Records from 2017 to 2026. Most recent: inspection, 1 April 2026.
Inspection history · 29
1 April 2026
Examination of Repairs · Vessel Attendance · Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8340668
31 March 2026
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8340673
5 June 2025
Damage Survey · Deficiency Check · In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 8152885
20 May 2025
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 8140263
7 May 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 8129264
28 January 2025
Hull Examination · Internal Structural Exam · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8071215
14 August 2024
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7981299
27 March 2024
Administrative Inspection · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7883630
30 August 2023
Internal Structural Exam · Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7780713
9 May 2023
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7685410
23 January 2023
Plan Review "T" Boat · Construction Oversight
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7659429
10 January 2023
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7620266
6 July 2022
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7498922
27 April 2022
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7439591
20 September 2021
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7316713
8 June 2021
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7221051
18 December 2020
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7113715
10 September 2020
Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7055546
2 August 2020
Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7023347
29 May 2020
Administrative Inspection · In-Service Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6965590
24 October 2019
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6842353
15 October 2019
Examination of Repairs · Administrative Inspection · Plan Review "T" Boat
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6836694
19 September 2019
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6821761
13 September 2019
In-Service Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6813110
5 July 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6745316
28 June 2019
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6732539
26 June 2019
COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6725649
7 November 2018
Deadweight Survey · Construction Oversight
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6690783
21 December 2017
Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6328140
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 June 2025
Resolved
Repairs or alterations to the hull that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] hull plate damaged along port quarter above waterline. Provide written repair plan and make repairs to the satisfaction of an attending Marine Inspector.
Call out Marine Inspector for approval of the following repair checkpoints: Cut-out of damaged plate. Fit-up and edge preparation of insert. Final visual inspection and non destructive testing of final weld.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2025
Resolution: Vessel made satisfactory crop and renew repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 May 2025
Resolved
Exhaust gas must not leak from the piping or any connections. Identified aft port engine was leaking exhaust at engine/exhaust junction. Repair leak to satisfaction of attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 May 2025
Resolution: Vessel replaced gasket in exhaust; all sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 May 2025
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. Identified boiler vent could not be secured fully. Make closure device capable of fully closing.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 May 2025
Resolution: Vessel installed new latch for vent closure; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2025
Resolved
A bilge suction must be fitted with a suitable strainer. Identified bilge suction in starboard steering compartment was missing strainer. Install strainer.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 May 2025
Resolution: Vessel replaced missing strainer; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 28 January 2025
Resolved
Remove all sea valves within 6 inches of the deepest load waterline for inspection.
Action required: 705 - Other - as specified
Resolved 30 January 2025
Resolution: Sea valves were removed for inspection; all sat.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 27 March 2024
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. The currently posted COD was expired. 46 CFR 67.313
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2024
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 27 March 2024
Resolved
The cognizant Officer in Charge, Marine Inspection (OCMI) may require a vessel to carry specialized or additional lifesaving equipment if the vessel is operated in Arctic, Antarctic, or other severe conditions not covered under this part. Vessel did not have 100% survival craft onboard for total persons allowed onboard. IBA's were serviced and sent to Ketchikan and not Sitka. 46 CFR 180.25(b)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2024
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 March 2024
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station: An audible alarm that sounds upon discharge. Audible alarm was inoperable when tested. 46 CFR 181.420(b)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2024
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 27 March 2024
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station: An audible alarm that sounds upon discharge. Audible alarm was inoperable when tested. 46 CFR 181.420(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 March 2024
Resolved
Each floating waterlight must be approved in accordance with § 161.010 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.110. Ring life buoy light locking swivel O ring was found broken. 46 CFR 180.70(d)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2024
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 30 August 2023
Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems within the protected space. Identified starboard engine room ventilation louvre did not close during fire boy test. Demonstrate proper operation of louvre during fire boy test.
46CFR181.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 August 2023
Resolved
Where rigid nonmetallic material is permitted in piping systems, protective coverings or shields shall be installed to satisfaction of OCMI. Identified unsupported hydraulic line hanging within ladder well of aft port engine room. Identified hydraulic line chaffing on inboard jet within starboard jet room. Provide support for hanging hydraulic line and provide chaffing gear/repair hydraulic line within starboard jet room.
Old 46CFR182.40-1(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 September 2023
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 30 August 2023
Resolved
Each ship transporting more than six passengers for hire equipped with a radiotelephone station must carry a radio operator who must hold a marine radio operator permit. Identified Master did not have a copy of marine radio operator permit.
47CFR80.159
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 August 2023
Resolved
The discharge end of vent pipes shall be fitted with
removable flame screens of at least 30x30 mesh. Found no
flame screen on boiler tank vent. Install flame screen.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 August 2023
Resolved
Remote fuel shutoff stations must be marked in clearly
legible letters at least 1 inch indicating purpose of the valve and direction of operation. Identified boiler fuel shutoff was not marked. Install markings.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 30 August 2023
Resolved
Each watertight hatch exposed to the weather must be watertight. Identified both forepeak spaces forward of the collision bulkhead were found with standing water in the spaces. Renew the gasket material on hatch covers and conduct hose test to demonstrate watertight hatches.
Old 46CFR171.124
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 September 2023
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 9 May 2023
Resolved
Fire pump non operational due to non operating STBD Main Engine.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 May 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 July 2022
Resolved
For fixed-gas fire extinguishing systems, the owner must provide satisfactory evidence of the required servicing to the marine inspector. The fixed system servicing tags in the port/stbd engine room and the generator room were all expired as of March 2022. Have the fixed fire system serviced by a qualified servicing technician and provide documentation to the attending MI.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 April 2022
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load. The port main engine experienced a small electrical fire, compromising the sensors and control wires. Prior to carrying passengers, complete permanent repairs and conduct sea trials with a marine inspector to demonstrate proper operation of the port main engine.
46 CFR 182.200(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2022
Resolution: Witnessed repair approved by the manufacturer and conducted sea trials.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 June 2021
Resolved
15 cracked welds were found in vessel. Gouge and reweld cracks as follows. 9 in #1 Port void, 4 in #1 STBD void, 2 in #2 Port void.
Action required: 705 - Other - as specified
Resolved 16 June 2021
Resolution: Cracks were found satisfactorily repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 September 2020
Resolved
Unable to prove proper bilge suction. Prove proper bilge suction in all bilge spaces.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 September 2020
Resolved 30 September 2020
Resolution: Witnessed proper bilge suction from both port and starboard forepeaks.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 10 September 2020
Resolved
Starboard Engine Room aft ventilation fire damper is inoperative. Prove proper operation of damper to include automatic closure when activate by fixed fire fighting system.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 September 2020
Resolved 30 September 2020
Resolution: Witnessed ventilation shut-down on enginroom ventilation system.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 10 September 2020
Resolved
6 person IBA stowed on main cabin roof is marked to be stowed no greater than 6 meters above the water. Current stowage is more than 7 meters above the water. Vessel restricted from carriage more than 150 total persons until IBA is properly stowed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2020
Resolved 18 December 2020
Resolution: new IBA has been installed
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 September 2020
Resolved
Starboard aft MDE turbo missing lagging. Replace missing lagging.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2020
Resolved 30 September 2020
Resolution: Lagging properly installed.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 10 September 2020
Resolved
30x30 mesh flame screen missing on starboard fuel vent. Replace flame screen.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2020
Resolved 30 September 2020
Resolution: Flame screen properly installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 September 2020
Resolved
Starboard forepeak bilge strainer missing. Provide bilge foot for bilge piping in starboard forepeak.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2020
Resolved 30 September 2020
Resolution: Strainer installed.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 10 September 2020
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2020
Resolved 18 December 2020
Resolution: Captian has rcvd his permit
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 September 2020
Resolved
Port and Starboard fuel tanks are equipped with plastic fuel level indicators. Provide means of measuring fuel level that meets 46CFR182.440(a)(7)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2020
Resolved 30 September 2020
Resolution: Plastic fuel gauges removed and valves capped. Vessel to take soundings to determine fuel levels.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 August 2020
Resolved
Prove proper operation of generator prior to carrying passengers
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 August 2020
Resolved 5 August 2020
Resolution: crew replaced impeller, tested all sat
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 May 2020
Resolved
Replace expired battery in life ring buoy light
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 May 2020
Resolved 4 June 2020
Resolution: Vesesl has repalced battery, all sat
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 May 2020
Resolved
Replace all expired alcohol testing strips
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 May 2020
Resolved 4 June 2020
Resolution: Vessel has repalced testing strips, all sat
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 May 2020
Resolved
Remark vessel name on main deck aft life ring and upper deck life ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2020
Resolved 4 June 2020
Resolution: vessel has remarked all rings all sat
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 May 2020
Resolved
Correctly mark all children’s life jacket with the
vessels name.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2020
Resolved 4 June 2020
Resolution: vessel has remarked all childs lifejackets, all sat
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 29 May 2020
Resolved
Provide Drill, lifesaving and fire maintains log for 2020. Log drill at less once every three months.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2020
Resolved 4 June 2020
Resolution: Vessel has provide 2020 drill/mantains log
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 May 2020
Resolved
Adjust aft port aft main engine lagging to protect hot
surfaces.
Action required: 10 - Deficiency Rectified
Resolved 29 May 2020
Resolution: fixed on the spot
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 26 June 2019
Resolved
Provide caps for fuel fill.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2019
Resolution: Fill caps installed.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 26 June 2019
Resolved
Conduct crew drills, demonstrate vessel familiarity and sea trials to an attending USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
Resolution: Witnessed satisfactory drills and sea trials.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 June 2019
Resolved
Install electrical covers on outlets in galley area.
Post stability letter at operating station.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
Resolution: Electrical covers installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 26 June 2019
Resolved
Post COI under glass.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 July 2019
Resolution: Received photos of posted COI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 June 2019
Resolved
Secure microwave ovens in galley to prevent movement in heavy seas.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
Resolution: MIcrowaves properly secured.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 26 June 2019
Resolved
Provide GRT tonnage to National Vessel Documentation Center and have COD updated.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 October 2019
Resolution: GRT added to COD
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 June 2019
Resolved
Provide accurate QFAs to Marine Safety Center for approval for all four MDE.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 October 2019
Resolution: QFA approved by MSC.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 June 2019
Resolved
Remove old official numbers from aft bulkhead and vessels roof.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
Resolution: Old official numbers removed.