Records from 2016 to 2020. Most recent: inspection, 17 August 2020.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 June 2019
Resolved
Pre-engineered gas fire extinguishing system must have a means to reset the engine upon shutdown. During testing of fireboy, the port engine woul not restart in override after fireboy testing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 June 2019
Resolution: Observed proper operation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 17 June 2019
Resolved
Thru hull fittings and shutoff valves must be metallic. Sewage thru hull is corroded. During inspection, material failed. Replace valve/piping.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 June 2019
Resolution: thru hull replaced and valve secured.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 17 June 2019
Resolved
Machinery shall be installed and maintained in such a manner to provide protection against fire, machinery, and personnel injury. Replace port engine belt cover for alternator.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 June 2019
Resolution: Replace
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 17 June 2019
No resolution recorded
Deck rails must be designed and constructed to w/stand a point load of 200 pounds. Cracked welds were identified on hand rails at - 1) top step of ladder to bridge, 2) handrail on stbd entrance on bow, 3) 2nd and 8th stanchion at top handrail stbd, 4) 1st and 8th stanchion at top handrail port
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2019 — due date passed with no resolution recorded
Resolution: Extended to next drydock in Dec 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2019
Resolved
Connections must be made insude an enclosure. Properly secure and cover junction box in overhead of stbd e/r.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 19 June 2019
Resolution: J-box removed and wiring to light removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2019
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] bar in port and stbd 2nd void space is corroded on terminals. Clean.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 17 July 2019
Resolution: Owner replaced bus bars.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 June 2019
No resolution recorded
At each subsequent inspection for ertification all accessible parts of the interior of the hull shall be examined. Make identified area available for inspection. Grind to dry material. Make permanent repairs iaw layup schedule.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019 — due date passed with no resolution recorded
Resolution: Taken back to good material, bubble between layers. Permanent repairs extended to drydock Dec 2019
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 19 June 2018
Resolved
Make permenant repairs/tighten all engine mount to engine bed fasteners.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2018
Resolution: Larger diameter and longer lag bolts were installed to the satisfaction of MI.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 19 June 2018
Resolved
Remove safety pins from both installed pre-engineered systems. Provide documentation for proper install of pull cables.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Proper pins were ordered and installed.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 19 June 2018
Resolved
Provide hard copy of navigation rules at operating station.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: A hard copy of the Nav Rules was onboard the vessel.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 19 June 2018
Resolved
Provide in date aspirin and antiseptic towlettes for first aid kit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 June 2018
Resolution: Proper supplies placed on board.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 19 June 2018
Resolved
Renew retro tape on 3 adult lifejackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Reflective material replaced.
Electrical › Electric Supply System (service) › Battery Installation
Issued 19 June 2018
Resolved
Replace aft battery on STBD side.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Battery for engine start replaced and tested.
Engineering › Bilge Water Management System › Pump
Issued 19 June 2018
Resolved
Make appropriate repairs or replace with UL bilge pump port forepeak pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 June 2018
Resolution: The wiring on the bilge pump was renewed and tested sat.
Engineering › Steering Gear System › Bracket/Clamp
Issued 19 June 2018
Resolved
Provide clamps for hydraulic steering tubing in STBD E.R./Wipe oil residue & tighten fittings.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Hose clamps installed to bulkhead.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 19 June 2018
Resolved
Cap sewage pipe in starboard forepeak.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: A cam lock fitting has been installed on the end of the sewage pipe.
Electrical › Electrical Distribution System (service) › Bus Bar Connection
Issued 19 June 2018
Resolved
Install busbar under main console on STBD side, ensure no more than 4 terminals on a stud.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Busbars have been installed and connections reduced as required.
Electrical › Electrical Distribution System (service) › Cable
Issued 19 June 2018
Resolved
Remove wire to port switch panel that is no longer in use.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 July 2018
Resolution: Wire removed.
Construction/Loadline › Hull › Hull Plating
Issued 19 June 2017
Resolved
Prior to operations, make appropriate repairs to areas of delamination in the Port #2 and #3 void. Fiberglass must be removed to the satisfaction of the attending MI and apropriate layup reinstalled.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 September 2017
Construction/Loadline › Hull › Hull Plating
Issued 19 June 2017
Resolved
Remove plywood in STBD #3 void in order to make bilge available for inspection.
Due 19 August 2017
Resolved 5 September 2017
Navigation › Piloting/Steering › US Coast Pilot
Issued 19 June 2017
Resolved
Provide excerpts of recent editions of the Coast Pilot and Light list for operating area.
Due 19 August 2017
Resolved 12 October 2017
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 19 June 2017
Resolved
Provide ships log to include training and drills (quarterly).
Due 19 August 2017
Resolved 5 September 2017
Communications › Radio Communications › VHF Radiotelephone
Issued 19 June 2017
Resolved
Re-wire VHF radio using 14 gauge or larger UL approved boat or marine cable. Ensure radio has adequate over current protection (in-line fuse acceptable).
Due 19 August 2017
Resolved 5 September 2017
Communications › Public Address System › Loudspeaker
Issued 19 June 2017
Resolved
Prove proper operation of PA system.
Due 19 August 2017
Resolved 12 October 2017
Lifesaving › Visual Distress Signals (General) › Storage
Issued 19 June 2017
Resolved
Provide watertight container for distress signals, mark "DISTRESS SIGNALS". Letters must be a minimum of .5 inch tall.
Due 19 August 2017
Resolved 5 September 2017
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 19 June 2017
Resolved
Provide 5 additional adult size Type I lifejackets, ensure they are marded with vessel name and reflective tape.
Due 19 August 2017
Resolved 5 September 2017
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 19 June 2017
Resolved
Repair and prove proper operation of fixed fire fighting engine override function for STBD engine.
Action required: 705 - Other - as specified
Due 19 August 2017
Resolved 5 April 2018
Resolution: The shutdown and override were satisfactorily tested.
Engineering › Bilge Water Management System › Hose
Issued 19 June 2017
Resolved
Replace bilge hose in STBD engine compartment. Ensure hose is SAE J2006.
Due 19 August 2017
Resolved 5 September 2017
Engineering › Bilge Water Management System › Pump
Issued 19 June 2017
Resolved
Permanently mount electric bilge pumps.
Due 19 August 2017
Resolved 5 September 2017
Engineering › Steering Gear System › Ram
Issued 19 June 2017
Resolved
Tighten hardware on steering cylinder on port side.
Due 19 August 2017
Resolved 5 September 2017
Engineering › Steering Gear System › Hydraulic Hose
Issued 19 June 2017
Resolved
Replace hydraulic hose on port side steering system (corroded fittings). Ensure hose are rated at proper pressure and are SAE J1942 approved.
Due 19 August 2017
Resolved 5 September 2017
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 19 June 2017
Resolved
Properly install forward LED lights; utilize 14 gauge or larger UL approved boat or marine cable, ensure properly sized overcurrent protection, and connect with switch.
Due 19 August 2017
Resolved 5 September 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 June 2017
Resolved
Remove dead end wires under console (red/black wire on port side) and in the fwd void on the STBD side.
Due 19 August 2017
Resolved 5 September 2017
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 19 June 2017
Resolved
Provide cover for electrical terminal bus in #2 Port void.
Due 19 August 2017
Resolved 5 September 2017
Accommodation/Occupational Safety › Potable Water System › General
Issued 19 June 2017
Resolved
Securely mount fresh water pump for the STBD water tank.
Due 19 August 2017
Resolved 5 September 2017
Construction/Loadline › Structures › Deck Plating
Issued 19 June 2017
Resolved
Crop and renew deck IWO Port side #2 void hatch.
Due 19 August 2017
Resolved 5 September 2017
Construction/Loadline › Structures › Deck Plating
Issued 19 June 2017
Resolved
Seal holes on bow deck IWO eye bolts for gangway (port and stbd).
Due 19 August 2017
Resolved 5 September 2017
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 19 June 2017
Resolved
Conduct satisfactory drills (man overboard and fire) while underway.
Due 19 August 2017
Resolved 5 September 2017
Communications › Radio Communications › VHF Radiotelephone
Issued 17 March 2016
Resolved
Provide for and properly activate the DSC feature on the VHF radio.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Not Required, vessel does not operate beyond the baseline.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 March 2016
Resolved
Repair the fractured weld in the port deck rail.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 17 March 2016
Resolved
Replace the reflective tape on the life jackets as needed.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 17 March 2016
Resolved
Twelve life jackets were condemned due to deterioration, nine life jackets are needed for a full compliment, the vessel is restricted to 146 total persons.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 17 March 2016
Resolved
Provide an appropriate means to test for alcohol.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Valid test strips verified onboard.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 17 March 2016
Resolved
Provide proof of enrollment in a drug testing consortium.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 March 2016
Resolved
Properly terminate all dead end wires, noted three under the operating station console and one in the passenger accommodations on the main deck.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Communications › Alarms/Indicators › Fire Alarm
Issued 17 March 2016
Resolved
The audible and visual indicators for the Seafire fixed fire fighting system in the stbd engine compartment are not operational, make repairs or replace and prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 17 March 2016
Resolved
Properly mark the new ring buoy with the vessels name.
Due 31 March 2016
Resolved 21 March 2016
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 17 March 2016
Resolved
Provide the new ring buoy with a lifeline.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Marking
Issued 17 March 2016
Resolved
Provide a new fire extinguisher marking on the bulkhead IWO the passenger accommodations on the stbd side.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 17 March 2016
Resolved
Replace the deteriorated bracket for the extinguisher in the operating station.
Due 31 March 2016
Resolved 21 March 2016
Engineering › Fuel Oil Service System › Hose
Issued 17 March 2016
Resolved
Where fuel hoses exceed 30" in length provide SAE J-1942 approved type hoses.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Hose were verified in place.
Engineering › Bilge Water Management System › Manifold
Issued 17 March 2016
Resolved
Label the bilge manifold with the compartments served.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 17 March 2016
Resolved
The fiberglass elbow for the stbd main engine exhaust has a pinhole leak, make repairs as needed.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Engineering › Fuel Oil Service System › Hose
Issued 17 March 2016
Resolved
Provide a second hose clamp where missing on the stbd main engine fuel return line.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 21 March 2016
Communications › Public Address System › Amplifier
Issued 17 March 2016
Resolved
Install the PA system amplifier and prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Engineering › Bilge Water Management System › Pump
Issued 17 March 2016
Resolved
The vessel representative was unable to prove proper operation of the power bilge pump, repair as needed and prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2016
Resolved 21 March 2016
Fire Fighting › Fire Pumps › Arrangement
Issued 17 March 2016
Resolved
Provide the vessel with a hand fire/bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2016
Resolved 21 March 2016
Electrical › Electrical Distribution System (service) › Panelboard
Issued 17 March 2016
Resolved
The stbd bilge pump control panel is hanging open, properly secure as needed.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: Item verified corrected.
Documentation › Markings/Placards › Vessel Number (state)
Issued 17 March 2016
Resolved
The name of the vessel has worn off of the stern, properly mark the stern with the vessel name.
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 19 June 2017
Resolution: A new name board has been installed.