PAN UNO is a 2001 freight ship. The Coast Guard has recorded 15 inspections since 2001, most recently in August 2016, along with 8 deficiencies — 3 with no resolution recorded — and 4 operational controls.

Records from 2001 to 2016. Most recent: inspection, 10 August 2016.

Built
2001
Last inspected
10 August 2016
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9226982 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9HA3681
Flag
ITALY
—
Maury page id
psix-30600

Inspections, by type

…with no type recorded5
…past their stated due date2
Years with a record 9 calendar years (2001–2016)
The 15 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it39126 - Convention (Subpart B), Gross Ton
25373 - Convention (Subpart B), Net Ton
75955 - Dead Weight, Ton
85937 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 15

10 August 2016 PII Safety Exam · Ballast Water Examination · Administrative Inspection · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5968767
8 August 2016 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5966646
8 December 2011 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4198438
26 November 2010 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3899203
21 November 2010 ISPS I Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3895816
8 January 2010 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3661124
3 January 2010 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3664753
29 December 2009 ISPS I Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3655352
29 December 2009 Type not recorded
No type recorded · Station Pascagoula · USCG Heartland District (CGD-H) · Activity 3657690
25 September 2006 MARPOL Annex I Examination · ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2782344
1 March 2005 Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2301599
13 December 2004 ISPS II Exam · Ballast Water Examination · NPV Safety Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2258034
19 April 2003 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1779274
15 April 2003 Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 1774289
3 December 2001 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 296036

Deficiency record · 8

Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (air motor)
Issued 10 August 2016 Resolved
74 SOLAS (01 Cons. Ed.) Ch II-1/28: Sufficient power for going astern shall be provided to secure proper control of the ship in all normal circumstances. Vessel is unable to give dead slow astern bell.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 August 2016
Resolution: The mechanical seal, bushes, and gears of the main F/O circulating pump No. 1 have been renewed, pump checked in operation and pressure was found to be normal. The M/E was tested on air and fuel in both ahead and astern directions and found satisfactory.
Engineering › Diesel Engine (auxiliary) › Cylinder
Issued 10 August 2016 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. Means shall be provided to control leaks of flammable liquids. MDE was leaking at each cylinder fuel pump, all three aux diesel generators are leaking at the fuel injectors, and the fuel pumps in the fuel purifier room are leaking fuel. These leaks create a fire hazard.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 August 2016
Resolution: M/E seal of F/O pump No.1 have been renewed, pump checked in operation and no leakage found. Multiple "O" rings replaced on suction vavles on Aux diesel generators No.1,2,3. All 3 Aux generators tested on load for 2 hours and no leakage found.
Engineering › Steam Boiler (auxiliary/waste heat) › Fan
Issued 10 August 2016 Resolved
Boilers and other pressure vessels, associated piping systems and fittings shall be of design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due to regard being paid to moving parts, hot surfaes and other hazards. Ship's aux boiler is inoperable due to damaged forced draft fan.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 August 2016
Resolution: Owner has ordered the Aux boiler forced draft fan from maker in Japan. Renewal of the draft fan in one month at next port of call and the boiler has to be put into operation.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 10 August 2016 No resolution recorded
ILO 92/13.9 All water closets shall be of an approved pattern and provided with an ample flush of water, available at all times and independently controllable. Crew toilets are unable to flush.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 September 2016 — due date passed with no resolution recorded
Fire Fighting › Structural - A Class Divisions › Corridors
Issued 10 August 2016 No resolution recorded
The purpose of this regulation is to contain a fire in the space of origin. The fire integrity of the division shall be maintained at openings and penetrations. Multiple penetrations were found in the electrical trunk rooms on multiple decks, including a 3 by 4 inch cut-out in the bulkhead on the "C" Deck
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Lifesaving › Launching Appliances › Davit
Issued 10 August 2016 No resolution recorded
Where davit arms are recovered by power, safety devices shall be fitted which automatically cut off the power before the davit arms reach the stop in order to prevent overstressing the falls or davits, unless the motor is designed to prevent such overstressing. Limit switch on port side lifeboat davit was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 August 2016 — due date passed with no resolution recorded
Navigation › Collision/Grounding Avoidance › Radar
Issued 8 August 2016 Resolved
Vessel has inoperable X-Band Radar. LOD
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 August 2016
Resolution: New parts received and X-band radar serviced by technician.
Navigation › Collision/Grounding Avoidance › Radar
Issued 19 April 2003 Resolved
Vessel reported inoperative secondary marine radar for inbound deviation. Repair and test secondary radar. Forward techician report after successful tests.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 April 2003
Resolved 21 April 2003
Resolution: Received report from technician attesting to repair and proper operation of the secondary marine radar.

Ownership record