Records from 1988 to 1993. Most recent: inspection, 16 October 1993.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
16 October 1993
Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1440757
16 July 1991
Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 936033
29 May 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 917536
22 May 1990
MARPOL Annex I Examination · Certificate of Compliance
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 906529
13 July 1989
Certificate of Compliance · MARPOL Annex I Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1033238
7 February 1988
Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1335861
Deck/Cargo
Issued 16 October 1993
Resolved
70MM FRACTURE IN #5 PORT WING BALLAST TANK BULKHEAD, COMMON BULKHEAD TO #4 CENTER CARGO TANK, BETWEEN FRAMES 81 & 82 AT FIRST STRINGER. MAKE PERMANENT REPAIR BY INSERT.
Condition: Unknown
Due 16 November 1993
Resolved 16 October 1993
Documentation
Issued 16 July 1991
Resolved
PROVIDE MOST RECENT CLASS SOCIETY DRY DOCK REPORT PRIOR TO NEXT ARRIVAL IN U.S. WATERS.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Construction/Loadline
Issued 16 July 1991
Resolved
PROVIDE GAS CHEMISTS CERT. FOR #5P WING BALLAST TANK AND MAKE AVAILABLE FORCG INSP. WHETHER TANK IS ENTERED WILL BE UP TO DISCRESSION OF OCMI AT NEXT U.S. PORT OF ARRIVAL.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Navigation
Issued 16 July 1991
Resolved
NO COAST PILOT ABD FOR LOCAL PORT. PROVIDE COAST PILOT AT NEXT U.S. PORT.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Engineering
Issued 16 July 1991
Resolved
REPAIR AFT BUNKER TANK FLAME SCREENS.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Fire Fighting
Issued 16 July 1991
Resolved
PROVIDE CLASS SOCIETY LETTER OF SATISFACTORY HYDRO TEST ON FOAM MAIN PRIOR TO NEXT ARRIVAL U.S. WATERS.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Deck/Cargo
Issued 16 July 1991
Resolved
REPLACE/RENEW TEMPORARY PATCHES ON IGS #1 BLOWER DISCHARGE PIPING PRIOR TO NEXT ARRIVEL U.S. WATERS.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Engineering
Issued 16 July 1991
Resolved
REPAIR OWS. VSL MUST RETAIN ALL SLOPS ABOARD UNTIL THIS REQ IS CLEARED.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Deck/Cargo
Issued 22 May 1990
Resolved
MAKE PERMANENT REPAIRS TO #2 IG BLOWER EXHAUST DUCT.
Condition: Unknown
Due 30 May 1990
Resolved 22 May 1990
Documentation
Issued 13 July 1989
Resolved
ENG. OIL RECORD BOOK NOT SIGNED BY CAPT. ON EACH COMPLETE PAGE.
Condition: Unknown
Due 13 July 1989
Resolved 13 July 1989
Engineering
Issued 13 July 1989
Resolved
15 PPM O.W.S. ALARM NOT OPERATIONAL.
Condition: Unknown
Due 13 July 1989
Resolved 13 July 1989
Deck/Cargo
Issued 7 February 1988
Resolved
PRIOR TO ENTRY INTO NEXT U.S. PORT OR TRANSFER IN U.S. WATERS. INSTALL FOUR BOLTS MINIMUM ON THE STARBOARD BUNKER "C" DECK MANIFOLD. 33 CFR 150.415
Condition: Unknown
Due 7 February 1988
Resolved 7 February 1988
Navigation
Issued 7 February 1988
Resolved
PRIOR TO ENTRY INTO NEXT U.S. PORT MAKE PERMANENT REPAIRS TO THE RADAR REPEATER. SEE SOLAS 74 CHAPTER I REG.7
Condition: Unknown
Due 7 February 1988
Resolved 7 February 1988
Documentation
Issued 7 February 1988
Resolved
PRIOR TO ENTRY INTO NEXT U.S. PORT OR TRANSFER IN U.S. WATERS DESIGNATE THE PERSON IN CHARGE AS REQUIRED BY 33 CFR 155.700
Condition: Unknown
Due 7 February 1988
Resolved 7 February 1988
Deck/Cargo
Issued 7 February 1988
Resolved
PRIOR ENTRY INTO NEXT U.S. PORT OR TRANSFER IN U.S. WATERS INSTALL 30X30 PER INCH MESH SCREENS ON TH 5/P&S VENTS SEE SOLAS 74 CHAPTER II REG. 60
Condition: Unknown
Due 7 February 1988
Resolved 7 February 1988
Deck/Cargo
Issued 7 February 1988
Resolved
PRIOR TO ENTRY INTO NEXT U.S. PORT OR TRANSFER IN U.S. WATERS DEMONSTRATE PROPER OPERATION OF THE IGS PRESSURE GAGE AND OXYGEN INDICATOR GAGE RECORDING DEVICE. 46 CFR 32.53-60
Condition: Unknown
Due 7 February 1988
Resolved 7 February 1988
Documentation
Issued 7 February 1988
Resolved
PRIOR TO ENTRY INTO NEXT U.S. PORT OR TRANSFER IN U.S. WATERS PROVIDE ON BOARD OIL TRANSFER PROCEDURES AS REQUIRED BY 33 CFR 155 SUBPART "C".
Condition: Unknown
Due 7 February 1988
Resolved 7 February 1988