MAURY USCG vessel records Sign in
← All vessels

ERNESTINA-MORRISSEY

ERNESTINA-MORRISSEY is a 1894 school ship. The Coast Guard has recorded 79 inspections since 1988, most recently in August 2026, along with 57 deficiencies and 2 casualty investigations between 2002 and 2003.

Records from 1988 to 2026. Most recent: inspection, 5 August 2026.

Built
1894
Last inspected
5 August 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDN3856
295993
Flag
UNITED STATES
368275660
Maury page id
psix-295993

Inspections, by type

…with no type recorded14
Years with a record 34 calendar years (1988–2026)
The 79 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the School Ship class in Maury's sources begin in 1981.

Documentation record

Registered dimensions (L × B × D)94.5 ft × 25.3 ft × 10.7 ft
Registered tonnagegross 139 / net 102
ITC dimensions (L × B × D)94.5 ft × 25.3 ft × 10.7 ft
ITC tonnagegross 122 / net 41
BuilderJAMES & TARR · ESSEX, MA, UNITED STATES · built 1894
Hull materialWood
PropulsionAuxiliary Sail
Hull shapeSail (Faired Keel)
Hull configurationMonohull
Hailing portNEW BEDFORD, MA
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 23 January 2026 · expires 31 January 2027
Service, as the file records itSchool Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it122 - Convention (Subpart B), Gross Ton
41 - Convention (Subpart B), Net Ton
139 - Regulatory (Subpart C or D), Gross Ton
102 - Regulatory (Subpart C or D), Net Ton
0 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDN3856MMSI 368275660 · active · voluntarily equipped · granted 1 September 2022, expires 1 September 2032
WTK7000MMSI not assigned · expired · compulsorily equipped · granted 7 September 1999, cancelled 16 October 2009
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

EVENING TIDE Towing Vessel · MISLE 105448 · 30 August 2003 · activity 1928756

Inspection history · 79

5 August 2026 Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8451632
6 July 2026 Attraction Vessel Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8430367
29 June 2026 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8418906
5 August 2025 Attraction Vessel Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8202774
20 May 2025 Annual Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8140507
20 August 2024 Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7980392
31 August 2023 Attraction Vessel Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7780446
28 July 2023 Attraction Vessel Exam
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 7754880
28 April 2023 In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7676044
13 April 2023 Attraction Vessel Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7668537
8 March 2023 Attraction Vessel Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7651443
7 March 2023 Administrative Inspection · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7646883
11 January 2023 Examination of Repairs · Plan Review (Other than "T") · Deficiency Check · COI Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7620499
11 September 2020 Examination of Repairs · Plan Review "T" Boat
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7055931
9 February 2020 Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6935915
7 October 2019 Construction Oversight
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6839052
19 January 2017 Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6073372
22 December 2016 Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6294853
7 October 2015 Plan Review (Other than "T") · Administrative Inspection · Construction Oversight · Initial Certification
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 5737765
21 May 2014 Attraction Vessel Exam
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 4864176
14 June 2012 Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4343958
2 February 2011 In-Service Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3955742
9 December 2009 Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 3648197
14 May 2009 Attraction Vessel Exam · Hull Examination
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 3475054
11 March 2008 Re-Inspection
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 3163012
13 July 2007 Attraction Vessel Exam · COI Inspection
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 2999177
15 June 2006 Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2680360
15 July 2005 Administrative Inspection
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2427484
27 April 2004 COI Inspection · Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2053214
30 August 2003 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1928756
2 May 2003 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1785345
23 January 2003 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1731834
21 October 2002 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1690060
5 August 2002 Damage Survey
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1655934
26 July 2002 Type not recorded
No type recorded · Station New London · USCG Northeast District (CGD-NE) · Activity 1652593
11 June 2002 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1650751
1 May 2002 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1598274
27 April 2001 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 772573
20 April 2001 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1444650
21 March 2001 Hull Examination
Physical examination · MSFO NEW BEDFORD · USCG Northeast District (CGD-NE) · Activity 1391741
23 June 2000 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1051157
8 May 2000 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1408530
23 June 1999 Type not recorded
No type recorded · Station Portsmouth Harbor · USCG Northeast District (CGD-NE) · Activity 1506439
29 April 1999 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1404744
29 January 1999 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1420059
26 August 1998 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1460229
7 May 1998 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1125551
23 April 1998 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 789613
2 October 1997 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1120658
21 July 1997 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 104496
10 July 1997 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 778781
23 April 1997 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1098828
15 November 1996 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 865583
23 August 1996 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1456405
28 June 1996 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1087270
15 September 1995 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1186846
28 July 1995 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 872033
31 May 1995 Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 875584
14 May 1995 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 121637
12 May 1995 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 905885
6 February 1995 Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 840980
11 August 1994 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1434148
29 July 1994 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1363066
19 October 1993 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1149480
9 August 1993 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1399916
9 July 1992 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1257419
6 July 1992 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 955577
8 May 1992 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 951100
26 September 1991 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 944062
3 July 1991 Excursion Permit
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 941746
2 July 1991 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 934678
26 June 1991 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 934677
26 April 1990 Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 916795
18 April 1990 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 899870
17 November 1989 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1215289
4 May 1989 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 893916
25 April 1989 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1202283
6 January 1989 Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1349737
7 January 1988 Initial Certification
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1010306

Deficiency record · 57

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 June 2026 Resolved
At each inspection the marine inspector will examine and test the following items to determine that they are in proper operating condition and fit for the service for which they are intended: means provided for pumping bilges are operationally tested. All suction strainers are examined. Vessels of 65 feet in length but less than 120 feet and under 100 gross tons must have two fixed power bilge pumps having a combined minimum capacity of 50 gpm. Prove proper operation of the bilge suctions using both fixed power bilge pumps.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 June 2026
Resolved 30 June 2026
01 - Certificates & Documentation › 013 - Documents › Garbage record book
Issued 29 June 2026 Resolved
The master or person in charge of a ship to which this section applies shall ensure that the ship is not operated unless a garbage management plan is on the ship and that each person handling garbage follows the plan. Each garbage management plan must be in writing and provide for the discharge of garbage by means that meet Annex V of MARPOL, the Act, and §§ 151.51 through 151.77; describe procedures for minimizing, collecting, processing, storing, and discharging garbage;and designate the person who is in charge of carrying out the plan. Provide a garbage management plan.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2026
Resolved 29 June 2026
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 20 May 2025 Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the unmanned spaces. Bilge system is not producing an audible alarm at the operating station. Repair to satisfaction of CG marine inspection prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 May 2025
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 20 May 2025 Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the unmanned spaces. The forepeak high water alarm is not producing neither a visual nor an audible alarm at the operating station. Repair to satisfaction of CG marine inspection prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 May 2025
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 20 May 2025 Resolved
As appropriate for the intended voyage, all vessels must carry adequate and up-to-date charts. Vessel unable to prove charts are updated. Provide evidence to CG marine inspector charts have been updated within last 6 months.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2025
Resolved 10 July 2025
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 20 May 2025 Resolved
For each marine casualty required to be reported, the owner, agent, master or person in charge of the vessel shall determine whether there is any evidence of alcohol or drug use by individuals directly involved in the casualty. Vessel has expired alcohol swabs on board. Procure updated alcohol swabs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2025
Resolved 1 July 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 24 May 2024 Resolved
Watertight door to the galley space does not properly close as designed. Repair watertight door.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2024
Resolved 24 June 2024
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 24 May 2024 Resolved
All unfired pressure vessels must be installed to the satisfaction of the cognizant [name withheld] airline for the horn sprung a leak. Make necessary repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2024
Resolved 24 June 2024
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 May 2024 Resolved
Every vessel equipped with inflatable liferafts must have posted in conspicuous places readily accessible to the ship's companyy and guests approved placards containing instructions for launching and inflating inflatable liferafts. Vessel did not have any instruction placards.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2024
Resolved 24 June 2024
Construction/Loadline › Hull › Side Shell
Issued 10 February 2010 Resolved
Make permanent repairs to hull to satisfaction of CG Marine Inspector. Temp repairs accepted in Dec 09 lazerette port side IWO the horn timber. Temp repairs acceptable for dockside use until next scheduled drydock(2011). No underway COI should be permitted until permanent reapairs are made.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2011
Resolved 29 June 2026
Construction/Loadline › Hull › Bottom Plating
Issued 9 December 2009 Resolved
Prior to carrying passengers make effective repairs to prevent water ingress to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 10 February 2010
Resolved 29 June 2026
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 July 2007 Resolved
Enclose both boarding platforms and install top rail.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 13 July 2007 Resolved
Service all fire fighting extinguishers and engine room system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2007
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 13 July 2007 Resolved
Install 2 60 foot heaving lines on 2 ring buoys.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2007
Operations/Management › Drills/Instruction › Safety Orientation
Issued 13 July 2007 Resolved
Post WQSB for all grew personnel. Define tasks during fire and man overboard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2007
Documentation › Markings/Placards › Warning Signs
Issued 13 July 2007 Resolved
Post no smoking signs at various locations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2007
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 13 July 2007 Resolved
Chain and lock both MSD ovbd valves located on the maifold system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 August 2007
Resolved 23 August 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 13 July 2007 Resolved
During system operational test of FFF system, the 25 sec time delay activated the system at 18 seconds. Replace time delay bottle with an operational time delay (30 sec). Prove proper operation of the FFF system to the satisfaction of a USCG Marine Inspector. Tours allowed to continue w/no engine room machinery in operation during tours. Contact USCG MI to schedule follow-up exam.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 September 2007
Resolved 17 September 2007
Resolution: New time delay bottle installed and tested (30 sec) - all sat
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 27 April 2004 Resolved
Service and inspect CO2 system in the presence and to the satisfaction of marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 August 2004
Resolved 29 July 2004
Resolution: System was serviced, and inspected.
Construction/Loadline › Hull › Keel
Issued 27 April 2004 Resolved
Provide sketch of futtocks, and bolts replaced. Also provide fresh water tank weight changes.
Due 2 August 2004
Resolved 29 July 2004
Resolution: Provided proper sketches, and weight calculations.
Lifesaving › Immersion Suits
Issued 2 May 2003 Resolved
Vessel is restricted to no more than 34 total persons on a subchapter "R" route until documentation is provided for the purchase of 8 Immersion suits.
Action required: 705 - Other - as specified
Due 14 June 2003
Resolved 30 June 2003
Construction/Loadline › Hull › Transverse Frame
Issued 23 January 2003 Resolved
FRAMES -1,5,6,7,8,9. REPLACE IN KIND, ROTTED/CRACKED.
Action required: 705 - Other - as specified
Due 28 February 2003
Resolved 4 April 2003
Resolution: REPLACED IN KIND.
Stability › Watertight Integrity
Issued 23 January 2003 Resolved
TRANSVERSE WTB'S FITTED W/LIMBER HOLES BENEATH CONCRETE BALLAST. LIMBER HOLES TO BE PLUGGED BY SPECIFIED DATE. BULKHEADS TO BE FURTHER ADDRESSESED AS MADE ACCESSIBLE BY PLANK WORK.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 February 2003
Resolved 24 April 2003
Resolution: LIMBER HOLES PLUGGED / CAPPED. AFT LAZERETTE WTB REPAIRED HOSE TESTED , SAT.
Construction/Loadline › Hull
Issued 23 January 2003 Resolved
KEEL BOLTS WASTED. LEGACY COMPONENT DESC: FASTENERS
Action required: 705 - Other - as specified
Due 24 February 2003
Resolved 25 April 2003
Resolution: REPLACED.
Construction/Loadline › Hull › Keel
Issued 2 August 2002 Resolved
KEEL FASTENINGS ACCEPTED AS TEMP REPAIR. CREDIT DRYDOCK TO BE COMPLETED BY 31OCT02.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 October 2002
Resolved 31 August 2003
Resolution: KEEL BOLTS RENEWED. 1 BOLT P/FRAME 1" GALV ROD.
Lifesaving › Rescue Boat
Issued 1 May 2002 Resolved
Provide an approved type rescue boat.
Due 14 June 2002
Resolved 27 June 2002
Resolution: Vessel demonstrated the ability to pick up a man overboard with the use of a wooden platform. Rescue boat is not required.
Operations/Management › Drills/Instruction
Issued 1 May 2002 Resolved
Conduct drills to the satisfaction of the attending marine inspector.
Due 3 June 2002
Resolved 27 June 2002
Stability
Issued 1 May 2002 Resolved
Provide a copy of the sail plans.
Due 3 June 2002
Resolved 28 May 2002
Lifesaving
Issued 20 April 2001 Resolved
MARK RESCUE BOAT WITH RETROTAPE, PORT AND STARBOARD SIDES, PRIOR TO SAILINGWITH PASSENGERS
Condition: Unknown
Due 27 April 2001
Resolved 3 December 2001
Navigation
Issued 20 April 2001 Resolved
PROVIDE CURRENT U.S. COAST GUARD LIGHT LIST PRIOR TO SAILING WITH PASSENGERS
Condition: Unknown
Due 27 April 2001
Resolved 3 December 2001
Lifesaving
Issued 20 April 2001 Resolved
MARK RESCUE BOAT WITH VESSEL'S NAME AND CAPACITY PRIOR TO SAILING WITH PASSENGERS
Condition: Unknown
Due 27 April 2001
Resolved 3 December 2001
Lifesaving
Issued 20 April 2001 Resolved
COMPLETE INSTALLATION OF PUBLIC ADDRESS SYSTEM PRIOR TO SAILING WITH PASSENGERS
Condition: Unknown
Due 27 April 2001
Resolved 3 December 2001
Construction/Loadline › Hull
Issued 21 March 2001 Resolved
Replaced futtocks (naval timbers) from FR #20 to FR #28 due to decayed wood LEGACY COMPONENT DESC: Futtocks, portside
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 March 2001
Resolved 21 March 2001
Resolution: Futtocks replaced
Construction/Loadline › Hull
Issued 21 March 2001 Resolved
Replaced 8 planks on portside, from garboard strake to Plank #8, between FR #15 and FR #32. Planks were replaced due to decay and /or in conjunction with futtock inspection and replacement. (Item#1) LEGACY COMPONENT DESC: Planks, portside
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 March 2001
Resolved 21 March 2001
Resolution: Planks replaced
Construction/Loadline › Hull
Issued 21 March 2001 Resolved
Replaced two planks on the starboard side due to decay. Plank #9 from stem to FR #5 due to wood decay, Plank #10 from stem to FR #9. LEGACY COMPONENT DESC: Planks, starboard side
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 March 2001
Resolved 21 March 2001
Resolution: Planks replaced
Construction/Loadline › Hull
Issued 21 March 2001 Resolved
Replaced plank on vessel transom, starboard half, 2 planks below rail due to wood decay LEGACY COMPONENT DESC: Plank, transom
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 March 2001
Resolved 21 March 2001
Resolution: Replaced plank
Construction/Loadline › Structures › Plowshare Breakwater
Issued 21 March 2001 Resolved
Inspection on stem revealed substantial wood decay that was scraped and treated. After concurrent inspection with MSO Providence ACID, the decision was made to tie in a steel u-bracket from the stem to port and starboard frames for additional strength. Address at next drydocking.. LEGACY COMPONENT DESC: Stem, internal
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 October 2002
Resolved 30 April 2009
Resolution: Stem replaced see SECNorthNE act3475054
Engineering
Issued 8 May 2000 Resolved
Vessel to install a shutdown for the main diesel engine at the operating station as required by 46 CFR 184.620(b).
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Construction/Loadline
Issued 8 May 2000 Resolved
Vsl to install a visual indication in addition to the audible indication for the main alarm (includes bilge alarm) panel at the operating station asrequired by 46 CFR 185.530(c)
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Fire Fighting
Issued 29 April 1999 Resolved
Prope operation of the panel lights.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Fire Fighting
Issued 29 April 1999 Resolved
Properly repair/replace the #2 fire hose.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Fire Fighting
Issued 29 April 1999 Resolved
Prove proper operation of the heat detector in the aft cabin.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999 Resolved
Replace/properly repair the three ring buoy's.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999 Resolved
Place reflective tape on 20 PFD's.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999 Resolved
Properly repair the zipper on an exposure suit.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Documentation
Issued 28 June 1996 Resolved
Properly conduct supervisor training and crew training for the drug program.
Condition: Unknown
Due 28 August 1996
Resolved 23 August 1996
Engineering
Issued 28 June 1996 Resolved
Provide and install 30 X 30 mesh vent screens for the fuel vent.
Condition: Unknown
Due 28 August 1996
Resolved 23 August 1996
Lifesaving
Issued 28 July 1995 Resolved
Label forecastle space emergency exit.
Condition: Unknown
Due 28 July 1995
Resolved 28 July 1995
Lifesaving
Issued 28 July 1995 Resolved
Label the vessel with the call sign.
Condition: Unknown
Due 28 July 1995
Resolved 28 July 1995
Documentation
Issued 28 July 1995 Resolved
Provide a copy of the operators valid FCC operators license.
Condition: Unknown
Due 28 July 1995
Resolved 28 July 1995
Lifesaving
Issued 28 July 1995 Resolved
Properly repair 2 exposure suits (zipper & inflation collar). The vessel is restricted to 40 persons when operating as an SSV.
Condition: Unknown
Due 28 July 1995
Resolved 28 July 1995
Electrical
Issued 11 August 1994 Resolved
REPAIR AND PROVE PROPER OPERATION OF HYDRAULIC GENERATOR.
Condition: Unknown
Due 11 August 1994
Resolved 11 August 1994
Lifesaving
Issued 11 August 1994 Resolved
PROVIDE PERMANENT STOWAGE FOR LIFE PRESERVERS ON MAIN DECK.
Condition: Unknown
Due 11 August 1994
Resolved 11 August 1994
Engineering
Issued 19 October 1993 Resolved
OBTAIN INSPECTION OF NEWLY INSTALLED MAST PRIOR TO CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 19 October 1993
Resolved 19 October 1993
Lifesaving
Issued 8 May 1992 Resolved
CONDUCT A FIRE AND MAN OVERBOARD DRILL IN THE PRESENCE OF A CG MARINE INSPECTOR PRIOR TO VESSEL GOING INTO OPERATION.
Condition: Unknown
Due 8 May 1992
Resolved 8 May 1992
Lifesaving
Issued 8 May 1992 Resolved
PROVIDE LIGHTS AND WHISTLES FOR ALL LIFE PRESERVERS PRIOR TO VESSEL OPERATING.
Condition: Unknown
Due 8 May 1992
Resolved 8 May 1992
Documentation
Issued 17 November 1989 Resolved
VESSEL IS NOT ALLOWED TO OPERATE UNTIL AN INSPECTION FOR CERTIFICATION IS COMPLETED.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989

Casualty record · 2

11 June 2002Routine · role: Involved in a Marine Casualty · activity 1650751
30 August 2003Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 2 injured · activity 1928756
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

ERNESTINA (2002–2003). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.