Records from 2010 to 2026. Most recent: inspection, 29 June 2026.
Inspection history · 27
29 June 2026
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8420332
6 May 2025
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8130127
17 January 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8065023
21 February 2024
COI Inspection · Administrative Inspection · In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7868086
21 October 2023
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7812056
20 October 2023
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7812759
9 August 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7764594
16 May 2023
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7688957
31 January 2023
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7660340
1 August 2022
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7522761
10 June 2022
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7474079
10 June 2022
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7502051
20 January 2022
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7382867
10 August 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7282594
12 August 2020
Deficiency Check · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7031133
11 February 2019
Administrative Inspection · MTSA Verification · DAPI Audit · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6623785
8 January 2019
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6612242
20 September 2018
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6549464
30 July 2018
Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6495195
3 January 2018
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6334112
1 November 2017
Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6300077
7 August 2017
MTSA Verification · DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6232861
28 August 2016
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5999829
1 August 2016
DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5959543
4 April 2016
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5846723
2 April 2016
Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5845766
8 January 2016
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5817011
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 October 2023
Resolved
Each vessel that relies on electricity to power vital systems, interior lighting, communication systems, and navigation equipment and lights must be arranged so that the loads can be energized from two sources of electricity.
Vessel reported a failure of their starboard generator while underway with passengers.
Determine cause of generator failure and repair as appropriate. 46 CFR 120.310
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 November 2023
Resolved 7 May 2025
Resolution: During the inspection the generator was operable.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 August 2023
Resolved
46 CFR 56-50-50(g) - Each individual bilge suction shall be fitted with a suitable bilge strainer having an open area of not less than three times that of the suction pipe. Multiple bilge pickups were missing suitable strainers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 August 2023
Resolved 21 October 2023
Resolution: Verified bilge pickups had appropriate strainers
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 9 August 2023
Resolved
46 CFR 116.405 - The general construction of the vessel must be such as to minimize fire hazards insofar as it reasonable and practicable. There was missing fire insulation in the soda room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 August 2023
Resolved 21 October 2023
Resolution: Verified insulation replaced in Soda Room
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 9 August 2023
Resolved
46 CFR 120.410(a) - Each lighting fixture globe, lens, or diffuser must have a guard or be made of high strength material, except in an accommodation space, radio room, galley, or similar space where it is not subject to damage. There were multiple lights missing guards.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 August 2023
Resolved 21 October 2023
Resolution: Verified glass covers installed in soda room, e/r, and second deck stdb
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 August 2023
Resolved
46 CFR 117.70(d)(2) - Each life ring buoy with a floating waterlight must have a lanyard of at least 3 feet in length but not more than 6 feet, securing the waterlight around the body of the ring life buoy. Waterlight did not have a lanyard attached.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 August 2023
Resolved 21 October 2023
Resolution: Verified lanyard attached to ring buoy light.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 9 August 2023
Resolved
46 CFR 116.700(a) - A crew accommodation space and a work space must be of adequate construction and with suitable equipment to provide for the safe operation and accommodation of the crew in a manner practicable. Metal stairway into galley space is wasted and heavily corroded. This is to be addressed at the next scheduled dry-dock 1/31/2025.
Action required: 705 - Other - as specified
Due 31 January 2025
Resolved 7 May 2025
Resolution: The stairwerll was fixerd during DDX.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 August 2022
Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the waterlight around the body of the ring life buoy. Life ring on bridge not connected to waterlight.
46CFR180.70(d)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 August 2022
Resolution: Waterlight was connected with 3-6 foot line.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 August 2022
Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Missing or inapropriate strainers on all bilge piping.
46CFR182.510(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2022
Resolved 31 January 2023
Resolution: New appropriate strainers were added.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 August 2022
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Piping at fire pump has unused section that needs to be capped off. Possible flooding hazard.
46CFR182.100
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2022
Resolved 31 January 2023
Resolution: Piping section was capped off.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 August 2022
Resolved
The neutral of each grounded generation and distribution system must be grounded at the generator switchboard and have the ground connection accessible for checking insulation resistance of the generator to ground before the generator is connected to the bus, except the neutral of an emergency power generation system must be grounded with:
(1) No direct ground connection at the emergency switchboard;
(2) The neutral bus permanently connected to the neutral bus on the main switchboard; and
(3) No switch, circuit breaker, or fuse in the neutral conductor of the bus-tie feeder connecting the emergency switchboard to the main switchboard. Ground test lamps indicate a fault for the #1 generator.
46CFR183.376(c)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2022
Resolved 31 January 2023
Resolution: Swichboard was properly grounded.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 June 2022
Resolved
New installations of electrical equipment and material, and the repair or replacement of wire and cable, on an existing vessel must comply with this part. Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock.
Vessel must provide report from certified marine electrician attesting to electrical system, as pertains to galley circuit breaker, is intact and unaffected by galley fire on 10JUN2022 IVO tilt skillet.
Until report is reviewed and approved by MI, vessel is to isolate/ensure galley circuit breaker inoperable when passengers onboard. Vessel must also ensure that fire watchstander is posted in galley to monitor for/respond to signs of fire at all times when passengers onboard.
46 CFR 120.115(c)
46 CFR 120.200(b)
Action required: 705 - Other - as specified
Resolved 17 June 2022
Resolution: Received satisfactory marine electrician survey from vsl rep confirming galley electrical systems in working order.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 10 August 2021
Resolved
Vessels which carry more than 150 passengers shall meet the requirements of subpart 72.05 of Subchapter H of this chapter. Structural fire protection was observed missing from multiple locations throughout the vessel, including above main deck air handler, second deck forward stores, and engine room bulkheads. Replace in kind.
"Old T" 117.10-5(a)
Table 46 CFR 72.05-10(d)
Table 46 CFR 72.05-10(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 August 2021
Resolution: Verified repairs to structural fire protection.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 August 2021
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] wiring was observed near forward galley bulkhead and equipment was observed being stored on vessel's electrical cable run in second deck forward storage space.
"Old T" 183.01-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 October 2021
Resolution: Received photographic evidence from vsl rep [name withheld] confirming exposed wiring removed from vsl galley.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 August 2021
Resolved
A fire control plan must be posted on the vessel showing the location of fire protection equipment. Multiple fire extinguishers were observed of improper size, off-station, or missing from locations listed on fire control plan.
46 CFR 116.115(b)
46 CFR 116.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 August 2021
Resolution: Verified proper stowage of extinguishers IAW fire control plan.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 August 2021
Resolved
Doors in stairway enclosures shall be of the self-closing type. MI observed second-deck self-closing doors not of adequate closing speed.
"Old T" 117.10-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 August 2021
Resolution: Verified proper operation of second deck self-closing doors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 August 2021
Resolved
Vertical exhaust systems shall be lagged with fire resistant material. During inspection missing lagging was observed on STBD engine exhaust. Replace in kind.
"Old T" 182.20-15(a)
"Old T" 182.15-20(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 August 2021
Resolution: Verified installation of new lagging on STBD engine exhaust.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 August 2021
Resolved
Portable fire extinguishers shall be installed to the satisfaction of the [name withheld] portable fire extinguishers observed onboard missing suitable marine-type mounts.
"Old T" 181.30-10(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 August 2021
Resolution: Verified portable extinguishers onboard installed with proper mounting devices.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 17 August 2020
Resolved
A fire door in a stair tower must be self closing. The fire door leading to the galley did not close all of the way upon actuation.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2020
Resolved 17 August 2020
Resolution: Maintenance performed during inspection. Door closure test sat. Cleared onsite.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 August 2020
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. The fire pump located port side engine room was missing the junction box cover, improper connections with screw on connectors as well as uninsulated connections were observed.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2020
Resolved 26 August 2020
Resolution: Cover installed and wiring issues remedied.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 August 2020
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Electrical junction box in storage area behind 2nd deck bar was missing an appropriate cover.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2020
Resolved 26 August 2020
Resolution: Cover installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 August 2020
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Use of extension cords to extend the reach of multi-outlet surge protectors observed to satisfy installed equipment on the 1st deck aft crew space both port and starboard side.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2020
Resolved 26 August 2020
Resolution: Permanent outlets installed.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 17 August 2020
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Pump located in the port side of the compartment aft of the engine room was not mounted and electrical cable clamp for the power source was loose.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2020
Resolved 26 August 2020
Resolution: Pump mounted and connecton secured.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 17 August 2020
Resolved
Fire protection shall be such as to minimize fire hazards insofar as reasonable and practical. Vessels contracted for on or after July 1, 1961, which carry more than 150 passengers shall meet the requirements of subpart 72.05 or Subchapter H of this chapter. Manual hold back was installed on the door leading to the stairway leading down to the machinery spaces.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2020
Resolved 26 August 2020
Resolution: Hold back removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 August 2020
Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support. Multiple instances of plastic wire ties discovered throughout the engine room and galley space.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2020
Resolved 26 August 2020
Resolution: Plastic wires ties replaced with metal bands.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 August 2020
Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date on your COI. You failed to complete your annual inspection within the required timeframe. Failure to complete your inspection by August 31, 2020 will result in your deficiency being upgraded to Prior to Carrying Passengers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 August 2020
Resolved 17 August 2020
Resolution: Conducted annual inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › Operational Limitations for Passenger ships
Issued 6 May 2019
Resolved
A vessel on LBS route must carry 3 Red Flares and 3 Orange smoke or 6 Red flares. 6 orange smoke flares on board. Provide at least 3 Red flares approved distress signals
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2019
Resolved 8 May 2019
Resolution: Attended vessel and cleared above deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019
Resolved
Provide diagram/Instructions for operation of each bilge pick-up line. Crew unable to satisfactorily drain water tight compartments.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2019
Resolved 8 May 2019
Resolution: Attended vessel and cleared above deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019
Resolved
Prove proper operation bilge pump and proper suction from each fixed bilge pick up.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2019
Resolved 9 May 2019
Resolution: Received proof that above deficiency was cleared.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 May 2019
Resolved
Bilges must have no excessive accumulation of oil, trash, debris or other matter that might create a fire hazard or clog bilge pumping system. Properly clean excessive grease accumulation in galley bilge.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2019
Resolved 8 May 2019
Resolution: Attended vessel and cleared above deficiency.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 20 September 2018
Resolved
Provide this office with a Repair Proposal for conducting permanent repairs to the affected area of the keel cooler. Ultrasonic Testing (UT) must be included as part of the Repair Proposal.
Action required: 705 - Other - as specified
Due 31 January 2019
Resolved 8 January 2019
Resolution: Included in the Dry-dock package.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 20 September 2018
Resolved
Ultrasonic Testing IWO the entire hull plating associated with both Keel Cool Systems. Any additions or updates to the proposal should include a schematic identifying all affected/wasted areas and a plan for conducting permanent repairs for all wasted areas identified. A copy of the UT Report must be provided to this office.
Action required: 705 - Other - as specified
Due 31 January 2019
Resolved 8 January 2019
Resolution: Included in the Dry-dock package.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 July 2018
Resolved
Properly secure main electrical supply cable (that feeds the main switchboard) located in the engine room
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 9 August 2018
Resolution: Vessel owner/operator provided proof that the previously identified main electrical supply cable (that feeds the main switchboard) located in the engine room were properly secured – ALL SAT
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 July 2018
Resolved
Remove all excessive electrical extension cords and surge protectors (“Daisy Chains)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 9 August 2018
Resolution: Vessel owner/operator provided proof that all excessive electrical extension cords and surge protectors (“Daisy Chains) were properly removed from the vessel – ALL SAT
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 July 2018
Resolved
Properly mount the portable fire extinguisher IWO engine room door located on the 1st deck
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2018
Resolved 9 August 2018
Resolution: Vessel owner/operator provided proof that the portable fire extinguisher IWO engine room door located on the 1st deck was properly mounted/secured – ALL SAT
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 July 2018
Resolved
Replace missing cover for junction box located the galley
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2018
Resolved 9 August 2018
Resolution: Vessel owner/operator provided proof of the installation of a cover for junction box located the galley – ALL SAT
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 July 2018
Resolved
Remove portable space heaters located throughout the vessel
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2018
Resolved 9 August 2018
Resolution: Vessel owner/operator provided proof that the portable space heaters located throughout the vessel were all removed – ALL SAT
Construction/Loadline › Hull › Bottom Plating
Issued 1 November 2017
Resolved
Vessel has 02 pinhole leaks in the hull bottom of the keel cooler system in between frames 23-24 IWO of the galley compartment. Provide temporary repair proposal to the satisfaction of the local [name withheld] approved, conduct repairs to the satisfaction of the local OCMI.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2017
Resolved 3 November 2017
Resolution: Received temp. repair proposal and observed temp. repair of 18" x 18" 3/8" insert plate. Temp repair air tested and sat.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 1 November 2017
Resolved
Provide next available dry dock dates and facility to local OCMI for external hull survey and perm. repair of hull bottom.
Condition: Invalid
Action required: 705 - Other - as specified
Due 6 November 2017
Resolved 3 November 2017
Resolution: Received perm. repair proposal. Proposal was sat. Vessel will drydock Jan 2nd at Gen. Ship. to effect perm. repair.
Construction/Loadline › Hull › Bracket
Issued 8 January 2016
Resolved
Port rub rail mounting wasted and not providing support to effectively hold in place. Repair as origional to satisfaction of attending marine inspector
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 April 2016
Resolved 1 August 2016
Resolution: Attended vessel and cleared above deficiency which was corrected by due date, but not cleared from the system.