Inspection history · 62
8 July 2026
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 8434519
30 June 2025
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 8173868
8 July 2024
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7953779
15 September 2023
In-Service Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7789456
23 May 2023
Deficiency Check · Annual Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7694467
1 November 2022
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7587436
27 April 2022
Drydock Exam · Drydock Extension · Internal Structural Exam
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7439145
8 April 2022
COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7412276
16 June 2021
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7227926
24 June 2020
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6985791
25 June 2019
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6727334
16 May 2018
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6415984
5 April 2017
Internal Structural Exam · MTSA Verification · Drydock Exam · COI Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6104427
26 April 2016
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 5863189
27 May 2015
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 5135738
10 July 2014
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4917562
23 July 2013
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4667859
3 April 2012
MTSA Verification · Drydock Exam · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4277862
1 March 2012
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4254230
11 July 2011
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4077411
2 June 2010
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 3755551
21 April 2009
Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 3437025
27 May 2008
Deficiency Check
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 3219337
12 May 2008
Deficiency Check
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 3204832
14 April 2008
MTSA Verification · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 3181819
3 March 2008
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3157440
16 April 2007
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 2907410
29 November 2006
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 2831027
6 June 2006
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 2673799
19 July 2005
Periodic Inspection
Physical examination · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 2435471
10 May 2005
MTSA Verification
Physical examination · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 2355973
7 May 2004
Deficiency Check · Annual Inspection
Physical examination · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 2070053
26 March 2003
Hull Examination
Physical examination · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 1766922
22 February 2003
Re-Inspection
Physical examination · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 1887905
19 April 2002
COI Inspection
Physical examination · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 1614954
26 June 2001
Deficiency Check · Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1441876
26 May 2000
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 820109
18 April 2000
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1459594
24 April 1999
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1437533
14 April 1998
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1406290
16 March 1998
Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1364627
16 June 1997
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1428803
24 April 1996
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1390292
8 June 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1431540
20 April 1995
Deficiency Check · COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1455260
26 September 1994
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1172657
21 July 1994
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 864572
14 July 1994
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 867710
21 April 1994
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1177587
18 April 1994
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1170452
27 July 1993
Deadweight Survey · Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1157560
21 April 1993
COI Inspection · Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 830407
30 September 1992
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1245734
22 April 1992
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1265953
31 July 1991
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 937917
14 June 1991
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1331439
3 May 1991
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 910658
3 May 1991
Excursion Permit
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1231333
4 August 1990
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 910268
24 July 1990
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 919339
24 October 1989
Administrative
Administrative · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1201372
19 May 1988
Initial Certification
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1352715
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 June 2025
Resolved
Each individual bilge suction shall be fitted with a suitable bilge strainer having an open area of not less than three times of the suction pipe. Install strainers to all missing suction baskets.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 July 2025
Resolved 30 July 2025
Resolution: Strainers installed on missing bilge suction basket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 July 2024
Resolved
Each individual bilge suction shall be fitted with a suitable bilge strainer having an open area of not less than three times of the suction pipe. Strainers were found missing in the FWD rake, and storage void suction baskets. Replace with new.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2024
Resolved 15 August 2024
Resolution: Photos added to "documents" tab.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 May 2023
Resolved
On a vessel without overnight accommodations, or with overnight accommodations for not more than 49 passengers, the fire pump must be capable of delivering a single hose stream from the highest hydrant, through the required hose and nozzle at a pressure of 50 psi. Pressure gauge was found not operable. Replace pressure gauge with new.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 June 2023
Resolved 16 June 2023
Resolution: Received video of new pressure gauge, and proper operation
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 May 2023
Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment, other than small buoyancy compartments, under all practicable conditions. Initial bilge operational test out of void #5 was unsuccessful. This was due to air in the line. Once properly primed, bilge pump operated satisfactory.
Action required: 10 - Deficiency Rectified
Resolved 23 May 2023
Resolution: Corrected on the spot.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 November 2022
Resolved
DD and DD extension dates have passed. The requirements of the COI have not been met.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2023
Resolution: Completed required worklist items for credit dry dock
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 27 April 2022
Resolved
wastage noted in forward compartment and aft of the collision bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2023
Resolution: Frames, and rake plating renewed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 8 April 2022
Resolved
Main deck fire valve leaks excessively.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 April 2022
Resolution: Packing was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 June 2021
Resolved
generator inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2021
Resolution: new battery and positive cable installed. generator operational.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 June 2020
Resolved
Emergency lighting was not operational.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 June 2020
Resolution: light operational.
Lifesaving › Lifejacket/PFD (Type III) › Retroreflective Material
Issued 10 April 2017
Resolved
Replace retro tape on 31 adult and 6 child lifejackets. Tape was worn and not reflective anymore.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2017
Resolved 13 April 2017
Resolution: Retro tape has been replaced.
Stability › Watertight Integrity › General
Issued 5 April 2017
Resolved
weld shut two quarter size holes starboard side amidships in way of old vent shaft that were never closed up. Daylight was seen from inside space 4 fwd to outside.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 10 May 2017
Resolution: holes have been welded closed.
Electrical › Electric Supply System (service) › Cable
Issued 5 April 2017
Resolved
Afix cable runs with wire ties 4th space forward. Several ties were rusted through or missing, allowing cables to hang loose.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2017
Resolved 10 May 2017
Resolution: Cable runs are now secured with wire ties.
Construction/Loadline › Penetrations › Gasket
Issued 5 April 2017
Resolved
Gaskets or appropriate material to be placed in through bulkhead cable runs 3rd space forward.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 10 May 2017
Resolution: Gasket renewed.
Construction/Loadline › Hull › Transverse Frame
Issued 5 April 2017
Resolved
2nd and 3rd space forward, reweld transverse frames. Frames had been removed years ago to make room for fuel/water tanks (that were never put in), and frames were never replaced/welded.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 10 May 2017
Resolution: Frames have been welded.
Engineering › Bilge Water Management System › Piping
Issued 5 April 2017
Resolved
Re-align vertical bilge suction 2nd space fwd. It was found lying on the deck horizontally.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 10 May 2017
Resolution: Bilge suction line aligned vertically.
Stability › Intact Righting Energy › General
Issued 23 July 2013
Resolved
Secure cement ballast in #2 Compartment.
Due 23 August 2013
Resolved 22 August 2013
Resolution: Cement ballast secured using metal straps.
Electrical › Electrical Distribution System (service) › Cable
Issued 21 April 2009
Resolved
Properly dead-end the electrical cable located within the Fire/Bilge pump compartment port side/aft overhead IAW 46 CFR 183.340.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 May 2009
Resolved 21 May 2009
Resolution: Electric properly dead-ended.
Electrical › Electrical Distribution System (service) › Cable
Issued 21 April 2009
Resolved
Properly dead-end the electrical cable located within the Potable water Hold, located stbd forward side IAW 46 CFR 183.340.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 May 2009
Resolved 21 May 2009
Resolution: Wire properly dead-ended.
Deck/Cargo › Ballast › Special Ballast Arrangements
Issued 21 April 2009
Resolved
Verify fixed Ballast (Cement blocks) with the 2nd and or 3rd compartments is installed IAW the current Stability letter and or approved drawings; after verifying secure/strap IAW 46 CFR 178.510(a)(1)(2).
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 May 2009
Resolved 21 May 2009
Resolution: Ballast strapped as required.
Construction/Loadline › Penetrations › Pipe Flange
Issued 21 April 2009
Resolved
Install pipe plug or cap on the open thru hull pipe located with in the Fire/Bilge pump compartment port side aft side shell IAW 46 CFR 179.350.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 May 2009
Resolved 21 May 2009
Resolution: Pipe plugged properly.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 21 April 2009
Resolved
Remove the temporary loaned Fire Extinguisher on the second deck and replace with correct type. Observed the fire extinguisher was loose when sitting in the fire extinguisher mounting bracket. 46 CFR 181.520.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 May 2009
Resolved 21 May 2009
Resolution: Correct fire extinguisher installed.
Lifesaving › Lifebuoys › Stowage
Issued 21 April 2009
Resolved
Place Type II retro reflective material/tape on life ring buoy IAW 46 CFR 185.604(i).
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 May 2009
Resolved 21 May 2009
Resolution: New retro installed on life ring buoy.
Electrical › Lighting (service) › Lighting Fixture
Issued 21 April 2009
Resolved
Install missing Globes and light fixture cage on light fixtures and remove trash within the second most aft compartment IAW 46 CFR 183.410 & 46 CFR 176.830.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 May 2009
Resolved 1 May 2009
Resolution: All missing globes replaced.
Electrical › Lighting (service) › Lighting Fixture
Issued 14 April 2008
Resolved
Install Glass Globe on Light fixture which is missing in the water/pop hold.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 May 2008
Resolved 12 May 2008
Resolution: Operator notified this office light fixture installed.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 April 2008
Resolved
Renew Stbd running light glass lens.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2008
Resolved 27 May 2008
Resolution: Runnning light replaced.
Lifesaving › Hand Flares › Expired
Issued 16 April 2007
Resolved
Required replacement of outdated flares
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 16 May 2007
Resolution: Replaced 6 hand flares same day
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 16 April 2007
Resolved
Required annual servicing for all portable fire extinguishers
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 April 2007
Resolved 19 April 2007
Resolution: Annual servicing completed as required
Engineering › Generator (propulsion/auxiliary-electric) › Cable
Issued 7 May 2004
Resolved
Properly provide and mark fuel shutoff for auxiliary generator. LEGACY COMPONENT DESC: Fuel Shutoff for Auxiliary Generator
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 June 2004
Resolved 17 June 2004
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 7 May 2004
Resolved
Properly remove locking mechanism from lifejacket stowage container. LEGACY COMPONENT DESC: Lifejacket Stowage
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 June 2004
Resolved 17 June 2004
Documentation
Issued 26 June 2001
Resolved
POST STABILITY LETTER DATED 25MAR97.
Condition: Unknown
Due 3 July 2001
Resolved 24 July 2001
Documentation
Issued 26 June 2001
Resolved
PROVIDE AND POST MAX PASSENGER ALLOWED ON UPPER DECK PLACARD.
Condition: Unknown
Due 3 July 2001
Resolved 24 July 2001
Fire Fighting
Issued 26 June 2001
Resolved
REPLACE FAULTY FIRE HOSE PRIOR TO TAKING PASSENGERS FOR HIRE.
Condition: Unknown
Due 3 July 2001
Resolved 24 July 2001
Fire Fighting
Issued 18 April 2000
Resolved
CONDUCT FIRE AND MAN OVERBOARD DRILLS WHEN NEWLY HIRED CREW IS ON BOARD
Condition: Unknown
Due 18 April 2000
Resolved 18 April 2000
Accommodation/Occupational Safety
Issued 18 April 2000
Resolved
PROVIDE AND POST STATION BILL
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Electrical
Issued 18 April 2000
Resolved
REPAIR EMERGENCY LIGHTING
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Lifesaving
Issued 18 April 2000
Resolved
PROVIDE AND POST PFD DONNING PLACARD
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Documentation
Issued 24 April 1996
Resolved
ENSURE THAT THE NEW GROSS TONNAGE & NET TONNAGE ARE PUT ON THE CERTIFICATE OF DOCUMENTATION. TONNAGE CERTIFICATE FROM DNV DATED 17APR96._x001C_ REGISTERED GROSS TONNAGE 238 AND NET TONNAGE 71._x001C_ REGULATORY GROSS TONNAGE 97 AND NET TONNAGE 97.
Condition: Unknown
Due 24 April 1996
Resolved 24 April 1996
Electrical
Issued 8 June 1995
Resolved
INSTALL ANOTHER 65 KW GEN ON THE M/V UGH THE TUG OR INSTALL GEN ON THE BETSEY NORTHRUP AND SUBMIT PLANS(ELECTRICAL & STRUCTURAL FIRE PROTECTION) FOR THE INSTALLATION OR MAKE THE 20 KW GENERATOR ONLY OPERATE THE BILGE & FIRE PUMPS, DECK LIGHTS AND TOWBOAT ELECTRICAL NEEDS.
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Documentation
Issued 20 April 1995
Resolved
RESUBMIT STRUCTURAL FIRE PROCTECTION PLANS TO INCLUDE THE PROPER INSULATION(A-0) UNDER THE FORWARD STAIRWAY LEADING TO THE UPPER DECK.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Fire Fighting
Issued 20 April 1995
Resolved
EITHER REMOVE THE TICKET OFFICE UNDER THE FORWARD STAIRWAY (INCLUDING THE BULKHEADS) OR PROVIDE THE BULKHEADS AS PER THE APPROVED PLANS.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Documentation
Issued 20 April 1995
Resolved
RESUBMIT STRUCTURAL FIRE PROTECTION PLANS TO INCLUDE THE PROPER CLASS FOR THE CONCESSION STAND OR INSTALL B-O BULKHEADS, DOORS AND DROP FIRE CURTAIN.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Documentation
Issued 20 April 1995
Resolved
RESUBMIT STUCTURAL FIRE PROTECTION PLANS TO INCLUDE THE PROPER LOCATION OF THE COUNTER IN THE SCULLERY. THE OPENING AT THE COUNTER SHOULD ALSO INCLUDEA DROP B-0 FIRE CURTAIN.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Documentation
Issued 14 July 1994
Resolved
Complete U.S. Coast Guard Marine Safety Center review of the deadweight survey conducted on 3 May 1993 not later than the compliance date.
Condition: Unknown
Due 14 July 1994
Resolved 14 July 1994
Accommodation/Occupational Safety
Issued 18 April 1994
Resolved
Remove upper deck fore and aft windows prior to carrying passengers for hire but not later than the compliance date. The upper deck must remain anopen deck.
Condition: Unknown
Due 18 April 1994
Resolved 18 April 1994
Lifesaving
Issued 18 April 1994
Resolved
Conduct emergency drills with the assigned vessel crew not later than the compliance date
Condition: Unknown
Due 18 April 1994
Resolved 18 April 1994
Electrical
Issued 18 April 1994
Resolved
Prove proper operation of the emergency lighting system prior to carrying passengers for hire but not later than the compliance date.
Condition: Unknown
Due 18 April 1994
Resolved 18 April 1994
Accommodation/Occupational Safety
Issued 18 April 1994
Resolved
Prove proper operation of toilets and sinks prior to carrying passengers for hire but not later than the compliance date.
Condition: Unknown
Due 18 April 1994
Resolved 18 April 1994
Accommodation/Occupational Safety
Issued 18 April 1994
Resolved
Repair broken bow rail guard prior to carrying passengers for hire but not later than the compliance date.
Condition: Unknown
Due 18 April 1994
Resolved 18 April 1994
Documentation
Issued 21 April 1993
Resolved
Admeasure vessel for determination of correct tonnage and provide certificate not later than the compliance date.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Fire Fighting
Issued 21 April 1993
Resolved
Provide approved structural fire protection plans not later than the compliance date.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Construction/Loadline
Issued 21 April 1993
Resolved
Clearly mark all bilge manifold valves not later than the compliance date.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Construction/Loadline
Issued 21 April 1993
Resolved
Provide cover gasket for the #7 void cover not later than the compliance date.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Lifesaving
Issued 21 April 1993
Resolved
Provide different stowage location for the childrens life preservers not later than the compliance date.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Accommodation/Occupational Safety
Issued 21 April 1993
Resolved
Provide garbage pollution placards as necessary for passenger viewing not later than the compliance date.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Documentation
Issued 21 April 1993
Resolved
Provide upper deck passenger limiting signs not later than the compliance date.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Construction/Loadline
Issued 22 April 1992
Resolved
THE INSTALLATION OF WINDOW PANELS TO THE SIDE RAILS OF THE UPPER DECK IS APPROVED FOR USE UNTIL MIDNIGHT OCT 18, 1992. NO PASSENGERS MAY BE CARRIED AFTER THAT TIME WITH THOSE PANELS INSTALLED. PANELS MAY NOT BE INSTALLED ON FORE AND AFT RAILINGS. COVERS MAY NOT BE INSTALLED ON THE OPEN (CONT.)
Condition: Unknown
Due 22 April 1992
Resolved 22 April 1992
Construction/Loadline
Issued 22 April 1992
Resolved
(CONT.) GRILL AREAS BELOW THE PORT AND STBD WINDOW PANELS. NO ADDITIONAL FURNISHINGS MAY BE ADDED TO THE VESSEL. THESE CONDITIONS WILL REMAIN IN EFFECT UNTIL THE REQUIRED PLANS FOR THE ALTERATIONS ARE SUBMITTED FOR APPROVAL AND THE INSTALLATION IS IN ACCORDANCE WITH THE APPROVED PLANS.
Condition: Unknown
Due 22 April 1992
Resolved 22 April 1992
Fire Fighting
Issued 14 June 1991
Resolved
Provide proof that the doors in the forward bulkhead of the salon and the doors to the aft storerooms are of A-0 construction.
Condition: Unknown
Due 14 June 1991
Resolved 14 June 1991
Unknown
Issued 4 August 1990
Resolved
Provide evidence that vessel is under 100 gross tons (ABS Certificate of Admeasurement).
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Unknown
Issued 4 August 1990
Resolved
Label bilge manifold system
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Accommodation/Occupational Safety
Issued 4 August 1990
Resolved
Install proper railing between the Betsy Northrup and the Anson Northrup prior to passengers transiting the area.
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Fire Fighting
Issued 4 August 1990
Resolved
Install pressure gauges on each of the electric fire pumps._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Lifesaving
Issued 4 August 1990
Resolved
Supply six orange smoke and six red flares and stow in a watertight container._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Electrical
Issued 4 August 1990
Resolved
Secure ship to ship electrical connection._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Unknown
Issued 4 August 1990
Resolved
Post Stability letter._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Fire Fighting
Issued 4 August 1990
Resolved
Replace existing fire nozzles with CG Approved nozzles._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990
Fire Fighting
Issued 4 August 1990
Resolved
Supply a portable fire/bilge pump (5 GPM)._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 August 1990
Resolved 4 August 1990