Inspection history · 27
14 March 2026
Damage Survey
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8326246
14 March 2026
Type not recorded
No type recorded · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8437474
29 January 2026
Deficiency Check · Damage Survey · Vessel Attendance
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8303791
29 January 2026
Type not recorded
No type recorded · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8310171
9 August 2025
Deficiency Check · Administrative Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8205947
8 August 2025
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8254704
28 May 2025
Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8145908
8 October 2024
Deficiency Check · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7864464
16 July 2024
Deficiency Check · Damage Survey
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7960847
21 May 2024
Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7916098
27 February 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7871266
7 February 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7861857
25 October 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7813294
25 May 2023
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7696694
19 October 2022
Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7609329
18 May 2022
Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7453828
3 August 2021
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7275776
13 June 2021
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7342263
9 April 2021
Deficiency Check · Re-Inspection · Administrative Inspection · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7180308
29 October 2020
In-Service Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7092627
9 June 2020
DAPI Audit · Annual Inspection · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6971623
30 May 2019
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6697460
2 October 2018
Drydock Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6564730
21 May 2018
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6452859
31 May 2017
COI Inspection · Administrative Inspection · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6146744
21 October 2016
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6090032
11 April 2016
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5914392
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 August 2025
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Captain reported inability to start port engine while tied off to mooring ball. Vessel requires mechanical diagnosis for port engine. 46 CFR 182.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 August 2025
Resolution: New Fireboy relay and override switch installed. No further requirements.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 28 May 2025
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction. Port forward deck rail stanchion found with crack. Requires repair. 46 CFR 177.900(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 30 May 2025
Resolution: Fracture on port forward deck rail stanchion repaired
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 28 May 2025
Resolved
Each survival craft on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway. (01) Lifefloat on vessel worn and wasted beyond use. Lifefloat requires renewal. Vessel shall reduce its passenger count to a max of 30 pax. Vessel currently has 1 operational 15-person lifefloat on board. 46 CFR 185.700(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2025
Resolved 30 May 2025
Resolution: life float renewed
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 21 May 2024
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. 01 life float damaged beyond repair but still serviceable for 1 year. Replace life float prior to 2025 annual inspection.
46 CFR 176.808(b)
Action required: 705 - Other - as specified
Resolved 28 May 2025
Resolution: 15-man life float replaced
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 21 May 2024
Resolved
Each survival craft must be stowed in a way that any protective covers will not interfere with launching and embarkation. Covers secured with line around body of life float. Provide cover that does will not interfere with launching or embarkation.
46 CFR 180.130(a)(8)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2024
Resolved 11 July 2024
Resolution: Cover provided without launching or embarkation interference.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2024
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Missing double hose clamps on bilge suction and discharge. Provide double hose clamps.
46 CFR 182.410 (d) (1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2024
Resolved 22 May 2024
Resolution: Hose clamps provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 May 2024
Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart. FireBoy wiring hanging from ceiling. Provide wire support.
46 CFR 183.340 (b)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2024
Resolved 22 May 2024
Resolution: Supports provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 May 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Dead end wires found in port forward and behind bar. Remove dead end wiring and update electrical plans.
46 CFR 183.200 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2024
Resolved 12 August 2024
Resolution: Dead end wiring removed and electrical plans updated.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 May 2024
Resolved
When operating a vessel on a body of water where the discharge of untreated sewage is prohibited, the operator must secure each Type III device in a manner which prevents discharge of sewage. Acceptable methods include - (1) closing each valve and removing the handle; (2) padlocking each valve in the closed position; (3) Using a non-releasable wire tie to hold each valve in the closed position. Vessel has type III MSD system and system was not secured to prevent discharge. Provide means of prevent discharge.
33 CFR 159.7 (c)
Action required: 10 - Deficiency Rectified
Resolved 21 May 2024
Resolution: Sewage overboard valve locked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2024
Resolved
Strong and effective rudder stops must be provided to prevent jamming and damage to the rudder and its fittings. Starboard side steering system missing rudder stop. Provide rudder stop starboard side.
46 CFR 182.610
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2024
Resolved 22 May 2024
Resolution: Rudder stop provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. The steering gear was missing nuts to secure bolt that held steering ram in place. Provide nuts to secure steering ram.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2024
Resolved 22 May 2024
Resolution: Bolts provided.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 May 2024
Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturer’s instructions. Fireboy pull handle was not supplied by manufacturer. Provide FireBoy pull handle and instructions.
46 CFR 181.420(a)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2024
Resolved 5 June 2024
Resolution: New FireBoy pull handles installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 October 2023
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Bilge pump indicator at helm not operational. Provide visual indicator for bilge pump.
46 CFR 182.530(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 November 2023
Resolved 22 January 2024
Resolution: Visual indicator operational.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 October 2023
Resolved
A means to reset devices used to automatically shut down ventilation systems and engines. Engine room Fireboy fixed system override switch does not operated as designed.
46 CFR 181.420
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2023
Resolution: FireBoy override operational.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 October 2023
Resolved
Sail Rigging Preventative Maintenance Plan (PMP)must be onboard vessel at all times. PMP not currently on vessel and not currently updated. Provide full rigging inventory of all old and new rigging components, inspection regime, and rigging details. Ensure to log all inspections in accordance with vessel PMP. Keep copy of PMP on board vessel at all times and submitted revised version of PMP to [name withheld].
46 CFR 176.802
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 November 2023
Resolved 23 November 2023
Resolution: PMP provided.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 May 2022
Resolved
A fixed gas fire extinguishing system may protect more than one space. The quantity of extinguishing agent must be at least sufficient for the space requiring the greatest quantity as determined by the requirements of paragraphs (f)(4) and (g)(2) of this section. Engine room fixed fire extinguisher agent is inadequate due to opening between two engine rooms.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2022
Resolved 16 June 2022
Resolution: All cross wing openings blocked to prevent communication between the engine rooms.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 18 May 2022
Resolved
Each vessel must have permanent loading marks placed on each side of the vessel forward and aft to indicate the maximum allowable trim and amidships to indicate the maximum allowable draft. No loading mark per stability letter. Due next drydock or NLT 31OCT22.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 October 2022
Resolved 26 October 2022
Resolution: Load marking placed per stability letter on both sides of the hull.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 April 2021
Resolved
The owner shall be prepared to conduct tests and have the vessel ready for inspection of the following: On a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Wood below aluminum mast step rotten.
46 CFR 176.802 (a)(3)
Action required: 10 - Deficiency Rectified
Due 21 April 2021
Resolved 21 April 2021
Resolution: Rotten wood removed, replaced in kind, and verified same day. See 3rd party rigging report.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 April 2021
Resolved
The owner shall be prepared to conduct tests and have the vessel ready for inspection of the following: On a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Stbd backstay chain plate noted small fracture.
46 CFR 176.802 (a)(3)
Action required: 10 - Deficiency Rectified
Due 21 April 2021
Resolved 21 April 2021
Resolution: Vessel able to remove and fabricate new port and stbd chain plates and install same day. See third party rigging report for details.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 April 2021
Resolved
The owner shall be prepared to conduct tests and have the vessel ready for inspection of the following: On a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Fracture at gooseneck fitting from main mast to boom.
Action required: 10 - Deficiency Rectified
Due 21 April 2021
Resolved 21 April 2021
Resolution: Vessel drill stopped, gouged out and rewelded fitting same day. Vessel to monitor in PMP and replace when able with new. See third party rigging report for more details.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 October 2020
Resolved
A drydock examination conducted in compliance with §176.600 must be conducted while the vessel is hauled out of the water or placed in a drydock or slipway. During the examination all accessible parts of the vessel's underwater body and all through hull fittings, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves, and sea strainers shall be made available for examination. The vessel was required to un-step the mast at the last drydock in accordance with NVIC 02-16. The mast was not un-stepped during the vessels October 2020 drydock. The vessel may not operate under sail till the mast has been un-step, inspected, and approved by a CG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 21 April 2021
Resolution: The vessel mast was un-stepped and inspected.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 October 2020
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. When repairs are made during an emergency, the owner, managing operator, or master shall notify the OCMI as soon as practicable after such repairs or alternations are made. Repairs or alterations that affect the safety of the vessel include, but are not limited to: replacement, repair, or refastening of deck or hull planking, plating, and structural members; repair of plate or frame cracks; damage repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers and other pressure vessels, and steering, propulsion and power supply systems; alterations affecting stability; and repair or alteration of lifesaving, fire detecting, or fire extinguishing equipment. The vessel made temporary repairs to the the vessel's forward beam in 2014. The vessel was required to replace the beam at the last drydock. The beam was not replaced during the vessels October 2020 drydock. The vessel may not operate with passengers till the forward beam has been replaced.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2021
Resolution: The forward beam was inspected and the beam’s 2014 temporary repairs are considered permeant repairs.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 31 May 2017
Resolved
Vessel’s pre-engineered fire extinguisher unit needs to emit a visual and audible indication when under power showing discharge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: The alarm on the vessel's pre engineered fire system is now operable.
Communications › Alarms/Indicators › Bilge Alarm
Issued 31 May 2017
Resolved
Vessel needs to have visual indicators installed at the operating station to show automatic actuation of all bilge pumps.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: The vessel's bilge alarm system is now operable.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 31 May 2017
Resolved
Vessel needs to incorporate in-water emergency procedures.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: The company created in-water emergency procedures.