MAURY USCG vessel records Sign in
← All vessels

FREEDOM

FREEDOM is a 1988 passenger vessel (inspected). The Coast Guard has recorded 76 inspections since 1988, most recently in May 2025, along with 176 deficiencies.

Records from 1988 to 2025. Most recent: inspection, 14 May 2025.

Built
1988
Last inspected
14 May 2025
Documentation
Expired · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDM9441
301660
Flag
UNITED STATES
368252680
Maury page id
psix-301660

Inspections, by type

…with no type recorded15
Years with a record 31 calendar years (1988–2025)
The 76 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)73.5 ft × 21.0 ft × 6.0 ft
Registered tonnagegross 64 / net 43
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSKIPPERLINER INDUSTRIES · LACROSS, WI, UNITED STATES · built 1988
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMONTAUK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it64 - Regulatory (Subpart C or D), Gross Ton
43 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDM9441MMSI 368252680 · active · compulsorily equipped · granted 26 April 2022, expires 26 April 2032
WDI4337MMSI 367697640 · expired · compulsorily equipped · granted 17 October 2015, cancelled 7 March 2026
WDC9884MMSI 367107930 · expired · voluntarily equipped · granted 19 April 2006, cancelled 25 June 2016 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 76

14 May 2025 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8133190
31 March 2025 Administrative Inspection · Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8100781
13 September 2024 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8001855
29 August 2023 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7780975
17 May 2023 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7704024
17 April 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7670178
17 February 2023 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7638302
9 June 2022 Internal Structural Exam · Re-Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7469782
9 August 2021 Deficiency Check · Examination of Repairs · Annual Inspection · Administrative Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 7281234
14 June 2021 Examination of Repairs · Administrative Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 7246746
8 July 2020 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7005414
7 January 2020 Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6884827
24 July 2019 DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6755068
8 August 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6504414
14 April 2018 Type not recorded
No type recorded · Station Washington DC · USCG East District (CGD-E) · Activity 6391606
10 April 2018 Type not recorded
No type recorded · Station Washington DC · USCG East District (CGD-E) · Activity 6389239
9 April 2018 Type not recorded
No type recorded · Station Washington DC · USCG East District (CGD-E) · Activity 6389308
5 February 2018 Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6351080
23 January 2018 Administrative Inspection · COI Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6342091
19 January 2018 Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6340359
3 June 2017 DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6229667
20 July 2016 Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5947733
8 September 2015 In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5730599
5 August 2014 Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4937428
26 June 2014 Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4915022
5 June 2012 Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4330819
2 August 2011 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4095717
9 July 2009 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3528984
19 March 2009 Administrative Inspection
Administrative · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3436403
28 January 2009 Administrative Inspection
Administrative · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3401541
8 May 2008 Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3201689
2 May 2008 COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3197278
28 February 2008 Administrative Inspection
Administrative · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3155180
3 May 2006 Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2615387
8 June 2005 Hull Examination · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2383680
4 June 2003 Hull Examination
Physical examination · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 1846863
15 August 1999 Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1381858
25 September 1998 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 799261
28 April 1998 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 798643
3 July 1997 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1114595
3 June 1997 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1108028
26 June 1996 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1090264
26 April 1996 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1082661
28 September 1995 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 145965
28 September 1995 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 215200
28 September 1995 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 218331
11 April 1995 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 847995
31 March 1995 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 164078
31 March 1995 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1147957
19 May 1994 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 861270
10 May 1994 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1168617
19 April 1994 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 857299
11 April 1994 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1449681
20 May 1993 Hull Examination
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 828263
21 April 1993 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 832507
9 March 1993 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1148737
2 March 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1149063
11 December 1992 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 827574
27 November 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 827773
17 November 1992 Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1134497
2 November 1992 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 935430
6 September 1992 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 11794
23 June 1992 Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1261235
22 April 1992 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1261577
8 April 1992 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 948542
7 May 1991 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 914170
27 March 1991 COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 997701
27 August 1990 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1216928
3 August 1990 Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1223495
19 April 1990 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 903722
2 April 1990 COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 981562
5 October 1989 Hull Examination
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1019047
12 April 1989 COI Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1204203
15 November 1988 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 892046
20 May 1988 Initial Certification
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1045023
5 May 1988 Initial Construction-Excluding Oversight · Hull Examination · Plan Review "T" Boat
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1345351

Deficiency record · 176

10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 14 May 2025 Resolved
Obtain updated nautical publications
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 4 June 2025
09 - Working and Living Conditions › 092 - Working Conditions › Adequate lighting - mooring arrangements
Issued 14 May 2025 Resolved
Repair anchor light
Action required: 10 - Deficiency Rectified
Due 28 May 2025
Resolved 14 May 2025
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 May 2025 Resolved
Provide proof of drug consortium and crew list
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2025
Resolved 4 June 2025
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 14 May 2025 Resolved
Obtain aspirin
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2025
Resolved 22 May 2025
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 14 May 2025 Resolved
obtain 3 red hand flares
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2025
Resolved 22 May 2025
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 14 May 2025 Resolved
Replace worn lifejacket donning placard on upper deck
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 22 May 2025
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 14 May 2025 Resolved
Prove proper operation of fire pump – 60 psi
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2025
Resolved 22 May 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2025 Resolved
Label bilge manifold in engine room
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 5 June 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025 Resolved
Remove or fix stbd side engine room battery cable
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 21 May 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025 Resolved
Remove loose wire on bilge suction in engine room
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 22 May 2025
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 May 2025 Resolved
Place guard on port side of main diesel engine
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 22 May 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025 Resolved
Remove dead end wires and twist connector port side main diesel engine, top
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 22 May 2025
09 - Working and Living Conditions › 091 - Living Conditions › Furnishings
Issued 14 May 2025 Resolved
Provide noncombustible waste bins and remove plastic bin
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 27 May 2025
Resolution: Purchased metal waste cans
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 14 May 2025 Resolved
Provide engine room ventilation covers
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2025
Resolved 5 June 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 13 September 2024 Resolved
Vessel is over the 3 month inspection requirement as per 46 CFR 176.500.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2024
Resolved 24 September 2024
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 13 September 2024 Resolved
Prior to operating in passenger service provide master with current MMC.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2024
Resolved 10 December 2024
Resolution: Provided master with current MMC.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 13 September 2024 Resolved
Prior to operating in passenger service conduct emergency U/W drills with CG inspectors.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2024
Resolved 14 May 2025
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 13 September 2024 Resolved
Prior to operating at night or during periods of reduced visibility repair/replace navigation lighting.
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 September 2024
Resolved 10 December 2024
Resolution: Repaired navigation lighting.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 13 September 2024 Resolved
Renew hydrostatic release on EPIRB.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2024
Resolved 10 December 2024
Resolution: Renewed hydrostatic release on EPIRB.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 February 2023 Resolved
Vsl is required to conduct a credit DD prior to the carriage of passengers. See MISLE activity # 7638302 for details.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2023
Resolved 17 April 2023
Resolution: Completed DDX/ISE. See Misle activity # 7670178
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021 Resolved
Vessel shall be provided with a satisfactory arrangement for draining any watertight compartment. Port overboard skin valve/flex hose leaking excessively while bilge/fire pump is in operation.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified replacement of valve/piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021 Resolved
All exhaust systems shall be water cooled. Water leaks noted IWO SSDG flexible exhaust cooling/injection hose. Flex hose is not rated for service intended.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 September 2021
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified flexible hose installation IWO SSDG exhaust/cooling water injection point.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 9 August 2021 Resolved
Owner/Operator required to submit vessel inspection fees (Users Fees). Vessels inspection fees have an outstanding balance of $600.00.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified status of vessels users fees.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021 Resolved
Fire hazards shall be minimized. Multiple hydraulic oil leaks noted IWO port MDE, i.e.: PTO pump, flex hoses, filters.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified status of hydraulic oil leaks IWO hydraulic/PTO system in machinery space.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 9 August 2021 Resolved
Vessel shall be equipped with audible/visual alarms to indicate high water. Existing bilge high water alarm IWO Tank/HVAC void not permanently mounted (bracket wasted).
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified installation of the bilge/high water alarm IWO Tank/HVAC void.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 9 August 2021 Resolved
The scope of an annual inspection includeds examination of all accessible parts of the vessels hull. Wastage noted IWO main deck plating @ transom IWO lazarette, port side (overhead). Area to be further examined/repaired at next Internal Structural Examination (ISE).
Action required: 705 - Other - as specified
Resolved 17 April 2023
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 August 2021 Resolved
The scope of an annual inspection includes examination of all accessible parts of the vessels hull & machinery. Wastage noted IWO raw water seachests in engine room (see special note dated 8/15/1999). Further inspection required at next Hull/Drydock inspection.
Action required: 705 - Other - as specified
Resolved 17 April 2023
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 9 August 2021 Resolved
The scope of an annual inspection includeds examination of all accessible parts of the vessels hull. Wastage noted IWO main deck @ starboard (fwd) exterior door framing/sill/superstructure. *Attending MI noted signs of previous repairs.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 17 April 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 9 August 2021 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 9 August 2021 Resolved
Vessel required to be marked IAW Certificate of Documentation (name/hailing port). Existing hailing port does not match the Certificate of Documentation.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 9 August 2021 Resolved
Vessel required to carry current/up to date marine charts for areas transited. Existing marine charts are outdated.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 9 August 2021 Resolved
Vessel required to be equipped with an operable Class A AIS unit. Existing Class A AIS unit is in an "alarm" status and is not transmitting vessels speed, COG, etc...
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 October 2021
Resolution: Attending Inspector(s) verified installation of "new" antenna and performed operational test with SEC CHAR. AIS unit is transmitting it position, speed, heading.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021 Resolved
Vessel required to be equipped with a first aid kit suitable for vessels service. Existing first aid kit contained expired items.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 August 2021 Resolved
Vessel required to be equipped with a navigational bell of at least 11.8" in diameter. Vessel is not equipped with a navigational bell.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 9 August 2021 Resolved
Installed toilets are required to be equipped with operating instructions. Existing (installed) toilets are not equipped with operating instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 14 October 2021
Resolution: Attending Inspector(s) verified posting of operating instructions for intalled toilets.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021 Resolved
Vessels emergency escapes shall be marked. Existing emergency escape doors are missing required markings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified posting of (temporary) emergency escape markings IWO accomodations space.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021 Resolved
Vessels watertight hatches are required to be marked. Existing watertight hatches are missing required markings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 14 October 2021
Resolution: Attending Inspector(s) verified watertight hatch markings.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021 Resolved
All wiring and cables shall be suitable for marine service. Attending MI noted multiple (non-marine) portable extension cords in use IWO bridge (port side console), main deck bar area & fwd. storeroom/void.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified removal of portable extension cords rom vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 August 2021 Resolved
PFD stowage locations shall be marked with size/qty of PFD's. Existing PFD stowage locker IWO upper deck (fwd of operating station) is missing required markings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021 Resolved
Conductors are required to be equipped with metallic supports. Existing conductors (throughout vessel) are not equipped with metallic supports. Recommend spacing @ 24" intervals.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 August 2021 Resolved
Vessels fixed bilge system required to be equipped with suitable strainers. Existing bilge suction strainer IWO house storeroom/void is damaged (requires repair/replacement).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 14 October 2021
Resolution: Attending Inspector(s) verified repairs to fixed bilge suction strainer.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 August 2021 Resolved
Vessels electric submersible bilge pumps, if equipped, shall be permanently mounted. Existing electric submersible bilge pumps IWO Tank/HVAC void & Engine Room are not permanently mounted.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 14 October 2021
Resolution: Attending Inspector(s) verified installation of bilge high water alarms for tank/HVAC void.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021 Resolved
Diesel engines shall be water cooled. Flexible hose between vessels sea chest and raw water strainer for starboard MDE & SSDG were found deteriorated requiring replacement.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 14 October 2021
Resolution: Attending Inspector(s) verified installation of flexible raw water cooling hose for starboard MDE (@ seachest).
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021 Resolved
Fire hazards on board vessels are to be minimized. Oil/oily residue noted IWO SSDG windings/fan.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021 Resolved
Penetrations in watertight bulkheads shall be made watertight. Attending MI noted open penetrations for fwd engine room watertight bulkhead IWO cableway(s).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified sealing of bulkhead penetrations IWO port/fwd machinery space (engine room).
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021 Resolved
Conductors shall be constructed of stranded copper & rated for marine service. Existing conductors for 12V start batteries IWO engine room for SSDG are improper.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 9 June 2022
Resolution: MI attended vessel and noted this item was corrected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 August 2021 Resolved
Vessel shall be equipped with a fixed fire pump. Existing cross connect valve for fire/bilge system requires servicing to ensure proper operation.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified servicing/operation of cross connect valve between fire/bilge piping system(s).
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 August 2021 Resolved
Vessel required to be equipped with emergency fuel shut-off valves. Existing emergency fuel shut-off valves are missing required operating instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2021
Resolved 12 October 2021
Resolution: Attending Inspector(s) verified markings for emergency fuel shut-off valves.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 July 2020 Resolved
A vessel of more than 65ft must have 3 lifebuoys. Upper deck lifebuoy found in unsatisfactory condition.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 July 2020
Resolution: O/O provide picture proof on new Lifebuoy with vessel name and new solas tape.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 July 2020 Resolved
Fuel lines must be accessible, protected from mechanical damage. Stbd Fuel oil line found severely chaffed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 July 2020
Resolution: O/O provided photo proof of new hose installed. Replaced severly chaffed Fuel oil hose.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 7 January 2020 Resolved
Provide this office with a Repair Proposal to address wastage of metal in the Sewage Tank Compartment (i.e. Hold #3). Wastage was located on the starboard / aft portion of the compartment in an 8’ x 8’ section primarily located underneath and just aft of the sewage tank. Prior to the start of repairs, you must provide this office with a copy of the Ultrasonic Testing (UT) Report.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 January 2020
Resolved 28 January 2020
Resolution: Verified satisfactory Repair Proposal to address wastage of metal in the Sewage Tank Compartment (i.e. Hold #3). Wastage was located on the starboard / aft portion of the compartment in an 8’ x 8’ section primarily located underneath and just aft of the
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 January 2020 Resolved
Provide this office with a Repair Proposal to address wastage of metal on the stanchion located on the starboard / aft section of the vessel’s bow.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 January 2020
Resolved 28 January 2020
Resolution: Verified satisfactory Repair Proposal to address wastage of metal on the stanchion located on the starboard / aft section of the vessel’s bow – ALL SAT.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 January 2020 Resolved
Provide this office with a Repair Proposal to address wastage of metal on the ductwork on the HVAC Intake System. The affected ductwork is located on the portside of the vessel in the Sewage Tank Compartment (i.e. Hold #3).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 January 2020
Resolved 28 January 2020
Resolution: Verified satisfactory Repair Proposal to address wastage of metal on the ductwork on the HVAC Intake System. The affected ductwork is located on the portside of the vessel in the Sewage Tank Compartment (i.e. Hold #3) – ALL SAT.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 7 January 2020 Resolved
Provide this office with a Repair Proposal to address wastage of metal in the Supply Storage Compartment. Wastage was located on the starboard / aft portion of the compartment IWO the overhead. The affected members include the corner structural bracing members.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 January 2020
Resolved 28 January 2020
Resolution: Verified satisfactory Repair Proposal to address wastage of metal in the Supply Storage Compartment. Wastage was located on the starboard / aft portion of the compartment IWO the overhead. The affected members include the corner structural bracing members
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 July 2019 Resolved
Provide proof of proper operation of the mechanical bilge pump installed on the starboard main diesel engine. This Power Take-Off (PTO) pump is designed to work in conjunction with the starboard main engine to provide de-watering capabilities in the event of loss of electrical power.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 August 2019
Resolved 19 August 2019
Resolution: Witnessed the proper operation of the installed mechanical bilge pump – ALL SAT.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 8 August 2018 Resolved
Vsl is broadcasting: No static draft information and no dimension information (AIS Antenna Position ABCD values equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 September 2018
Resolved 24 October 2018
Resolution: Vessel met all requirements for AIS broadcasting.
Construction/Loadline › Hull › Bottom Plating
Issued 19 January 2018 Resolved
Provide hull gauge report for the following areas: IVO leak in keel, belt line along bottom of hull, belt line along wind/water line.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 January 2018
Resolved 5 February 2018
Resolution: Cleared by Sector DelBay see MISLE #6351080.
Construction/Loadline › Hull › Bottom Plating
Issued 19 January 2018 Resolved
Provide written repair proposal to address leak along keel, and any areas of concern as a result of the gauging, for approval prior to beginning any repair work.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 January 2018
Resolved 5 February 2018
Resolution: Cleared by Sector DelBay see MISLE #6351080.
Construction/Loadline › Hull › Bottom Plating
Issued 19 January 2018 Resolved
Make repairs available for inspection and final repair for NDT.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 January 2018
Resolved 5 February 2018
Resolution: Cleared by Sector DelBay see MISLE #6351080.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 2 August 2017 Resolved
Floating waterlight battery was expired. Replace with non-expired battery.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 August 2017
Resolved 31 August 2017
Resolution: Master submitted image of non-expired light
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 2 August 2017 Resolved
Emergency Instructions were not ship specific. Update em. instructions to be ship specific.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 August 2017
Resolved 31 August 2017
Resolution: Master updated emergency instructions.
Engineering › Bilge Water Management System › Strainer
Issued 2 August 2017 Resolved
Repair/replace bilge suction strainer in storage compartment.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 August 2017
Resolved 31 August 2017
Resolution: Strainer was replaced.
Stability › Watertight Integrity › General
Issued 2 August 2017 Resolved
Blank hydraulic hose penetrating a watertight bulkhead that is no longer connected to fin stabilizer system.
Action required: 705 - Other - as specified
Due 9 August 2017
Resolved 31 August 2017
Resolution: Hose was properly blanked with valve that is capped.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 8 September 2015 Resolved
Cover open area of Bridge console which is a shock hazard.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Electrical › Lighting (service) › Lighting Fixture
Issued 8 September 2015 Resolved
Repair/replace light in overhead of bridge. Cover is missing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Documentation › Markings/Placards › Capacity Marking
Issued 8 September 2015 Resolved
Mark upper deck with persons allowed on upper deck.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Engineering › Bilge Water Management System › Not Operational
Issued 8 September 2015 Resolved
Repair/replace engine room high water alarm.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 8 September 2015 Resolved
Provide guards on front of MDEs.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Electrical › Electrical Distribution System (service) › Cable
Issued 8 September 2015 Resolved
Ensure all wire and hose runs have steel wire ties every 24 inches in engine room.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Fire Fighting › Fire Hydrants › Location/Position
Issued 8 September 2015 Resolved
Ensure both fire stations are properly marked and have hose, nozzel and wrench inplace.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Fire Fighting › Fire Hoses › Material
Issued 8 September 2015 Resolved
Replace both fire hoses with U/L approved hoses50' X 1.5".
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 8 September 2015 Resolved
Replace missing exhaust protection wrap to wet exhaust intake pipe.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Engineering › Bilge Water Management System › Not Operational
Issued 8 September 2015 Resolved
Ensure bilge pump (Fixted) system instructions are accurate and bilge pump system operates properly.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 1 October 2015
Resolution: Attended vessel and cleared above deficiency.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 August 2014 Resolved
Make vessel ready for and complete annual inspection in presence of CG inspector. 46 CFR 176.502
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 August 2014
Resolution: Completed satisfactory annual inspection.
Lifesaving › Lifefloat › Lifeline
Issued 2 August 2011 Resolved
Properly install life floats.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: All life floats tied together and lights attached and installed satifactorily.
Engineering › Compressed Air System (control) › Compressor
Issued 2 August 2011 Resolved
Secure air compressor.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Air compressor secured with tie down strap.
Engineering › Thrusters › Piping
Issued 2 August 2011 Resolved
Repair hydraulic leaks in steering gear and bow thruster spaces.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Hydraulic leak repaired with new fitting.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 2 August 2011 Resolved
Repair starboard M/E following overheating.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: M/E raw water intake valve was partially closed. Valve was opened completely and M/E runs satisfactorily.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 August 2011 Resolved
Remove dead end wires from wheelhouse and forepeak,
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Dead end wires have been removed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 August 2011 Resolved
Properly install electrical wiring behind main deck bar.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Main deck bar wiring has been terminated at a metal enclosed box. All sat.
Engineering › Bilge Water Management System › Not Operational
Issued 2 August 2011 Resolved
Operationally test bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Bilge pump tested satisfactorily.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 August 2011 Resolved
Properly secure electrical wiring in engine room. No plastic tie-wraps.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Metal supports installed on wiring,
Fire Fighting › Fire Hoses › Condition
Issued 2 August 2011 Resolved
Replace fire hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2011
Resolution: Fire hose replaced.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 July 2009 Resolved
electrical wiring to the SB nav light were found not secured to the overhead, causing an entanglement hazard.
Action required: 705 - Other - as specified
Due 10 August 2009
Resolved 10 August 2009
Resolution: Vessel had repaired the electrical wiring hazard caused by wires being unrestrained enroute to light fixture of the sb side bridge wing. The wires are now properly connected and restrained.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 9 July 2009 Resolved
one of the fire extinguishers was not annually serviced.
Action required: 705 - Other - as specified
Due 10 July 2009
Resolved 10 July 2009
Resolution: fire extinguisher was replaced with a serviced spare fire extinguisher
Fire Fighting › Fire Hoses › Condition
Issued 9 July 2009 Resolved
fire hose from the #2 fire station was found to leak when charged.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 July 2009
Resolution: new fire hose was installed and tested satisfactorily @ the # 2 fire station.
Lifesaving › Lifefloat › Netting
Issued 9 July 2009 Resolved
netting of one LF was found with two 12-20 inch by 4-6 inch sections torn. retro reflective tape was inadequate on all LFs. painter lines were found connected to attachment loop which has degraded beyond use.
Action required: 705 - Other - as specified
Due 10 August 2009
Resolved 31 August 2009
Resolution: LF netting, retro reflective tape, and painter lines were in need of replacement. LF netting retro tape and painters had been replaced in kind.
Communications › Radio Communications › EPIRB
Issued 9 July 2009 Resolved
NOAA registry is expired on the EPIRB.
Action required: 705 - Other - as specified
Due 10 August 2009
Resolved 31 August 2009
Resolution: EPIRB NOAA registration is now showning as current.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 2 May 2008 Resolved
No report provide for portable fire extinguishers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2008
Resolution: all fire extinguishers are new and or serviced in May 2008.
Navigation › Piloting/Steering › US Coast Pilot
Issued 2 May 2008 Resolved
Coast pilot not current.
Action required: 705 - Other - as specified
Due 30 May 2008
Resolved 14 October 2008
Resolution: US Coast Pilot applicable section now provided.
Lifesaving › Lifefloat › Serviceable
Issued 2 May 2008 Resolved
lifefloat webbing loops dry rotted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 January 2009
Resolution: Removed 4th Life float, reduced passenger count and lifesaving equipt required.
Engineering › Bilge Water Management System › Piping
Issued 2 May 2008 Resolved
flex hose section deteriorated.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2008
Resolution: new hose installed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 2 May 2008 Resolved
battery covers not installed.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 24 October 2008
Resolution: battery box covers properly installed.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 3 May 2006 Resolved
Repair starboard engine tachometer.
Condition: Improper/Lack of Maintenance
Due 3 June 2006
Resolved 15 August 2006
Resolution: Starboard engine tachometer repaired
Stability › Weathertight Integrity › General
Issued 3 May 2006 Resolved
Repair broken windows on main deck
Condition: Improper/Lack of Maintenance
Due 3 June 2006
Resolved 15 August 2006
Resolution: Broken safety glass replaced on main deck.
Documentation › Certificates/Documents › Stability Letter
Issued 3 May 2006 Resolved
Post all required documents i.e. garbage management plan, lifejacket, COI, stability letter, etc.
Condition: Improper/Lack of Maintenance
Due 3 June 2006
Resolved 15 August 2006
Resolution: All prev. mentioned documents posted.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 3 May 2006 Resolved
Label Adult and child lifejacket storage locations.
Condition: Improper/Lack of Maintenance
Due 3 June 2006
Resolved 15 August 2006
Resolution: Lifejacket stowage locations labeled.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 3 May 2006 Resolved
Repair/Renew air conditioning salt water cooling strainer mounting bracket.
Condition: Improper/Lack of Maintenance
Due 3 June 2006
Resolved 15 August 2006
Resolution: Repaired a/c salt water cooling strainer mounting bracket.
Navigation › Electronic Positioning › LORAN C Receiver
Issued 3 May 2006 Resolved
Demonstrate proper operation of Loran equipment.
Condition: Improper/Lack of Maintenance
Due 3 June 2006
Resolved 15 August 2006
Resolution: Operator demonstrated proper operation of installed Loran equipment.
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 May 2006 Resolved
Provide double hose clamps for mde and generator salt water cooling hoses.
Condition: Improper/Lack of Maintenance
Due 3 June 2006
Resolved 15 August 2006
Resolution: Double hose clamps provided for both mde and generator salt water cooling hoses
Deck/Cargo
Issued 15 August 1999 Resolved
PROVIDE AN ANCHOR FOR THE VESSEL.
Condition: Unknown
Due 1 May 2000
Resolved 23 January 2004
Accommodation/Occupational Safety
Issued 3 June 1997 Resolved
MAKE PERMANENT REPAIRS TO THE INTERCOM BETWEEN THE MAIN BAR AND THE PILOT HOUSE.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Accommodation/Occupational Safety
Issued 3 June 1997 Resolved
DETERMINE THE SOURCE OF SEWAGE ODOR/GAS IN THE MSD VOID BY HYDROSTATICALLY TESTING THE SYSTEM. MAKE REPAIRS TO THE SYSTEM TO CORRECT THE BUILD UP OF ODOR/GAS.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 3 June 1997 Resolved
REPAIR/REPLACE ALL FRACTURED WINDOW GLASS THROUGH-OUT THE VESSEL. REPLACEMENT GLASS SHALL COMPLY WITH 46CFR177.1010 (SAFETY GLAZING MATERIALS).
Condition: Unknown
Due 3 August 1997
Resolved 10 June 2005
Deck/Cargo
Issued 3 June 1997 Resolved
PROVIDE VESSEL WITH A SATISFACTORY SIZED ANCHOR AND CABLE. ANCHOR WEIGH SHALL BE A MINIMUM OF 130 POUNDS. THE ANCHOR CABLE SHALL HAVE A MINIMUM DIAMETER OF 1 INCH.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Navigation
Issued 3 June 1997 Resolved
RE-BUSH THE WORN RUDDER TILLER ON THE PORT AND STBD RUDDER POST.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Accommodation/Occupational Safety
Issued 3 June 1997 Resolved
MUCK OUT THE FWD PEAK VOID, INSURE LIMBER HOLES ARE OPEN AND WATER FLOWS TOTHE LOWEST POINT OF THE KEEL.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Accommodation/Occupational Safety
Issued 3 June 1997 Resolved
REPAIR THE PUMP OUT TRANSFER LINE FROM THE SEWAGE HOLDING TANKS.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Electrical
Issued 3 June 1997 Resolved
INSTALL THE RUDDER ANGLE INDICATOR SPLICE IN AN ELECTRICAL BOX. SECURE WIRING WITH CLAMPS.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Construction/Loadline
Issued 3 June 1997 Resolved
INSTALL PERMANENT DRAFT OR LOADING MARKS FWD AND AFT. REF 46CFR185.602.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Engineering
Issued 3 June 1997 Resolved
DETERMINE PROBLEM AND MAKE PERMANENT REPAIRS TO THE FOLLOWING ENGINE GAUGE(S): (1) STARBOARD FUEL OIL TANK SENDER, (2) STARBOARD ENGINE MARINE GEAR PRESSURE.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Lifesaving
Issued 3 June 1997 Resolved
INSTALL CLIPS/SNAP HOOKS IN WAY OF THE CONNECTION BETWEEN WATERLIGHTS AND RING BUOYS.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Construction/Loadline › Penetrations › Pipe Flange
Issued 3 June 1997 Resolved
PROVIDE VESSEL WITH HIGH LEVEL BILGE ALARMS AS REQUIRED IN 46CFR185.530.
Condition: Unknown
Due 3 June 1998
Resolved 3 May 2006
Construction/Loadline
Issued 3 June 1997 Resolved
MAKE SATISFACTORY REPAIRS OR REPLACE THE VENT BOX IN WAY OF THE FWD PEAK VOID.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Construction/Loadline
Issued 26 June 1996 Resolved
THE BOW THRUSTER COMPARTMENT SHALL BE INSPECTED PRIOR TO EVERY DEPLOYMENT TO ENSURE SPACE IS DRY AND THE MASTIC REPAIRS ARE HOLDING. IF WATER IS FOUND IN THE SPACE THE DUTY USCG INSPECTOR SHALL BE IMMEDIATELY NOTIFIED. PERMANENT REPAIRS SHALL BE MADE AT NEXT SCHEDULED DRYDOCKING.
Condition: Unknown
Due 26 June 1996
Resolved 26 June 1996
Engineering
Issued 26 April 1996 Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY FLANGE IN WAY OF THE BOW THRUSTER TUNNEL. COMPARTMENT SHALL BE INSPECTED AND PUMPED OUT PRIOR TO GETTING THEVESSEL UNDERWAY.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Electrical
Issued 26 April 1996 Resolved
INSTALL COVER ON FLUORESCENT LIGHT FIXTURE IN GALLEY OR REPLACE WITH TYPE THAT MEETS UNDERWRITERS LABORATORIES 595.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Navigation
Issued 26 April 1996 Resolved
PROVE SATISFACTORY OPERATION OF VESSEL'S RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Navigation
Issued 26 April 1996 Resolved
VESSEL IS RESTRICTED TO OPERATE INSIDE THE PROTECTED WATERS OF THE MILWAUKEE HARBOR UNTIL A OPERABLE MARINE COMPASS IS INSTALLED.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Accommodation/Occupational Safety
Issued 26 April 1996 Resolved
REPLACE BROKEN GLASS LOCATED ON THE STBD SIDE OF THE PILOT HOUSE.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Construction/Loadline
Issued 26 April 1996 Resolved
INSTALL A PERMANENT MEANS TO OPEN AND CLOSE THE BOW THRUSTER COMPARTMENT SCUTTLE.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Navigation
Issued 31 March 1995 Resolved
MAKE REPAIRS AND PROVE SATISFACTORY OPERATION OF VESSELS REMOTE RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 10 April 1995
Resolved 14 April 1995
Fire Fighting
Issued 31 March 1995 Resolved
MAKE PERMANENT REPAIRS TO WASTED SECTION OF VESSELS FIRE MAIN IN WAY OF THEDISCHARGE SIDE OF THE ELECTRIC FIRE PUMP.
Condition: Unknown
Due 10 April 1995
Resolved 14 April 1995
Accommodation/Occupational Safety
Issued 19 April 1994 Resolved
MAKE PERMANENT REPAIRS TO VARIOUS FRACTURED SAFETY GLASS WINDOWS, LOCATED VARIOUS LOCATIONS ON VESSEL.
Condition: Unknown
Due 19 April 1994
Resolved 19 April 1994
Engineering
Issued 19 April 1994 Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE PORT DIESEL FUEL TANK LEVEL INDICATOR.
Condition: Unknown
Due 19 April 1994
Resolved 19 April 1994
Lifesaving
Issued 19 April 1994 Resolved
CONDUCT EMERGENCY SAFETY DRILLS IN THE PRESENCE OF A U.S. COAST GUARD MARINE INSPECTOR. DRILL'S TO INCLUDE BUT NOT LIMITED TO: MAN OVERBOARD, FIRE, AND FLOODING.
Condition: Unknown
Due 19 April 1994
Resolved 19 April 1994
Engineering
Issued 19 April 1994 Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE PORT MAIN ENGINE TACHOMETER.
Condition: Unknown
Due 19 April 1994
Resolved 19 April 1994
Accommodation/Occupational Safety
Issued 20 May 1993 Resolved
PUMP SEWAGE AND FLUSH WITH FRESH WATER, NO.4 VOID, AND MAKE PERMANENT REPAIRS TO THE PORT AND STBD OVERBOARD SEWAGE DISCHARGE LINE AS PER ORGINALCOAST GUARD APPROVED CONSTRUCTION DRAWINGS.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Construction/Loadline
Issued 20 May 1993 Resolved
MAKE PERMANENT REPAIRS TO THE DAMAGED MAIN DECK SIDE SHELL IN WAY OF THE PORT SIDE, BETWEEN VOID NO.2 AND NO.3, AND APPROX TWO FEET UP AND DOWN FROMTHE MAIN DECK.
Condition: Unknown
Due 20 May 1993
Resolved 20 May 1993
Construction/Loadline
Issued 20 May 1993 Resolved
INSTALL PERMANENT (WELD OR PUNCH OUTLINE) DRAFT MARKS ON EACH SIDE AT EACH END OF VESSEL OR INSTALL PERMANENT (WELD OR PUNCH OUTLINE) LOADING MARKS FWD, MIDSHIPS, AND AFT. REF 46CFR185.30-3.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Engineering
Issued 20 May 1993 Resolved
REPLACE THE STRUT AND SHAFT LOG CUTLESS BEARINGS, PORT AND STBD SIDE WITH BUILDERS TYPE SPECIFIED. REF BUILDERS DRAWING 561-115.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Construction/Loadline
Issued 20 May 1993 Resolved
REPAIR BROKEN WELDS IN WAY OF THE PORT SIDE LONGITUDINAL, "A" STRAKE, BETWEEN THE STERN AND FIRST FRAME FWD.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Construction/Loadline
Issued 20 May 1993 Resolved
CROP, INSERT, AND MAKE SATISFACTORY REPAIRS TO THE FRACTURED BOTTOM PLATE _x001C_IN WAY THE STBD SIDE, STEERING COMPARTMENT, "A" STRAKE, BETWEEN THE STERN AND FIRST FRAME FWD.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Engineering
Issued 20 May 1993 Resolved
REPLACE OR REPAIR THE WORN BEARING SURFACE ON THE PORT AND STBD PROPELLER SHAFT TO MANUFACTURES SPECIFICATION. REF BUILDERS DRAWING 561-115.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Construction/Loadline
Issued 9 March 1993 Resolved
Plate stbd side aft compt and install properly inserted plate.
Condition: Unknown
Due 9 March 1993
Resolved 9 March 1993
Construction/Loadline
Issued 9 March 1993 Resolved
Remove oil from E.R. bilges.
Condition: Unknown
Due 7 April 1993
Resolved 7 April 1993
Lifesaving
Issued 9 March 1993 Resolved
Permanently mount 1 EPIRB outside wheelhouse so they are float free.
Condition: Unknown
Due 7 April 1993
Resolved 7 April 1993
Engineering
Issued 9 March 1993 Resolved
Repair oil pressure & water temp gauges for port engine.
Condition: Unknown
Due 7 April 1993
Resolved 7 April 1993
Engineering
Issued 9 March 1993 Resolved
Demonstrate proper operation of stbd engine after change-out.
Condition: Unknown
Due 7 April 1993
Resolved 7 April 1993
Electrical
Issued 27 November 1992 Resolved
Rewire lights on 2nd deck starboard side using junction box and proper typecable.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Navigation
Issued 27 November 1992 Resolved
Clean lens for stern light.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Lifesaving
Issued 27 November 1992 Resolved
Remove excess oil & hydraulic fluid from engine compartment.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Construction/Loadline
Issued 17 November 1992 Resolved
REMOVE DOUBLER PLATE IN WAY OF PORT SIDE MID SECTION AND INSTALL PROPERLY INSERTED PLATE.
Condition: Unknown
Due 17 November 1992
Resolved 17 November 1992
Electrical
Issued 8 April 1992 Resolved
repair battery box
Condition: Unknown
Due 8 April 1992
Resolved 25 October 1992
Engineering
Issued 8 April 1992 Resolved
clean aft compartment in way of fuel tanks
Condition: Unknown
Due 8 April 1992
Resolved 25 October 1992
Lifesaving
Issued 8 April 1992 Resolved
repair line on ring buoy
Condition: Unknown
Due 8 April 1992
Resolved 25 October 1992
Construction/Loadline
Issued 8 April 1992 Resolved
Renew four broken glass windows port side, main deck lounge area.
Condition: Unknown
Due 25 June 1992
Resolved 25 October 1992
Electrical
Issued 8 April 1992 Resolved
make permanent repairs to fuel leak on diesel generator.
Condition: Unknown
Due 22 April 1992
Resolved 22 April 1992
Electrical
Issued 8 April 1992 Resolved
make permanent repairs to generator racor fuel filter, repairs to be to thesatisfaction of the attending Coast Guard inspector.
Condition: Unknown
Due 22 April 1992
Resolved 22 April 1992
Navigation
Issued 8 April 1992 Resolved
make permanent repairs to the stabilizer hydraulic system leak at the sightglass. Repairs to be to the satisfaction of the attending Coast Guard inspector.
Condition: Unknown
Due 22 April 1992
Resolved 22 April 1992
Engineering
Issued 8 April 1992 Resolved
Renew port main diesel engine raw water temperature gauge in pilot house. Prove satisfactory operation of this gauge to the cognizant OCMI.
Condition: Unknown
Due 22 April 1992
Resolved 22 April 1992
Accommodation/Occupational Safety
Issued 8 April 1992 Resolved
repair broken weld in the lower course of the forward most rail on the STBDside.
Condition: Unknown
Due 8 April 1992
Resolved 25 October 1992
Accommodation/Occupational Safety
Issued 8 April 1992 Resolved
Submit plans for the installation of the auxiliary heating system, including a bill of materials and specifications. The heater is not to be used until all the plans have been submitted and approved.
Condition: Unknown
Due 8 April 1992
Resolved 8 April 1992
Lifesaving
Issued 8 April 1992 Resolved
Attach water lights to buoyant apparatus.
Condition: Unknown
Due 8 April 1992
Resolved 25 October 1992
Deck/Cargo
Issued 27 March 1991 Resolved
SECURE ANCHOR.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Electrical
Issued 27 March 1991 Resolved
PROVE PROPER OPERATION OF INSTALLED EMERGENCY LIGHTING SYSTEM.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Lifesaving
Issued 27 March 1991 Resolved
RENEW PADDLES ON ALL (8) LIFEFLOATS AND REMARK VESSEL NAME ON PADDLES AND LIFEFLOATS AS REQUIRED.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Navigation
Issued 3 August 1990 Resolved
MAKE PERM REPAIRS TO GROUNDS IN NAV LIGHT SYSTEM. TEMP REPAIRS OF REROUTEDWIRING AUTHORIZED FOR TWO WEEKS.
Condition: Unknown
Due 3 August 1990
Resolved 3 August 1990
Engineering
Issued 2 April 1990 Resolved
ADJUST STARBOARD PACKING GLAND TO REDUCE WATER FLOW.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Lifesaving
Issued 2 April 1990 Resolved
PROVIDE ONE ADDITIONAL WATERLIGHT FOR LIFEFLOAT.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Fire Fighting
Issued 2 April 1990 Resolved
HAVE ALL FIRE EXTINGUISHERS SERVICED.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Construction/Loadline
Issued 2 April 1990 Resolved
PROVIDE FOREPEAK HATCH COVER WITH CAPTIVE DEVICE.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Lifesaving
Issued 2 April 1990 Resolved
ATTACH ALL LIFEFLOATS TO PAINTERS.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Lifesaving
Issued 2 April 1990 Resolved
PROVIDE 6 RED AND 6 ORANGE HAND HELD FLARES.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Lifesaving
Issued 2 April 1990 Resolved
PROVIDE PROPER PENDANTS FOR ALL LIFE FLOATS.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Navigation
Issued 12 April 1989 Resolved
LABEL EPIRBS WITH VESSEL NAME.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Navigation
Issued 12 April 1989 Resolved
REPAIR RUDDER ANGLE INDICATOR LINKAGE.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Engineering
Issued 12 April 1989 Resolved
REMOVE FURNITURE FROM IN WAY OF EMERGENCY FUEL SHUTOFFS IN SALON AND PROVIDE MEANS OF ENSURING THAT NO GEAR IS STOWED IN WAY OF FUEL VALVE HANDLES NEAR TANKS.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Fire Fighting
Issued 12 April 1989 Resolved
PROVIDE SPANNER WRENCHES AT FIRE STATIONS. SECURE LEAK IN FIRE HYDRANT VALVE FORWARD.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Documentation
Issued 12 April 1989 Resolved
POST STABILITY LETTER IN WHEELHOUSE.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Lifesaving
Issued 12 April 1989 Resolved
PROVIDE 2 ADDITIONAL LIGHTS FOR ADULT LIFE PRESERVERS.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Deck/Cargo
Issued 12 April 1989 Resolved
PROVIDE ADDITIONAL ANCHOR LINE TO EQUAL 300 FEET.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Lifesaving
Issued 12 April 1989 Resolved
LABEL ALL BUOYANT APPARATUS WITH PERSONS CAPACITY IN 1-1/2 INCH LETTERS. PROVIDE STOWAGE AND PAINTER ARRANGEMENT WITH COMPLIES WITH 46CFR180.20. RE-NEW ALL BUOYANT PENDANTS.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Lifesaving
Issued 12 April 1989 Resolved
PROVIDE NEW BATTERY FOR ONE RING BUOY WATER LIGHT.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Fire Fighting
Issued 12 April 1989 Resolved
PROVIDE ONE ADDITIONAL B-II FIRE EXTINGUISHER IN GALLEY.
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Documentation
Issued 15 November 1988 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 15 November 1988
Resolved 15 November 1988

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.