Inspection history · 74
11 August 2025
COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8207061
24 September 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8008739
25 January 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7855792
18 September 2023
Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7793503
22 September 2022
Internal Structural Exam · Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7565104
26 August 2021
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7296886
22 December 2020
Appeal
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7115064
20 August 2020
COI Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7037933
24 July 2020
Drydock Exam · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7014877
28 October 2019
Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6843389
28 November 2018
MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6588643
4 October 2017
Internal Structural Exam · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6282134
19 August 2016
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5976976
2 September 2015
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5233128
11 August 2015
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5212470
25 September 2014
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4991580
18 November 2013
Periodic Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4675213
20 December 2012
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4504997
24 October 2012
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4471085
25 October 2011
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4466167
13 August 2010
Drydock Exam · Deficiency Check · COI Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3823002
29 July 2009
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3542768
29 July 2008
MTSA Verification · Periodic Inspection · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3282729
20 December 2007
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3118523
15 August 2007
Annual Inspection · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3027904
26 July 2006
Annual Inspection · MARPOL Annex II Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2725262
25 July 2005
MARPOL Annex II Examination · COI Inspection · Hull Examination · MARPOL Annex I Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2438891
28 September 2004
MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2207048
21 January 2004
Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1989655
9 January 2004
Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2007322
2 October 2003
Re-Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1919417
10 December 2002
Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1716789
18 September 2002
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1677007
17 October 2001
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1074962
12 July 2001
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1068194
6 July 2001
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1467770
10 January 2001
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 825047
25 October 2000
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1055310
2 October 2000
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 822025
1 September 2000
Hull Examination · Re-Inspection · MARPOL Annex II Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1379163
9 August 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 775030
19 July 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1098762
6 July 1999
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1095476
30 July 1998
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 800124
3 March 1998
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 783152
3 December 1997
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1450106
3 November 1997
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 781490
9 July 1997
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 779031
26 February 1997
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1104074
12 February 1997
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1441199
11 September 1996
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 835433
18 March 1996
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 886353
28 September 1995
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 877116
11 July 1995
COI Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1187721
23 December 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1139706
13 April 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 683331
8 April 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 75120
13 March 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 130396
30 August 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 939712
2 April 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 909281
6 February 1991
Examination of Repairs
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 920515
21 December 1990
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1229204
26 September 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 909228
18 September 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 931825
27 August 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1240629
1 May 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1213991
29 March 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 927269
6 October 1989
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1039189
21 September 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1315952
6 September 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1032971
14 November 1988
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1038509
30 December 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1315436
24 December 1987
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1340874
4 September 1987
Initial Certification
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1018201
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 11 August 2025
Resolved
Location 5P ballast tank double bottom. Discovered inset in bottom plating beyond original extending approximately 6 ft forward and 6 feet aft of transverse frame and across 2 associated longitudinal frames. Area marked local for crop & renew of bottom plate to remove all deflection. The following applies:
1.) Submit repair proposal to this office with proposed scope. 2.) Provide notice to this office for fit-up, back-gouge and final pressure testing. See related observation (02) for continued steel work.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 August 2025
Resolved 22 August 2025
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 11 August 2025
Resolved
Location 5P ballast tank double bottom previously repaired transverse frame insert needs to be cropped & renewed to good metal. Area marked locally. Frame repair in way of and related to repair requirement (01).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 August 2025
Resolved 25 August 2025
Resolution: Photos received 25AUG25.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 11 August 2025
Resolved
Port side after-most notch void showed signs of water ingress from a faulty hatch cover causing accelerated corrosion along each of the associated lower sections of the aft bulkheads, decks & slosh bulkheads. UT samples of suspect frame spaces to determine extent of wastage and report findings of proposed, if necessary, repair work if readings are determined below tolerance.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 11 August 2025
Resolved 19 August 2025
Resolution: Reviewed UT Report. No findings.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 18 September 2023
Resolved
Each cargo vessel must carry the number of lifebuoys prescribed in table 199.271 of this section. The vessel is required to carry 10 lifebuoys for embarking on an oceans route, and table 199.640(a) does not grant lifebuoy quantity alternative requirements for cargo vessels on an oceans route. Acquire the appropriate number of lifebuoys prior to sailing on an oceans route.
Due 18 September 2023
Resolved 30 September 2024
Resolution: Route changed to Lakes, Bays, and Sounds.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 August 2021
Resolved
Each room, locker, and box for storage batteries must be arranged or ventilated to prevent accumulation of flammable gas.
Upon entering the battery storage room in the bow thruster machinery space, the marine inspectors detected a hazardous environment due to inadequate ventilation. The bow thruster machinery space is equipped with adequate mechanical ventilation but it is not being run continuously.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 August 2021
Resolved 26 August 2021
Resolution: Mechanical ventilation is now on continuously.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 20 August 2020
Resolved
In tank vessels carrying Grade A,B,C, or D liquid cargo, cargo pumps shall be isolated from source of vapor ignition by gastight bulkheads.
Both Cargo Pumps need new seals on the bulkhead dividing the on deck piping and the pump room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 September 2020
Resolved 24 August 2020
Resolution: Gaskets were replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 August 2020
Resolved
Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards.
Both generators in the aft house have an exposed rotary belt that needs a cover to protect personnel from injury.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 September 2020
Resolved 24 August 2020
Resolution: MEtals guards were fitted over the rotary belts on both generators.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 28 October 2019
Resolved
The high/overfill alarm on 5p cargo tank was inoperable. vessel is to repair and prove proper operation of alarm prior to loading cargo.
Action required: 705 - Other - as specified
Resolved 30 October 2019
Resolution: received class report of operational high level alarm on the 5P cargo tank.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 2 September 2015
Resolved
A ground was detected in the ship's 120v system as well as the 440v system. Grounds need to be identified and corrected.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 September 2015
Resolved 21 September 2015
Resolution: Vessel isolated and removed both grounds.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 18 November 2013
Resolved
Vessel must have operational closed liquid level gauging for each tank on deck.
Due 23 December 2013
Resolved 12 December 2013
Resolution: Received purchased order from vessel representative for six liquid level rising sticks and replace and installed into cargo tanks.
Engineering › Compressed Air System (start air) › Valve
Issued 18 November 2013
Resolved
Vessel must prove proper operation of the relief valve on the air receiver and thermal fluid heater.
Due 23 December 2013
Resolved 12 December 2013
Resolution: Vessel provided proper documentation for purchase of new relief valve with a set pressure of 150 psi for the air receiver. Vessel also provided certificate for the thermal fluid heater relief valve pressure test.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 18 November 2013
Resolved
Vessel may only use a connection for fuel transfer operations if it is bolted/threaded or a quick-connect coupling acceptable to the Commandant.
Due 23 December 2013
Resolved 20 December 2013
Resolution: Received email from vessel representative showing the inspection certificate for the new purchase of quick-connect coupling fuel hose.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 24 October 2012
Resolved
Vsl’s overfill audible alarm is not operating properly. Vsl has gauging stick. Repair installed system to sound properly.
Action required: 705 - Other - as specified
Due 31 October 2012
Resolved 6 November 2012
Resolution: Def cleared.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 24 October 2012
Resolved
Stbd pump engine lube oil psi and engine temp gauges are not operational. Repair or replace gauges.
Action required: 705 - Other - as specified
Due 31 October 2012
Resolved 6 November 2012
Resolution: Def cleared.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 13 August 2010
Resolved
Vessel could not show proper overspeed trip of the #1 SSDG.
Due 12 September 2010
Resolved 31 August 2010
Resolution: Witnessed overspeed trip on #1 SSDG.
Engineering › Diesel Engine (auxiliary) › Bearing
Issued 13 August 2010
Resolved
Vessel could not prove proper operation of lube oil shutdowns for both SSDGs.
Action required: 705 - Other - as specified
Due 12 September 2010
Resolved 31 August 2010
Resolution: Witnessed lube oil shutdowns for both SSDGs.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 29 July 2008
Resolved
Personnel aboard the barge were unable to lower the anchor due a broken solenoid switch on the accumulator. Provide service report to SENCY that problem has been fixed and anchor was able to be lowered.
Action required: 705 - Other - as specified
Due 12 August 2008
Resolved 12 August 2008
Resolution: Received tech report from Cunningham Marine Hydraulics stating that the anchor windlass had been fixed and the vessel was able to raise and lower the anchor properly.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 15 August 2007
Resolved
Prove proper operation of generator diesel engine overspeed device.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 4 September 2007
Electrical › Electric Generation Source (service) › Generator
Issued 15 August 2007
Resolved
Prove proper operation of #2 generator to sat of attending marine inspector.
Due 30 August 2007
Resolved 30 August 2007
Resolution: Returned to witness operation.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 26 July 2006
Resolved
Provide fire fighting systems certificate for the forward CO2 suppression system.
Action required: 705 - Other - as specified
Due 26 August 2006
Resolved 1 September 2006
Resolution: Made repairs and submitted SeaSafety Documents.
Electrical › Lighting (service) › Lighting Fixture
Issued 2 October 2003
Resolved
MISSING OR BLOWN LIGHT BULBS
Condition: Unknown
Due 3 October 2003
Resolved 3 October 2003
Resolution: BULBS REPLACED
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 2 October 2003
Resolved
EMERGENCY LIGHTERING EQUIPMENT MISSING LEGACY COMPONENT DESC: Reducers
Condition: Unknown
Due 3 November 2003
Resolved 2 October 2003
Resolution: Vessel aquired the neccessary equipment.
Construction/Loadline
Issued 6 July 2001
Resolved
Prove proper operation of fwd rake hand bilge pump.
Condition: Unknown
Due 12 July 2001
Resolved 12 July 2001
Electrical
Issued 6 July 2001
Resolved
Replace one electrical receptacle in engine room with approved type or remove as necessary.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Deck/Cargo
Issued 6 July 2001
Resolved
Provide updated calibration/test record for cargo pump relief valves.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Engineering
Issued 6 July 2001
Resolved
Prove proper operation of stbd cargo pump engine lube oil pressure gauge.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Engineering
Issued 6 July 2001
Resolved
Provide flame screen for deck port side fuel tank vent.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Electrical
Issued 6 July 2001
Resolved
Run both main generators under load and prove proper operation of switchboard breakers and distribution system in presence of USCG marine inspector.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Construction/Loadline
Issued 6 July 2001
Resolved
Replace two missing dogs on fwd rake hatch.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Deck/Cargo
Issued 6 July 2001
Resolved
Prove proper operation of anchor windlass brake.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Engineering
Issued 6 July 2001
Resolved
Prove proper operation of bow thruster engine shutdown.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Engineering
Issued 6 July 2001
Resolved
Repair fuel leak on bow thruster engine fuel pump.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Fire Fighting
Issued 1 September 2000
Resolved
PROVIDE PLAN APPROVAL FF CO2 SYS TO ACTIVITIES NY USCG MI FOR REVIEW.
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Deck/Cargo
Issued 6 July 1999
Resolved
PROPERLY STENCIL CARGO TRANSFER HOSE WITH OIL SERVICE DATE AND MAWP.
Condition: Unknown
Due 19 July 1999
Resolved 19 July 1999
Navigation
Issued 6 July 1999
Resolved
PROOVE PROPER OPERATION OF NAVIGATION LIGHTS.
Condition: Unknown
Due 19 July 1999
Resolved 19 July 1999
Accommodation/Occupational Safety
Issued 6 July 1999
Resolved
CONDUCT HYDROSTATIC TEST ON THREE PRESSURE VESSELS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 July 1999
Resolved 22 July 1999
Deck/Cargo
Issued 6 July 1999
Resolved
PROOVE PROPER OPERATION OF BOW THRUSTER.
Condition: Unknown
Due 19 July 1999
Resolved 19 July 1999
Documentation
Issued 6 July 1999
Resolved
PROVIDE PROOF OF VALID IOPP. VESSEL IS RESTRICTED TO DOMESTIC ROUTES UNTIL_x001C_A VALID IOPP IS PROVIDED ONBOARD.
Condition: Unknown
Due 9 August 1999
Resolved 9 August 1999
Deck/Cargo
Issued 6 July 1999
Resolved
PROVIDE PROOF OF CARGO PIPING RELIEF VALVE TEST AND CARGO PIPING PRESSURE GAUGE CALIBRATION.
Condition: Unknown
Due 19 July 1999
Resolved 19 July 1999
Electrical
Issued 30 July 1998
Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIP FOR #2 SSDG.
Condition: Unknown
Due 31 July 1998
Resolved 17 September 1998
Fire Fighting
Issued 9 July 1997
Resolved
PROVE PROPER OPERATION OF FORWARD FIXED C02 VISUAL ALARM TO SATISFACTION OFATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 17 July 1997
Resolved 31 July 1997
Electrical
Issued 9 July 1997
Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIP ON NO. 2 GENERATOR.
Condition: Unknown
Due 17 July 1997
Resolved 31 July 1997
Electrical
Issued 9 July 1997
Resolved
PROVE PROPER OPERATION OF NO. 1 GENERATOR INCLUDING TEST OF OVERSPEED, LOW LUBE OIL & COOLING WATER HIGH TEMP. TRIPS/ALARMS TO THE SATISFACTION OF THEATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 17 July 1997
Resolved 31 July 1997
Electrical
Issued 11 September 1996
Resolved
RENEW LIGHT FIXTURE TO DECK LIGHTING AT DECKHOUSE FORWARD BULKHEAD, PORTSIDE, AND ON DECKLIGHT ATOP DECK STANTION NEAR C/L AFT.
Condition: Unknown
Due 11 September 1996
Resolved 11 September 1996
Unknown
Issued 11 September 1996
Resolved
COMPLETE ALL REQUIREMENTS TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 11 September 1996
Resolved 11 September 1996
Electrical
Issued 11 September 1996
Resolved
BLANK OFF #13 OPENING ON BREAKER BOX TO LIGHTIN PANEL IN GENERATOR ROOM.
Condition: Unknown
Due 11 September 1996
Resolved 11 September 1996
Lifesaving
Issued 11 September 1996
Resolved
REMOVE SPARE BATTERIES AND OLD FIRE EXTINGUISHERS FROM DISPLACED HOUSE FROMT/B NORTH CAPE.
Condition: Unknown
Due 11 September 1996
Resolved 11 September 1996
Fire Fighting
Issued 11 September 1996
Resolved
PROVE PROPER OPERATION OF VENT SHUTDOWNS FOR GENERATOR SPACE AND BOW THRUSTER SPACE PRIOR TO OPERATING THE VESSEL
Condition: Unknown
Due 11 September 1996
Resolved 11 September 1996
Deck/Cargo
Issued 30 August 1991
Resolved
PROVE ALARM ON TELEMTRY SYSTEM.
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Fire Fighting
Issued 30 August 1991
Resolved
REPLACE DETERIORATED FIXED CO2 BOTTLES. THIS SYSTEM IS A SECONDARY SYSTEM.THE VESSEL HAS THE REQUIRED FIRE-FIGHTING EQUIPMENT ON BOARD. THIS IS TO BE DONE, TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR NO LATER THAN 16 SEPTEMBER 1991.
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Electrical
Issued 30 August 1991
Resolved
REPAIR ELECTRIC LIGHTING DISTRIBUTION PANEL IN FORWARD ENGINE ROOM. PUT BLANK SPACER IN CIRCUIT PANEL.
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Documentation
Issued 21 December 1990
Resolved
PROVIDE ALL REQUIRED DOCUMENTATION NEEDED AROUND BARGE.
Condition: Unknown
Due 21 December 1990
Resolved 21 December 1990
Deck/Cargo
Issued 21 December 1990
Resolved
VESSEL NOT TO LOAD CARGO AND/OR PROCEED FROM NY SHIP YARD UNTIL PERMANENT_x001C_ REPAIRS ARE COMPLETED TO THE SATISFACTION OF USCG MARINE INSPECTOR.
Condition: Unknown
Due 21 December 1990
Resolved 21 December 1990
Fire Fighting
Issued 18 September 1990
Resolved
REPLACE ONE (1) EMPTY 100 LBS CO2 FIXED FIRE EXTINGUISHER IN FORWARD MACHINERY SPACE.
Condition: Unknown
Due 18 September 1990
Resolved 18 September 1990
Construction/Loadline
Issued 29 March 1990
Resolved
PROVIDE PROPOSAL FOR PERMANENT REPAIR OF STRUCTURAL FAILURE IN WB1S & WB1P WITH PRIOR ABS APPROVAL TO THE [name withheld] 30 MAY 90.
Condition: Unknown
Due 29 March 1990
Resolved 29 March 1990
Construction/Loadline
Issued 29 March 1990
Resolved
COMPLETE COAST GUARD APPROVED PERMANENT REPAIR IN WB1S AND WB1P NO LATER THAN 30 SEP 90.
Condition: Unknown
Due 29 March 1990
Resolved 29 March 1990
Unknown
Issued 6 September 1989
Resolved
SAFETY/WARNING SIGNS NEEDTO BE REPAINTED.
Condition: Unknown
Due 6 September 1989
Resolved 6 September 1989
Electrical
Issued 6 September 1989
Resolved
#1 MAIN GENERATOR VENT FAN CONTROLLWR PANEL RUN LAMP DOES NOT OPERATE.
Condition: Unknown
Due 6 September 1989
Resolved 6 September 1989
Electrical
Issued 6 September 1989
Resolved
GLOBE AND GUARD ARE MISSING FROM FIXTURE ON STARBOARD SIDE OF NOTCH.
Condition: Unknown
Due 6 September 1989
Resolved 6 September 1989
Accommodation/Occupational Safety
Issued 6 September 1989
Resolved
STANCION FOR SAFETY/LIFE LINES IS MISSING FROM STARBOARD SIDE OF STERN.
Condition: Unknown
Due 6 September 1989
Resolved 6 September 1989
Construction/Loadline
Issued 6 September 1989
Resolved
FLAME SCREEN ON #3 BALLAST VENT IS TORN.
Condition: Unknown
Due 6 September 1989
Resolved 6 September 1989
Accommodation/Occupational Safety
Issued 6 September 1989
Resolved
SNAP HOOKS ON SAFETY LINES HAVE CORRODED.
Condition: Unknown
Due 6 September 1989
Resolved 6 September 1989
Construction/Loadline
Issued 24 December 1987
Resolved
MADE PERMANENT REPAIR TO PORTSIDE HULL DAMAGE CAUSED BY COLLISION W/THE WALL COVE ENROUTE U.S. FROM SINGAPORE.
Condition: Unknown
Due 24 December 1987
Resolved 24 December 1987
Electrical
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR DTD 29 JAN 87, SONIC LEVEL PROBES INSTALLED IN TANKS ARE TO BE INTRINSICALLY SAFE AND UL, FM OR CSA APPROVED.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Documentation
Issued 4 September 1987
Resolved
OBTAIN AND PLACE ONBOARD A COAST GUARD CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Deck/Cargo
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR OF 12 FEB 87, HYDRAULIC ACCUMULATOR SHALL BE ACCEPTED AND APPROVED BY THE USCG AS REQUIRED BY 46 CFR 58.30-25 (C).
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Deck/Cargo
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR DTD 5 MAR 87, CONFIRM MATERIALS USED IN THE CONSTRUCTION OF SLUDGE DUMP VALVES.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Electrical
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR DTD 21 JAN 87, EACH BATTERY CHARGER IS TO BEAR THE UL MARINE LISTING MARK. OTHERWISE, A LINE BY LINE COMPARISON TO UL 1236INCLUDING THE MARINE SUPPLEMENT IS TO BE SUBMITTED. THE CHARGERS ARE TO BE AT LEAST DRIP-PROOF.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Deck/Cargo
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR DTD 12 FEB 87, PROVIDE EVIDENCE THAT DISCHARGE HOSE (INCL END FTNGS) HAVE BEEN ACCEPTED BY USCG G-MTH.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Deck/Cargo
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR 5 MAR 87, PROVIDE BURST TEST REPORTS REQUIRED BYABS.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Electrical
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR DTD 27 MAR 87, SAFETY CONTROLS ON THE ELECTRIC HEATER ARE TO BE OF THE MANUALLY RESETTABLE TYPE (46 CFR 111.87-3 (C).
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Documentation
Issued 4 September 1987
Resolved
OBTAIN AND PLACE ONBOARD A CERTIFICATE OF FINANCIAL RESPONSIBILITY.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Electrical
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR DTD 27 MAR 87, THE RECEPTACLE FOR THE TUG/BARGE COMBO SHALL BE OF THE MALE AND REVERSE SVC TYPE (46 CFR 111-79.9 (B).
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987
Electrical
Issued 4 September 1987
Resolved
IN ACCORDANCE WITH ABS LTR DTD 27 JAN 87, ALL ELECTRIC EQUIP INSTALLED ON DECK WITHIN 3 METERS OF ANY TANK OUTLET IS TO BE INTRINSICALLY SAFE,OR EXPLPROOF. ANY ELEC EQUIP INSTALLED WITHIN THE TANK IS TO BE INTRINS SAFE. EQUIP MUST BE UL,FM OR CSA APPR FOR USE IN CLASS I DIV I GROUP D LOCATIONS.
Condition: Unknown
Due 4 September 1987
Resolved 4 September 1987