This record may be incomplete: the most recent inspection recorded for this vessel was 15 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
1059 - Convention (Subpart B), Gross Ton
317 - Convention (Subpart B), Net Ton
Maury page id
psix-30824
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 June 2011Resolved
Replace tripped and bent side long on the port forward rake.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Weld
Issued 2 June 2011Resolved
In port forward rake, repair fractured welds on outboard vertical deck support.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Stiffener
Issued 2 June 2011Resolved
Vertical stiffeners in forward rake center found to be fractured along port and starboard sides in way of outboard longitudinal bulkheads. Crop and renew lower 36" of vertical stiffeners.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 June 2011Resolved
Vee and reweld upper deck longitudinal fractured at attachment weld with frame #1 and #2 in forward rake starboard.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 June 2011Resolved
Vee and reweld side longitudinal #1 fractured in way of attachment weld at frame #2 in forward rake starboard.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 June 2011Resolved
In forward rake starboard, crop and renew 36" of side longitudinal #1 where it is fractured through the flange in way of the attachment weld at frame #1.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 June 2011Resolved
Crop and renew 36" of side longitudinals #2 and #3 where they are fractured at weld attachments to frame #2 on forward and aft sides in the forward rake starboard.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Bracket
Issued 2 June 2011Resolved
In 01 centerline void, replace bent brackets on bottom longs at ladder.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 June 2011Resolved
Vee and reweld side longitudinal #5 in way of weld attachment with frame #23 in 04 starboard void.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Bottom Plating
Issued 2 June 2011Resolved
In aft rake starboard void, replace bottom plating between bottom longitudinal #6 and #8 where it is inset.
Action required: 705 - Other - as specified
Resolved 7 July 2011
Construction/Loadline › Hull › Bottom Plating
Issued 2 June 2011Resolved
Crop and renew bottom plating and tripped bottom longitudinal #1 on aft side of frame #29 in the aft rake starboard void.
Action required: 705 - Other - as specified
Resolved 7 July 2011
Construction/Loadline › Hull › Bottom Plating
Issued 2 June 2011Resolved
Crop and renew inset bilge turn between bottom longitudinals #2 and #4 in aft rake port void.
Action required: 705 - Other - as specified
Resolved 7 July 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 June 2011Resolved
Crop and renew 48" of bottom longitudinal #8 and #9 in the aft rake port void, including tripping brackets.
Action required: 705 - Other - as specified
Resolved 22 July 2011
Construction/Loadline › Hull › Stiffener
Issued 2 June 2011Resolved
Vee and reweld stern log horizontal shell stiffener weld attachment in way of the 2nd outboard stanchion in the aft rake port void.
Action required: 705 - Other - as specified
Resolved 22 July 2011