MAURY USCG vessel records Sign in
← All vessels

RACHEL MARIE

RACHEL MARIE is a 1988 passenger vessel (inspected). The Coast Guard has recorded 105 inspections since 1988, most recently in August 2026, along with 180 deficiencies, 2 operational controls and 22 casualty investigations between 2005 and 2025.

Records from 1988 to 2026. Most recent: inspection, 12 August 2026.

Built
1988
Last inspected
12 August 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDC5080
293215
Flag
UNITED STATES
367540000
Maury page id
psix-293215

Inspections, by type

…with no type recorded17
Years with a record 36 calendar years (1988–2026)
The 105 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)72.2 ft × 28.5 ft × 8.9 ft
Registered tonnagegross 60 / net 39
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNICHOLS BROS BOAT BLDRS. · FREELAND, WA, UNITED STATES · built 1988
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSEWARD, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 11 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it60 - Regulatory (Subpart C or D), Gross Ton
39 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDC5080MMSI 367540000 · active · compulsorily equipped · granted 18 April 2025, expires 21 April 2035
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 105

12 August 2026 In-Service Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8462865
13 July 2025 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8347135
12 July 2025 Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8186617
25 June 2025 Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8166818
24 June 2025 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8167592
16 October 2024 Drydock Exam · Administrative Inspection · Damage Survey · Annual Inspection · Examination of Repairs · Deficiency Check · Internal Structural Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8020211
23 July 2024 Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7996478
22 July 2024 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7966088
5 June 2024 Deficiency Check · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7926481
8 June 2023 Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7710737
11 January 2023 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7620093
21 July 2022 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7512385
21 July 2022 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7890235
2 June 2022 Security Plan Amendment Review - ASP · Internal Structural Exam · COI Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7460216
1 June 2022 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7465716
27 April 2022 Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7444229
27 August 2020 Drydock Exam · Examination of Repairs · Administrative Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7043849
1 May 2020 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6946993
29 October 2019 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6848955
21 October 2019 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6841146
4 October 2019 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6829905
25 March 2019 Deficiency Check · Examination of Repairs · Administrative Inspection · Plan Review "T" Boat
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6648835
11 March 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6640510
11 December 2018 Deficiency Check · DAPI Audit · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6595776
6 December 2018 Deadweight Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6593741
29 August 2018 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6526938
17 April 2018 Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6393679
1 December 2017 Drydock Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6316572
27 September 2017 Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6275846
10 May 2017 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6143144
24 March 2017 Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6111172
10 March 2017 Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6099724
10 March 2016 Deficiency Check · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5831590
21 September 2015 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5726925
23 May 2014 In-Service Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4863491
8 May 2014 Special
Type not classified · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4853846
11 July 2012 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4376400
11 July 2012 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4405193
18 June 2012 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4350007
9 May 2012 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4313126
31 January 2012 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4235479
31 January 2012 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4236018
28 December 2011 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4215593
14 January 2011 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3926827
10 January 2011 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3926059
20 October 2010 Re-Inspection · Drydock Exam · Damage Survey · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3922931
1 October 2010 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3864828
26 September 2010 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3858257
21 September 2010 Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3706643
11 March 2010 Deficiency Check · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3692498
26 January 2010 Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3671073
30 July 2009 Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3551141
25 July 2009 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3548629
7 November 2008 Plan Review "T" Boat · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3363189
24 September 2008 In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3331722
11 December 2007 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3113846
1 December 2007 Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3112851
12 September 2007 Damage Survey · In-Service Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3056377
4 September 2007 Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3048991
8 June 2007 Annual Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2955707
17 August 2006 Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2763199
21 June 2006 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2687129
10 May 2006 MTSA Verification · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2645748
16 January 2006 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2568080
10 November 2005 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2538617
7 October 2005 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2509839
6 October 2005 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2513075
12 July 2005 MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2424304
16 June 2005 Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2392930
15 June 2005 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2405494
17 May 2005 Damage Survey
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2360263
21 April 2005 MTSA Verification · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2333370
15 February 2005 Administrative Inspection · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2291321
25 February 2003 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1747819
7 January 2003 Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1726042
5 April 2002 COI Inspection · Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1598813
17 May 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1064337
26 April 2001 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1465646
31 January 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1057583
10 April 2000 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1048728
24 March 2000 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1386746
22 March 1999 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1127149
24 February 1999 Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1467106
29 August 1998 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1461910
2 January 1998 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 784827
25 June 1997 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 212497
25 June 1997 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1364410
23 November 1996 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1357894
20 May 1996 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1414634
26 May 1995 Hull Examination · MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1430045
7 July 1994 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1358460
30 May 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1362995
6 April 1994 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 57822
26 October 1993 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1470886
17 August 1993 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1358136
1 June 1993 COI Inspection · MARPOL Annex V Examination · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 841419
14 November 1992 Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1140460
26 May 1992 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 958718
18 September 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 939813
30 May 1991 Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1314925
2 June 1990 COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 930694
18 August 1989 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 888547
31 May 1989 COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1345132
6 December 1988 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 896887
3 June 1988 Hull Examination · Initial Certification
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1344574

Deficiency record · 180

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 July 2025 Resolved
The OCMI may require an inspection and testing whenever a repair or alteration is undertaken. The port main engine gear box experienced knocking and requires replacement or rebuild. A Marine Inspector must attend to witness completed repairs and conduct sea trials prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2026
Resolved 27 May 2026
Resolution: Conducted sea trials of brand new engines and gear box. All sat. Gearbox def is clear.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 June 2025 Resolved
The OCMI may require an inspection and testing whenever a repair or alteration is undertaken. The port main engine experienced a high jacket water temperature suspected to have been caused by a damaged heat exchanger. A Marine Inspector must attend to witness repairs and conduct sea trials prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 July 2025
Resolution: Cracked cylinder liner replaced. Sea trials sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 May 2025 Resolved
Each individual bilge suction must be fitted with a suitable strainer. Port #4 void strainer not mounted. 46CFR119.510, 46CFR56-50.50(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2025
Resolved 3 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 May 2025 Resolved
The fire pump must be capable of delivering a single hose stream at a pitot tube pressure of 50 psi. Port pump pressure gauge inaccurate. 46CFR118.300(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2025
Resolved 3 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 May 2025 Resolved
The arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for protection against fire. Port engine room hatch missing structural fire protection insulation. 46CFR116.100(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2025
Resolved 19 June 2025
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 21 May 2025 Resolved
The emergency lighting must automatically actuate upon failure of the main lighting system. Upper deck emergency lighting inoperable. 46CFR120.432(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2025
Resolved 3 June 2025
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 21 May 2025 Resolved
A crew work space must be with suitable equipment to provide for the safe operation of the vessel and the protection of the crew. Starboard engine room grates at base of ladder are inadequately supported. 46CFR116.700(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2025
Resolved 3 June 2025
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 6 June 2024 Resolved
Make both aft engine room to laz bulkhead vapor/ smoke tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 2 July 2024
Resolution: Rectified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 June 2024 Resolved
Cap off unused overboard piping in the port engine room inboard side and in the starboard laz inboard side
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 2 July 2024
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 June 2024 Resolved
Replace Starboard side main deck leaking fire hose.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 June 2024
Resolved 12 June 2024
Resolution: Replace both fire hoses.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 June 2024 Resolved
Replace both expired life ring buoy light batteries.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 2 July 2024
Resolution: Rectified
10 - Safety of Navigation › N/A - No Subsystem › Compass correction log
Issued 5 June 2024 Resolved
Provide and post a compass deviation card in wheelhouse.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 2 July 2024
Resolution: Rectified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 June 2024 Resolved
Reinstall broken and missing grounding straps n both main engine exhaust systems.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 2 July 2024
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 June 2024 Resolved
Post schematic diagram of the CO2 system in the storage location for both engine rooms.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 2 July 2024
Resolution: Rectified
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 June 2024 Resolved
Remark the vessel’s name on life rings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 2 July 2024
Resolution: Rectified
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 June 2023 Resolved
33 CFR 104.120:Compliance Documentation. For vessels operating under a Coast Guard-approved Alternative Security Program as provided in § 104.140, a copy of the Alternative Security Program the vessel is using, including a vessel specific security assessment report generated under the Alternative Security Program, as specified in § 101.120(b)(3) of this subchapter, and a letter signed by the vessel owner or operator, stating which Alternative Security Program the vessel is using and certifying that the vessel is in full compliance with that program. Vessel missing one or more required documents pertaining to security.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2024
Resolved 21 May 2025
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 9 June 2023 Resolved
46 CFR 171.080: Damage stability standards. (a) Calculations. Each vessel with Type I or Type II subdivision must be shown by design calculations to meet the survival conditions in paragraph (e), (f), or (g) of this section in each condition of loading and operation assuming the extent and character of damage specified in paragraph (b) of this section. Update stability calculations to account for weight changes/shift and sail area modification.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 June 2024
Resolved 15 June 2024
Resolution: Stability letter issued.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 January 2023 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Both engine rooms flooded due to the sea strainers freezing and breaking the hose fittings off. Both MDEs, SSDG's, switchboards, all wiring, and pumps have been compromised. Make all repairs to the satisfaction of the attending Marine Inspector prior to carrying passengers. 46 CFR 119.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 July 2022 Resolved
EXCESSIVE WATER WAS FOUND IN THE STARBOARD HULL STEERING GEAR VOID. MAKE PERMANENT REPAIRS TO STARBOARD AFT STEERING VOID HATCH SEAL.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2022
Resolved 22 August 2022
Resolution: Operator replaced the recently damaged hatch gasket with a brand new one and hose tested - all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 July 2022 Resolved
PROVIDE INSPECTION REPORT OF INTERNAL EXAMINATION OF STARBOARD HULL AND IDENTIFY LOCATION OF WATER INGRESS THAT CAUSED FLOODING TO SATISFACTION OF USCG MARINE INSPECTOR.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2022
Resolved 22 August 2022
Resolution: Operator discovered the hatch gasket was previously damaged allowing water flow into the void from the flush deck. Operator replaced the gasket with a brand new gasket and hose tested - all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 July 2022 Resolved
VISUALLY INSPECT STARBOARD HULL VOID PRIOR TO EACH TRIP AND DOCUMENT INTO SHIP'S LOG BOOK UNTIL PERMANENT REPAIRS ARE MADE TO SATISFACTION OF USCG MARINE INSPECTOR.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2022
Resolved 22 August 2022
Resolution: Operator inspected and logged inspections of the starboard aft steering void until the hatch was repaired - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 July 2022 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. The port Main Diesel Engine shut down unexpectedly upon further investigation the jacket water coolant drained into the oil sump. Properly repair the port engine to the satisfaction of the attending Marine Inspector prior to carrying passengers. 46 CFR 119.100
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2022 Resolved
Electrical equipment in a machinery space or other wet location must be dripproof. The 110 vt outlet in the stbd side aft MSD space is not a dripproof fixture. Install proper dripproof electrical fixture for the MSD space 110 vt outlet. 46 CFR 120.210
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2022
Resolved 28 June 2022
Resolution: The owner installed a weather proof 110vt outlet box - all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2022 Resolved
The use of twist on type wire nuts is permitted under the following conditions. The connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration, twist on connectors may not be used for making joints in cables, facilitating a conductor splice, or extending the length of the circuit. The heat detector wiring over the stbd main diesel engine has exposed wire nuts for wire connectinos. Properly repair the wire connections for the stbd engine room heat detection system. 46 CFR 120.340
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2022
Resolved 28 June 2022
Resolution: Owners mechanic replaced the twist connectors with waterproof pressure connectors and secured wiring - all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2022 Resolved
Electrical equipment on a vessel must be installed and maintained to protect the crew and the vessel from electrical hazards. The electrical cover for the shore power terminal block on the port side of the vessel is loose and not secured. Properly secure the electrical terminal block cover. 46 CFR 120.200
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2022
Resolved 29 June 2022
Resolution: Owners electrician properly secured the electrical cover - all sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 June 2022 Resolved
Bilge high level alarms must be provided with a visual and audible alarm at the operating station to indicate a high water level. At the operating station the port bilge high level alarm indicator light is out of commission. Properly repair the port high bilge level alarm indicator light. 46 CFR 119.530
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2022
Resolved 24 June 2022
Resolution: Owner replaced the faulty light - all sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 3 June 2022 Resolved
Ventilation of the engine room, provisions must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. The forward engine room supply fan and duct vent closures are not closing 100%. Properly repair vent closures in the port and starboard engine rooms to ensure the supply vent ducts are 100% closed when closures are activated. 46 CFR 119.465
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2022
Resolved 28 June 2022
Resolution: Owner replaced worn out vent closure springs vents now fully close when activated - all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
During fixed CO2 system testing, port system released at 43 seconds and starboard system released at 37 seconds. These systems are both equipped with 30 second time delays. Restore system to release within tolerance and demonstrate to the attending CG marine inspector. - 46 CFR 118.410
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2020
Resolved 1 May 2020
Resolution: Cleared upon surrender of COI. See activity 6946993 narrative.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 December 2018 Resolved
Repair Fuel leak on port main engine fwd raycor fuel filter
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 March 2019
Resolution: Filter no longer leaking fuel.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 12 December 2018 Resolved
Provide a horn that produces the required dB and audibility range listed in 33 CFR 86
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 March 2019
Resolution: Horn repaired and sounded.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 12 December 2018 Resolved
Prove proper operation of port engine room high level bilge alarm
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 March 2019
Resolution: Alarms work.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 12 December 2018 Resolved
Conduct underway fire and abandon ship drills with CG inspectors attending
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 April 2019
Resolution: Conducted underway drills, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 December 2018 Resolved
Vessel's passenger count is reduced to 72 adults and 9 children until remaining life jackets are replaced or repaired per NVIC 2-63
Action required: 705 - Other - as specified
Resolved 29 April 2019
Resolution: Vessel has replaced all lifejackets
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 12 December 2018 Resolved
Fill port engine room fwd bulkhead wire thought bulkhead run to make it smoke tight
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 March 2019
Resolution: Vessel has filled wire run.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 December 2018 Resolved
Repair exhaust raw cooling water leak on starboard main engine
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 March 2019
Resolution: Vessel has completed repairs to the exhaust raw cooling water leak on starboard main engine
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 December 2018 Resolved
Permanently attach life buoy floating water light to life buoy as per 46 CFR 117.70 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 March 2019
Resolution: vessel has Permanently attach life buoy floating water light to life buoy
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 12 December 2018 Resolved
Get FCC Bridge to Bridge updated with a expiration date
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 March 2019
Resolution: vessel has a current FCC Bridge to Bridge
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 December 2018 Resolved
Provide covers on electrical outlets in both engine rooms
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 March 2019
Resolution: Elec. covers have been installed
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 December 2018 Resolved
During annual security exercise properly list all participants attending exercise
Action required: 705 - Other - as specified
Due 11 December 2019
Resolved 11 March 2019
Resolution: Vessel has correctly listed all participants attending exercise
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 12 December 2018 Resolved
Within 1 month temporary mark starboard aft Draft mark and permanently fix within 6 months
Action required: 705 - Other - as specified
Due 12 June 2019
Resolved 3 April 2019
Resolution: Vessel has installed draft marks
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 18 April 2018 Resolved
The port engine room fixed CO2 system discharge piping does not have the odorizing unit connected, resulted in an opening in the discharge piping that would immediately release CO2 into the activation area. Replace odorizing unit on discharge piping.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 25 April 2018
Resolution: Odorizer installed.
Operations/Management › Drills/Instruction › Fire
Issued 18 April 2018 Resolved
Records of fire and abandon ship/man overboard drills are not available onboard. Provide documentation of the completion of required drills.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 December 2018
Resolution: Vessel has been documenting all drills
Lifesaving › Lifebuoys › Serviceable
Issued 18 April 2018 Resolved
Two ring lifebuoys are unservicable. Replace unservicable lifebuoys.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 April 2018
Resolution: Lifebuoys replaced.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 18 April 2018 Resolved
Floating waterlight on port side upper deck ring buoy contains unapproved battery. Replace with approved battery of appropriate weight.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 April 2018
Resolution: battery replaced with approved battery.
Construction/Loadline › Hull › Bottom Plating
Issued 18 April 2018 Resolved
A pit in excess of 1/8" in depth is present in starboard fuel tank space hull plating. Repair hull plating to the satisfaction of the attending CG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 April 2018
Resolution: Pit repaired with insert.
Stability › Watertight Integrity › General
Issued 18 April 2018 Resolved
An unprotected bulkhead penetration exists between the port engine room and lazarette. Restore watertight integrity of bulkhead to the satisfaction of the attending CG Marine Inspector.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 April 2018
Resolution: Penetration sealed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 April 2018 Resolved
Lighting guard on light above sink area in main passenger compartment broken. Replace guard.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 April 2018
Resolution: Guard replaced.
Accommodation/Occupational Safety › Potable Water System › General
Issued 18 April 2018 Resolved
Potable water pump and filter housing are both cracked. Repair or replace pump and replace filter housing.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 April 2018
Resolution: Pump and filter housing replaced.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 11 March 2017 Resolved
Properly repair the port forward engine room supply vent fan damper. Bracket broke off keeping the damper in the closed position.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Maintenance personnel installed a new cable bracket. Tested SAT.
Personnel › Training › Passenger Safety
Issued 11 March 2017 Resolved
Conduct u/w emergency drills in the presence of the CG Marine Inspector.
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 10 May 2017
Resolution: Witnessed satisfactory drills.
Engineering › Bilge Water Management System › Manifold
Issued 11 March 2017 Resolved
Prove proper operation of the emergency bilge cross over. During inspection cross over line was blocked with frozen water. Both the port and stbd bilge systems op tested - SAT.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Test bilge cross over using the port and stbd bilge pumps - All SAT.
Fire Fighting › Remote Fuel Shutoff › General
Issued 11 March 2017 Resolved
Properly secure emergency fuel shut off valve control cable to bracket for the port SSDG. Control cable secured the fuel valve however it is slipping through the support bracket making it unreliable and potential to fail.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Maintenance personnel secured the fuel cable. Tested - SAT.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 11 March 2017 Resolved
Repair or renew x4 Type 1 adult PFD's and x1 child Type 1 PFD. PFD's retro-flective tape is heavily worn and some the vessels name has worn off or has the incorrect name.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Ships crew repaired the life jackets by adding new SOLAS retro tape and placed the vessels name onto the same - All SAT.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 11 March 2017 Resolved
Properly secure the A60 insulation iwo the port and stbd aft engine room ventilation dampers. The dampers are rubbing on the insulation wearing it out and slowing the operation of the dampers.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Maintenance personnel secured the insulation out of the way of the ventilation dampers port and stbd engine rooms - Tested SAT.
Electrical › Electric Generation Source (emergency) › Conductor
Issued 11 March 2017 Resolved
Properly secure and cover exposed battery terminals under the stbd bridge counsel.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Maintenance personnel installed a proper battery cover. All SAT.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 11 March 2017 Resolved
Properly repair second deck port side aft Emergency light and secure all loose light covers on the weather decks.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Maintenance personnel replaced a burned out light bulb and secure the light covers. All SAT.
Lifesaving › Visual Distress Signals (General) › Marking
Issued 11 March 2017 Resolved
Properly mark distress flare container "DISTRESS SIGNALS" minimum of 1/2 high lettering in a contrasting color.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 24 March 2017
Resolution: Ships crew marked DISTRESS SIGNALS onto the VDS container. All SAT.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 10 March 2016 Resolved
CO2 System instructions are for the old system and do not match the current arrangement.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 March 2016
Resolved 28 March 2016
Resolution: New Instructions posted in each CO2 Control Space.
Engineering › Bilge Water Management System › Piping
Issued 10 March 2016 Resolved
Bilge crossover is not capable of taking suction. Operation must be proved to the USCG.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 March 2016
Resolved 28 March 2016
Resolution: Piping to crossover pipe in each hull was replaced due to excessive wear and non sealing ability. Vessel was able to prove operation of the bilge crossover system after replacing.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 10 March 2016 Resolved
Battery Operated Emergency Exit lighting needs to have batteries replaced. None of them function when the ship loses power.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 28 March 2016
Resolution: Batterys were replaced and operation was verified.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 10 March 2016 Resolved
Expired items in first aid kit, including Iodine, Ammonia, and Aspirin are expired and must be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 28 March 2016
Resolution: Expired items were replaced.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 10 March 2016 Resolved
Retro Reflective tape is peeling off two of the Ring buoys and must be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 November 2016
Resolved 28 March 2016
Resolution: Retro Reflective tape was replaced where worn on 3 lifebuoys onboard.
Engineering › Bilge Water Management System › Interface Detector
Issued 10 March 2016 Resolved
Audible alarm was not witnessed to be operational while onboard the vessel. Proper operation must be proved to a USCG marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 March 2016
Resolved 28 March 2016
Resolution: 1 Bilge float sensor was replaced and proper operation of alarm panel was shown. it was determined that when 1 alarm has been silenced and has not been fully cleared, the audible alarm will not sound for any other bilge sensors until the first is clear.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 10 March 2016 Resolved
Retro Reflective tape on 1 child sized PFD was un satisfactory and must be renewed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 28 March 2016
Resolution: PFD retro reflective tape was replaced.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 10 March 2016 Resolved
Ventilation shut downs in the engineering spaces would not properly close.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 March 2016
Resolved 28 March 2016
Resolution: Fire dampers were proved to be operational. It was found that the all thread material at the end of the cable was causing the pull to be difficult to pull. The all thread was filed down to make it easier to release.
Engineering › Freshwater Generation System › Pump
Issued 10 March 2016 Resolved
Permenantly mount potable water pump in aft void.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 28 March 2016
Resolution: Water pump was permenantly mounted.
Engineering › Freshwater Generation System › Pump
Issued 10 March 2016 Resolved
Remount psi switch to potable water pump and secure wiring in port aft void.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 28 March 2016
Resolution: Pump switch was secured to pump.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 March 2016 Resolved
Replace port aft void light fixture.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 28 March 2016
Resolution: Light fixture was replaced with new unit.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 March 2016 Resolved
Replace missing clip on stbd aft light fixture.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 28 March 2016
Resolution: Missing clip was replaced.
Fire Fighting › Remote Fuel Shutoff › General
Issued 10 March 2016 Resolved
Repair loose fuel shut off cable on port generator.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 March 2016
Resolved 28 March 2016
Resolution: Fuel shut off was secured properly and proved to operate.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 10 March 2016 Resolved
Properly install placard(s) in both engine rooms close to the typhoon alarms stating "WHEN ALARM SOUNDS-VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED".
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 28 March 2016
Resolution: Placard placed in engine compartment.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 11 July 2012 Resolved
Vessel must submit a repair proposal for the permanent repair of the raw water exhaust cooling line on both stbd and port engines and have permanent repairs completed by 11Aug12
Condition: Improper Installation
Due 11 August 2012
Resolved 5 August 2012
Resolution: Vessel submitted repair proposal and installed new piping and brackets. Sat.
Engineering › Fuel Oil Service System › Tank
Issued 18 June 2012 Resolved
A 1/2 inch crack in the aft bulkhead of port fuel tank has been identified. Vessel will complete temporary repairs and will complete permanent repairs on 6/23/12. A repair proposal must be submitted prior to completion of permanent repairs. Rounds must be conducted in the morning before the vessel operates and at the end of the day.
Action required: 705 - Other - as specified
Due 23 June 2012
Resolved 23 June 2012
Resolution: Witness successful NDT.
Engineering › Sea-water System (primary cooling) › Pump
Issued 31 January 2012 Resolved
Starboard main engine raw water pump failed.
Action required: 705 - Other - as specified
Resolved 31 January 2012
Resolution: New raw water cooling pump installed. Sea trials were conducted prior to inspection. Ran up engines at the dock and engine temperatures were determined to be in normal operation. All sat
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 14 January 2011 Resolved
Repalce main breaker for STBD generator prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 January 2011
Resolved 14 January 2011
Resolution: Witnessed satisfactory installation and operational test of new 200 amp breaker.
Communications › Public Address System › Amplifier
Issued 5 January 2011 Resolved
Public address system inoperable at time of inspection.
Action required: 705 - Other - as specified
Due 6 January 2011
Resolved 6 January 2011
Resolution: Inpsector witnessed replacement of PAS amplifier internal fuse, and successful operation test.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 5 January 2011 Resolved
20 child size lifejackets tightly stowed in manner that prevented timely removal for use. Vessel required to supply alternative stowage arrangement for lifejackets.
Action required: 705 - Other - as specified
Due 6 January 2011
Resolved 6 January 2011
Resolution: Operator removed 4 jackets from stowage location allowing for satisfactory access. Placarding for stowage updated to reflect 16 lifejackets. 20 additional childsize lifejackets have been provided in portable stowage containers on vessel main deck.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 5 January 2011 Resolved
Operator required to replace warn retro tape on lifejackets.
Action required: 705 - Other - as specified
Due 6 January 2011
Resolved 6 January 2011
Resolution: Witnessed satisfactory replacement of retroreflective tape on lifejackets.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 5 January 2011 Resolved
Lifejackets stowed with strap tightly wrapped around vest with clip attached to D-ring; condition restricts passenger ability to properly don PFD in emergency. Vessel required to stow lifejacket with strap/clip unnattached from D-ring.
Action required: 705 - Other - as specified
Due 6 January 2011
Resolved 6 January 2011
Resolution: Witnessed satisfactory stowage of PFD''''s with clips not attached to D-ring.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 5 January 2011 Resolved
Vessel rquired to re-stencil vessel name to 1 ring life buoy.
Action required: 705 - Other - as specified
Due 6 January 2011
Resolved 6 January 2011
Resolution: Witnessed satisfactory completion of life buoy markings.
Construction/Loadline › Hull › Weld
Issued 20 October 2010 Resolved
Repair shaft log to original scantiling.
Action required: 705 - Other - as specified
Due 30 December 2010
Resolved 30 December 2010
Resolution: Inspector witnessed satisfactory repair of shaft log
Construction/Loadline › Hull › Hull Plating
Issued 20 October 2010 Resolved
Complete repairs to bow/headog as indicated on repair proposal
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 December 2010
Resolved 5 January 2011
Resolution: Inspector witnessed various stages of all required repairs to include crop, fit up, back gouge, and final weld.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 11 March 2010 Resolved
Floating water lights attached to grab line on ring buoys. Ensure that floating water lights are attached to body of ring buoy IAW 46 CFR 181.
Condition: Unknown
Due 18 March 2010
Resolved 19 March 2010
Resolution: Witnessed satisfactory attachment of waterlights on ring buoys.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 11 March 2010 Resolved
Two emergency light fixtures are missing bulbs. Replace bulbs IAW 46 CFR 183.
Condition: Unknown
Due 18 March 2010
Resolved 19 March 2010
Resolution: Operator provided bulbs in emergency lighting fixtures.
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 March 2010 Resolved
Sea suction pipe for port engine room is inacdequately supported. Provide support for piping installation IAW 46 CFR182.
Condition: Improper Installation
Due 18 March 2010
Resolved 22 March 2010
Resolution: Verified proper installation of support bracket for piping.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 11 March 2010 Resolved
Bilges should be clean and free of debris. Clean bilges IAW 46 CFR 181.
Condition: Improper/Lack of Maintenance
Due 18 March 2010
Resolved 19 March 2010
Resolution: Operator appropriately cleaned bilge system on vessel.
Construction/Loadline › Hull › Hull Plating
Issued 26 January 2010 Resolved
Crop and renew to good metal, starboard stem inset approximately 12 x 40 inches as per NVIC 11-80.
Action required: 705 - Other - as specified
Due 26 February 2010
Resolved 10 February 2010
Resolution: NDT tested satisfactory.
Construction/Loadline › Hull › Hull Plating
Issued 26 January 2010 Resolved
Five welds on the port stem and three welds on the starboard stem are worn. Vee out and reweld in accordance with NVIC 11-80.
Action required: 705 - Other - as specified
Due 28 February 2010
Resolved 10 February 2010
Resolution: All welds made to the satisfaction of the attending CGMI.
Construction/Loadline › Penetrations › Pipe Flange
Issued 29 December 2008 Resolved
Worklist item 14: During clad weld on black water pipe, a small area around pipe doubler was found to be wasted. Per Domestic Inspection Branch Chief, permission given to clad weld area affected.
Action required: 705 - Other - as specified
Resolved 29 December 2008
Resolution: Corrected. Clad weld completed.
Construction/Loadline › Penetrations › Pipe Flange
Issued 22 December 2008 Resolved
Worklist 13: Clean pipe surface and clad weld small pitting on upper and lower sewage head piping.
Action required: 705 - Other - as specified
Resolved 29 December 2008
Resolution: Corrected. Pipe repaired.
Construction/Loadline › Hull › Weld
Issued 18 December 2008 Resolved
Worklist item 12: Witnessed Dye Penetrant Test NDT and found 1 area in need of repair. Area located approximately 6 inches above chine and approximately 1 inch behind aft edge of lower insert in an existing insert weld. Repair and make preparations to Dye Penetrant NDT during upper insert NDT.
Action required: 705 - Other - as specified
Resolved 24 December 2008
Resolution: Corrected. Dye Penetrant NDT passed.
Construction/Loadline › Hull › Weld
Issued 16 December 2008 Resolved
Worklist item 11: Back-gouge inspection of lower insert showed one area in need of additional grinding and back-gouge inspection. Aft edge from chine to approximately 10 inches below chine needs additional grinding.
Action required: 705 - Other - as specified
Resolved 17 December 2008
Resolution: Corrected. Inspection of remaining section SAT. Scheduled Dye Penetrant NDT for 0730 18DEC08.
Construction/Loadline › Hull › Weld
Issued 14 December 2008 Resolved
Worklist item 10: During fit-up of lower insert piece, found 4 areas which needed to have additional grinding or preparation. Forward edge approximately 8 inches from bottom, bottom edge approximately 3 feet from forward edge, bottom edge approximately 5 feet from forward edge, and aft edge of existing hull plate at chine cut.
Action required: 705 - Other - as specified
Resolved 15 December 2008
Resolution: Corrected. All areas ground and prepared to the satisfaction of the attending inspector. Permission given to weld insert in place and prepare for back-gouge inspection.
Construction/Loadline › Structures › Superstructure
Issued 10 December 2008 Resolved
Worklist item 6: Remove all wasted aluminum mounts listed on mount matrix diagram and reposition on existing mount base.
Action required: 705 - Other - as specified
Resolved 29 December 2008
Resolution: Corrected. All mounts noted on mount matrix diagram were repositioned.
Construction/Loadline › Structures › Superstructure
Issued 10 December 2008 Resolved
Worklist item 7: Remove metal base on starboard mount #14 and replace.
Action required: 705 - Other - as specified
Resolved 29 December 2008
Resolution: Corrected. Aluminum base on starboard mount #14 replaced.
Construction/Loadline › Penetrations › Valve Flange
Issued 10 December 2008 Resolved
Worklist item 8: Install valve immediately adjacent to spool piece for both port and starboard shaft cooling line and dripless shaft seal line. 46 CFR 179.350(d).
Action required: 705 - Other - as specified
Resolved 29 December 2008
Resolution: Corrected. Valves installed.
Construction/Loadline › Penetrations › Pipe Flange
Issued 10 December 2008 Resolved
Worklist item 9: Remove flexible hose on sewage drain pipe from heads to black water tank. Make pipe ready for inspection.
Action required: 705 - Other - as specified
Resolved 22 December 2008
Resolution: Corrected. Flexible hose was removed and pipe inspected. Found small pitting on both pipe ends. Issued additional worklist item to clad weld pits.
Construction/Loadline › Hull › Bottom Plating
Issued 3 December 2008 Resolved
Worklist item 1: Clean and make ready for inspection MSD void, Port fuel tank void, forward void aft of collision bulkhead, and general cleaning of all voids. Make steering spaces ready for inspection.
Action required: 705 - Other - as specified
Resolved 10 December 2008
Resolution: Cleaned and ready for inspection.
Construction/Loadline › Structures › Superstructure
Issued 3 December 2008 Resolved
Worklist item 2: Make all superstructure mounts available for inspection.
Action required: 705 - Other - as specified
Resolved 10 December 2008
Resolution: Corrected. Inspected all superstructure mounts. Issued CG-835.
Construction/Loadline › Penetrations › Valve Flange
Issued 3 December 2008 Resolved
Worklist item 3: Remove all sea valves to through-hull fittings and make available for inspection.
Action required: 705 - Other - as specified
Resolved 16 December 2008
Resolution: Corrected. Conducted satisfactory inspection of all through-hull valves.
Construction/Loadline › Penetrations › Valve Flange
Issued 3 December 2008 Resolved
Worklist item 4: Clean port and starboard salt water feed connector to dripless shaft seal and make available for inspection.
Action required: 705 - Other - as specified
Resolved 10 December 2008
Resolution: Corrected. Inspected port and starboard side shaft cooling hose and spool piece and dripless shaft seal hose and spool piece. Issued 1 CG-835.
Construction/Loadline › Structures › Superstructure
Issued 3 December 2008 Resolved
Worklist item 5: Make superstructure mounts #14 port and stbd (from mount matrix diagram) available for inspection.
Action required: 705 - Other - as specified
Resolved 10 December 2008
Resolution: Corrected. Inspected all superstructure mounts. Issued CG 835.
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 1 December 2007 Resolved
Vsl sustained a casualty to port side main propulsion engine requiring full replacement of engine. Issued CG-835 to conduct repairs prior to operating with pax.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 December 2007
Resolved 6 December 2007
Electrical › Electrical Distribution System (service) › Conductor
Issued 24 September 2007 Resolved
Vessel rep reports the electronic control module and master interface module for starting and operating the port main engine are inoperative and require replacement.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 September 2007
Resolution: Vessel rep reports the module are replaced as well as (2) starting batteries for each engine, satisfactory sea trials completed and vessel is ready to commence service.
Communications › Radio Communications › EPIRB
Issued 21 September 2007 Resolved
Replace EPRIB Battery prior to the carriage of passengers
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 September 2007
Resolved 21 September 2007
Resolution: EPIRB Battery replaced
Communications › Public Address System › Amplifier
Issued 21 September 2007 Resolved
Prove proper operation of vessel's PA System
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 September 2007
Resolved 21 September 2007
Resolution: PA System functioning properly
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 19 September 2007 Resolved
Provide new retroreflective tape for lifejackets, and label indicated lifejackets with vessel name
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 September 2007
Resolved 21 September 2007
Resolution: New retro and markings provided
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 19 September 2007 Resolved
Provide IBA for vessel, vessel route limited to 3 miles from shore until IBA is installed
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 September 2007
Resolved 21 September 2007
Resolution: Certificates and IBA Sat
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 September 2007 Resolved
Remove wiring at thermostat mount on starboard passenger decks
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 September 2007
Resolved 28 September 2007
Resolution: Wiring removed
Engineering › Freshwater System (intermediary cooling) › Piping
Issued 19 September 2007 Resolved
Repair raw water cooling line at generator
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 September 2007
Resolved 21 September 2007
Resolution: Raw water cooling line repaired
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 19 September 2007 Resolved
Make repairs to deck rail port side, ensure rail capable of supporting 200lbs.
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 September 2007
Resolved 21 September 2007
Resolution: Deck rail installation satisfactory
Construction/Loadline › Structures › Ventilators
Issued 4 September 2007 Resolved
Install power ventilator in port lazzerette
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 September 2007
Resolved 19 September 2007
Resolution: Power ventilator installed in port lazzerette
Construction/Loadline › Hull › Bracket
Issued 4 September 2007 Resolved
repair cabin mounts as noted on diagram updated on 9/4/2007 diagram scanned into documents
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 September 2007
Resolved 14 September 2007
Resolution: Cabin mounts repaired, with the exception of mount #1 on the starboard side
Construction/Loadline › Hull › Weld
Issued 4 September 2007 Resolved
fracture weld on # 13 frame in the fwd holes port and stbd near bottom
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 September 2007
Resolved 19 September 2007
Resolution: Weld repaired at frame #13
Stability › Watertight Integrity › Weathertight Enclosure
Issued 4 September 2007 Resolved
make all hatches watertight
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 September 2007
Resolved 19 September 2007
Resolution: Hatches made watertight
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 8 June 2007 Resolved
Replace CO2 Pilot cylinder instruction label for emergency discharge, port side.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 September 2007
Resolved 19 September 2007
Resolution: CO2 Pilot instructions present on port side
Electrical › Electrical Distribution System (service) › Switch
Issued 8 June 2007 Resolved
Repair/replace melted wiring and 12 - 24 V. transformer in port lazerette.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 September 2007
Resolved 19 September 2007
Resolution: Melted wiring repaired in port lazerette space.
Communications › Alarms/Indicators › Fire Alarm
Issued 8 June 2007 Resolved
Prove proper operation of all fire alarms including trouble alarm. Retro-fit a USCG approved fire detection system, or modify current system to satisfaction of attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 September 2007
Resolved 19 September 2007
Resolution: Alarms functioning properly
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 8 June 2007 Resolved
Prove proper operation of forward damper, P & S engineroom.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 September 2007
Resolved 19 September 2007
Resolution: Forward damper functioning properly.
Engineering › Sea-water System (primary cooling) › Valve
Issued 8 June 2007 Resolved
Prove proper operation of MDE sea chest valve, stbd hull sea suction. Valve handle spins without stopping, open or closed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 August 2007
Resolution: Witnessed operation of rebuilt valve crank mechanism in machine shop during drydocking.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 8 June 2007 Resolved
Provide fixed F/E system servicing certificate.
Due 8 July 2007
Resolved 19 September 2007
Resolution: Certificates provided to Marine Inspectors
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 8 June 2007 Resolved
Remove all oily rags and oil/water mix in P & S engineroom.
Due 8 July 2007
Resolved 19 September 2007
Resolution: Oily rags removed along with oil/water mix in P&S engineroom
Engineering › Bilge Water Management System › Manifold
Issued 8 June 2007 Resolved
Clearly label P & S hull bilge suction valves near manifold.
Due 8 July 2007
Resolved 19 September 2007
Resolution: Bilge suction valves properly labeled
Engineering › Sea-water System (primary cooling) › Valve
Issued 8 June 2007 Resolved
Attach remote reach rod stbd MDE sea suction as original (no plastic ties).
Due 8 July 2007
Resolved 19 September 2007
Resolution: Remote reach rod replaced
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 8 June 2007 Resolved
Prove that CO2 discharge piping is adequate and clear of debris. Replace piping where wall thickness is suspect.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 August 2007
Resolution: Noted new piping in P & S fixed system run, as well as discussed retro fitting with [name withheld] rep.
Construction/Loadline › Hull › Hull Plating
Issued 8 June 2007 Resolved
Remove lagging from around P & S engineroom hatches, and above MDE muffler hangers to expose suspect/wasted overhead hull plating for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 August 2007
Resolution: Noted plate is in satisfactory condition, CO2 piping penatration appeared to be allowing sea water ingress (re-sealed when new piping installed) however muffler brackets still wasted. (new 835 from DDX activity.)
Operations/Management › Drills/Instruction › Not Conducted
Issued 8 June 2007 Resolved
Conduct all emergency drills in presence of marine inspector.
Action required: 705 - Other - as specified
Due 19 September 2007
Resolved 19 September 2007
Resolution: Satisfactory emergency drill conducted
Documentation › Manuals/Policy Documentation › Training Manual (lifesaving)
Issued 8 June 2007 Resolved
Establish and maintain drill logs, training record book, and lifesaving equipment maintenance record.
Action required: 705 - Other - as specified
Due 19 September 2007
Resolved 19 September 2007
Resolution: Drill logs and training record book provided.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 8 June 2007 Resolved
Prove enrollment of all crew in approved drug testing program.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 September 2007
Resolved 19 September 2007
Resolution: Crew enrolled in approved drug testing program
Construction/Loadline › Hull › Side Shell
Issued 17 August 2006 Resolved
Found two pinholes below waterline and wastage (pitting) on outboard side shell in way of port engine room between generator and MDE. Wastage also evident on longitudinals. Must crop and renew. Instructed owner to check space 2x a day and log during operation, checking for water.
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 October 2006
Resolved 8 August 2007
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 10 May 2006 Resolved
Fire detecion audible alarm not operational on the bridge for main and upper deck. Prove proper operation of fire detection system.
Action required: 705 - Other - as specified
Due 9 June 2006
Resolved 20 June 2006
Resolution: New sending units installed and tested, both indicated visual and audible in wheelhouse.
Electrical › Electric Supply System (service) › Cable
Issued 7 October 2005 Resolved
Wires that control the port engine were chaffing against the block and shorted out.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 October 2005
Resolved 14 October 2005
Resolution: Replaced control wires for the port engine.
Electrical › Electric Supply System (service) › Cable
Issued 7 October 2005 Resolved
Inspect wire and hose runs in port and starboard engine room for chaffing. Install chaffing gear as needed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 October 2005
Resolved 14 October 2005
Resolution: Chaffing gear was installed in port and starboard engine rooms.
Construction/Loadline › Hull › Weld
Issued 17 May 2005 Resolved
Failure of repair weld in port lazerette chime seam allowing water seepage from behind weld. Until proper repairs are made, crew to monitor condition underway and log findings, any significant findings are to be reported to CG.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 May 2005
Resolved 23 May 2005
Resolution: Weld repair satisfactory. Repair work performed by Fairhaven Ship Yard, WA, job#301362, item#0304.
Stability › Weathertight Integrity › General
Issued 15 February 2005 Resolved
Replace two broken windows in main cabin.
Due 15 March 2005
Resolved 20 April 2005
Resolution: windows replaced
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 7 January 2003 Resolved
Renew wasted sewage system flange and pipe nipple at inboard side of overboard valve.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 January 2003
Resolved 10 January 2003
Engineering › Fuel Oil Service System › Valve
Issued 7 January 2003 Resolved
Prove proper operation of remote fuel stop valve for port Aux. Generator.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 January 2003
Resolved 10 January 2003
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 7 January 2003 Resolved
Install pipe plugs at the port and starboard fuel tank drain valves.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 January 2003
Resolved 10 January 2003
Engineering › Lubricating Oil Service System › Hose
Issued 7 January 2003 Resolved
Renew dry rotten lube oil hose at starboard main engine turbo charger.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 January 2003
Resolved 10 January 2003
Construction/Loadline › Hull
Issued 7 January 2003 Resolved
Repair cracked weld in starboard Laz. at aft bulkhead stiffener as marked. LEGACY COMPONENT DESC: Weld
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Construction/Loadline › Structures
Issued 7 January 2003 Resolved
Repair hole in starboard Laz. at forward bulkhead IWO weld burn hole LEGACY COMPONENT DESC: Longitudinal Bulkhead
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Construction/Loadline › Hull
Issued 7 January 2003 Resolved
Repair 4 cracked welds in the starboard NR. 5 void, between frames 10 and 11 inboard side at NR. 9 longitudinal stiffener. LEGACY COMPONENT DESC: Weld
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Construction/Loadline › Hull
Issued 7 January 2003 Resolved
Repair 1 cracked weld in NR. 6 Starboard void at collision bulkhead longitudinal stiffener. LEGACY COMPONENT DESC: Weld
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Construction/Loadline › Hull
Issued 7 January 2003 Resolved
Complete hull repairs stbd hull, forward inboard side between frames 12 and 13, ( Approx. 42" x 26" insert) and conduct non destructive test of weld. LEGACY COMPONENT DESC: Side Shell
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Construction/Loadline › Hull
Issued 7 January 2003 Resolved
Complete hull repairs on port hull, aft bottom plate between frames 0 and 1, (approx. 25" x 19" insert) and conduct non destructive test of weld. LEGACY COMPONENT DESC: Bottom Plating
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Engineering › Fuel Oil Service System
Issued 7 January 2003 Resolved
Install flame shields on all Racor fuel filters IAW 46CFR119.455 (b) (5). LEGACY COMPONENT DESC: Filter
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Engineering › Fuel Oil Service System
Issued 7 January 2003 Resolved
Install fuel filter drain valves/plugs IAW 46CFR119.455 (a) (3) and 46CFR119.455 (b) (7). LEGACY COMPONENT DESC: Filter
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2003
Resolved 25 February 2003
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 5 April 2002 Resolved
Properly mark vessel hull with vessel name and hailing port in accordance with 46 CFR 67.123.
Due 25 April 2002
Resolved 6 April 2002
Resolution: Vessel operator properly marked vessel name and hailing port on vessel.
Engineering › Response Equipment
Issued 5 April 2002 Resolved
Ensure vessel's bilges are free of oil, trash and debris in accordance with 46 CFR 115.830. LEGACY COMPONENT DESC: Bilges
Due 25 April 2002
Resolved 6 April 2002
Resolution: Vessel operator removed all oil, trash and debris from engineroom bilges.
Lifesaving › Lifejacket/PFD (Type III)
Issued 5 April 2002 Resolved
Properly mark (14) adult and (22) child lifejackets with vessels name. LEGACY COMPONENT DESC: Marking
Due 25 April 2002
Resolved 6 April 2002
Resolution: Vessel operator properly marked (14) adult and (22) child lifejackets with vessels name.
Construction/Loadline
Issued 5 April 2002 Resolved
Make permanent repairs to inboard sideshell of #6 void, between #4 & #6 longitudinals. LEGACY COMPONENT DESC: Sideshell
Due 20 December 2002
Resolved 10 January 2003
Accommodation/Occupational Safety
Issued 5 April 2002 Resolved
Remove all plastic trash containers and replace with metal trash containers. LEGACY COMPONENT DESC: Plastic Trash Containers
Due 25 April 2002
Resolved 6 April 2002
Resolution: Vessel operator replaced all plastic trash containers with metal containers.
Electrical
Issued 26 April 2001 Resolved
Repair/replace inoperative emergency lighting exit signs in accordance with46 CFR 120.432.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Lifesaving
Issued 26 April 2001 Resolved
Provide 1st Aid/CPR training for at least 50% of the crew in accordance with NVIC 1-91.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Documentation
Issued 26 April 2001 Resolved
Provide a valid FCC Marine Operator Permit in accordance with 46 CFR 121.502.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Navigation
Issued 24 March 2000 Resolved
Equip vessel with a bell iaw 33CFR Part 86 and COLREGS Annex III.
Condition: Unknown
Due 10 April 2000
Resolved 10 April 2000
Unknown
Issued 24 March 2000 Resolved
Provide EAP affirmation form for employee's signature iaw 46CFR 16.401.
Condition: Unknown
Due 10 April 2000
Resolved 10 April 2000
Accommodation/Occupational Safety
Issued 24 March 2000 Resolved
Repair and/or replace cracked window in passenger compartments iaw 46CFR 177.1020.
Condition: Unknown
Due 24 March 2000
Resolved 24 March 2000
Lifesaving
Issued 24 February 1999 Resolved
Replace or repair inoperable water light attached to Buoyant Apparatus IAW 46 CFR 180.175 (e).
Condition: Unknown
Due 24 February 1999
Resolved 24 February 1999
Lifesaving
Issued 24 February 1999 Resolved
Install float-free links on all Buoyant apparatus IAW 46 CFR 180.130.
Condition: Unknown
Due 24 February 1999
Resolved 24 February 1999
Construction/Loadline
Issued 24 February 1999 Resolved
Install means of attachment for all hatch covers IAW 46 CFR 179.360.
Condition: Unknown
Due 24 February 1999
Resolved 24 February 1999
Lifesaving
Issued 29 August 1998 Resolved
Water light was not properly attached to ring buoy.
Condition: Unknown
Due 31 August 1998
Resolved 15 September 1998
Fire Fighting
Issued 29 August 1998 Resolved
Port and Stbd fire pump discharge pressure gauges inoperative.
Condition: Unknown
Due 16 September 1998
Resolved 16 September 1998
Lifesaving
Issued 29 August 1998 Resolved
Retro tape missing from ring buoy.
Condition: Unknown
Due 31 August 1998
Resolved 15 September 1998
Lifesaving
Issued 25 June 1997 Resolved
Provide Category I 406 EPIRB.
Condition: Unknown
Due 19 November 1997
Resolved 19 November 1997
Engineering
Issued 23 November 1996 Resolved
Provide plans for the installation of the electrical control system for themain diesel engines.
Condition: Unknown
Due 23 November 1996
Resolved 23 November 1996
Fire Fighting
Issued 20 May 1996 Resolved
Submit plans to OCMI and MSC on newly installed fixed CO2 firefighting system, for approval.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Engineering
Issued 20 May 1996 Resolved
Prove proper operation of the CO2 shutdown devices, both main diesel engines.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Accommodation/Occupational Safety
Issued 20 May 1996 Resolved
Repair wasted high level sewage alarm located on sewage tank.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Accommodation/Occupational Safety
Issued 20 May 1996 Resolved
Crop and renew wasted sewage cross over piping located in the starboard lazaret.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Electrical
Issued 20 May 1996 Resolved
Properly install and prove proper operation of all electrical controller reset devices, located in the port/stbd engineroom and lazaret.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Engineering
Issued 20 May 1996 Resolved
Repair cracked exhaust expansion joint port main diesel engine and install lagging around the same.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Electrical
Issued 20 May 1996 Resolved
Replace and prove proper operation of the battery charger meter, located inthe port lazaret.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Construction/Loadline
Issued 20 May 1996 Resolved
Install bilge piping strainer, starboard lazaret.
Condition: Unknown
Due 20 May 1996
Resolved 20 May 1996
Deck/Cargo
Issued 30 May 1994 Resolved
RENEW ANCHOR WINCH.
Condition: Unknown
Due 30 May 1994
Resolved 30 May 1994
Navigation
Issued 30 May 1994 Resolved
PROVE PROPER OPERATION OF ENGINE ROOM TO BRIDGE COMMUNICATION. UNTIL THE COMMUNICATION SYSTEM IS REPAIRED, PROVIDE SOUND POWERED PHONE ON THE BRIDGEAND IN THE ENGINE ROOM.
Condition: Unknown
Due 30 May 1994
Resolved 30 May 1994
Engineering
Issued 1 June 1993 Resolved
RENEW EXHAUST INSULATION ON BOTH MAIN ENGINES AS ORIGINAL.
Condition: Unknown
Due 1 June 1993
Resolved 1 June 1993
Engineering
Issued 30 May 1991 Resolved
RENEW THE STARBOARD CUTLASS BEARING (CURRENT ONE IS WORN MORE THAN 50%).
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Construction/Loadline
Issued 30 May 1991 Resolved
INSTALL HAND RAILS ON THE FORWARD OUTBOARD CORNERS OF THE DECKHOUSE AT MAINDECK LEVEL.
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Engineering
Issued 31 May 1989 Resolved
PROVIDE AND INSTALL FLAME DEFLECTOR SHIELDS TO EACH MAIN ENGINE DUPLEX AND GENERATOR SINGLE RAYCOR FUEL FILTER. (4 TOTAL)
Condition: Unknown
Due 31 May 1989
Resolved 31 May 1989

Casualty record · 22

6 October 2005Routine · role: Involved in a Marine Casualty · activity 2513075
10 November 2005Routine · role: Involved in a Marine Casualty · activity 2538617
2 June 2010Routine · role: Involved in a Marine Casualty · activity 3859579
26 September 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 8 injured · activity 3858257
10 January 2011Routine · role: Involved in a Marine Casualty · activity 3926059
1 March 2011Routine · role: Involved in a Marine Casualty · activity 3956109
21 March 2011Routine · role: Involved in a Marine Casualty · activity 3985399
12 May 2011Routine · role: Involved in a Marine Casualty · activity 4009706
23 October 2011Routine · role: Involved in a Marine Casualty · activity 4176646
31 January 2012Routine · role: Involved in a Marine Casualty · activity 4235479
9 May 2012Routine · role: Involved in a Marine Casualty · activity 4313126
11 July 2012Routine · role: Involved in a Marine Casualty · activity 4405193
10 August 2012Routine · role: Involved in a Marine Casualty · activity 4407098
12 February 2013Routine · role: Involved in a Marine Casualty · activity 4532661
15 August 2013Routine · role: Involved in a Marine Casualty · activity 4697572
16 August 2013Routine · role: Involved in a Marine Casualty · activity 4690306
6 November 2013Routine · role: Involved in a Marine Casualty · activity 4752613
21 April 2014Routine · role: Involved in a Marine Casualty · activity 4842069
21 July 2022Routine · role: Involved in a Marine Casualty · activity 7890235
22 July 2024Routine · role: Involved in a Marine Casualty · activity 7966088
24 June 2025Routine · role: Involved in a Marine Casualty · activity 8167592
13 July 2025Routine · role: Involved in a Marine Casualty · activity 8347135
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record