Records from 1988 to 2018. Most recent: inspection, 6 April 2018.
Inspection history · 75
6 April 2018
Damage Survey · Hull Examination · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6385984
6 October 2017
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6298801
14 March 2017
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6100120
30 August 2016
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5988473
8 June 2016
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5901344
11 June 2014
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4885341
3 December 2010
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3904916
20 November 2010
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3894572
1 November 2010
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3884837
18 March 2010
COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3698044
19 February 2010
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3682208
20 March 2009
MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3436482
23 December 2008
Drydock Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3391712
28 March 2008
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3175233
19 March 2008
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3163998
28 February 2008
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3155202
26 February 2008
Drydock Extension
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3153678
2 May 2007
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3042686
22 March 2007
MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2892542
17 January 2007
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2857386
22 March 2006
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2607574
21 February 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2589144
15 March 2005
MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2310266
21 December 2004
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2263070
30 November 2004
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2250552
29 June 2004
MTSA/ISPS Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2114694
7 June 2004
Administrative Inspection
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2091528
11 March 2004
MARPOL Annex I Examination · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2022471
6 March 2004
Administrative Inspection
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2019342
13 January 2004
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1982739
13 March 2003
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1756687
6 January 2003
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1738338
20 March 2002
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1597681
10 December 2001
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1597670
23 October 2001
Drydock Extension
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1597653
20 March 2001
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1465650
16 March 2000
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1372964
2 March 2000
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1389019
22 February 1999
Re-Inspection · MARPOL Annex V Examination · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1472251
29 January 1999
Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 789626
22 June 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1126302
27 January 1998
Re-Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1364566
3 February 1997
COI Inspection · Examination of Repairs · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1356051
1 November 1996
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 118103
1 November 1996
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 219928
1 August 1996
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1431658
22 January 1996
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1463212
29 October 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1186863
22 August 1995
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1403995
3 March 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 855470
24 February 1995
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 87362
14 February 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 843037
31 January 1995
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1462425
23 August 1994
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1463857
20 April 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 857870
10 February 1994
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1354575
14 September 1993
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1447277
24 February 1993
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1399810
30 September 1992
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1242676
23 June 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 954795
16 June 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1256589
6 March 1992
Hull Examination · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1255970
6 March 1992
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1261476
19 September 1991
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1245005
21 February 1991
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 922548
19 September 1990
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1240136
15 February 1990
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 919375
18 October 1989
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1041962
11 May 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 889996
10 April 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1203664
16 February 1989
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1344598
11 October 1988
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 891691
7 September 1988
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1348958
16 February 1988
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1040776
16 February 1988
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1337529
Construction/Loadline › Hull › Side Shell
Issued 6 October 2017
Resolved
Make permanent repairs to hull damage IWO port bow at the water line.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2018
Resolution: Permanent repairs conducted. Damaged areas cropped and renewed.
Construction/Loadline › Structures › Deck Plating
Issued 6 October 2017
Resolved
Make permanent repairs to vessel's trim tap.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2018
Resolution: Trim tabs repaired.
Construction/Loadline › Hull › Weld
Issued 20 November 2010
Resolved
Prior to carrying passengers, make permanent repairs to stbd exhaust penetration collar at transom, as shown.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 November 2010
Resolved 20 November 2010
Resolution: WITHDRAWN
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 20 November 2010
Resolved
Provide and install retaining device for forepeak and steering gear deck scuttle, as shown.
Action required: 705 - Other - as specified
Due 22 November 2010
Resolved 3 December 2010
Engineering › Bilge Water Management System › Strainer
Issued 20 November 2010
Resolved
Prior to carrying passengers, renew forward engine room broken bilge strainer foot, as shown.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 November 2010
Resolved 3 December 2010
Engineering › Steering Gear System › Pin
Issued 20 November 2010
Resolved
Remove, inspect port steering gear crossmember pin.
Action required: 705 - Other - as specified
Due 22 November 2010
Resolved 3 December 2010
Lifesaving › Lifefloat › Serviceable
Issued 18 March 2010
Resolved
One of the required lifefloats was noted with holes in the outer surface. Using the procedures prescribed by the manufacturer, make appropriate repairs to ensure lifefloat remains serviceable.
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Lifesaving › Lifefloat › Markings
Issued 18 March 2010
Resolved
Two of the lifefloats were missing the required marking of the vessel name. Ensure that every lifefloat is legibly marked as required by 46 CFR 185.604(a).
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 March 2010
Resolved
Twist on type wire nuts were noted as the splicing method for the high water bilge alarm switch. This means of connection may only be used within an enclosure and the insulated cap of the nut must be secured to prevent loosening due to vibration. Replace connections with pressure type connectors or install as required.
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Electrical › Lighting (service) › Lighting Fixture
Issued 18 March 2010
Resolved
Protective globe for the light fixture outside of the heads was missing. Renew the required globe.
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Navigation › Piloting/Steering › US Coast Pilot
Issued 18 March 2010
Resolved
Vessel was missing the nautical publications required by 46 CFR 184.420. Ensure the vessel is outfitted with each of the required publications or extracts appropriate for the areas to be transitted.
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 18 March 2010
Resolved
The handle to the childrens lifejacket locker located on the top deck was nearly frozen. Ensure the handle is adequately lubricated so that the it functions with ease.
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Documentation › Markings/Placards › Lifejacket Placard
Issued 18 March 2010
Resolved
There was no lifejacket donning placard on the top deck. Post an additional placard in a conspicuous location on the top deck so that it is readily visible to the crew and passengers.
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 March 2010
Resolved
Wire runs in the fuel tank compartment were not secured within the installed metallic supports. Ensure the wire runs are adequately supported within the metallic supports.
Action required: 705 - Other - as specified
Due 19 April 2010
Resolved 12 April 2010
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 26 February 2008
Resolved
PROVIDE DOCUMENTATION ATTESTING TO THE COMPLETION OF ANNUAL SERVICING OF ALL PORTABLE AND FIXED FIREFIGHTING EQUIPMENT NO LATER THAN 29 FEBRUARY 2008.
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 28 February 2008
Operations/Management › Drills/Instruction › Not Conducted
Issued 26 February 2008
Resolved
PROVIDE DOCUMENTATION ATTESTING TO THE PAYMENT OF THE CG USER FEES DUE 01 MARCH 2008.
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 28 February 2008
Engineering › Steering Gear System › Pin
Issued 22 March 2007
Resolved
PROVIDE AND INSTALL COTTER PIN FOR STBD STEERING ARM PIN.
Action required: 705 - Other - as specified
Due 23 April 2007
Resolved 2 May 2007
Navigation › Piloting/Steering › Marine Charts
Issued 22 March 2007
Resolved
PROVIDE 2007 REED'S CARIBBEAN ALMANAC.
Action required: 705 - Other - as specified
Due 23 April 2007
Resolved 2 May 2007
Documentation › Certificates/Documents › FCC SSL
Issued 22 March 2007
Resolved
PROVIDE RENEWAL OF VESSELS FCC SHIP RADIO STATION LICENSE.
Action required: 705 - Other - as specified
Due 25 April 2007
Resolved 2 May 2007
Documentation › Certificates/Documents › FCC SSL
Issued 22 March 2007
Resolved
PROVIDE RENEWAL OF FCC SAFETY RADIOTELEPHONY CERTIFICATE.
Action required: 705 - Other - as specified
Due 30 March 2007
Resolved 2 May 2007
Lifesaving › Hand Flares › Condition
Issued 22 March 2007
Resolved
PROVIDE HAND FLARES THAT ARE VALID FOR A MINIMUM OF 12 MONTHS.
Action required: 705 - Other - as specified
Due 31 May 2007
Resolved 2 May 2007
Engineering › Fuel Oil Service System › Filter
Issued 22 March 2007
Resolved
PROVIDE DOCUMENTATION FOR THE SPIN-ON FUEL OIL/WATER SEPERATOR AS INSTALLED ON EACH MAIN PROPULSION ENGINE SHOWING CG COMMANDANT APPROVAL/ACCEPTANCE AND RATED FOR MARINE USE.
Action required: 705 - Other - as specified
Due 23 April 2007
Resolved 2 May 2007
Engineering › Lubricating Oil Storage/Transfer System › Tank
Issued 22 March 2007
Resolved
MAKE PERMANENT REPAIRS TO HYDRAULIC OIL HEAD TANK SIGHTGLASS LEAKAGE LOCATED IN FUEL OIL STORAGE TANK COMPARTMENT.
Action required: 705 - Other - as specified
Due 23 April 2007
Resolved 2 May 2007
Navigation › Piloting/Steering › Compass Deviation Table
Issued 20 February 2007
Resolved
PRIOR TO CARRYING MORE THAN SIX PASSENGERS, PROVIDE COMPASS DEVIATION TABLE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 February 2007
Resolved 7 March 2007
Construction/Loadline › Hull › Stiffener
Issued 6 February 2007
Resolved
CROP & RENEW APPROX. 4 FEET OF 8 INCH BY 2-1/2 INCH BY 3/8 INCH OF SHELL LONG TEE #3 IN WAY OF BAY #2, STBD SIDE, AS MARKED IN FORWARD HEAD COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Stiffener
Issued 6 February 2007
Resolved
CROP & RENEW APPROX. 4 FEET OF 8 INCH BY 2-1/2 INCH BY 3/8 INCH OF SHELL LONG TEE #3 IN WAY OF BAY #4, STBD SIDE, AS MARKED IN FORWARD HEAD COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Stiffener
Issued 6 February 2007
Resolved
CROP & RENEW APPROX. 4 FEET OF 8 INCH BY 2-1/2 INCH BY 3/8 INCH OF SHELL LONG TEE #3 IN WAY OF BAY #2, PORT SIDE, AS MARKED IN FORWARD HEAD COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Stiffener
Issued 6 February 2007
Resolved
CROP & RENEW APPROX. 4 FEET OF 8 INCH BY 2-1/2 INCH BY 3/8 INCH OF SHELL LONG TEE #3 IN WAY OF BAY #3, PORT SIDE, AS MARKED IN FORWARD HEAD COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Stiffener
Issued 6 February 2007
Resolved
CROP & RENEW APPROX. 4 FEET OF 8 INCH BY 2-1/2 INCH BY 3/8 INCH OF SHELL LONG TEE #3 IN WAY OF BAY #4, PORT SIDE, AS MARKED IN FORWARD HEAD COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Weld
Issued 6 February 2007
Resolved
REPAIR BROKEN WELD LOCATED AT FIRST WEB FRAME FLAT STOCK TO WEB ABOVE STBD SHELL LONG TEE # 4 IN THE HEAD COMPARTMENT, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 23 February 2007
Construction/Loadline › Hull › Weld
Issued 6 February 2007
Resolved
REPAIR BROKEN WELD LOCATED AT FIRST WEB FRAME FLAT STOCK TO WEB ABOVE PORT SHELL LONG TEE # 3 AND # 4 IN THE HEAD COMPARTMENT, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 23 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 24 January 2007
Resolved
IN ADDITION TO DEFICIENCY NUMBER 5, CROP & RENEW APPROX. 13 FEET, 2 INCHES OF 3/8 INCH ALUMINUM HULL PLATING, PORT SIDE, FROM BETWEEN SHELL LONG #2 AND #3 AND SHELL LONG #5 AND #6, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 6 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 24 January 2007
Resolved
IN ADDITION TO DEFICIENCY NUMBER 6, CROP & RENEW APPROX. 13 FEET, 2 INCHES OF 3/8 INCH ALUMINUM HULL PLATING, STBD SIDE, FROM BETWEEN SHELL LONG #2 AND #3 AND SHELL LONG #5 AND #6, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 6 February 2007
Construction/Loadline › Hull › Keel Plate
Issued 24 January 2007
Resolved
CROP & RENEW 14 ADDITIONAL INCHES OF VERTICAL KEEL PLATE IMMEDIATELY FORWARD OF HEAD COMPARTMENT AFT WATERTIGHT BULKHEAD.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Keel Plate
Issued 24 January 2007
Resolved
CROP & RENEW 17 ADDITIONAL INCHES OF VERTICAL KEEL PLATE IMMEDIATELY AFT OF FUEL TANK FORWARD WATERTIGHT BULKHEAD BOUNDARY.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 January 2007
Resolved
CROP & RENEW FORWARD FUEL OIL STORAGE TANK WATERTIGHT BULKHEAD BOUNDARY IN ITS ENTIRETY (APPROX. 7 FEET BY 7 INCHES BY 56 INCHES BY 3/8 INCH PLATE).
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 24 January 2007
Resolved
IN ADDITION TO DEFICIENCY NUMBER 22, CROP & RENEW AN ADDITIONAL 27 INCHES BY 11-1/2 INCHES BY 1/2 INCH ALUMINUM HULL PLATING, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 38 INCH BY 32 INCH BY 3/8 INCH ALUMINUM HULL PLATING, STBD BOW, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 36.5 INCH BY 33 INCH BY 3/8 INCH ALUMINUM HULL PLATING, PORT BOW, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 17 January 2007
Resolved
RENEW OR PROPERLY REPAIR PORT & STBD PROPELLERS FOUND WORN DUE TO ELECTROLYSIS.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 13 February 2007
Engineering › Shafting/Propeller Arrangements › Strut
Issued 17 January 2007
Resolved
CLEAN, PREP AND REPAIR, AS REQUIRED, PORT & STBD STRUT CASTING TOP, BETWEEN STRUT ARMS, AS MARKED, DUE TO ELECTROLYSIS.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 15 FEET OF 3/8 INCH ALUMINUM HULL PLATING, PORT SIDE, FROM KEEL TO BETWEEN SHELL LONG #2 AND SHELL LONG #3, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 15 FEET OF 3/8 INCH ALUMINUM HULL PLATING, STBD SIDE, FROM KEEL TO BETWEEN SHELL LONG #2 AND SHELL LONG #3, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Stiffener
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 15 FEET OF SHELL LONG #1 TEE AND SHELL LONG #2 TEE (5X2X3/8) PORT SIDE, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Hull › Stiffener
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 15 FEET OF SHELL LONG #1 TEE AND SHELL LONG #2 TEE (5X2X3/8) STBD SIDE, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 17 January 2007
Resolved
REMOVE SEWAGE TANK IN ITS ENTIRETY FOR FURTHER FRAMING AND HULL INSPECTION
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 24 January 2007
Engineering › Bilge Water Management System › Piping
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 7 FEET OF 1-1/2 INCH BILGE SUCTION PIPING FOR HEAD COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 7 March 2007
Engineering › Sea-water System (primary cooling) › Valve
Issued 17 January 2007
Resolved
MAKE PERMANENT REPAIRS TO WASTED FITTING BETWEEN STBD OVERBOARD GATE VALVE AND CHECK VALVE LOCATED IN HEAD COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 7 March 2007
Accommodation/Occupational Safety › Washroom/Toilet › Hot and Cold Running Water
Issued 17 January 2007
Resolved
CROP AND RENEW APPROX. TOTAL OF 10 FEET OF 1 INCH WATER SUPPLY PIPING (5 FEET EACH SIDE) FOR TOILET RAW WATER SUPPLY.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 7 March 2007
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 17 January 2007
Resolved
FUEL OIL STORAGE TANK REQUIRES TO BE EMPTIED, GAS-FREED AND MADE AVAILABLE FOR ENTRY FOR FORWARD BULKHEAD BOUNDARY INSPECTION.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 24 January 2007
Construction/Loadline › Hull › Keel Plate
Issued 17 January 2007
Resolved
ALUMINUM VERTICAL KEEL PLATE CONDITION IN FORWARD HEAD COMPARTMENT IS QUESTIONABLE.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 24 January 2007
Fire Fighting › Fixed Halon Fire Extinguishing System › Tanks
Issued 17 January 2007
Resolved
PROVIDE ANNUAL SERVICING OF FIXED FIREFIGHTING SYSTEM LOCATED IN FUEL OIL STORAGE TANK COMPARTMENT FOR ENGINE ROOM.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 23 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 4 FEETBY 4 FEET BY 1/2 INCH ALUMINUM PLATING IN WAY OF STBD SEA WATER STRAINER AND BATTERY BOX IN ENGINE ROOM, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 6 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 4 FEETBY 4 FEET BY 1/2 INCH ALUMINUM PLATING IN WAY OF PORT SEA WATER STRAINER AND BATTERY BOX IN ENGINE ROOM, AS MARKED.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 6 February 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 17 January 2007
Resolved
PORT, AFT ENGINE ROOM BULKHEAD MOUNTED PORTABLE FIRE EXTINGUISHER REQUIRES INSPECTION DUE TO BOTTLE BASE WASTAGE.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 23 February 2007
Fire Fighting › Fire Pumps › Arrangement
Issued 17 January 2007
Resolved
MAKE PERMANENT REPAIRS TO WASTED PROPULSION ENGINE BELT-DRIVEN FIRE PUMP OVERBOARD DISCHARGE PIPING, STBD SIDE OF ENGINE ROOM.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 7 March 2007
Engineering › Sea-water System (primary cooling) › Piping
Issued 17 January 2007
Resolved
MAKE PERMANENT REPAIRS TO SEA SUCTION PIPING WASTAGE/LEAK FOR STBD MAIN ENGINE.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 7 March 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 30 INCH BY 36 INCH BY 1/2 INCH HULL PLATING IN WAY OF STARBOARD EXHAUST MUFFLER, AS MARKED IN STEERING GEAR COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 6 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 10 FEET BY 4 FEET BY 1/2 INCH HULL PLATING IN WAY OF PORT EXHAUST MUFFLER, AS MARKED IN STEERING GEAR COMPARTMENT. THIS INSERT WILL ALSO INCORPORATE AN EXISTING, UNACCEPTABLE INSERT FOUND AT TRANSOM.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Construction/Loadline › Penetrations › Pipe Flange
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 6 INCHES OF STBD FWD END AND 12 INCHES OF STBD AFT END WET EXHAUST PIPING, AS MARKED IN STEERING GEAR COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 23 February 2007
Construction/Loadline › Penetrations › Pipe Flange
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 9 INCHES OF PORT FWD END AND 9 INCHES OF PORT AFT END WET EXHAUST PIPING, AS MARKED IN STEERING GEAR COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 23 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007
Resolved
CROP & RENEW APPROX. 30 INCH BY 36 INCH BY 1/2 INCH ALUMINUM HULL PLATING IN WAY OF STBD MUFFLER, AS MARKED IN STEERING GEAR COMPARTMENT.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 12 February 2007
Engineering › Steering Gear System › Fastener
Issued 17 January 2007
Resolved
DISASSEMBLE STEERING GEAR HYDRAULIC RAM MOUNTING HARDWARE AT HULL FOR FURTHER INSPECTION.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 23 February 2007
Communications › Radio Communications › EPIRB
Issued 17 January 2007
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE VALID EPIRB REGISTRATION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 January 2007
Resolved 7 March 2007
Documentation › Logs/Records › Logbook (official)
Issued 15 March 2005
Resolved
PROVIDE MASTER TRAINING LIST WITH ALL CREW DRILL PARTICIPATION FOR ALL COMPANY VESSELS.
Due 15 March 2005
Resolved 25 March 2005
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 15 March 2005
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS ON AN INTERNATIONAL VOYAGE, PROVIDE A DETAILED SPECIFIC PROCEDURE FOR THE CUSTODY, ROUTING, AND COMPLETION OF THE PRE-UNDERWAY CHECKLISTS.
Due 15 March 2005
Resolved 25 March 2005
Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 15 March 2005
Resolved
PRIORT TO CARRYING PASSENGERS ON AN INTERNATIONAL VOYAGE, CUSTOMIZE PRE-UNDERWAY CHECKLISTS FOR EACH VESSEL WITH CRITICAL EQUIPMENT INCORPORATED INTO THE LIST.
Due 15 March 2005
Resolved 25 March 2005
Documentation › Safety Management System › Designated Person(s) Documentation
Issued 15 March 2005
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS ON ANINTERNATIONAL VOYAGE, UPDATE SMS MANUAL WITH CORRECT CHANGES ABD SIGNATURES.
Due 15 March 2005
Resolved 25 March 2005
Communications › Radio Communications › EPIRB
Issued 15 March 2005
Resolved
PROVIDE OPERATIONAL EPIRB WITH NEW HYDROSTATIC RELEASE
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2005
Resolved 25 March 2005
Navigation › Piloting/Steering › Magnetic Compass
Issued 15 March 2005
Resolved
PERMANENTLY MOUNT COMPASS AND PROVIDE UPDATED DEVIATION CARD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2005
Resolved 25 March 2005
Lifesaving › Buoyant Apparatus › Lifeline
Issued 15 March 2005
Resolved
MAKE REPAIRS TO LIFEFLOAT GRABLINES, STRAPS, AND LABEL ALL LIFEFLOAT PADDLES.
Due 29 March 2005
Resolved 25 March 2005
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 15 March 2005
Resolved
PROVIDE OPERATING INSTRUCTIONS FOR FIXED HALON EXTINGUISHING SYSTEM.
Due 29 March 2005
Resolved 25 March 2005
Construction/Loadline › Structures › Door
Issued 15 March 2005
Resolved
MAKE OPERABLE FORWARD AND AFT WATERTIGHT DECK SCUTTLES.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2005
Resolved 25 March 2005
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 30 November 2004
Resolved
Replace both port and starboard propellers prior to completion of drydock.
Due 20 December 2004
Resolved 21 December 2004
Lifesaving › Buoyant Apparatus
Issued 13 March 2003
Resolved
Replace painter line for life floats. LEGACY COMPONENT DESC: Painter
Due 13 March 2003
Resolved 13 March 2003
Navigation › Piloting/Steering › Coast Guard Light List
Issued 20 March 2002
Resolved
PROVIDE UPDATED REEDS CARIBBEAN ALMANAC
Due 26 March 2002
Resolved 20 March 2002
Documentation › Logs/Records › Drug Test Records
Issued 20 March 2002
Resolved
PROVIDE EVIDENCE OF RANDOM DRUG TEST CONSORTIUM MEMBERSHIP
Due 26 March 2002
Resolved 22 March 2002
Electrical
Issued 20 March 2001
Resolved
PROVIDE 2 PORTABLE LIGHTS NO LATER THAN 27MAR01.
Condition: Unknown
Due 27 March 2001
Resolved 18 May 2001
Construction/Loadline
Issued 20 March 2001
Resolved
MAKE MAIN ENGINE ROOM DECK HATCH OPERABLE AND WATERTIGHT WITH DOGGING WRENCH PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 20 March 2001
Resolved 18 May 2001
Engineering
Issued 20 March 2001
Resolved
RENEW STBD DIESEL ENGINE SEA WATER DISCHARGE HOSE AT EXHAUST DISCHARGE FITTING NO LATER THAN 27MAR01.
Condition: Unknown
Due 27 March 2001
Resolved 18 May 2001
Navigation
Issued 20 March 2001
Resolved
PROVIDE COAST PILOT, LIGHT LIST, TIDE/CURRENT TABLES FOR OPERATION AREAS LISTED ON THE COI NO LATER THAN 27MAR01.
Condition: Unknown
Due 27 March 2001
Resolved 18 May 2001
Lifesaving
Issued 20 March 2001
Resolved
PROVIDE PROOF OF CURRENT EPIRB REGISTRATION NO LATER THAN 27MAR01.
Condition: Unknown
Due 27 March 2001
Resolved 18 May 2001
Fire Fighting
Issued 20 March 2001
Resolved
REPLACE/REPAIR I B-I FIRE EXTINGUISHER LOCATED AT THE OPERATING STATION NO LATER THAN 27MAR01.
Condition: Unknown
Due 27 March 2001
Resolved 18 May 2001
Documentation
Issued 3 February 1997
Resolved
PROVIDE A VALID COPY OF THE RADIO STATION LICENSE.
Condition: Unknown
Due 3 February 1997
Resolved 3 February 1997
Documentation
Issued 3 February 1997
Resolved
PROVIDE PROOF OF COMPLIENCE WITH RANDOM DRUG TESTING REQUIREMENTS.
Condition: Unknown
Due 3 February 1997
Resolved 3 February 1997
Documentation
Issued 3 February 1997
Resolved
COMPLETE IFR WORKLIST TO BRING VESSEL INTO COMPLIENCE WITH INTERM FINAL RULE.
Condition: Unknown
Due 3 February 1997
Resolved 3 February 1997
Unknown
Issued 22 August 1995
Resolved
Provide draftmarks or loading marks on vessel in accordance with 46 CFR 185.30-3(a)(4),(b).
Condition: Unknown
Due 22 August 1995
Resolved 22 August 1995
Construction/Loadline
Issued 22 August 1995
Resolved
Repair 3" hairline fracture in second compartment from bow, forward of first transverse frame, below first longitudinal frame, four feet above waterline.
Condition: Unknown
Due 22 August 1995
Resolved 22 August 1995
Construction/Loadline
Issued 22 August 1995
Resolved
Repair small cracks in rubrail, port and starboard corner on the upper rubrail and the starboard lower rubrail.
Condition: Unknown
Due 22 August 1995
Resolved 22 August 1995
Documentation
Issued 31 January 1995
Resolved
PROVIDE COPY OF PREVIOUS YEARS RANDOM DRUG TESTING RESULTS.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Fire Fighting
Issued 31 January 1995
Resolved
SERVICE FIXED HALON FIRE EXTINGUISHING SYSTEM IN ENGINE ROOM.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Navigation
Issued 31 January 1995
Resolved
PLACE ON BOARD CHARTS FOR AREA OF OPERATION.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Accommodation/Occupational Safety
Issued 31 January 1995
Resolved
DOUBLE CLAMP ALL MARINE SANITATION DEVICE SALT WATER SUPPY HOSES.
Condition: Unknown
Due 14 February 1995
Resolved 14 February 1995
Lifesaving
Issued 31 January 1995
Resolved
SEPARATE LIFEFLOATS BY INSTALLING WOODED SLATS BETWEEN LAYERS.
Condition: Unknown
Due 14 February 1995
Resolved 14 February 1995
Lifesaving
Issued 10 February 1994
Resolved
REPLACE MISSING REFLECTIVE TAPE ON UPPERMOST BUOYANT APPARATUS.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Lifesaving
Issued 10 February 1994
Resolved
MARK CAPACITY ON ALL BOUYANT APPARATUSES.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Lifesaving
Issued 10 February 1994
Resolved
INSTALL REFLECTIVE TAPE ON ALL RING BOUYS.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Documentation
Issued 10 February 1994
Resolved
PROVIDE PROOF OF PRE-EMPLOYMENT AND RANDOME DRUG TESTING PROGRAM IN ACCORDANCE WITH 46 C.F.R. PART 16.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Documentation
Issued 10 February 1994
Resolved
OBTAIN NEW FCC EXEMPTION CERTIFICATE, TO INCLUDE NAVTEX OR PLACE NAVTEX ON BOARD.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Lifesaving
Issued 10 February 1994
Resolved
REPLACE GRAB LINE ON RING BOUY LOCATED ON BOW.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Lifesaving
Issued 10 February 1994
Resolved
PROVIDE SOLAS APPROVED LIGHTS FOR ALL LIFE JACKETS.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Lifesaving
Issued 24 February 1993
Resolved
Provide retro-reflective tape on lifefloats where missing.
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Engineering
Issued 24 February 1993
Resolved
Clean flame screen for fuel tank vent.
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Construction/Loadline
Issued 24 February 1993
Resolved
Make wire and cable penetrations in forward bulkhead of tank compartment watertight.
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Lifesaving
Issued 24 February 1993
Resolved
Properly rig lifefloats. Each grouping of three lifefloats shall be tied together with a 10' polypropylene line and have one waterlight per float. Each group shall also have one 100 foot painter and one weak link of propersize for the group.
Condition: Unknown
Due 27 October 1993
Resolved 27 October 1993
Lifesaving
Issued 6 March 1992
Resolved
PROVIDE TWO PADDLES FOR EACH LIFE FLOAT. STENCIL THE VESSEL'S NAME ON EACH PADDLE IN CONTRASTING COLOR. REPLACE RETROREFLECTIVE TAPE. REPLACE DETERIORATED GRAB LINE RETAINING LOOPS. PROVIDE TWO 6' PENDANTS AT EACH RING ATTACHMENT. GROUP THE LIFE FLOATS BY ATTACHING 12' LINE 1/2' DIAMETER.
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Lifesaving
Issued 6 March 1992
Resolved
PROVIDE TWO PADDLES FOR EACH LIFE FLOAT. STENCIL THE VESSEL'S NAME ON EACH PADDLE IN CONTRASTING COLOR. REPLACE RETROREFLECTIVE TAPE. REPLACE DETERIORATED GRAB LINE RETAINING LOOPS. PROVIDE TWO 6' PENDANTS AT EACH RING ATTACHMENT. GROUP THE LIFE FLOATS BY ATTACHING 12' LINE 1/2' DIAMETER.
Condition: Unknown
Due 22 July 1992
Resolved 22 July 1992
Engineering
Issued 16 February 1989
Resolved
RENEW FLAME SCREEN IN FUEL TANK VENT.
Condition: Unknown
Due 16 February 1989
Resolved 16 February 1989
Documentation
Issued 11 October 1988
Resolved
OBTAIN VALID FCC SAFETY RADIOTELEPHONY CERTIFICATE.
Condition: Unknown
Due 11 October 1988
Resolved 11 October 1988
Documentation
Issued 11 October 1988
Resolved
OBTAIN FCC SAFETY RADIOTELEGRAPHY EXEMPTION CERTIFICATE.
Condition: Unknown
Due 11 October 1988
Resolved 11 October 1988