MAURY USCG vessel records Sign in
← All vessels

ISLAND BREEZE

ISLAND BREEZE is a 1988 passenger vessel (inspected). The Coast Guard has recorded 51 inspections since 1988, most recently in August 2020, along with 115 deficiencies — 2 with no resolution recorded —.

Records from 1988 to 2020. Most recent: inspection, 17 August 2020.

Built
1988
Last inspected
17 August 2020
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WUY4147
305968
Flag
UNITED STATES
367368760
Maury page id
psix-305968

Inspections, by type

…with no type recorded3
…past their stated due date2
Years with a record 27 calendar years (1988–2020)
The 51 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 6 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)64.8 ft × 26.0 ft × 5.3 ft
Registered tonnagegross 59 / net 47
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCORINTHIAN YACHTS · TARPON SPRINGS, FL, UNITED STATES · built 1988
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portMIAMI, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it59 - Simplified, Gross Ton
47 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK4659MMSI 367368760 · active · compulsorily equipped · granted 6 September 2018, expires 6 September 2028 · licensed under a name not among this hull’s recorded names (not shown)
WUY4147MMSI 367368760 · terminated · compulsorily equipped · granted 17 July 2008, cancelled 4 September 2018 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 51

17 August 2020 Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7037013
17 June 2019 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6713077
19 June 2018 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6448989
6 February 2018 Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6351394
15 June 2017 Deficiency Check · Annual Inspection · Administrative Inspection · Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6176591
26 February 2016 COI Inspection · Deficiency Check · Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5821776
14 January 2016 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 5797503
30 August 2011 Annual Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4129734
22 March 2010 Internal Structural Exam · Hull Examination · Drydock Exam
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3701580
28 August 2008 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3311077
24 March 2008 Hull Examination
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3170117
23 August 2006 Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 2757211
16 March 2006 Hull Examination
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 2603558
25 May 2005 COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2361476
23 August 2004 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2169917
21 July 2004 Administrative Inspection
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2140719
4 March 2004 Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2015900
22 August 2003 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1881997
10 July 2002 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1644252
2 April 2002 Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1597121
8 November 2001 Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1075688
31 August 2001 Deficiency Check · Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1384870
24 May 2000 COI Inspection · Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1466150
30 March 2000 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 227681
30 March 2000 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 228132
3 March 1999 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 821738
30 May 1998 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1127835
16 April 1998 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1457558
30 March 1998 Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1368680
18 May 1997 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 21681
3 March 1997 COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1451148
19 June 1996 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1080475
9 April 1996 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1079762
29 March 1996 Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1078234
20 March 1995 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1183448
13 March 1995 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 826664
9 March 1994 Hull Examination · COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 854254
8 October 1993 Drydock Extension
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 830102
15 April 1993 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1150851
27 April 1992 Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 958089
30 March 1992 Hull Examination · COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1270300
31 May 1991 COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1219952
25 April 1991 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 930267
27 July 1990 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1242190
11 April 1990 Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 916707
4 December 1989 Drydock Extension
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1219987
18 July 1989 Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1199735
1 August 1988 Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1039668
12 July 1988 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1208388
1 July 1988 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 900457
31 May 1988 Initial Certification · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 886668

Deficiency record · 115

07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 June 2019 Resolved
Pre-engineered gas fire extinguishing system must have a means to reset the engine upon shutdown. During testing of fireboy, the port engine woul not restart in override after fireboy testing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 June 2019
Resolution: Observed proper operation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 17 June 2019 Resolved
Thru hull fittings and shutoff valves must be metallic. Sewage thru hull is corroded. During inspection, material failed. Replace valve/piping.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 June 2019
Resolution: thru hull replaced and valve secured.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 17 June 2019 Resolved
Machinery shall be installed and maintained in such a manner to provide protection against fire, machinery, and personnel injury. Replace port engine belt cover for alternator.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 June 2019
Resolution: Replace
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 17 June 2019 No resolution recorded
Deck rails must be designed and constructed to w/stand a point load of 200 pounds. Cracked welds were identified on hand rails at - 1) top step of ladder to bridge, 2) handrail on stbd entrance on bow, 3) 2nd and 8th stanchion at top handrail stbd, 4) 1st and 8th stanchion at top handrail port
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2019 — due date passed with no resolution recorded
Resolution: Extended to next drydock in Dec 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2019 Resolved
Connections must be made insude an enclosure. Properly secure and cover junction box in overhead of stbd e/r.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 19 June 2019
Resolution: J-box removed and wiring to light removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2019 Resolved
All electrical installations shall be to the satisfaction of the [name withheld] bar in port and stbd 2nd void space is corroded on terminals. Clean.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 17 July 2019
Resolution: Owner replaced bus bars.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 June 2019 No resolution recorded
At each subsequent inspection for ertification all accessible parts of the interior of the hull shall be examined. Make identified area available for inspection. Grind to dry material. Make permanent repairs iaw layup schedule.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019 — due date passed with no resolution recorded
Resolution: Taken back to good material, bubble between layers. Permanent repairs extended to drydock Dec 2019
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 19 June 2018 Resolved
Make permenant repairs/tighten all engine mount to engine bed fasteners.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2018
Resolution: Larger diameter and longer lag bolts were installed to the satisfaction of MI.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 19 June 2018 Resolved
Remove safety pins from both installed pre-engineered systems. Provide documentation for proper install of pull cables.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Proper pins were ordered and installed.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 19 June 2018 Resolved
Provide hard copy of navigation rules at operating station.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: A hard copy of the Nav Rules was onboard the vessel.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 19 June 2018 Resolved
Provide in date aspirin and antiseptic towlettes for first aid kit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 June 2018
Resolution: Proper supplies placed on board.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 19 June 2018 Resolved
Renew retro tape on 3 adult lifejackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Reflective material replaced.
Electrical › Electric Supply System (service) › Battery Installation
Issued 19 June 2018 Resolved
Replace aft battery on STBD side.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Battery for engine start replaced and tested.
Engineering › Bilge Water Management System › Pump
Issued 19 June 2018 Resolved
Make appropriate repairs or replace with UL bilge pump port forepeak pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 June 2018
Resolution: The wiring on the bilge pump was renewed and tested sat.
Engineering › Steering Gear System › Bracket/Clamp
Issued 19 June 2018 Resolved
Provide clamps for hydraulic steering tubing in STBD E.R./Wipe oil residue & tighten fittings.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Hose clamps installed to bulkhead.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 19 June 2018 Resolved
Cap sewage pipe in starboard forepeak.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: A cam lock fitting has been installed on the end of the sewage pipe.
Electrical › Electrical Distribution System (service) › Bus Bar Connection
Issued 19 June 2018 Resolved
Install busbar under main console on STBD side, ensure no more than 4 terminals on a stud.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Busbars have been installed and connections reduced as required.
Electrical › Electrical Distribution System (service) › Cable
Issued 19 June 2018 Resolved
Remove wire to port switch panel that is no longer in use.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Wire removed.
Construction/Loadline › Hull › Hull Plating
Issued 19 June 2017 Resolved
Prior to operations, make appropriate repairs to areas of delamination in the Port #2 and #3 void. Fiberglass must be removed to the satisfaction of the attending MI and apropriate layup reinstalled.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 September 2017
Construction/Loadline › Hull › Hull Plating
Issued 19 June 2017 Resolved
Remove plywood in STBD #3 void in order to make bilge available for inspection.
Due 19 August 2017
Resolved 5 September 2017
Navigation › Piloting/Steering › US Coast Pilot
Issued 19 June 2017 Resolved
Provide excerpts of recent editions of the Coast Pilot and Light list for operating area.
Due 19 August 2017
Resolved 12 October 2017
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 19 June 2017 Resolved
Provide ships log to include training and drills (quarterly).
Due 19 August 2017
Resolved 5 September 2017
Communications › Radio Communications › VHF Radiotelephone
Issued 19 June 2017 Resolved
Re-wire VHF radio using 14 gauge or larger UL approved boat or marine cable. Ensure radio has adequate over current protection (in-line fuse acceptable).
Due 19 August 2017
Resolved 5 September 2017
Communications › Public Address System › Loudspeaker
Issued 19 June 2017 Resolved
Prove proper operation of PA system.
Due 19 August 2017
Resolved 12 October 2017
Lifesaving › Visual Distress Signals (General) › Storage
Issued 19 June 2017 Resolved
Provide watertight container for distress signals, mark "DISTRESS SIGNALS". Letters must be a minimum of .5 inch tall.
Due 19 August 2017
Resolved 5 September 2017
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 19 June 2017 Resolved
Provide 5 additional adult size Type I lifejackets, ensure they are marded with vessel name and reflective tape.
Due 19 August 2017
Resolved 5 September 2017
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 19 June 2017 Resolved
Repair and prove proper operation of fixed fire fighting engine override function for STBD engine.
Action required: 705 - Other - as specified
Due 19 August 2017
Resolved 5 April 2018
Resolution: The shutdown and override were satisfactorily tested.
Engineering › Bilge Water Management System › Hose
Issued 19 June 2017 Resolved
Replace bilge hose in STBD engine compartment. Ensure hose is SAE J2006.
Due 19 August 2017
Resolved 5 September 2017
Engineering › Bilge Water Management System › Pump
Issued 19 June 2017 Resolved
Permanently mount electric bilge pumps.
Due 19 August 2017
Resolved 5 September 2017
Engineering › Steering Gear System › Ram
Issued 19 June 2017 Resolved
Tighten hardware on steering cylinder on port side.
Due 19 August 2017
Resolved 5 September 2017
Engineering › Steering Gear System › Hydraulic Hose
Issued 19 June 2017 Resolved
Replace hydraulic hose on port side steering system (corroded fittings). Ensure hose are rated at proper pressure and are SAE J1942 approved.
Due 19 August 2017
Resolved 5 September 2017
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 19 June 2017 Resolved
Properly install forward LED lights; utilize 14 gauge or larger UL approved boat or marine cable, ensure properly sized overcurrent protection, and connect with switch.
Due 19 August 2017
Resolved 5 September 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 June 2017 Resolved
Remove dead end wires under console (red/black wire on port side) and in the fwd void on the STBD side.
Due 19 August 2017
Resolved 5 September 2017
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 19 June 2017 Resolved
Provide cover for electrical terminal bus in #2 Port void.
Due 19 August 2017
Resolved 5 September 2017
Accommodation/Occupational Safety › Potable Water System › General
Issued 19 June 2017 Resolved
Securely mount fresh water pump for the STBD water tank.
Due 19 August 2017
Resolved 5 September 2017
Construction/Loadline › Structures › Deck Plating
Issued 19 June 2017 Resolved
Crop and renew deck IWO Port side #2 void hatch.
Due 19 August 2017
Resolved 5 September 2017
Construction/Loadline › Structures › Deck Plating
Issued 19 June 2017 Resolved
Seal holes on bow deck IWO eye bolts for gangway (port and stbd).
Due 19 August 2017
Resolved 5 September 2017
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 19 June 2017 Resolved
Conduct satisfactory drills (man overboard and fire) while underway.
Due 19 August 2017
Resolved 5 September 2017
Communications › Radio Communications › VHF Radiotelephone
Issued 17 March 2016 Resolved
Provide for and properly activate the DSC feature on the VHF radio.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Not Required, vessel does not operate beyond the baseline.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 March 2016 Resolved
Repair the fractured weld in the port deck rail.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 17 March 2016 Resolved
Replace the reflective tape on the life jackets as needed.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 17 March 2016 Resolved
Twelve life jackets were condemned due to deterioration, nine life jackets are needed for a full compliment, the vessel is restricted to 146 total persons.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 17 March 2016 Resolved
Provide an appropriate means to test for alcohol.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Valid test strips verified onboard.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 17 March 2016 Resolved
Provide proof of enrollment in a drug testing consortium.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 March 2016 Resolved
Properly terminate all dead end wires, noted three under the operating station console and one in the passenger accommodations on the main deck.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Communications › Alarms/Indicators › Fire Alarm
Issued 17 March 2016 Resolved
The audible and visual indicators for the Seafire fixed fire fighting system in the stbd engine compartment are not operational, make repairs or replace and prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 17 March 2016 Resolved
Properly mark the new ring buoy with the vessels name.
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 17 March 2016 Resolved
Provide the new ring buoy with a lifeline.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Marking
Issued 17 March 2016 Resolved
Provide a new fire extinguisher marking on the bulkhead IWO the passenger accommodations on the stbd side.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 17 March 2016 Resolved
Replace the deteriorated bracket for the extinguisher in the operating station.
Due 31 March 2016
Resolved 21 March 2016
Engineering › Fuel Oil Service System › Hose
Issued 17 March 2016 Resolved
Where fuel hoses exceed 30" in length provide SAE J-1942 approved type hoses.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Hose were verified in place.
Engineering › Bilge Water Management System › Manifold
Issued 17 March 2016 Resolved
Label the bilge manifold with the compartments served.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 17 March 2016 Resolved
The fiberglass elbow for the stbd main engine exhaust has a pinhole leak, make repairs as needed.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Engineering › Fuel Oil Service System › Hose
Issued 17 March 2016 Resolved
Provide a second hose clamp where missing on the stbd main engine fuel return line.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Communications › Public Address System › Amplifier
Issued 17 March 2016 Resolved
Install the PA system amplifier and prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Engineering › Bilge Water Management System › Pump
Issued 17 March 2016 Resolved
The vessel representative was unable to prove proper operation of the power bilge pump, repair as needed and prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2016
Resolved 21 March 2016
Fire Fighting › Fire Pumps › Arrangement
Issued 17 March 2016 Resolved
Provide the vessel with a hand fire/bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Electrical › Electrical Distribution System (service) › Panelboard
Issued 17 March 2016 Resolved
The stbd bilge pump control panel is hanging open, properly secure as needed.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Item verified corrected.
Documentation › Markings/Placards › Vessel Number (state)
Issued 17 March 2016 Resolved
The name of the vessel has worn off of the stern, properly mark the stern with the vessel name.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: A new name board has been installed.
Engineering › Bilge Water Management System › Valve
Issued 22 March 2010 Resolved
Install valve on all bilge overboard line IAW 46 CFR 182.520(e)(7).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Engineering › Bilge Water Management System › Pump
Issued 22 March 2010 Resolved
Ensure all submersible bilge pumps are secured IAW 46 CFR 182.520 (e)(3).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Engineering › Bilge Water Management System › Piping
Issued 22 March 2010 Resolved
Make permanent repairs to the starboard forepeak bilge overboard thru hull fitting IAW 46 CFR 182.520(e)(6).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Stability › Watertight Integrity › General
Issued 22 March 2010 Resolved
Install new lanyards of chain or wire rope IAW 46 CFR 179.360(b)(1) and (2).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 22 March 2010 Resolved
Crop and renew the access ladder leading to the port forepeak IAW 46 CFR 176.800.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Stability › Watertight Integrity › General
Issued 22 March 2010 Resolved
Clean all watertight hatch gaskets IAW 46 CFR 179.360.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Construction/Loadline › Hull › Hull Plating
Issued 22 March 2010 Resolved
Grind areas of the hull as indicated to facilitate further examination IAW 176.600
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 22 March 2010 Resolved
Remove portside M/E exhaust hoses for further inspection IAW 46 CFR 182.430.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Engineering › Steering Gear System › Rudder
Issued 22 March 2010 Resolved
Make permanent repairs to the port side rudder support IAW 46 CFR 182.600.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Engineering › Freshwater System (jacketwater cooling) › Valve
Issued 22 March 2010 Resolved
Renew the port main engine sea suction valve IAW 46 CFR 176.600.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2010
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 28 August 2008 Resolved
Install means to manually activate fire system from outside the space IAW 46 CFR 181.420
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2008
Resolved 9 September 2008
Resolution: installed remote pulls, engine shut downs and overrides were tested
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 28 August 2008 Resolved
Post employee assistance information where visable to crew.
Condition: Unknown
Due 28 September 2008
Resolved 3 September 2008
Resolution: EAP information posted
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 28 August 2008 Resolved
Repair / replace light attached to life ring
Condition: Unknown
Due 28 September 2008
Resolved 28 August 2008
Resolution: battery replaced in light
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 28 August 2008 Resolved
ensure flex hoses on eng. exhaust are double clamped.
Condition: Unknown
Due 28 September 2008
Resolved 28 August 2008
Resolution: all flex hoses were double clamped
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 August 2008 Resolved
Repair fiberglass around rudder post bracket IWO bulkhead (port and stbd)
Condition: Unknown
Due 28 September 2008
Resolved 3 September 2008
Resolution: fiberglass repaired
Engineering › Steering Gear System › Hydraulic Hose
Issued 28 August 2008 Resolved
replace hydraulic hose on stbd steering gear.
Condition: Unknown
Due 28 September 2008
Resolved 3 September 2008
Resolution: hose replaced.
Engineering › Fuel Oil Service System › Hose
Issued 28 August 2008 Resolved
Replace all fuel supply hoses with SAE J.1942 hose.
Condition: Improper Installation
Due 28 September 2008
Resolved 3 September 2008
Resolution: hoses replaced
Construction/Loadline › Structures › Deck Plating
Issued 28 August 2008 Resolved
replace rotten decking IWO the port engine room.
Condition: Unknown
Due 28 September 2008
Resolved 3 September 2008
Resolution: decking replaced
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 August 2008 Resolved
properly secure switch and wiring to fuel pump on generator
Condition: Unknown
Due 28 September 2008
Resolved 3 September 2008
Resolution: wiring and switch secured.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 28 August 2008 Resolved
properly attach water light to the life float (18 ft.)
Condition: Improper Installation
Due 28 September 2008
Resolved 3 September 2008
Resolution: light properly attached.
Electrical › Electrical Distribution System (service) › Wiring
Issued 23 August 2006 Resolved
Replace wire nuts on port fresh water pump with authorized connections
Action required: 705 - Other - as specified
Due 6 September 2006
Resolved 6 September 2006
Resolution: Wire nuts replaced with authorized wire connections
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 23 August 2006 Resolved
Replace machinery guards on both main diesel engines
Action required: 705 - Other - as specified
Due 6 September 2006
Resolved 24 August 2006
Resolution: Machinery guards installed prior to completion of inspection.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 23 August 2006 Resolved
Replace wasted ladder in Port MSD space
Action required: 705 - Other - as specified
Due 6 September 2006
Resolved 6 September 2006
Resolution: Ladder replaced
Construction/Loadline › Hull › Bottom Plating
Issued 16 March 2006 Resolved
Found soft spots in fiberglass on bow of sponsons where fiberglass had been thickened by operator.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 March 2006
Resolved 19 March 2006
Resolution: Spots were ground to depth of good material and area re-glassed
Electrical
Issued 31 August 2001 Resolved
Provide adequate lighting on interior of main deck area.
Condition: Unknown
Due 11 September 2001
Resolved 11 September 2001
Engineering
Issued 31 August 2001 Resolved
Provide fuel collection bowls for fuel strainers on both main diesel engines and generator.
Condition: Unknown
Due 11 September 2001
Resolved 11 September 2001
Fire Fighting
Issued 16 April 1998 Resolved
PROVIDE 02 ADDITIONAL B-II OR B-III PORTABLE EXTINGUISHERS IN THE ENGINE ROOM UNTIL THE FIXED HALON EXTINGUISHING SYSTEM IS OPERATIONAL. PROVE_x001C_ PROPER OPERATION OF HALON SYSTEM NLT 16 MAY 98.
Condition: Unknown
Due 16 April 1998
Resolved 16 April 1998
Engineering
Issued 9 April 1996 Resolved
PROVIDE REMOTE SHUTOFF VALVE FOR EACH INSTALLED FUEL TANK NLT 09JUN96.
Condition: Unknown
Due 19 June 1996
Resolved 21 June 1996
Accommodation/Occupational Safety
Issued 29 March 1996 Resolved
remove stbd M/S deck vent, strip and replace delaminated or rotted plywood deck as necessary to reach sound dry wood.
Condition: Unknown
Due 9 April 1996
Resolved 10 April 1996
Accommodation/Occupational Safety
Issued 29 March 1996 Resolved
Reseal deck coaming at fwd end of deckhouse.
Condition: Unknown
Due 9 April 1996
Resolved 10 April 1996
Accommodation/Occupational Safety
Issued 29 March 1996 Resolved
Strip and replace plywood deck to the extent necessary to remove any and all water soaked and/or rotted wood, from the fwd end of the anchor lockersaft to sound dry wood.
Condition: Unknown
Due 9 April 1996
Resolved 10 April 1996
Lifesaving
Issued 13 March 1995 Resolved
PROVIDE 15 ADDITIONAL ADULT PFDS TO REPLACE REJECTED UNITS, VESSEL RESTRICTED TO 139 TOTAL PERSONS UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 13 March 1995
Resolved 13 March 1995
Fire Fighting
Issued 13 March 1995 Resolved
CORRECT HALON SYSTEM ENGINE SHUT-DOWNS TO OPERATE.
Condition: Unknown
Due 13 March 1995
Resolved 13 March 1995
Lifesaving
Issued 9 March 1994 Resolved
REPLACE 32 ADULT PFD'S REJECTED DURING COI INSPECTION. VESSEL RESTRICTED TO A TOTAL OF 122 PERSONS UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 9 March 1994
Resolved 9 March 1994
Documentation
Issued 9 March 1994 Resolved
PROVIDE PROOF OF EMPLOYEE RANDOM DRUG TESTING.
Condition: Unknown
Due 21 March 1994
Resolved 10 March 1994
Documentation
Issued 9 March 1994 Resolved
PROVIDE AND POST A WRITTEN WASTE MANAGEMENT PLAN.
Condition: Unknown
Due 9 March 1994
Resolved 9 March 1994
Fire Fighting
Issued 15 April 1993 Resolved
REPAIR LEAKS IN THE FIRE MAIN IN THE STARBOARD HULL VOID SPACE.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Construction/Loadline
Issued 15 April 1993 Resolved
REPIR LEAK IN PIPING ON STARBOARD HULL BILGE PUMP.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Lifesaving
Issued 15 April 1993 Resolved
REPLACE WORN LIFE RING.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Fire Fighting
Issued 31 May 1991 Resolved
INSTALLED FIRE PUMP CANNOT USE ENGINE COOLING WATER PUMP-MAY BE CONNECTED TO ONE OF THE INSTALLED BILGE PUMPS.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Accommodation/Occupational Safety
Issued 31 May 1991 Resolved
VESSELS RAIL HEIGHT TO BE INCREASED TO 42 INCHES DUE TO VESSELS SERVICE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Electrical
Issued 31 May 1991 Resolved
SUBMIT PLANS ON THE INSTALLED 110VOLT SHORE POWER AND INVERTOR SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Engineering
Issued 31 May 1991 Resolved
INSTALL CROSS-CONNECTION FOR THE BILGE SYSTEM FROM PORT HULL TO STBD HULL._x001C__x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Fire Fighting
Issued 31 May 1991 Resolved
LABEL HALON MANUAL PULLS AT ENGINE ROOM HATCH AND INSTALL SEAL TO PREVENT ACCIDENTAL DISCHARGE.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Accommodation/Occupational Safety
Issued 31 May 1991 Resolved
INSTALL SOLID BULWARK OR EQUIVALENT ON THE LOWER 24 INCHES OF THE UPPER ANDLOWER DECK RAILS.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Accommodation/Occupational Safety
Issued 27 July 1990 Resolved
BLANK-OFF OR REMOVE MSD OVERBOARD DISCHARGE VALVES IN THE PORT AND STARBOARD HULLS.
Condition: Unknown
Due 27 July 1990
Resolved 27 July 1990
Engineering
Issued 18 July 1989 Resolved
INSTALL FIXED METALLIC BILGE PIPING SYSTEM AND MANIFOLD IN ACCORDANCE WITH 46 CFR 182.25.
Condition: Unknown
Due 18 July 1989
Resolved 18 July 1989
Navigation
Issued 18 July 1989 Resolved
MAKE PERMANENT REPAIRS TO THE FRACTURES IN THE STARBOARD RUDDER POST SUPPORT TUBE. PROVIDE BUILDER'S RECOMMENDED PROCEDURE TO THE COGNIZANT OCMIPRIOR TO ANY REPAIRS.
Condition: Unknown
Due 18 July 1989
Resolved 18 July 1989
Fire Fighting
Issued 1 July 1988 Resolved
INSTALL ENGINE SHUTDOWNS ON FIXED HALON SYSTEMS IN ENGINE ROOMS.
Condition: Unknown
Due 1 July 1988
Resolved 1 July 1988
Documentation
Issued 1 July 1988 Resolved
SUBMIT LIGHT SHIP CENTER OF GRAVITY CALCULATIONS ACCOUNTING FOR INSTALLATION OF TUNA TOWER AND DIESEL GENERATOR.
Condition: Unknown
Due 1 July 1988
Resolved 1 July 1988
Documentation
Issued 31 May 1988 Resolved
PROVIDE EVIDENCE OF CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Documentation
Issued 31 May 1988 Resolved
PROVIDE RADIO STATION LICENSE AND RADIO TELEPHONE CERTIFICATE PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Lifesaving
Issued 31 May 1988 Resolved
PROVIDE 15 USCG APPROVED TYPE I CHILD LIFE PRESERVERS PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Electrical
Issued 31 May 1988 Resolved
REMOVE TEMPORARY WIRING AND INSTALL PERMANENT MAST HEAD AND ANCHOR LIGHT PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Electrical
Issued 31 May 1988 Resolved
SUBMIT REVISED (AS BUILT) ONE LINE ELECTRICAL DRAWING FOR REVIEW.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Electrical
Issued 31 May 1988 Resolved
SUBMIT (ADD ON) 110 VOLT ELECTRICAL DRAWING FOR REVIEW PRIOR TO PUTTING SYSTEM IN OPERATION.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.