Records from 1988 to 2008. Most recent: inspection, 23 October 2008.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 59
23 October 2008
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3350368
19 February 2008
Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3153155
13 February 2006
Deficiency Check · Annual Inspection · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2818518
8 June 2005
Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2546274
7 September 2004
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2269654
26 March 2004
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2033293
3 January 2004
Damage Survey · Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1977071
30 October 2003
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1939113
22 October 2003
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1935565
25 June 2003
Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1826905
21 August 2002
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1674803
15 August 2002
Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1661923
11 March 2002
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1492953
11 October 2001
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1071821
27 August 2001
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 187083
10 August 2001
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1075124
8 August 2001
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1408796
17 July 2000
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1379140
3 March 2000
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1397329
4 August 1999
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1391075
17 December 1998
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 121777
9 November 1998
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 806205
22 July 1998
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1375464
15 April 1998
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1458511
28 August 1997
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 784765
17 July 1997
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1380934
16 July 1997
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 72964
20 June 1996
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1357674
20 May 1996
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1083836
17 May 1996
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1441071
19 April 1996
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1377684
1 February 1996
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1183864
7 November 1995
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1079337
20 October 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1385567
28 September 1995
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1396381
21 September 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1422568
24 August 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1358883
27 July 1995
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1455277
25 November 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 707768
18 October 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 372794
29 September 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354949
20 September 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 126635
15 September 1994
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1356812
29 July 1994
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1426945
16 July 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 27126
27 April 1994
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1356642
27 February 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1432770
26 February 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 35728
22 February 1994
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 854152
21 July 1993
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 843221
14 July 1993
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1158457
24 July 1992
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 961707
10 June 1992
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1255286
31 July 1991
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1251010
4 December 1990
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 916809
11 June 1990
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1221766
15 July 1989
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1197011
15 May 1989
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 971689
1 August 1988
Hull Examination · Initial Certification
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1325434
Construction/Loadline › Structures › Deck Plating
Issued 19 February 2008
Resolved
Crop/renew broken welds and damaged deck IWO forepeak/stbd bow.
Action required: 705 - Other - as specified
Resolved 22 February 2008
Construction/Loadline › Hull › Side Shell
Issued 19 February 2008
Resolved
Renew, at a minimum, 18" X 18" sideshell plate IWO pitting on port side amidships between turn of bilge and rub rail.
Action required: 705 - Other - as specified
Resolved 22 February 2008
Construction/Loadline › Hull › Weld
Issued 19 February 2008
Resolved
Renew/remove wasted cleat located on stbd quarter. Cleat was added by previous owner due to operations.
Action required: 705 - Other - as specified
Resolved 22 February 2008
Construction/Loadline › Hull › Weld
Issued 19 February 2008
Resolved
Grind out/weld broken/wasted weld on port side exterior IWO turn of bilge.
Action required: 705 - Other - as specified
Resolved 22 February 2008
Construction/Loadline › Structures › Deck Plating
Issued 19 February 2008
Resolved
Renew/re-weld base of gunwale portside amidships IWO ladder.
Action required: 705 - Other - as specified
Resolved 22 February 2008
Construction/Loadline › Hull › Weld
Issued 19 February 2008
Resolved
Grind/re-weld (3) broken welds located in lazarette.
Action required: 705 - Other - as specified
Resolved 22 February 2008
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 19 February 2008
Resolved
Make (2) thru-hulls available for inspection.
Action required: 705 - Other - as specified
Resolved 22 February 2008
Engineering › Bilge Water Management System › Pump
Issued 8 June 2005
Resolved
Prove proper operation of aft bilge pump
Due 8 July 2005
Resolved 9 June 2005
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 8 June 2005
Resolved
Obtain two addtional lights for lifefloats.
Due 8 July 2005
Resolved 9 June 2005
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 7 September 2004
Resolved
Reconfigure lifejackets and label accordingly.
Due 7 October 2004
Resolved 10 September 2004
Engineering › Steering Gear System › Rudder Stock
Issued 7 September 2004
Resolved
Repack rudder post and secure small leak.
Due 7 October 2004
Resolved 10 September 2004
Documentation › Markings/Placards › Warning Signs
Issued 7 September 2004
Resolved
Post emergency broadcast placard.
Due 7 October 2004
Resolved 10 September 2004
Construction/Loadline › Hull
Issued 6 January 2004
Resolved
Complete satisfactory repairs to the vessel's aft deck & railing assembly.
Action required: 705 - Other - as specified
Due 6 February 2004
Resolved 21 January 2004
Construction/Loadline
Issued 8 August 2001
Resolved
Make acceptable temporary repairs to the engine room aft bilge overboard connection prior to 9 Aug 01 and make permanent repairs prior to 10 Aug 01.
Condition: Unknown
Due 8 August 2001
Resolved 8 August 2001
Construction/Loadline
Issued 8 August 2001
Resolved
Make acceptable temporary repairs to the 3/4 inch hole in the collision bulkhead prior to 09 Aug 01 and make acceptable permanent repairs.
Condition: Unknown
Due 8 August 2001
Resolved 8 August 2001
Lifesaving
Issued 8 August 2001
Resolved
Procure three red flares.
Condition: Unknown
Due 8 August 2001
Resolved 8 August 2001
Navigation
Issued 22 July 1998
Resolved
Hawaii Coast Pilot and Light List were not available on vessel or office. Obtain copies of Hawaii Coast Pilor and relevant Light List.
Condition: Unknown
Due 22 July 1998
Resolved 22 July 1998
Lifesaving
Issued 17 July 1997
Resolved
Install in a float free arrangement a 406 MHz 406 Category 1 EPIRB.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Construction/Loadline
Issued 17 July 1997
Resolved
Install suction strainer on the portable bilge hand pump.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Engineering
Issued 17 July 1997
Resolved
Install exhaust lagging on main engine exhaust piping up to the point of water injection.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Construction/Loadline
Issued 17 July 1997
Resolved
Renew defective on/off switch for the electric bilge pump in the forward compartment.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Construction/Loadline
Issued 19 April 1996
Resolved
Install at the through hull fittings, a stainless steel positive shutoff valve for each bilge pump overboard discharge(three valves required); or inlieu of flexible hose, install schedule 80 aluminum pipe between the through hull fitting and the existing positive shutoff valve.
Condition: Unknown
Due 19 April 1996
Resolved 19 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Make cable penetration in collision bulkhead watertight.
Condition: Unknown
Due 19 April 1996
Resolved 19 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Permanently repair fractured vertical side shell stiffener at main deck- forward bulkhead connection, port side of engine room.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Permanently repair fractured vertical bulkhead stiffeners at centerline, steering space.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Engineering
Issued 19 April 1996
Resolved
Reinstall exhaust pipe flapper valve, transom.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Engineering
Issued 19 April 1996
Resolved
Recondition the propeller prior to carrying passengers.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Engineering
Issued 19 April 1996
Resolved
Renew, in kind, deteriorated propeller shaft prior to carrying passengers.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Properly label the watertight hatches in accordance with 46 CFR 185.610.
Condition: Unknown
Due 19 April 1996
Resolved 19 April 1996
Lifesaving
Issued 19 April 1996
Resolved
Conduct and log weekly maintenance and inspection of the survival craft in accordance with 46 CFR 185.720.
Condition: Unknown
Due 19 April 1996
Resolved 19 April 1996
Lifesaving
Issued 19 April 1996
Resolved
Conduct and log annual maintenance of the life saving equipment in accordance with 46 CFR 185.726.
Condition: Unknown
Due 19 April 1996
Resolved 19 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Properly clean to white metal and prepare, then clad weld severely pitted area of transom, port side at chine.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Permanently repair fractures in bulwark and main deck connections at the port stbd center embarkation areas, and the stbd aft embarkation area.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Lifesaving
Issued 19 April 1996
Resolved
Properly Install retroreflective tape on life ring buoy in accordance with 46 CFR 185.604(i).
Condition: Unknown
Due 19 April 1996
Resolved 19 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Grind and weld from the interior side, the 12 small bolt holes in the port transom corner.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 19 April 1996
Resolved
Permanently repair fractures in main deck-engine room supply vent connections, port and stbd sides.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Documentation
Issued 28 September 1995
Resolved
PROVIDE VALID FCC OPERATORS PERMIT ONBOARD, VESSEL RESTRICTED TO LESS THAN 1000 FEET FROM SHORE.
Condition: Unknown
Due 28 September 1995
Resolved 28 September 1995
Lifesaving
Issued 24 August 1995
Resolved
Properly stencil the capacity on both 18 person buoyant apparatuses.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Lifesaving
Issued 24 August 1995
Resolved
Properly connect each 18 person buoyant apparatus to the sea painter.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Lifesaving
Issued 24 August 1995
Resolved
Install the required number of 12 foot pendants on the 15 person buoyant apparatus using ultraviolet resistant, buoyant line.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Lifesaving
Issued 27 July 1995
Resolved
PROVIDE PROPER WEAK LINK FOR TWO TETHERED TOGETHER BUOYANT APPARATUS'.
Condition: Unknown
Due 29 August 1995
Resolved 29 August 1995
Engineering
Issued 27 July 1995
Resolved
REPLACE MISSING FUEL TANK FLAME SCREEN ON STARBOARD SIDE VENT.
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 27 July 1995
Resolved
PROVIDE PROPER VENTILATION FOR FOREPEAK VOID IN ACCORDANCE WITH 46 CFR 177.20-1(a).
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 27 July 1995
Resolved
PROVIDE PLANS AND PROPERLY INSTALL BILGE PUMP AND PIPING SYSTEM IN ACCORDANCE WITH 46 CFR 182.25 OR PROPOSED REGULATIONS, 46 CFR 182.500, 182.510, 182.520, AND 182.530.
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Accommodation/Occupational Safety
Issued 18 October 1994
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 18 October 1994
Resolved 25 November 1994
Engineering
Issued 29 July 1994
Resolved
CLEAN OR REPLACE FUEL TANK VENT FLAME SCREENS.
Condition: Unknown
Due 29 July 1994
Resolved 29 July 1994
Construction/Loadline
Issued 29 July 1994
Resolved
PROVIDE CAPTIVE CHAINS FOR WATERTIGHT HATCH COVERS.
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Accommodation/Occupational Safety
Issued 29 July 1994
Resolved
DOUBLE CLAMP HOSE FOR HEAD WATER SUCTION AND PROPERLY STOW.
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Accommodation/Occupational Safety
Issued 29 July 1994
Resolved
PROPERLY ATTACH SUPPLY LINE TO HOLDING TANK OF MARINE SANITATION DEVICE.
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Accommodation/Occupational Safety
Issued 29 July 1994
Resolved
REPLACE COVERS ON FLUORESCENT LIGHTS.
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Electrical
Issued 29 July 1994
Resolved
REMOVE DEAD-END WIRES FROM ENGINE ROOM AND PILOT HOUSE._x001C_ _x001C_
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Engineering
Issued 22 February 1994
Resolved
MAKE PERMENANT REPAIRS TO VESSEL'S ENGINE & DEMONSTRATE REPAIRS DURING SEA TRIAL TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR PRIOR TO CARRYING PASSENGERS FOR HIRE
Condition: Unknown
Due 28 February 1994
Resolved 23 February 1994
Engineering
Issued 31 July 1991
Resolved
INSTALL PROPER FLAME SCREENS ON BOTH PORT AND STARBOARD FUEL TANK VENTS.
Condition: Unknown
Due 31 July 1991
Resolved 31 July 1991
Navigation
Issued 1 August 1988
Resolved
PROVIDE MAGNETIC COMPASS DEVIATION CARD.
Condition: Unknown
Due 1 August 1988
Resolved 1 August 1988
Electrical
Issued 1 August 1988
Resolved
LABEL FUSES ON DC POWER PANEL.
Condition: Unknown
Due 1 August 1988
Resolved 1 August 1988
Lifesaving
Issued 1 August 1988
Resolved
PROVIDE READY ACCESS TO BUOYANT APPARATUS.
Condition: Unknown
Due 1 August 1988
Resolved 1 August 1988