Records from 1987 to 2017. Most recent: inspection, 3 September 2017.
Inspection history · 82
3 September 2017
Administrative Inspection · Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6282625
7 June 2017
Internal Structural Exam · Administrative Inspection · COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6242772
20 June 2016
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5921699
22 May 2012
COI Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4317443
11 January 2012
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4223521
25 January 2011
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3942384
27 November 2010
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3900241
4 February 2010
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3675670
19 January 2010
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3668376
16 January 2010
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3669469
2 July 2009
Damage Survey · Examination of Repairs
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3521003
13 April 2009
Hull Examination
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3451738
12 March 2009
Deficiency Check · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3433017
12 March 2009
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3434311
21 May 2008
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3212869
25 February 2008
Examination of Repairs
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3152961
25 February 2008
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3153147
11 February 2008
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3150332
24 May 2007
COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2938891
5 April 2007
Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2902315
20 June 2006
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2687267
24 May 2006
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2657501
12 February 2006
Examination of Repairs · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2584445
21 January 2006
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2622577
7 September 2005
Damage Survey · Examination of Repairs
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2486170
6 September 2005
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2544872
23 May 2005
Annual Inspection · Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2365757
11 April 2005
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2327183
21 May 2004
Deficiency Check · Annual Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2073901
1 April 2003
Hull Examination · Annual Inspection · Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1763002
15 February 2003
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1746685
4 May 2002
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1618077
3 May 2002
Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1612319
1 May 2002
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1618047
26 April 2002
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1609865
6 February 2002
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1484587
26 October 2001
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1076051
10 August 2001
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1075101
28 May 2001
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 23904
25 May 2001
Hull Examination · Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1408675
13 October 2000
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 823531
28 September 2000
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 822342
21 August 2000
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 821528
25 July 2000
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1052435
24 July 2000
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 27677
8 June 2000
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1050474
22 April 2000
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 69706
21 April 2000
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 148266
20 April 2000
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1466124
8 October 1999
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1122654
31 August 1999
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1120735
2 July 1999
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1091155
26 May 1999
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 798806
22 April 1999
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1369150
5 March 1999
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 801428
20 November 1998
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1472441
12 May 1998
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1125149
5 May 1998
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1396925
5 May 1997
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1448900
20 November 1996
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1430310
29 April 1996
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1445084
1 May 1995
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1385431
18 January 1995
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1392151
13 May 1994
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1169961
4 May 1994
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1403780
11 May 1993
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 832883
10 May 1993
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1466311
8 February 1993
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1139207
11 May 1992
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1134309
18 February 1992
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1444669
14 May 1991
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 905429
14 May 1991
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1213920
25 January 1991
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 913917
16 May 1990
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1241350
15 February 1990
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 918432
18 May 1989
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1206185
3 March 1989
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1197228
25 May 1988
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1194193
17 February 1988
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1329484
27 January 1988
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1015248
7 January 1988
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1012077
26 May 1987
Initial Certification · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1009444
Documentation › Certificates/Documents › Certificate of Inspection
Issued 27 October 2017
Resolved
Vessel Unable to complete COI Renewal due to Hurricane Harvey. Scheduled for 02 Nov. 2017
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 November 2017
Resolved 3 November 2017
Resolution: Completed Vessel Inspection. Vessel is fit for service listed on COI. Issued renewed COI to Vessel.
Engineering › Steering Gear System › Rudder
Issued 3 September 2017
Resolved
Vessel sustained damage to hull and rudder during heavy weather. Vessel shall be hauled out for drydock and be made available for internal structural exam and hull exam. All repairs shall be made to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 27 October 2017
Resolution: Repairs completed satisfactory and steering checks conducted to the satisfaction of the attending marine inspector.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 7 June 2017
Resolved
Vessels charts, and publications were out of date, ensure required charts and publications are the most current version.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 3 November 2017
Resolution: Inspected Vessel Charts. Charts have been properly updated and porperly labeled.
Engineering › Diesel Engine (propulsion-direct drive) › Turbocharger
Issued 25 January 2011
Resolved
Replace double nuts on try-dyne actuator with permanent replacement.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 23 February 2011
Resolved 22 May 2012
Resolution: Double nuts and wiring installed on the actuator for safety.
Engineering › Fuel Oil Service System › Piping
Issued 27 November 2010
Resolved
Prove proper operation of fuel system prior to carrying passengers.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 January 2011
Resolution: Fuel system repairs were made and a test conducted satisfactorily.
Engineering › Diesel Engine (propulsion-direct drive) › Nozzle, Injection (fuel injection)
Issued 19 January 2010
Resolved
Replace outlet side compression fitting on Port Aransas side fuel pump.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 January 2010
Resolved 4 February 2010
Resolution: COMPRESSION FITTING REPLACED
Engineering › Compressed Air System (control) › Piping
Issued 12 March 2009
Resolved
Repair broken fitting attaching the air line to the governor on the island side diesel engine to the satisfaction of the attending CG marine inspector
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 March 2009
Resolved 12 March 2009
Resolution: Governor and air line were replaced, satisfactory tests were conducted in the presence of attending CG marine inspector.
Engineering › Bilge Water Management System › Valve
Issued 5 April 2007
Resolved
Prove proper operation of the ballast water suction valves; midship shaft alleyway fwd, both both valves. Midship aft alleyway port side valve.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 April 2007
Resolution: Valves have been replaced and tested, all sat.
Construction/Loadline › Hull › Stiffener
Issued 5 April 2007
Resolved
Repair fracture along seam weld for the #2 and #7 vertical stiffener port side along bow headlog.
Action required: 705 - Other - as specified
Resolved 30 April 2007
Resolution: Proper repairs have been made, all sat.
Stability › Watertight Integrity › General
Issued 5 April 2007
Resolved
Both alarm lamps in the wheelhouse used to indicate closure from both WTD's were inop. Replace lamps and prove proper operation at upcoming COI.
Action required: 705 - Other - as specified
Due 1 June 2007
Resolved 24 May 2007
Resolution: Made lamps operational
Engineering › Bilge Water Management System › Piping
Issued 24 May 2006
Resolved
Make permanent repairs to the holes in the bilge pipe overboard discharge.
Action required: 705 - Other - as specified
Due 24 June 2006
Resolved 20 June 2006
Engineering › Diesel Engine (propulsion-electric) › Governor
Issued 24 May 2006
Resolved
Prove proper operation of Harbor Island engine tachometers in pilot house.
Action required: 705 - Other - as specified
Due 24 June 2006
Resolved 20 June 2006
Engineering › Fuel Oil Service System › Hose
Issued 24 May 2006
Resolved
Provide double hose clamps on main engines and generators where applicable (salt water and fuel hoses).
Action required: 705 - Other - as specified
Due 24 June 2006
Resolved 20 June 2006
Construction/Loadline › Structures › Superstructure
Issued 7 September 2005
Resolved
Make permanent repairs to Harbor Island side ramp hook and warped area in vicinity.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 September 2005
Resolved 15 September 2005
Fire Fighting › Ventilation Systems › Ducts
Issued 23 May 2005
Resolved
Prove proper closure of engine room ventilation supply louvers. (rusted, do not close)
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 May 2005
Resolved 24 May 2005
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 May 2004
Resolved
Make all pages of the COI visible.
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 May 2004
Resolved
Secure bracket under radios for cable.
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 21 May 2004
Resolved
Secure brackets for two ring buoy water lights.
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 21 May 2004
Resolved
Overhaul all stbd side fuel tank vents. (broken screens)
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Construction/Loadline › Structures › Ventilators
Issued 21 May 2004
Resolved
Repair two supply ventilation ducts. (corroded, no screens)
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Electrical › Electrical Distribution System (service) › Switchboard
Issued 21 May 2004
Resolved
Replace missing ammeter on/off knob for switchboard in E/R.
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 21 May 2004
Resolved
Make visible or replace two hydraulic psi gauges for vehicle gate hydraulic system.
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Construction/Loadline › Penetrations
Issued 1 April 2003
Resolved
Seal tubing penetrations in bulkhead betwen enginer room and shaft alleys.
Action required: 705 - Other - as specified
Due 1 May 2003
Resolved 23 April 2003
Construction/Loadline › Hull
Issued 1 April 2003
Resolved
Provide recent (within 48 mos) gauging report for hull plating or have UT measurements take along P&S keel. Highlight any areas of wasteage exceeding 20%.
Due 3 April 2003
Resolved 3 April 2003
Resolution: Received gauging report, all sat.
Engineering › Bilge Water Management System
Issued 1 April 2003
Resolved
Provide proper operation of bilge valves in rudder rooms.
Due 1 May 2003
Resolved 23 April 2003
Engineering › Bilge Water Management System
Issued 1 April 2003
Resolved
Install bilge strainers. LEGACY COMPONENT DESC: Strainer
Due 1 May 2003
Resolved 23 April 2003
Engineering › Diesel Engine (propulsion-direct drive)
Issued 1 April 2003
Resolved
Repair/ replace bridge tachometers for main diesel engine.
Action required: 705 - Other - as specified
Due 23 May 2003
Resolved 14 May 2003
Engineering › Bilge Water Management System
Issued 1 April 2003
Resolved
Identify bilge alarms to the compartments served.
Action required: 705 - Other - as specified
Due 23 May 2003
Resolved 14 May 2003
Personnel › Certificates/Documents/Licenses
Issued 1 April 2003
Resolved
Provide update on CPR training and first aid program. LEGACY COMPONENT DESC: Certificate, First Aid Course Completion
Action required: 705 - Other - as specified
Due 23 May 2003
Resolved 14 May 2003
Engineering › Bilge Water Management System
Issued 1 April 2003
Resolved
Secure bilge alarms with a minimum of two fasteners.
Action required: 705 - Other - as specified
Due 23 May 2003
Resolved 14 May 2003
Engineering › Shafting/Propeller Arrangements
Issued 1 April 2003
Resolved
Tighten shaft packing gland to minimum of a slow drip.
Action required: 705 - Other - as specified
Due 23 May 2003
Resolved 1 April 2003
Electrical › Lighting (emergency)
Issued 1 April 2003
Resolved
Repair battle lantern and prove proper operation in engine room. LEGACY COMPONENT DESC: Battery Operated Lantern
Action required: 705 - Other - as specified
Due 23 May 2003
Resolved 23 April 2003
Engineering › Steering Gear System
Issued 1 April 2003
Resolved
Repair leak on #1 hydraulic hose on Harbor Side steering gear. LEGACY COMPONENT DESC: Hydraulic Hose
Action required: 705 - Other - as specified
Due 23 May 2003
Resolved 14 May 2003
Electrical › Electrical Distribution System (service)
Issued 26 April 2002
Resolved
Remove dead end wire IWO pilot house console. LEGACY COMPONENT DESC: Wiring
Due 29 May 2002
Resolved 26 April 2002
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 26 April 2002
Resolved
Notify OCMI upon completion of generator replacement.
Action required: 705 - Other - as specified
Resolved 26 April 2002
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 26 April 2002
Resolved
Provide guard or safety harness attachment loops on pilothouse roof access ladder. Reattach ladder base to secure both legs.
Action required: 705 - Other - as specified
Resolved 21 June 2004
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 26 April 2002
Resolved
Attach all hatch cover lanyards.
Due 29 May 2002
Resolved 21 June 2004
Unknown
Issued 25 May 2001
Resolved
INSTALL EMERGENCY USE ONLY PORTABLE LIGHTS AT WHEELHOUSE AND ENTRANCE TO ENGINEROOM.
Condition: Unknown
Due 25 May 2001
Resolved 25 May 2001
Unknown
Issued 25 May 2001
Resolved
ENSURE ALL ENGINEROOM & PILOT HOUSE GAGES & ALARMS FOR THE GENERATORS AND MAIN ENGINES (TACHS, TEMPS, PRESS) ARE IN WORKING ORDER TO THE SATISFACTIONOF ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 25 May 2001
Resolved 25 May 2001
Navigation
Issued 13 October 2000
Resolved
Replace corroded feedback units on both steering gear assemblies at next dry dock.
Condition: Unknown
Due 13 October 2000
Resolved 13 October 2000
Navigation
Issued 28 September 2000
Resolved
REPAIR LEAKING RAM ON PORT ARANSAS SIDE STEERING GEAR.
Condition: Unknown
Due 28 September 2000
Resolved 28 September 2000
Navigation
Issued 25 July 2000
Resolved
SUBMIT CG-2692 FOR 24JUL00 STEERING FAILURE.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Navigation
Issued 25 July 2000
Resolved
REPAIR LEAKING RAM ON PORT A SIDE STEERING GEAR.
Condition: Unknown
Due 25 July 2000
Resolved 25 July 2000
Navigation
Issued 25 July 2000
Resolved
TEST STEERING MOTOR OVERLOAD ALARMS ON BOTH STEERING PANELS AT WHEELHOUSE.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Navigation
Issued 25 July 2000
Resolved
DEWATER/REMOVE OIL FROM PORT ARANSAS SIDE STEERING COMPARTMENT.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Navigation
Issued 25 July 2000
Resolved
ADJUST RUDDER STOPS ON PORT ARANSAS SIDE STEERING GEAR.
Condition: Unknown
Due 31 July 2000
Resolved 8 August 2000
Navigation
Issued 25 July 2000
Resolved
RENEW STEERING HOSES ON RAM TO STEERING GEAR ON PORT ARANSAS SIDE OF VLS AND POSITION SO AS NOT TO CHAFE.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Navigation
Issued 25 July 2000
Resolved
CHECK SYSTEM SPECS TO ENSURE MOTORS FOR PUMPS ARE ADEQUATE FOR SYSTEM.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Fire Fighting
Issued 20 April 2000
Resolved
INSTALL GLASS ON HALON RELEASE HANDLE BOXES.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Electrical
Issued 20 April 2000
Resolved
ENSURE ALL EMERGENCY LIGHTING IS OPERATING (NEW BATTERIES).
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Electrical
Issued 20 April 2000
Resolved
RENEW DISCONNECT BOXES FOR AIR COMPRESSORS, DIRTY OIL PUMP, FUEL OIL PUMP, BARRIER GATE FORWARD.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Fire Fighting
Issued 20 April 2000
Resolved
INSTALL HEAT DETECTOR IN ENGINEROOM WITH MONITOR/ALARM ON BRIDGE.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Electrical
Issued 20 April 2000
Resolved
NOTCH OR DRILL HOLE TO ACCOMODATE WIRE TO RADIO IN WAY OF GNERATOR BATTERY BOX (LID PINCHING DUE TO RUNNING ON TOP LIP).
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Engineering
Issued 20 April 2000
Resolved
INSTALL NEW CONTROL AIR GUAGE ON PORT ARANSAS SIDE OF WHEELHOUSE CONTROL STATION.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Lifesaving
Issued 20 April 2000
Resolved
INSTALL 3/4" COTTON LINE ON BOTH SIDES OF BACKBOARD.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Fire Fighting
Issued 20 April 2000
Resolved
PROVIDE SERVICE REPORT ON HALON SYSTEM PROVING 25 SECOND DELAY AND SHUT- DOWNS.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Construction/Loadline
Issued 20 April 2000
Resolved
REPLACE BOTH EMERGENCY EXIT HATCHES LEADING TO MAIN DECK FROM BOTH AFTER STEERING SPACES AT NEXT DRYDOCK. LIPS CORRODED AND DO NOT SEAL WELL.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Electrical
Issued 20 April 2000
Resolved
CLEAN ELECTOLYTE FROM BOTH GENERATOR BATTERY BOXES (INBETWEEN THE LEAD AND THE BOX/HEAVY BUILD UP).
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Fire Fighting
Issued 20 April 2000
Resolved
EVALUATE CURRENT SHUT-DOWNS ON HALON SYSTEM TO DETERMINE WHAT ORIGINALLY WAS SUPPOSE TO SHUT-DOWN UPON RELEASE.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Navigation
Issued 20 April 2000
Resolved
FIX LEAK ON PORT A SIDE STEERING RAM AND STEERING HOSES.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Lifesaving
Issued 2 July 1999
Resolved
RELOCATE/SEPARATE CHILDRENS LIFE JACKETS FROM ADULTS AND LABEL STORAGE ACCORDINGLY.
Condition: Unknown
Due 2 July 1999
Resolved 2 July 1999
Lifesaving
Issued 22 April 1999
Resolved
PROVE VESSEL IS ARRANGED, EQUIPPED AND MANUEVERABLE TO RESCUE A HELPLESS PERSON FROM THE WATER IAW 46 CFR 180.210.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Navigation
Issued 22 April 1999
Resolved
PROVE PROPER OPERATIN OF STEERING GEAR ALARM PANELS IN WHEELHOUSE.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Fire Fighting
Issued 20 November 1998
Resolved
PROVIDE VENTILATION COVERS FOR PORT AND STBD MAIN DECK EXHAUST VENTS AND ACCESS TO INSTALL IN THE EVENT OF A FIRE AND DISCHARGING OF E/R CO2 SYSTEM.
Condition: Unknown
Due 20 November 1998
Resolved 20 November 1998
Fire Fighting
Issued 5 May 1998
Resolved
PRIOR TO GETTING UNDERWAY WITH PASSENGERS ABOARD REPLACE SEVERELY ABRADED FIRE HOSE.
Condition: Unknown
Due 12 May 1998
Resolved 13 May 1998
Engineering
Issued 5 May 1998
Resolved
REPLACE EIGHT CORRODED FLAME SCREENS IN WAY OF FUEL VENTS AS INDICATED DURING INSPECTION.
Condition: Unknown
Due 12 May 1998
Resolved 13 May 1998
Lifesaving
Issued 5 May 1998
Resolved
PROVIDE METAL CLIPS FOR LIFE RINGS IN ACCORDANCE WITH 46 CFR 180.70 (d)(3).
Condition: Unknown
Due 12 May 1998
Resolved 13 May 1998
Electrical
Issued 29 April 1996
Resolved
CLEAN AND TIGHTEN TERMINAL CONNECTIONS ON GENERATOR START BATTERIES.
Condition: Unknown
Due 15 May 1996
Resolved 13 May 1996
Engineering
Issued 29 April 1996
Resolved
LOCKWIRE LOOSE EXHAUST LAGGING ON MAIN ENGINE.
Condition: Unknown
Due 29 April 1996
Resolved 20 May 1996
Construction/Loadline
Issued 29 April 1996
Resolved
RENEW VALVE HANDLE ON VOID SUCTION VALVE IN SHAFT ALLEY.
Condition: Unknown
Due 15 May 1996
Resolved 13 May 1996
Fire Fighting
Issued 4 May 1994
Resolved
HARD PIPE FIRE MAIN LINE BY FIRE PUMP.
Condition: Unknown
Due 20 May 1994
Resolved 20 May 1994
Navigation
Issued 10 May 1993
Resolved
Renew inboard air receiver pressure guage and prove operation of relief valve.
Condition: Unknown
Due 24 May 1993
Resolved 12 May 1993
Engineering
Issued 10 May 1993
Resolved
Renew wasted fuel line on stbd. gen. and repair fuel leak at fuel filter.
Condition: Unknown
Due 24 May 1993
Resolved 12 May 1993
Electrical
Issued 10 May 1993
Resolved
Remove/Tape ends of unused wiring
Condition: Unknown
Due 24 May 1993
Resolved 12 May 1993
Navigation
Issued 10 May 1993
Resolved
Repair Hydraulic ram seal, and hose leaks in both end compartments
Condition: Unknown
Due 24 May 1993
Resolved 12 May 1993
Fire Fighting
Issued 10 May 1993
Resolved
Provide proof of annual service of Halon fixed system
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Electrical
Issued 10 May 1993
Resolved
Provide light guard for Harbor Island end compartment.
Condition: Unknown
Due 24 May 1993
Resolved 12 May 1993
Construction/Loadline
Issued 10 May 1993
Resolved
Clean-up oil residue in bilges of both end compartments and on top of hydraulic pump/resevior unit.
Condition: Unknown
Due 24 May 1993
Resolved 12 May 1993
Engineering
Issued 10 May 1993
Resolved
Make perm. repairs to remote ventilation shut down and demonstrate operation.
Condition: Unknown
Due 10 June 1993
Resolved 12 May 1993
Fire Fighting
Issued 18 May 1989
Resolved
HAVE SERVICED AND PROVIDE DOCUMENTATION ON 50-POUND CO2 PILOT BOTTLE FOR FIXED HALON FIRE EXTINGUISHING SYSTEM.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Fire Fighting
Issued 18 May 1989
Resolved
HAVE SERVICED AND PROVIDE DOCUMENTATION FOR THE TWO B-II PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Electrical
Issued 7 January 1988
Resolved
CONTROL WIRING TO GATE CONTROLLERS ON BOTH ENDS OF VESSEL TO BE PROPERLY REINSTALLED, WIRING IN RUDDER COMPTS TO BE PROPERLY SUPPORTED AS PER NATIONAL ELECTRIC CODE AND 46 CFR SUBCHAPTER J ELECTRICAL REGULATIONS
Condition: Unknown
Due 7 January 1988
Resolved 7 January 1988
Navigation
Issued 26 May 1987
Resolved
REPLACE TINTED GLASS IN PILOT HOUSE WITH CLEAR GLASS; AND VESSEL IS LIMITEDTO DAYLIGHT OPERATION ONLY WHILE TINTED GLASS IN INSTALLED IN THE PILOT HOUSE.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987