Records in 2017. Most recent: operational control imposed, 24 February 2017.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
Professional
Detail on this page
1 inspection, each with its date, unit and type; 9 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder
Issued 23 February 2017
Resolved
1410 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Cylinder number one is leaking cooling water. - SOLAS '74 ('14 CONS) I/11(a) - 30ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 February 2017
Resolved 26 February 2017
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. PSC Officers attended vessel and verified no leaking from #1 M/E cylinder.
Communications › Alarms/Indicators › Steering Failure Alarm System
Issued 23 February 2017
Resolved
1499 - In the event of a failure of electrical power supply to the control system, an audible and visual alarm shall be given on the navigation bridge. When testing #1 and #2 steering systems the loss of power alarms are not activating on the navigation bridge. - SOLAS '74 ('04 CONS) II-I/29.5.2 - 30ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 February 2017
Resolved 26 February 2017
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. PSC Officers attended vessel and witnessed steering tests. PSC Officers found proper operation of audible and visual alarms.
Communications › Alarms/Indicators › Steering Failure Alarm System
Issued 23 February 2017
Resolved
1499 - All the steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the administration. The hydraulic lock alarms for the #1 and #2 steering systems sounded during tests of each steering system from the bridge while in follow-up and non-follow-up modes. - SOLAS '74 ('04 CONS) II-I/29.2.1 - 17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 February 2017
Resolved 26 February 2017
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. PSC Officers witnessed steering test with no hydraulic lock alarms in either mode on either pump.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 23 February 2017
Resolved
0999 - The cond of the ship and its equip shall be maintained to conform with the provisions of the present regs to ensure that the ship in all respects will remain fit to proceed to sea w/o danger. Vent piping to forepeak ballast tank in bosun hold has a 5"-6" section removed. There is no shut off valve to prevent internal flooding from the forepeak ballast tank- SOLAS '74 ('14 CONS) I/11(a)-17ac
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 23 February 2017
Resolved 26 February 2017
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. PSC Officers attended vessel and verified deficiency was rectified.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 23 February 2017
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 23 February 2017
Resolved 26 February 2017
Resolution: Flag State conducted SMS training.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 23 February 2017
No resolution recorded
0750 FIRE PREVENTION: Where "A" class divisions are penetrated for the passage of electric cable, pipes, trunks, ducts, etc., arrangements shall be made to ensure that the fire resistance is not impaired. Vessel was unable to provide documentation stating the material used in the cable penetrations on al decks is fire resistant. SOLAS'74(01 CONS)II-2/18.1.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Fire Fighting › Structural - A Class Divisions › External Escape Routes
Issued 23 February 2017
Resolved
0750 FIRE PROTECTION: Doors fitted in boundary bulkheads of machinery spaces of category "A" shall be reasonably gastight and self-closing. Self-closing door from the engine room into the emergency escape trunk on the lower level, forward, starboard side had the self-closing device removed. SOLAS '74(01 CONS) II-2/47.1 10c
Due 23 February 2017
Resolved 23 February 2017
Resolution: Vessel crew re-installed the self-closing device witnessed by PSC officers.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 23 February 2017
Resolved
0699 OTHER (LIFE-SAVING APPLIANCES) Muster and embarkation stations shall be adequately illuminated by lighting supplied from the emergency source of electrical power. 03 lights near lifeboat embarkation and rescue boat embarkation were found extinguished.
Due 23 February 2017
Resolved 23 February 2017
Resolution: Vessel crew replaced extinguished lights. PSC officers witnessed proper illumination.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 23 February 2017
Resolved
0699 OTHER (LIFE-SAVING APPLIANCES) Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. One lifebuoy was found not operational. SOLAS 74(14CONS) III/20.10 10c
Due 23 February 2017
Resolved 23 February 2017
Resolution: Vessel crew replaced buoy light. PSC officers witnessed properly operation.