← All vessels
FREEDOM
Passenger (Inspected) · Passenger Ship class · Built 1980s · USCG Northeast District (CGD-NE) · Other hulls named FREEDOM
FREEDOM is a 1988 passenger vessel (inspected). The Coast Guard has recorded 76 inspections since 1988, most recently in May 2025, along with 176 deficiencies.
Records from 1988 to 2025. Most recent: inspection, 14 May 2025.
- Built
- 1988
- Last inspected
- 14 May 2025
- Documentation
- Expired · documentation file of 10 September 2026
- Deficiencies
- 176 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
928582
WDM9441
301660
Flag
UNITED STATES
368252680
Maury page id
psix-301660
Inspections, by type
…with no type recorded15
Years with a record
31 calendar years (1988–2025)
The 76 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)73.5 ft × 21.0 ft × 6.0 ft
Registered tonnagegross 64 / net 43
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSKIPPERLINER INDUSTRIES · LACROSS, WI, UNITED STATES · built 1988
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMONTAUK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it64 - Regulatory (Subpart C or D), Gross Ton
43 - Regulatory (Subpart C or D), Net Ton
43 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDM9441MMSI 368252680 · active · compulsorily equipped · granted 26 April 2022, expires 26 April 2032
WDI4337MMSI 367697640 · expired · compulsorily equipped · granted 17 October 2015, cancelled 7 March 2026
WDC9884MMSI 367107930 · expired · voluntarily equipped · granted 19 April 2006, cancelled 25 June 2016 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 76
14 May 2025
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8133190
31 March 2025
Administrative Inspection · Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8100781
13 September 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8001855
29 August 2023
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7780975
17 May 2023
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7704024
17 April 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7670178
17 February 2023
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7638302
9 June 2022
Internal Structural Exam · Re-Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7469782
9 August 2021
Deficiency Check · Examination of Repairs · Annual Inspection · Administrative Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 7281234
14 June 2021
Examination of Repairs · Administrative Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 7246746
8 July 2020
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7005414
7 January 2020
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6884827
24 July 2019
DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6755068
8 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6504414
14 April 2018
Type not recorded
No type recorded · Station Washington DC · USCG East District (CGD-E) · Activity 6391606
10 April 2018
Type not recorded
No type recorded · Station Washington DC · USCG East District (CGD-E) · Activity 6389239
9 April 2018
Type not recorded
No type recorded · Station Washington DC · USCG East District (CGD-E) · Activity 6389308
5 February 2018
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6351080
23 January 2018
Administrative Inspection · COI Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6342091
19 January 2018
Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6340359
3 June 2017
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6229667
20 July 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5947733
8 September 2015
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5730599
5 August 2014
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4937428
26 June 2014
Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4915022
5 June 2012
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4330819
2 August 2011
Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4095717
9 July 2009
Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3528984
19 March 2009
Administrative Inspection
Administrative · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3436403
28 January 2009
Administrative Inspection
Administrative · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3401541
8 May 2008
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3201689
2 May 2008
COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3197278
28 February 2008
Administrative Inspection
Administrative · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3155180
3 May 2006
Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2615387
8 June 2005
Hull Examination · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2383680
4 June 2003
Hull Examination
Physical examination · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 1846863
15 August 1999
Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1381858
25 September 1998
Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 799261
28 April 1998
Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 798643
3 July 1997
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1114595
3 June 1997
COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1108028
26 June 1996
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1090264
26 April 1996
COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1082661
28 September 1995
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 145965
28 September 1995
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 215200
28 September 1995
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 218331
11 April 1995
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 847995
31 March 1995
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 164078
31 March 1995
COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1147957
19 May 1994
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 861270
10 May 1994
Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1168617
19 April 1994
COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 857299
11 April 1994
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1449681
20 May 1993
Hull Examination
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 828263
21 April 1993
COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 832507
9 March 1993
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1148737
2 March 1993
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1149063
11 December 1992
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 827574
27 November 1992
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 827773
17 November 1992
Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1134497
2 November 1992
Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 935430
6 September 1992
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 11794
23 June 1992
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1261235
22 April 1992
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1261577
8 April 1992
COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 948542
7 May 1991
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 914170
27 March 1991
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 997701
27 August 1990
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1216928
3 August 1990
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1223495
19 April 1990
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 903722
2 April 1990
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 981562
5 October 1989
Hull Examination
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1019047
12 April 1989
COI Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1204203
15 November 1988
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 892046
20 May 1988
Initial Certification
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1045023
5 May 1988
Initial Construction-Excluding Oversight · Hull Examination · Plan Review "T" Boat
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1345351
Deficiency record · 176
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 14 May 2025
Resolved
Obtain updated nautical publications
09 - Working and Living Conditions › 092 - Working Conditions › Adequate lighting - mooring arrangements
Issued 14 May 2025
Resolved
Repair anchor light
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 May 2025
Resolved
Provide proof of drug consortium and crew list
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 14 May 2025
Resolved
Obtain aspirin
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 14 May 2025
Resolved
obtain 3 red hand flares
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 14 May 2025
Resolved
Replace worn lifejacket donning placard on upper deck
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 14 May 2025
Resolved
Prove proper operation of fire pump – 60 psi
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2025
Resolved
Label bilge manifold in engine room
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025
Resolved
Remove or fix stbd side engine room battery cable
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025
Resolved
Remove loose wire on bilge suction in engine room
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 May 2025
Resolved
Place guard on port side of main diesel engine
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025
Resolved
Remove dead end wires and twist connector port side main diesel engine, top
09 - Working and Living Conditions › 091 - Living Conditions › Furnishings
Issued 14 May 2025
Resolved
Provide noncombustible waste bins and remove plastic bin
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 14 May 2025
Resolved
Provide engine room ventilation covers
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 13 September 2024
Resolved
Vessel is over the 3 month inspection requirement as per 46 CFR 176.500.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 13 September 2024
Resolved
Prior to operating in passenger service provide master with current MMC.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 13 September 2024
Resolved
Prior to operating in passenger service conduct emergency U/W drills with CG inspectors.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 13 September 2024
Resolved
Prior to operating at night or during periods of reduced visibility repair/replace navigation lighting.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 13 September 2024
Resolved
Renew hydrostatic release on EPIRB.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 February 2023
Resolved
Vsl is required to conduct a credit DD prior to the carriage of passengers. See MISLE activity # 7638302 for details.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021
Resolved
Vessel shall be provided with a satisfactory arrangement for draining any watertight compartment. Port overboard skin valve/flex hose leaking excessively while bilge/fire pump is in operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021
Resolved
All exhaust systems shall be water cooled. Water leaks noted IWO SSDG flexible exhaust cooling/injection hose. Flex hose is not rated for service intended.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 9 August 2021
Resolved
Owner/Operator required to submit vessel inspection fees (Users Fees). Vessels inspection fees have an outstanding balance of $600.00.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021
Resolved
Fire hazards shall be minimized. Multiple hydraulic oil leaks noted IWO port MDE, i.e.: PTO pump, flex hoses, filters.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 9 August 2021
Resolved
Vessel shall be equipped with audible/visual alarms to indicate high water. Existing bilge high water alarm IWO Tank/HVAC void not permanently mounted (bracket wasted).
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 9 August 2021
Resolved
The scope of an annual inspection includeds examination of all accessible parts of the vessels hull. Wastage noted IWO main deck plating @ transom IWO lazarette, port side (overhead). Area to be further examined/repaired at next Internal Structural Examination (ISE).
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 August 2021
Resolved
The scope of an annual inspection includes examination of all accessible parts of the vessels hull & machinery. Wastage noted IWO raw water seachests in engine room (see special note dated 8/15/1999). Further inspection required at next Hull/Drydock inspection.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 9 August 2021
Resolved
The scope of an annual inspection includeds examination of all accessible parts of the vessels hull. Wastage noted IWO main deck @ starboard (fwd) exterior door framing/sill/superstructure. *Attending MI noted signs of previous repairs.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 9 August 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 9 August 2021
Resolved
Vessel required to be marked IAW Certificate of Documentation (name/hailing port). Existing hailing port does not match the Certificate of Documentation.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 9 August 2021
Resolved
Vessel required to carry current/up to date marine charts for areas transited. Existing marine charts are outdated.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 9 August 2021
Resolved
Vessel required to be equipped with an operable Class A AIS unit. Existing Class A AIS unit is in an "alarm" status and is not transmitting vessels speed, COG, etc...
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021
Resolved
Vessel required to be equipped with a first aid kit suitable for vessels service. Existing first aid kit contained expired items.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 August 2021
Resolved
Vessel required to be equipped with a navigational bell of at least 11.8" in diameter. Vessel is not equipped with a navigational bell.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 9 August 2021
Resolved
Installed toilets are required to be equipped with operating instructions. Existing (installed) toilets are not equipped with operating instructions.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021
Resolved
Vessels emergency escapes shall be marked. Existing emergency escape doors are missing required markings.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021
Resolved
Vessels watertight hatches are required to be marked. Existing watertight hatches are missing required markings.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021
Resolved
All wiring and cables shall be suitable for marine service. Attending MI noted multiple (non-marine) portable extension cords in use IWO bridge (port side console), main deck bar area & fwd. storeroom/void.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 August 2021
Resolved
PFD stowage locations shall be marked with size/qty of PFD's. Existing PFD stowage locker IWO upper deck (fwd of operating station) is missing required markings.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021
Resolved
Conductors are required to be equipped with metallic supports. Existing conductors (throughout vessel) are not equipped with metallic supports. Recommend spacing @ 24" intervals.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 August 2021
Resolved
Vessels fixed bilge system required to be equipped with suitable strainers. Existing bilge suction strainer IWO house storeroom/void is damaged (requires repair/replacement).
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 August 2021
Resolved
Vessels electric submersible bilge pumps, if equipped, shall be permanently mounted. Existing electric submersible bilge pumps IWO Tank/HVAC void & Engine Room are not permanently mounted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021
Resolved
Diesel engines shall be water cooled. Flexible hose between vessels sea chest and raw water strainer for starboard MDE & SSDG were found deteriorated requiring replacement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021
Resolved
Fire hazards on board vessels are to be minimized. Oil/oily residue noted IWO SSDG windings/fan.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021
Resolved
Penetrations in watertight bulkheads shall be made watertight. Attending MI noted open penetrations for fwd engine room watertight bulkhead IWO cableway(s).
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 August 2021
Resolved
Conductors shall be constructed of stranded copper & rated for marine service. Existing conductors for 12V start batteries IWO engine room for SSDG are improper.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 August 2021
Resolved
Vessel shall be equipped with a fixed fire pump. Existing cross connect valve for fire/bilge system requires servicing to ensure proper operation.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 August 2021
Resolved
Vessel required to be equipped with emergency fuel shut-off valves. Existing emergency fuel shut-off valves are missing required operating instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 July 2020
Resolved
A vessel of more than 65ft must have 3 lifebuoys. Upper deck lifebuoy found in unsatisfactory condition.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 July 2020
Resolved
Fuel lines must be accessible, protected from mechanical damage. Stbd Fuel oil line found severely chaffed.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 7 January 2020
Resolved
Provide this office with a Repair Proposal to address wastage of metal in the Sewage Tank Compartment (i.e. Hold #3). Wastage was located on the starboard / aft portion of the compartment in an 8’ x 8’ section primarily located underneath and just aft of the sewage tank. Prior to the start of repairs, you must provide this office with a copy of the Ultrasonic Testing (UT) Report.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 January 2020
Resolved
Provide this office with a Repair Proposal to address wastage of metal on the stanchion located on the starboard / aft section of the vessel’s bow.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 January 2020
Resolved
Provide this office with a Repair Proposal to address wastage of metal on the ductwork on the HVAC Intake System. The affected ductwork is located on the portside of the vessel in the Sewage Tank Compartment (i.e. Hold #3).
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 7 January 2020
Resolved
Provide this office with a Repair Proposal to address wastage of metal in the Supply Storage Compartment. Wastage was located on the starboard / aft portion of the compartment IWO the overhead. The affected members include the corner structural bracing members.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 July 2019
Resolved
Provide proof of proper operation of the mechanical bilge pump installed on the starboard main diesel engine. This Power Take-Off (PTO) pump is designed to work in conjunction with the starboard main engine to provide de-watering capabilities in the event of loss of electrical power.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 8 August 2018
Resolved
Vsl is broadcasting: No static draft information and no dimension information (AIS Antenna Position ABCD values equals 0).
Construction/Loadline › Hull › Bottom Plating
Issued 19 January 2018
Resolved
Provide hull gauge report for the following areas: IVO leak in keel, belt line along bottom of hull, belt line along wind/water line.
Construction/Loadline › Hull › Bottom Plating
Issued 19 January 2018
Resolved
Provide written repair proposal to address leak along keel, and any areas of concern as a result of the gauging, for approval prior to beginning any repair work.
Construction/Loadline › Hull › Bottom Plating
Issued 19 January 2018
Resolved
Make repairs available for inspection and final repair for NDT.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 2 August 2017
Resolved
Floating waterlight battery was expired. Replace with non-expired battery.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 2 August 2017
Resolved
Emergency Instructions were not ship specific. Update em. instructions to be ship specific.
Engineering › Bilge Water Management System › Strainer
Issued 2 August 2017
Resolved
Repair/replace bilge suction strainer in storage compartment.
Stability › Watertight Integrity › General
Issued 2 August 2017
Resolved
Blank hydraulic hose penetrating a watertight bulkhead that is no longer connected to fin stabilizer system.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 8 September 2015
Resolved
Cover open area of Bridge console which is a shock hazard.
Electrical › Lighting (service) › Lighting Fixture
Issued 8 September 2015
Resolved
Repair/replace light in overhead of bridge. Cover is missing.
Documentation › Markings/Placards › Capacity Marking
Issued 8 September 2015
Resolved
Mark upper deck with persons allowed on upper deck.
Engineering › Bilge Water Management System › Not Operational
Issued 8 September 2015
Resolved
Repair/replace engine room high water alarm.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 8 September 2015
Resolved
Provide guards on front of MDEs.
Electrical › Electrical Distribution System (service) › Cable
Issued 8 September 2015
Resolved
Ensure all wire and hose runs have steel wire ties every 24 inches in engine room.
Fire Fighting › Fire Hydrants › Location/Position
Issued 8 September 2015
Resolved
Ensure both fire stations are properly marked and have hose, nozzel and wrench inplace.
Fire Fighting › Fire Hoses › Material
Issued 8 September 2015
Resolved
Replace both fire hoses with U/L approved hoses50' X 1.5".
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 8 September 2015
Resolved
Replace missing exhaust protection wrap to wet exhaust intake pipe.
Engineering › Bilge Water Management System › Not Operational
Issued 8 September 2015
Resolved
Ensure bilge pump (Fixted) system instructions are accurate and bilge pump system operates properly.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 August 2014
Resolved
Make vessel ready for and complete annual inspection in presence of CG inspector. 46 CFR 176.502
Lifesaving › Lifefloat › Lifeline
Issued 2 August 2011
Resolved
Properly install life floats.
Engineering › Compressed Air System (control) › Compressor
Issued 2 August 2011
Resolved
Secure air compressor.
Engineering › Thrusters › Piping
Issued 2 August 2011
Resolved
Repair hydraulic leaks in steering gear and bow thruster spaces.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 2 August 2011
Resolved
Repair starboard M/E following overheating.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 August 2011
Resolved
Remove dead end wires from wheelhouse and forepeak,
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 August 2011
Resolved
Properly install electrical wiring behind main deck bar.
Engineering › Bilge Water Management System › Not Operational
Issued 2 August 2011
Resolved
Operationally test bilge pump.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 August 2011
Resolved
Properly secure electrical wiring in engine room. No plastic tie-wraps.
Fire Fighting › Fire Hoses › Condition
Issued 2 August 2011
Resolved
Replace fire hose.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 July 2009
Resolved
electrical wiring to the SB nav light were found not secured to the overhead, causing an entanglement hazard.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 9 July 2009
Resolved
one of the fire extinguishers was not annually serviced.
Fire Fighting › Fire Hoses › Condition
Issued 9 July 2009
Resolved
fire hose from the #2 fire station was found to leak when charged.
Lifesaving › Lifefloat › Netting
Issued 9 July 2009
Resolved
netting of one LF was found with two 12-20 inch by 4-6 inch sections torn.
retro reflective tape was inadequate on all LFs.
painter lines were found connected to attachment loop which has degraded beyond use.
Communications › Radio Communications › EPIRB
Issued 9 July 2009
Resolved
NOAA registry is expired on the EPIRB.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 2 May 2008
Resolved
No report provide for portable fire extinguishers.
Navigation › Piloting/Steering › US Coast Pilot
Issued 2 May 2008
Resolved
Coast pilot not current.
Lifesaving › Lifefloat › Serviceable
Issued 2 May 2008
Resolved
lifefloat webbing loops dry rotted.
Engineering › Bilge Water Management System › Piping
Issued 2 May 2008
Resolved
flex hose section deteriorated.
Electrical › Electric Supply System (service) › Battery Installation
Issued 2 May 2008
Resolved
battery covers not installed.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 3 May 2006
Resolved
Repair starboard engine tachometer.
Stability › Weathertight Integrity › General
Issued 3 May 2006
Resolved
Repair broken windows on main deck
Documentation › Certificates/Documents › Stability Letter
Issued 3 May 2006
Resolved
Post all required documents i.e. garbage management plan, lifejacket, COI, stability letter, etc.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 3 May 2006
Resolved
Label Adult and child lifejacket storage locations.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 3 May 2006
Resolved
Repair/Renew air conditioning salt water cooling strainer mounting bracket.
Navigation › Electronic Positioning › LORAN C Receiver
Issued 3 May 2006
Resolved
Demonstrate proper operation of Loran equipment.
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 May 2006
Resolved
Provide double hose clamps for mde and generator salt water cooling hoses.
Deck/Cargo
Issued 15 August 1999
Resolved
PROVIDE AN ANCHOR FOR THE VESSEL.
Accommodation/Occupational Safety
Issued 3 June 1997
Resolved
MAKE PERMANENT REPAIRS TO THE INTERCOM BETWEEN THE MAIN BAR AND THE PILOT HOUSE.
Accommodation/Occupational Safety
Issued 3 June 1997
Resolved
DETERMINE THE SOURCE OF SEWAGE ODOR/GAS IN THE MSD VOID BY HYDROSTATICALLY TESTING THE SYSTEM. MAKE REPAIRS TO THE SYSTEM TO CORRECT THE BUILD UP OF ODOR/GAS.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 3 June 1997
Resolved
REPAIR/REPLACE ALL FRACTURED WINDOW GLASS THROUGH-OUT THE VESSEL. REPLACEMENT GLASS SHALL COMPLY WITH 46CFR177.1010 (SAFETY GLAZING MATERIALS).
Deck/Cargo
Issued 3 June 1997
Resolved
PROVIDE VESSEL WITH A SATISFACTORY SIZED ANCHOR AND CABLE. ANCHOR WEIGH SHALL BE A MINIMUM OF 130 POUNDS. THE ANCHOR CABLE SHALL HAVE A MINIMUM DIAMETER OF 1 INCH.
Navigation
Issued 3 June 1997
Resolved
RE-BUSH THE WORN RUDDER TILLER ON THE PORT AND STBD RUDDER POST.
Accommodation/Occupational Safety
Issued 3 June 1997
Resolved
MUCK OUT THE FWD PEAK VOID, INSURE LIMBER HOLES ARE OPEN AND WATER FLOWS TOTHE LOWEST POINT OF THE KEEL.
Accommodation/Occupational Safety
Issued 3 June 1997
Resolved
REPAIR THE PUMP OUT TRANSFER LINE FROM THE SEWAGE HOLDING TANKS.
Electrical
Issued 3 June 1997
Resolved
INSTALL THE RUDDER ANGLE INDICATOR SPLICE IN AN ELECTRICAL BOX. SECURE WIRING WITH CLAMPS.
Construction/Loadline
Issued 3 June 1997
Resolved
INSTALL PERMANENT DRAFT OR LOADING MARKS FWD AND AFT. REF 46CFR185.602.
Engineering
Issued 3 June 1997
Resolved
DETERMINE PROBLEM AND MAKE PERMANENT REPAIRS TO THE FOLLOWING ENGINE GAUGE(S): (1) STARBOARD FUEL OIL TANK SENDER, (2) STARBOARD ENGINE MARINE GEAR PRESSURE.
Lifesaving
Issued 3 June 1997
Resolved
INSTALL CLIPS/SNAP HOOKS IN WAY OF THE CONNECTION BETWEEN WATERLIGHTS AND RING BUOYS.
Construction/Loadline › Penetrations › Pipe Flange
Issued 3 June 1997
Resolved
PROVIDE VESSEL WITH HIGH LEVEL BILGE ALARMS AS REQUIRED IN 46CFR185.530.
Construction/Loadline
Issued 3 June 1997
Resolved
MAKE SATISFACTORY REPAIRS OR REPLACE THE VENT BOX IN WAY OF THE FWD PEAK VOID.
Construction/Loadline
Issued 26 June 1996
Resolved
THE BOW THRUSTER COMPARTMENT SHALL BE INSPECTED PRIOR TO EVERY DEPLOYMENT TO ENSURE SPACE IS DRY AND THE MASTIC REPAIRS ARE HOLDING. IF WATER IS FOUND IN THE SPACE THE DUTY USCG INSPECTOR SHALL BE IMMEDIATELY NOTIFIED. PERMANENT REPAIRS SHALL BE MADE AT NEXT SCHEDULED DRYDOCKING.
Engineering
Issued 26 April 1996
Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY FLANGE IN WAY OF THE BOW THRUSTER TUNNEL. COMPARTMENT SHALL BE INSPECTED AND PUMPED OUT PRIOR TO GETTING THEVESSEL UNDERWAY.
Electrical
Issued 26 April 1996
Resolved
INSTALL COVER ON FLUORESCENT LIGHT FIXTURE IN GALLEY OR REPLACE WITH TYPE THAT MEETS UNDERWRITERS LABORATORIES 595.
Navigation
Issued 26 April 1996
Resolved
PROVE SATISFACTORY OPERATION OF VESSEL'S RUDDER ANGLE INDICATOR.
Navigation
Issued 26 April 1996
Resolved
VESSEL IS RESTRICTED TO OPERATE INSIDE THE PROTECTED WATERS OF THE MILWAUKEE HARBOR UNTIL A OPERABLE MARINE COMPASS IS INSTALLED.
Accommodation/Occupational Safety
Issued 26 April 1996
Resolved
REPLACE BROKEN GLASS LOCATED ON THE STBD SIDE OF THE PILOT HOUSE.
Construction/Loadline
Issued 26 April 1996
Resolved
INSTALL A PERMANENT MEANS TO OPEN AND CLOSE THE BOW THRUSTER COMPARTMENT SCUTTLE.
Navigation
Issued 31 March 1995
Resolved
MAKE REPAIRS AND PROVE SATISFACTORY OPERATION OF VESSELS REMOTE RUDDER ANGLE INDICATOR.
Fire Fighting
Issued 31 March 1995
Resolved
MAKE PERMANENT REPAIRS TO WASTED SECTION OF VESSELS FIRE MAIN IN WAY OF THEDISCHARGE SIDE OF THE ELECTRIC FIRE PUMP.
Accommodation/Occupational Safety
Issued 19 April 1994
Resolved
MAKE PERMANENT REPAIRS TO VARIOUS FRACTURED SAFETY GLASS WINDOWS, LOCATED VARIOUS LOCATIONS ON VESSEL.
Engineering
Issued 19 April 1994
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE PORT DIESEL FUEL TANK LEVEL INDICATOR.
Lifesaving
Issued 19 April 1994
Resolved
CONDUCT EMERGENCY SAFETY DRILLS IN THE PRESENCE OF A U.S. COAST GUARD MARINE INSPECTOR. DRILL'S TO INCLUDE BUT NOT LIMITED TO: MAN OVERBOARD, FIRE, AND FLOODING.
Engineering
Issued 19 April 1994
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE PORT MAIN ENGINE TACHOMETER.
Accommodation/Occupational Safety
Issued 20 May 1993
Resolved
PUMP SEWAGE AND FLUSH WITH FRESH WATER, NO.4 VOID, AND MAKE PERMANENT REPAIRS TO THE PORT AND STBD OVERBOARD SEWAGE DISCHARGE LINE AS PER ORGINALCOAST GUARD APPROVED CONSTRUCTION DRAWINGS.
Construction/Loadline
Issued 20 May 1993
Resolved
MAKE PERMANENT REPAIRS TO THE DAMAGED MAIN DECK SIDE SHELL IN WAY OF THE PORT SIDE, BETWEEN VOID NO.2 AND NO.3, AND APPROX TWO FEET UP AND DOWN FROMTHE MAIN DECK.
Construction/Loadline
Issued 20 May 1993
Resolved
INSTALL PERMANENT (WELD OR PUNCH OUTLINE) DRAFT MARKS ON EACH SIDE AT EACH END OF VESSEL OR INSTALL PERMANENT (WELD OR PUNCH OUTLINE) LOADING MARKS FWD, MIDSHIPS, AND AFT. REF 46CFR185.30-3.
Engineering
Issued 20 May 1993
Resolved
REPLACE THE STRUT AND SHAFT LOG CUTLESS BEARINGS, PORT AND STBD SIDE WITH BUILDERS TYPE SPECIFIED. REF BUILDERS DRAWING 561-115.
Construction/Loadline
Issued 20 May 1993
Resolved
REPAIR BROKEN WELDS IN WAY OF THE PORT SIDE LONGITUDINAL, "A" STRAKE, BETWEEN THE STERN AND FIRST FRAME FWD.
Construction/Loadline
Issued 20 May 1993
Resolved
CROP, INSERT, AND MAKE SATISFACTORY REPAIRS TO THE FRACTURED BOTTOM PLATE _x001C_IN WAY THE STBD SIDE, STEERING COMPARTMENT, "A" STRAKE, BETWEEN THE STERN AND FIRST FRAME FWD.
Engineering
Issued 20 May 1993
Resolved
REPLACE OR REPAIR THE WORN BEARING SURFACE ON THE PORT AND STBD PROPELLER SHAFT TO MANUFACTURES SPECIFICATION. REF BUILDERS DRAWING 561-115.
Construction/Loadline
Issued 9 March 1993
Resolved
Plate stbd side aft compt and install properly inserted plate.
Construction/Loadline
Issued 9 March 1993
Resolved
Remove oil from E.R. bilges.
Lifesaving
Issued 9 March 1993
Resolved
Permanently mount 1 EPIRB outside wheelhouse so they are float free.
Engineering
Issued 9 March 1993
Resolved
Repair oil pressure & water temp gauges for port engine.
Engineering
Issued 9 March 1993
Resolved
Demonstrate proper operation of stbd engine after change-out.
Electrical
Issued 27 November 1992
Resolved
Rewire lights on 2nd deck starboard side using junction box and proper typecable.
Navigation
Issued 27 November 1992
Resolved
Clean lens for stern light.
Lifesaving
Issued 27 November 1992
Resolved
Remove excess oil & hydraulic fluid from engine compartment.
Construction/Loadline
Issued 17 November 1992
Resolved
REMOVE DOUBLER PLATE IN WAY OF PORT SIDE MID SECTION AND INSTALL PROPERLY INSERTED PLATE.
Electrical
Issued 8 April 1992
Resolved
repair battery box
Engineering
Issued 8 April 1992
Resolved
clean aft compartment in way of fuel tanks
Lifesaving
Issued 8 April 1992
Resolved
repair line on ring buoy
Construction/Loadline
Issued 8 April 1992
Resolved
Renew four broken glass windows port side, main deck lounge area.
Electrical
Issued 8 April 1992
Resolved
make permanent repairs to fuel leak on diesel generator.
Electrical
Issued 8 April 1992
Resolved
make permanent repairs to generator racor fuel filter, repairs to be to thesatisfaction of the attending Coast Guard inspector.
Navigation
Issued 8 April 1992
Resolved
make permanent repairs to the stabilizer hydraulic system leak at the sightglass. Repairs to be to the satisfaction of the attending Coast Guard inspector.
Engineering
Issued 8 April 1992
Resolved
Renew port main diesel engine raw water temperature gauge in pilot house. Prove satisfactory operation of this gauge to the cognizant OCMI.
Accommodation/Occupational Safety
Issued 8 April 1992
Resolved
repair broken weld in the lower course of the forward most rail on the STBDside.
Accommodation/Occupational Safety
Issued 8 April 1992
Resolved
Submit plans for the installation of the auxiliary heating system, including a bill of materials and specifications. The heater is not to be used until all the plans have been submitted and approved.
Lifesaving
Issued 8 April 1992
Resolved
Attach water lights to buoyant apparatus.
Deck/Cargo
Issued 27 March 1991
Resolved
SECURE ANCHOR.
Electrical
Issued 27 March 1991
Resolved
PROVE PROPER OPERATION OF INSTALLED EMERGENCY LIGHTING SYSTEM.
Lifesaving
Issued 27 March 1991
Resolved
RENEW PADDLES ON ALL (8) LIFEFLOATS AND REMARK VESSEL NAME ON PADDLES AND LIFEFLOATS AS REQUIRED.
Navigation
Issued 3 August 1990
Resolved
MAKE PERM REPAIRS TO GROUNDS IN NAV LIGHT SYSTEM. TEMP REPAIRS OF REROUTEDWIRING AUTHORIZED FOR TWO WEEKS.
Engineering
Issued 2 April 1990
Resolved
ADJUST STARBOARD PACKING GLAND TO REDUCE WATER FLOW.
Lifesaving
Issued 2 April 1990
Resolved
PROVIDE ONE ADDITIONAL WATERLIGHT FOR LIFEFLOAT.
Fire Fighting
Issued 2 April 1990
Resolved
HAVE ALL FIRE EXTINGUISHERS SERVICED.
Construction/Loadline
Issued 2 April 1990
Resolved
PROVIDE FOREPEAK HATCH COVER WITH CAPTIVE DEVICE.
Lifesaving
Issued 2 April 1990
Resolved
ATTACH ALL LIFEFLOATS TO PAINTERS.
Lifesaving
Issued 2 April 1990
Resolved
PROVIDE 6 RED AND 6 ORANGE HAND HELD FLARES.
Lifesaving
Issued 2 April 1990
Resolved
PROVIDE PROPER PENDANTS FOR ALL LIFE FLOATS.
Navigation
Issued 12 April 1989
Resolved
LABEL EPIRBS WITH VESSEL NAME.
Navigation
Issued 12 April 1989
Resolved
REPAIR RUDDER ANGLE INDICATOR LINKAGE.
Engineering
Issued 12 April 1989
Resolved
REMOVE FURNITURE FROM IN WAY OF EMERGENCY FUEL SHUTOFFS IN SALON AND PROVIDE MEANS OF ENSURING THAT NO GEAR IS STOWED IN WAY OF FUEL VALVE HANDLES NEAR TANKS.
Fire Fighting
Issued 12 April 1989
Resolved
PROVIDE SPANNER WRENCHES AT FIRE STATIONS. SECURE LEAK IN FIRE HYDRANT VALVE FORWARD.
Documentation
Issued 12 April 1989
Resolved
POST STABILITY LETTER IN WHEELHOUSE.
Lifesaving
Issued 12 April 1989
Resolved
PROVIDE 2 ADDITIONAL LIGHTS FOR ADULT LIFE PRESERVERS.
Deck/Cargo
Issued 12 April 1989
Resolved
PROVIDE ADDITIONAL ANCHOR LINE TO EQUAL 300 FEET.
Lifesaving
Issued 12 April 1989
Resolved
LABEL ALL BUOYANT APPARATUS WITH PERSONS CAPACITY IN 1-1/2 INCH LETTERS. PROVIDE STOWAGE AND PAINTER ARRANGEMENT WITH COMPLIES WITH 46CFR180.20. RE-NEW ALL BUOYANT PENDANTS.
Lifesaving
Issued 12 April 1989
Resolved
PROVIDE NEW BATTERY FOR ONE RING BUOY WATER LIGHT.
Fire Fighting
Issued 12 April 1989
Resolved
PROVIDE ONE ADDITIONAL B-II FIRE EXTINGUISHER IN GALLEY.
Documentation
Issued 15 November 1988
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.