Records from 1987 to 1998. Most recent: inspection, 16 November 1998.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 19
16 November 1998
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 422674
1 September 1992
Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 952141
10 July 1992
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 64881
9 July 1992
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 510747
4 August 1991
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 449857
4 August 1991
Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 939624
27 July 1989
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 490298
4 April 1989
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 329486
23 January 1989
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 327980
23 January 1989
Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1208580
28 October 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 319240
28 October 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1020230
28 August 1987
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1315490
16 July 1987
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1331406
1 July 1987
Type not recorded
No type recorded · COTP NEW HAVEN · USCG Northeast District (CGD-NE) · Activity 461670
19 June 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1311505
16 June 1987
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 533327
16 June 1987
Certificate of Compliance
Administrative · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1309651
16 June 1987
MARPOL Annex II Examination
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1310661
Fire Fighting
Issued 1 September 1992
Resolved
MAKE PERMANANT REPAIRS TO FIREMAIN ON MAIN DECK AT ENTRANCES TO PUMP ROOM._x001C_TWO PINHOLE LEAKS FOUND, ONE PORT AND ONE STBD, TEMPORARY REPAIRS SAT. TO BE COMPLETED AT NEXT U.S. PORT OF ENTRY.
Condition: Unknown
Due 1 October 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 4 August 1991
Resolved
INSTALL RETRO REFLECTIVE TAPE ON ALL LIFEBOATS IN ACCORDANCE WITH SOLAS 74/78 III/30.2.7 BY NLT NEXT U.S. PORT VISIT.
Condition: Unknown
Due 4 August 1991
Resolved 4 August 1991
Lifesaving
Issued 4 August 1991
Resolved
PROPERLY INSTALL LIFE RAFT HYDROSTATIC RELEASES AND WEAKLINKS IN ACCORDANCEWITH SOLAS 74/78 III/38.6.1 AND 38.6.2 BY NLT NEXT U.S. PORT VISIT.
Condition: Unknown
Due 4 August 1991
Resolved 4 August 1991
Fire Fighting
Issued 4 August 1991
Resolved
RENEW FIREMAIN LINE FOR THE #2 STBD FOAM MONITOR IN AREA OF BURST PIPE BY NLT NEXT U.S. PORT VISIT.
Condition: Unknown
Due 4 August 1991
Resolved 4 August 1991
Deck/Cargo
Issued 4 August 1991
Resolved
REMOVE ALL OIL FROM CARGO PUMP ROOM BILGES BY NLT NEXT U.S. PORT VISIT.
Condition: Unknown
Due 4 August 1991
Resolved 4 August 1991
Deck/Cargo
Issued 4 August 1991
Resolved
PROVE PROPER OPERATION OF OXYGEN PERCENT OUTPUT BY NLT NEXT U.S. PORT VISIT.
Condition: Unknown
Due 4 August 1991
Resolved 4 August 1991
Lifesaving
Issued 4 August 1991
Resolved
REPLACE PORTABLE HAND RADIOS OR PROVIDE PROOF THAT PRESENT RADIOS ARE INTRINSICALLY SAFE BY NLT NEXT U.S. PORT VISIT.
Condition: Unknown
Due 4 August 1991
Resolved 4 August 1991
Documentation
Issued 28 October 1987
Resolved
VESSEL ENTERED PORT AND BEGAN DISCHARGE OF CRUDE OIL CARGO AND DID NOT HAVEA VALID I.O.P.P. CERTIFICATE OR VALID EQUIVALENT DOCUMENTATION AS REQUIRED BY 33CFR151.21(A). THE VESSELS I.O.P.P. CERTIFICATE HAD EXPIRED 02OCT87.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Documentation
Issued 28 October 1987
Resolved
THE VESSEL DOES NOT HAVE AN APPROVED C.B.T. SYSTEM NOR CERTIFICATION THAT THE VESSEL COMPLIES WITH MARPOL RESOLUTION 14 AND DOES NOT HAVE AN APPROVEDC.B.T. OPS MANUAL ON BOARD AS REQUIRED BY 33CFR157.216(A)(1) & (A)(2).
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Documentation
Issued 28 October 1987
Resolved
THE VESSEL ENTERED PORT AND DISCHARGED CARGO OF CRUDE OIL AND DID NOT HAVE AN APPROVED C.O.W. SYSTEM, NOR A DOCUMENT CERTIFYING THAT THE C.O.W. SYSTEMCOMPLIES WITH RES.15 OF MARPOL, AND DID NOT HAVE AN APPROVED C.O.W. MANUAL ON BOARD AS REQUIRED BY 33CFR157.118(A)(1) & (A)(2).
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Deck/Cargo
Issued 28 October 1987
Resolved
OIL RECORD BOOK ENTRIES SHOW VESSEL HAS BEEN LOADING OIL PRODUCTS IN # 4C DEDICATED CLEAN BALLAST TANK.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Documentation
Issued 28 October 1987
Resolved
VESSEL HAS NOT BEEN FOLLOWING PROVISIONS OF I.O.P.P. CERTIFICATION AND CBT/COW OPS MANUALS. VSL HOLDS DUAL IOPP CERTS (COW & PROD MODES) AND IS REQUIRED TO UNDERGO CLS SURVEY WHEN CHANGING MODES. VSL HAS CHANGED MODES FREQUENTLY SINCE FEB 87 AND HAS NOT COMPLIED WITH THESE REQUIREMENTS.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Deck/Cargo
Issued 28 October 1987
Resolved
VESSEL FAILED TO INSURE CARGO TANKS WERE MAINTAINED WITH AN INERT ATMOSPHERE AS REQUIRED BY 46CFR32.53-5. VSL CONTINUED DISCHARGE OF CRUDE OIL AFTER I.G. FAILURE, CAUSING NEGATIVE PRESSURE IN CARGO TANKS AND SUBSEQUENT ENTRY OF AIR INTO CARGO TANKS DEPLETING THE INERT ATMOSPHERE.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Electrical
Issued 16 June 1987
Resolved
DEMONSTRATE PROPER OPERATION OF THE EMERGENCY GENERATOR & EMERGENCY FIRE PUMP, TO THE SATISFACTION OF THE U.S. COAST GUARD.
Condition: Unknown
Due 16 June 1987
Resolved 16 June 1987
Documentation
Issued 16 June 1987
Resolved
PROVIDE ONBOARD AN APPROVED CRUDE OIL WASHING OPERATIONS & EQUIPMENT MANUAL.
Condition: Unknown
Due 16 June 1987
Resolved 16 June 1987
Documentation
Issued 16 June 1987
Resolved
PROVIDE ONBOARD AN APPROVED OPERATIONS MANUAL FOR THE DISCHARGE MONITORING AND CONTROL SYSTEM.
Condition: Unknown
Due 16 June 1987
Resolved 16 June 1987
Documentation
Issued 16 June 1987
Resolved
PROVIDE ONBOARD AN APPROVED DEDICATED CLEAN BALLAST TANK OPERATIONS MANUAL.
Condition: Unknown
Due 16 June 1987
Resolved 16 June 1987