial vessel NLT 01 January 2024.
Action required: 705 - Other - as specified
Due 1 January 2024
Resolved 15 December 2023
Resolution: Vessel representative emailed proof of proper registration - "commercial passenger carrying".
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 August 2022
Resolved
A pre-engineered fixed gas fire extinguishing system must: Automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. The pre-engineered fixed gas fire extinguishing system did not automatically shutdown the engine during multiple tests of the system.
46 CFR 181.420(a)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 November 2023
Resolution: Verified the engine automatically shutdown when fixed gas fire extinguishing system was activated to the satisfaction of the attending CG MArine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 August 2022
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. There were no markings for the remote fuel shutoffs.
46 CFR 185.608
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 November 2023
Resolution: Verified markings of the remote fuel shutoffs to the satisfaction of the attending CG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 November 2021
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have, at the operating station, a means to reset devices used to automatically shut down engines. Engine could not be restarted following an activation test of the pre-engineered fixed gas fire extinguishing system.
46 CFR 181.420(b)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 August 2022
Resolution: Deficiency rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 November 2021
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Operating station visual indicator for engine compartment automatic bilge pump is inoperable.
46 CFR 182.530(c)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 November 2021
Resolved 8 August 2022
Resolution: Bilge pump visual indicator is operable.