Records from 2016 to 2026. Most recent: inspection, 14 April 2026.
Inspection history · 16
14 April 2026
Annual Inspection · Deficiency Check · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8350159
27 March 2025
Administrative Inspection · COI Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8100719
28 May 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7897622
15 April 2024
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7880973
24 April 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7674636
22 April 2022
Examination of Repairs · Annual Inspection · Administrative Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7423210
1 April 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7404588
12 October 2021
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7330868
3 June 2020
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6967112
14 April 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6930950
17 June 2019
Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6704458
21 May 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6415942
12 April 2018
Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6383123
25 April 2017
Annual Inspection · DAPI Audit
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6112300
22 July 2016
Excursion Permit
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5956553
21 April 2016
Internal Structural Exam · Annual Inspection · DAPI Audit · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5843933
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 April 2023
Resolved
A vessel must carry one floating waterlight unless it is limited to daytime operation. This must be approved IAW 160.010 or 160.110. Each waterlight must have a lanyard of at least 3ft in length but not more than 6ft in length, securing the waterlight around the body of the ring life buoy. Floating waterlight is not approved type.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2023
Resolved 29 April 2023
Resolution: New approved type floating waterlight has been obtained with lanyard.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 17 June 2019
Resolved
Missing annual fixed fire equipment inspection.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 June 2019
Resolved 1 July 2019
Resolution: Report provided of satisfactory annual service of system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 June 2019
Resolved
Wire connections utilizing wire twist nuts. Replace with proper connections.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 June 2019
Resolved 1 July 2019
Resolution: Proper connection made.